Hi, problem in goods issue to cost center Error message M7314

Hi to you all,
I am trying to post a good issue for a material to a cost center but an error message is coming out and says that "stock becomes negative see long text. message no - M7314". the material type was at the begining not valorated (like NLAG material type) but later on it had to be valorated, so the flag was triggered from the basic configuration of material type. if i see the material master record i can noticed that the material has no price neither the amount of stock in the plant, but if i check the stock in any MM report TX like MMBE or MB52 i can see that there is some stock in it. we need to registered the stock issue, any help that you can provide me i´ll appreciate it.
Best regards.
OOOP

When we issue the material to Cost Center then amount (Qty X Value) get debited to that particular cost center,
I think system fails to calculate the amount as there is NO value maintained in material master
this is what I thought
Error Message M7314 is
Short Text
Valuated stock becomes negative: & -> see long text
Diagnosis
When a goods movement or an incoming invoice is entered, the system simulates the update of the valuation data in the material master record. The current simulation indicates that this posting would lead to a negative stock quantity (or a negative sales value) although negative stocks are not allowed for this material.
Procedure
You cannot post this item. Therefore, terminate current processing.
Display the material master record (accounting data).
Check the price, stock value, and stock quantity (also for the previous month, if required).
Proceed
Display the material documents and the accounting documents for the material and check whether the stock quantity is realistic.
Material documents Proceed
Accounting documents Proceed
If the stock value does not correspond to the stock quantity, data inconsistencies may exist.
Please contact SAP Support via SAPNet Frontend as soon as possible.
Support requires the following information from you:
ID and number of this error message (M7 3XX)
Material number and plant
Total stock and its value (see the accounting data in the material master record)

Similar Messages

  • Batch not determined in MIGO-Goods Issue for cost center

    Hi,
    We are using Batch Determination while posting Goods Issue to cost center. However, when we enter * in the batch field system does not propose the batches.
    We have done following settngs
    Strategy type ME01 which is SAP standard
    Batch search procedure - ME0001
    Search procedure ME0001 is assigned to movement type 201 in "Allocate IM Search Procedure/Activate Check"
    Sort Rule - 01 using charecterstics (ascending)
    Class - BATCH_MASTER created
    Characterstics - Size, Shape, Color (No table or field are maintained in Addional Data) assigned to this class.
    Material is maintained with classification and batch management active.
    Master Data - Search Strategy is maintained using t code MBC1 for stratefy type ME01 (Key combination Movement Type/Plant/Material). Selection criteria - Values maintained for characterstics. Sort Rule - 01
    Now when we are issuing goods to cost center and enter * in batch field, system is supposed to suggest the batches (material is in stock and batches are available). However, system does not give pop up.
    Am I missing something? Where is the batch determination button as system is giving message to use button?
    Shekhar

    Thank you for the answer.
    It gives only one batch and not all the batches. Why it could be?
    Shekhar

  • Good issues to cost center with extra charges 10% from cost

    Hiii Guy,
    My user would like to charge the cost center 10% from cost when good issues to cost center is perform,
    can we do it in sap ?

    The scenario is like this,
    Only Merchandise Department have the authority to ordering merchandise item from vendor, when other depart required that merchandise item, Merchandise depart will perform GI to that requested cost center.
    So Merchandise Depart would like to have extra charge on there extra work.

  • Where do I define the automatic posting of goods issue to Cost Center?

    Dear Experts,
    I found out that all the raw material consumed each time I do the confirmation of process order via CORK did not post to Cost Center.
    Where do I define the automatic posting to Cost Center for Goods issue for consumption?
    regards,
    Abraham

    Hi,
    I found out the default movement type has been predefined to 261 (GI for Order, in which it doesn't post to Cost Center).  I guess the standard system has a valid reason to set it as 261 instead of 201 (GI for cost center). 
    As far as I understand, the Process order will accumulate all the costs (direct cost - material, labour and machine hour and also indirect cost) during the confirmation (material is backflushed and fnished goods is auto-GR).  And at the end of the period, this process order will be settled its variance if there is (between the total cost credited - based on standard cost of the finished goods and actual total accumulated costs debited).
    So, my question is, by right should there be any CO posting being made to Cost Center for material consumption in the above process flow as I checked in the standard system, the material movement for raw material and finished goods have no Cost Center posting at all?
    regards,
    Abraham

