Resume/restore a running process

i issue a command within an applescript and at a later time, need to access this new running process to check on its status. is this possible?
the command i am issuing is the HandBrakeCLI app which reencodes video's and can take many hours. the command in the applescript is of the syntax:
+set hbcli_cmd to "/Applications/HandbrakeCLI -i /path/to/file -o /path/to/out/file -other -parameters"+
+do shell script hbcli_cmd+
listing running processes with "ps -efwww", i can see the process. i need to "reopen" this process to see how its getting on. additionally, i would also need to place it back to the background as well!
many thanks,
jingo_man

thats exactly it. if i run the HandbrakeCLI command directly in a terminal session, it has an "interface" with progress, etc. i would like to be able to see this data if possible.
i used to have a linux machine, which i used the "screen" utility to run/wrap other commands inside. i could then restore that session or command. it was useful for overnight torrent work... would this be applicable on the osx platform?
or can i access it directly like you suggested?

Similar Messages

  • "Resume"/"Restore windows" features

    Dear members of the community,
    I have the following issue with "Resume"/"Restore Windows When Quitting and Re-opening Apps" features on my MacBook Pro (Early 2011) running Lion 10.7.3 :
    The "Resume"/"Restore Windows When Quitting and Re-opening Apps" features
    fail to restore windows of various applications (Safari, Preview etc.) to the corresponding Desktops
    on which they were before the system reboot/shutdown or application restart.
    E.g. Preview windows appear on random Desktops after the system reboot
    and on the same Desktop after Preview restart (that Desktop is the one on which I quit Preview).
    The same issues exist on another, Administrative, account on my computer
    (that account was created during the initial system setup and never used before).
    "Number of recent items" is set to max (50) for Applications, Documents, and Servers in System Preferences.
    The same issue was observed with Lion 10.7.2, and (most likely), the initial Lion release.
    My MacBook is the only Apple computer I have access to.
    Can somebody check if his/her Lion system behaves in the same way? Please.
    I do use "Resume"/"Restore Windows When Quitting and Re-opening Apps" and, actually, find them useful.
    Unfortunately, their behavior I described above becomes more and more annoying...
    Thanks

    I see some similar behavior as you.  I expect that's just the way it is at the moment.
    We should tell Apple:
    Apple - Mac OS X - Feedback
    charlie

  • How to stop a process chain after the current running process

    Hi experts,
    I try to stop a running process chain, but only at the end of the current process load.
    I try to unscheduled process chain : the job of the current process is killed and the process stop
    I try to execute the programm rspc_process_finsh : same result.
    Actually, I aim at waiting of the current process completion and stop the chain.
    Thanks and regards,
    Bobby

    Hi all,
    Thanks for answer.
    If I resume the situation :
    - Click on Unschedule process chain stop the current process. We have to change the status of the process in Yellow to Red.
    - Go to sm37 to kill the job change the statut in red.
    So there is no way to stop the running of a process chain only after the good or bad end of the last runnning process ?
    Example :
    My chain is running. The process which is running is a DTP loading process. There are 50 packages to load. I decide to click on Unschedule process chain when the package 18 is running.
    If I do that, the loading of package 19 will not start right ?
    So is there a way to wait that the 50 packages are loaded before that the system stop the chain ?
    Thanks in advance,
    Bobby.

  • URGENT: running processes fail because BPM change

    Hi,
    We've got some running processes on our CE 7.30 instance.
    I've done a change in the corresponding BPM (added one parameter to the WSDL of a sub-process).
    Now we're facing the following problem:
    When the running process instances are further processed, they run into error status 'failed' with the following error message:
    com.sap.glx.core.kernel.api.CancelTransitionException: java.lang.IllegalStateException: Container '$Approver' unavailable
    com.sap.glx.mapping.execution.api.exception.TExecutionException
    at Approver( StandardChild )
    at ( DeepExpression )
    at xxx.com/approvalproduct/pr/pm/Inform_requester/Inform_requester:Approver( TerminalPart:expression )
    at ( BroadMapping )
    com.sap.glx.core.internaladapter.ExceptionAdapter.raiseException(ExceptionAdapter.java:647)
    com.sap.glx.core.internaladapter.ExceptionAdapter.raiseException(ExceptionAdapter.java:617)
    com.sap.glx.core.internaladapter.Transformer$ExceptionProvider.createTransitionException(Transformer.java:616)
    com.sap.glx.core.internaladapter.Transformer$TransformerTemplateAccessor$MapperTemplate$ImplementedInvocationHandler.invoke(Transformer.java:3075)
    com.sap.glx.core.internaladapter.Transformer$TransformerInvocationHandler.invoke(Transformer.java:3356)
    com.sap.glx.core.dock.impl.DockObjectImpl.invokeMethod(DockObjectImpl.java:543)
    com.sap.glx.core.kernel.trigger.config.Script$MethodInvocation.execute(Script.java:248)
    com.sap.glx.core.kernel.trigger.config.Script.execute(Script.java:798)
    com.sap.glx.core.kernel.execution.transition.ScriptTransition.execute(ScriptTransition.java:67)
    com.sap.glx.core.kernel.execution.transition.Transition.commence(Transition.java:138)
    com.sap.glx.core.kernel.mmtx.DirectNestedTransaction.inPrepare(DirectNestedTransaction.java:67)
    ... (15 more)
    This seems to be caused due a missing container in the sub-process.
    It's not possible to resume those processes.
    My question: Is there a way to rescue those process instances?
    I wasn't aware that - if we deploy a new BPM - all the existing process instances can fail...
    Thanks in advance,
    Eddie.