  • Goods Issue for Cost Center 201 : special stock E not supported

    Dear guru ,
    I need to run a goods issue(trx.MIGO) for cost center using movement type 201 for a material
    in special stock E (with sales order and sales order item).
    The system send this message : special stock E not supported.
    How can it solved this problem ?
    Thanks in advance.

    first tranfer stock from Sales Stock to Own stock as follows
    Tcode - MB1B / MIGO
    Mvt type -  411 E           Transfer posting sales order to own
    Then issue this own stock to Cost center as follows
    Tcode - MB1A / MIGO
    Mvt type - 201
    hope it helps]
    Regards,
    Rahul

  • Cost Center Error Message in Posting a Billing Document to Accounting

    Hi Experts,
    I am in process of testing my form enhancement for Billing Documents especially Debit Note and Credit Notes. However, when I post my Billing Documents in VF02, this status message appears:
    "Field Cost Ctr is a required field for G/L account 2100 855020".
    Now I already checked the configuration in FS00, VKOA and we want the cost center field filled-up in the process but automatically. Do I missed some of my configuration to maintain also the Cost Center? What transaction code should I check and maintain the Cost Center for this scenario.
    Thanks a lot for your answers.

    Here is the Entire Error Message:
    Field Cost Ctr is a required field for G/L account 2100 855020
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "855020" in company code "2100" linked to the field selection for posting key "50".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.

  • Good Receipt and Cost Center

    I Created PO Stock. and i want to do Good Receipt. but i getting error like this
    Cost center 1000/130102 blocked against direct postings on 08.12.2011
    i have checked the cost center. and yes for cost center 130102 are blocked. what i want to ask is.
    is there any connection between Good receipt and Cost Center. as far as i know, Good Recipt only related with GL Account. except for GR for PO from maintenance Order.
    if it's related what are the T-Code to change/setting the cost center for Good Receipt.
    Thanks.

    Hi Elam24,
    I have checked fs00. and for Cost cneter it's already Optional Entry.
    HI Rajesh Satope,
    yes i have checked the cost center and the cost center should not be used. so how to change the cost center, so when i created GR system will not send an error for this material.
    NOTE : when i do GR for another material. it goes fine.
    Hi Bijay Kumar Barik,
    Thanks. it work. GR related to Cost Center from GL Account. and like Rajesh Satope said. "There are cases where some accounts do require a assignment to CO object". and to Change the cost center for certain GL Account(in my case it's Gl Account for Cost Difference) use T-Code KA03 at Tab Default Account Assignment. change the Cost Center and it's work :).
    Thanks.

  • BAPI_ACC_DOCUMENT_POST : getting cost center error

    Hi guys,
    regarding GL posting, I am using the BAPI_ACC_DOCUMENT_POST.
    I am uploading file with so many fields. I am able to upload properly.
    But, I am getting error only with cost center.
    error: "Cost center 512401 does not exist on 2009/07/31.  "
    actually, cost center exists and functional consultant showed me and he uploaded the record manually.
    when i post manually using FB01 t code, I am able upload correctly.
    I tried to debug, but it is taking more than 2 hours, as it is standard BAPI.
    Please help me if any body come across this situation.

    Hi ,
        please check this thread will provide you some insight on the BAPi.
    LINK:[Thread1|HOW TO PROGRAM THE ERRORS IN POSTING A DOCU USING BAPI_ACC_DCOCUMENT_POST;.
    Link:[Thread2|https://wiki.sdn.sap.com/wiki/display/ABAP/TransferMROrelatedGLBalances]
    Hope your query resolves quickly.
    Have a best day ahead.

  • I am having a problem opening pdf document.  I get error message: "Adobe Reader has stopped working"

    I am having a problem opening pdf document.  I get error message: "Adobe Reader has stopped working" then I get Windows is looking on line for a solution, but then my document closes. I tried uninstalling and reinstalling Adobe Reader XI, rebooted my computer but this did not help.  I get the same message. What to do?

    Can you open Reader by itself?  If so, check if disabling Protected Mode improves the situation [Edit | Preferences | Security (Enhanced)].

  • Photoshop suddenly does not print to Epson 3880 - PROBLEM: Cannot print from Photoshop  After restart error message appears:  - "There was an error opening your printer. Printing functions will not be available until you have selected a printer and reopen

    PROBLEM: Cannot print from Photoshop
    After restart error message appears:
    — “There was an error opening your printer. Printing functions will not be available until you have selected a printer and reopened any documents.”
    • All print commands are greyed out and unavailable — even to call up the printer commands cannot be done.
    The printer printed fine until about 2 weeks ago when this error message appeared.  Printing continues from Pages, I-photo, preview etc. —  only Photoshop fails.
    The printer has been turned on and off, as have open documents been closed and open etc..   Preferences reset.  Repeatedly I have read through blogs and forums and attempted to contact Adobe — all without results
    Epson support struggled to find reason and several solutions were tried and they assume this is an Adobe problem.
    Running Mac Powerbook X 10.10.2 / Photoshop CS6 13.0.6.x64
    Attempting unsuccessfully to print to Epson 3880
    What Adobe support will be of help.
    Robert Darling —  2/19, 20, 21,22,23/2015

    Probably best to ask in Photoshop General Discussion
    This forum is about the Cloud as a delivery process, not about using individual programs
    If you start at the Forums Index https://forums.adobe.com/welcome
    You will be able to select a forum for the specific Adobe product(s) you use
    Click the "down arrow" symbol on the right (where it says All communities) to open the drop down list and scroll

  • GR/IR Clearing-Good Receipt Accounting Document issue-no cost center / IO

    Hi All,
    For the GR/IR Clearing Account, users did  the Goods Receipt. GR document post to FI and created Accounting Document. When we look at GL line item display of GR/IR clearing account (FBL3N), we cannot see the cost center or internal order on Goods Receipt doucment ( document type WE).
    When we look at Invoice ( document type RE), we can see cost center or internal order on invoice accounting document. 
    Anyone know how to capture cost center / internal order from Goods Receipt to FI accounting document during GR time ?
    Thank You
    Alex Lee

    Hi,
    Indeed, during the invoice inscription, the information regarding cost centre (or other CO object) is stored on GR/IR account, even (see the explanantion in note 27881). However, for GR there is no standard solution. You can try making a substitution (OBBH), taking the cost centre from the expense line and putting it on GR/IR as well. I doubt, though, if SAP allows GR/IR line item to be changed by substitution...
    Additionally, please check note 378800.
    Regards,
    Eli
    P.S. Please, see your thread in FI. Try avoiding cross-posting.

  • BW Analysis authorization issue on cost center range

    Hello BIW security experts
    I have a problem where I created an analysis authorization on a cost center range and it looks like the interval is not working. The report is just a list of cost centers (demo to users to prove that analysis authorizations work in order to skip 2 managerial cost centers.
    . Cost centers are numeric. Example:  2000100. In the drop down list they appear as such.
    . I want to have the following cost center range: 1000000 to 1000771, 1000773 to 2000771, 2000773 to 9999999.
    Thereofore 1000772  and 2000772 should not appear in the list.
    . In the analysis authorization I have put the 3 ranges above on 3 separate lines. 'BT' is the operator. The cost centers have been selected from the drop down list.
    Results:  I get only 1 record from the report....  2000772. (which is one I want to exclude..
    Steps tried to debug:
    . When I put a list of cost centers in the analysis authorization on separate line with the 'EQ' operator, then the report works.
    . I tried putting ' ' delimiters since cost center is a char field but it fails.
    . I tried adding leading and trailing zeros to fill up the char(10) but no luck.
    . I tried creating a hierarchy with the interval and put it in the hierachy auth. tab and it does not work either. It gives the same number of records than the first step.
    . A hierarchy with single values work.
    I do not know what else to try..
    Thanks.
    YB.