    Thanks for your answer...
    One way to solve this issue is to put 0..1 as Multiplicity in the WSDL of the sub-process.
    Afterwards the sub-process can be resumed.

  • SP3 Almost completes installation but freezes at the Finishing stage showing "Running processes after install"

    I have an HP Pavilion zd7000 laptop with Windows XP & SP2 update installed. Processor is Intel Pentium 4. My system is clean with no rubbish software running. I have several anti-malware & anti-spyware systems installed but they are dormant & not running during the attempted installation. SP3 almost completes installation but freezes at "Finishing" stage showing "Running processes after install". Anti-virus is of course switched off. The system then hangs fore-ever with hard disc activity showing intermittently but nothing else happening. Luckily, by holding down the laptop on/off switch I can always eventually restore to previous settings & recover full use but without SP3! This is annoying & frustrating. I have seen a lot of threads about this problem but no real answers. Can anyone help please?

    What is Shmrate.exe is not running?
     This can be read two different ways
    One well if you look at it like this
    User>shmgrate>Operating system>drivers>computer. Result is denied!
    If you have something like this
    User > User Account Control >Operating system>drivers>computer. Result is denied again!
    Note that an adminstrator is only a adminstrator and Computer Adminstrator can install Sp(s). Which I believe is tyour question. Which is my guess.
    Which is the reason some people reccommend installing from the "Adminstrator" account Which generally is not a User account. Yes some people add and modify there account access by using Subinacl.exe and reset.cmd, which bumps the account from adminstrator to Computer Adminstrator. An alternative is to boot into safe mode. Pressing the *F8* key before the windows welcome screen starts up. And selecting safe mode. Which is why more people report success with using the .ISO install.
      To add to your confusion. Windows Sp2 usually has windows installer 3.0, or windows installer 3.1
    Table us types of accounts. I wish windows 200 documentation had made it completely into Xps documentation. They had an excellent table with tthe types of accounts
    Limited user. Not able to run more then basic programs. Not able to ;install device drivers, not able to install progras, not able to install Sp(s)s
    Power user Able to run more advanced programs. IE Defragger.
    adminstrator. Mess with the operating system, back up things, able to install programs, add users.When Windows Xp is installed this is the type of user associated with adminstrator. NOT CA
    Computer adminstrator. Able to Install of all things Sp(s).
    Hopefully this helps you out. Of course there is the release notes, Xp solution center and of course things to do before installing Sp3.
    Keith

  • AP Payment Run Process

    Hi,
    Please provide an overview of AP payment run process.
    Thanks,
    Teo

    Hi,
    APP ( T.code F110) is used to make payments enmasse for one or more vendors/customers.
    We can also group vendors/customers for more than 1 co.code for payments.
    The entore config for APP is done in capsule T.code FBZP.
    Here are the steps:
    1. Set up paying and sending co.codes( In case of cRoss co. payments paying and sending co.codes will ahve to be different)
    2.Set up a payment method for country and co.code 1 each for outgoing and incoming payments.
    3.Define house banks and set up bank accounts for payment method with relative ranking.
    4.In F110 :
    define the parameters like co,code;vendors etc
    craete and edit a payment proposal where you can select the open items to be paid
    create and run a payment run
    Hope this helps.
    I would also recommend to go thru SAP help and also search this forum for further notes and specific queries in F110.
    Pls assign points if this info was helpful.
    Thanks,
    Vamsi

  • Firefox is already running, but is not responding. To open a new window, you must first close the existing Firefox process, or restart your system. This doesn't work because Firefox is not a running process so I can't close it.