    Good morning
    Here it is from RSECVAL
    ZCC_TEST     0COSTCENTER                    I       BT        1000000                                                      1000771
    ZCC_TEST     0COSTCENTER                    I       BT        1000773                                                      2000771
    ZCC_TEST     0COSTCENTER                    I       BT        2000773                                                      9999999
    ZCC_TEST     0COSTCENTER                    I       EQ        #
    ZCC_TEST     0COSTCENTER                    I       EQ        :
    ZCC_TEST     0INFOPROV                         I       CP        *
    ZCC_TEST     0TCAACTVT                        I       EQ        03
    ZCC_TEST     0TCAIPROV                         I       CP        *
    ZCC_TEST     0TCAKYFNM                       I       CP        *
    Thank you for your help.

  • Goods Issue with cost

    Hello
    I am trying to make a goods issue to adjust the inventory, but i want to make it with the real cost of the product.
    I have just made a formated search to get the cost of the product, the problem is that if i select the last purchase price list, i update this price with the cost, and i dont want to update the last purchase price.
    If i choose another list, for example price list 01, this list doesnt get update with the cost?
    Thanks
    Jacobo

    Hi,
    The price list in goods issue document is defaulted the 'last purchase
    price', and you could manually change it by select from the drop down
    list before you add the document.And you could also manually change the info price column.
    However the price list and price in the document is only informative. From the testing we could see that the item's cost will always be
    used to calculate released stockvalue and create journal postings.
    The item cost and last purchase price will not be affected by adding the
    goods issue document.
    Best Regards
    Helen Sun

  • Issue with Cost center in PO and Work Order

    Dear Expert,
    I am facing an issue with respect to cost center in Purchase Order and Work Order. The PO is made against a work order. There are two cost center associated with the work order. One is updated under u201CAdditional datau201D field and other is at u201Clocationu201D . So the cost center in PO should essentially be the same one mentioned under u2018locationu2019 field of work order. So the issue here is that while creating PO, the cost center is picked from the u201Cadditional datau201D field of work order not from u2018locationu2019 field of WO.
    Is there any exit available that needs to be implemented for overriding the cost center in PO or any other way of solving this problem?
    Thanks in advance.
    Thanks
    Deba

    Hi,
    I guess that there is already some user exit or enhancement in place, since this doesn't sound like standard SAP (picking the cost data from additional data, or even having it there).
    Mario

  • Vendor Stock issue to cost center

    Dear Experts,
    We are using standard Subcon PO solution for MM.  We transfer materials to vendor via 541.  In case of damage goods at the vendor location, they request more materials from our company.  Now during 543 (backflush) at GR of PO, there will be excess stock left at vendor location in SAP.  How should we treat them? 
    (Assuming that during MIGO, we dont change the component quantities).
    Can we issue the scraps to vendor cost center?
    Thanks!

    Dear Padmasri,
    Thank you for the inputs.  However, MB04 will require a PO right?  Just to summarize, we have floating stocks at vendor location every period.  Now before period end, we would like to issue these floating stocks at vendor location to consumption.  If possible, via 543 also, but i think it's not possible without the PO.  Please advise, thanks!

Maybe you are looking for

  • AFAB - Depreciation Posting Run Error

    When I tried to execute the Depreciation Posting Run, I get the error message "Internal error with background job scheduling RAPOST2000" Hv anyone face this problem before? Pls help! Thanks.

  • Parmeter testing condition

    I am converting some ingress procedures into PL/SQL and have a situation where based on the results (i.e. rows returned) I execute different code. So I have a v_file_name_found parameter that is defined locally to the procedure. The procedure is pass

  • Add a ReplyTo or From in a mail using OLE2 in Forms 6

    Hi, I am doing a form to automatically send mails (I use forms because I do Excel docs using OLE to link them to the mails...). It works but the From and ReplyTo properties. My code is: FUNCTION Send_a_mail( Recp IN varchar2,                         

  • Turning off alarms in selected calendars only.

    I'm running Lion on a macbook and have an iPhone with IOS 5.  I have three shared calendars.  How do I turn off the alarms on the iPhone for the three shared calendars onlly.  Would like to keep the alarms active on my two calendars.

  • Layout of menu on Portal

    Hi, I want use portal menu as a portlet, but I don't know how to change layout of generated menu. I know how I can change colors and fonts but I don't know how to change layout. Currently is menu in porlet generated into html table by PL/SQL procedur