    I don't use Firefox now because of this running problem. It started about a month ago. So when I access the task manager, Firefox does not show up in the running processes. Because of this, I can't end the task. I got tired and fed up of rebooting my computer just to use Firefox, so I just switched to IE8, and Opera and Google Chrome. I prefered Firefox but it also runs so so sooooo slowly now. IE is much much faster, as are the other browsers now. Once upon a time, I bragged to everyone about how fast Firefox used to be, where now I admit I don't use it because it's so slow now and it won't run anyway.

    See:
    * http://kb.mozillazine.org/Recovering_a_missing_profile
    * http://kb.mozillazine.org/Profile_in_use

  • GR/IR expenses not affected with the settlement rule run process in the GL

    <i><b>Please neglect by previous post with the same title</b></i>
    There is a problem I face while running the settlement rule process related to internal orders on the GR/IR expenses.
    According to the internal order settlement rule every expense associated to an Internal order no. whether its an account payable or manual journal accounts it should be settled (distributed) on the cost centers specified in each internal order after the monthly settlement run process is done through T.Code "KO8G", and this actually happens on the entries that are booked manually through T.Code "FB50", but the GR/IR entries is the biggest problem, it didn't reflect the settlement rule distributions in the GL it just gives me the original transaction once its was automatically created through T.Code "MIGO" they are only allocated to a one profit center with no cost center and without being distributed to a multiple cost centers according to the distribution strategy.
    After a long search I found that the cost center distribution occurred only on a secondary none GL account named A&P Settlement (720010), all GR/IR expenses was settled correctly only on this account not through the ordinary GL accounts (e.g. Gifts, printed materials) and of course the correct distribution didn't appear in the GL,
    So is there a transaction or any way to allocate the GR/IR expenses to there correct cost centers with the correct cost element in the GL?
    Is there anything to do with the GR/IR calculation that depends on quantity base not value base?
    <i><b>The Process as follows:</b></i>
    (<b>1) Creating Internal order with a settlement rule (E.g. Cost center 1 (50%) Cost center 2 (50%)</b>
    <b>2) Creating a purchase order associated to an internal order</b>
    <b>3) The Goods received and creating the GR transaction T.Code "MIGO"</b>
    Acc/DR Expenses accounts
    Acc/CR GI/IR Account 400301
    Profit enter ###### (eg. 111177)
    Cost Center <blank>
    Internal order no. ####### (e.g. 9810512)
    <b>
    4) Closing the GR/IR accounts when receiving the invoice T.Code "MIRO"</b>
    <b>When we receive vendor invoice:</b>
    Acc/Dr GI/IR Account 400301
    Acc/Cr Vendor Account
    Profit enter ###### (eg. 111177)
    Cost Center <blank>
    Internal order no. ####### (e.g. 9810512)
    <b>5) Performing the Internal order settlement rule run process</b>
    <b>(N.B.</b> By entering the report of the cost center (Actual/Plan/ Variance) T.Code S_ALR_87013611
    I found that GR/IR expenses was not charged on the concerned cost centers as shown in the GL <b>)</b>
    <b>Your Reply is highly appreciated</b>

    Thanks for your kind reply,
    But is there a way solve this problem?
    And what is the use of leaving a field in the account assignment tab for an internal order while creating a PO and it will not take advantage of the settlement rule????????
    And as you know the internal order settlement is a way to create a multiple account assignment
    Can we solve the problem by making an automatic fake transaction that reverse the value of the GR/IR and creating another transaction can apply on it the settlement rule??
    You know that settlement rule process is one of the best features in the SAP system it save time and effort to make distributions manually

  • Can I get a List of all the running processes in the system using java ?

    I want a complete list of all the Running processes currently in the system.
    List of running processes is like, in MS Window environment while we presses ctrl + alt + del and we get a small window containing a list of all the running processes currently in system.
    I hope somebody have done the same and will help me.
    thanx.

    Here is the sample code to get All running process in your system .
    Its in C++.And you have use JNI to use this code.
    For complete project goto
    http://www.mindcracker.com/mindcracker/c_cafe/winapi/protracker.asp
    typedef BOOL (WINAPI * PFNENUMPROCESSES)(
    DWORD * lpidProcess,
    DWORD cb,
    DWORD * cbNeeded
    typedef BOOL (WINAPI * PFNENUMPROCESSMODULES)(
    HANDLE hProcess,
    HMODULE *lphModule,
    DWORD cb,
    LPDWORD lpcbNeeded
    typedef DWORD (WINAPI * PFNGETMODULEFILENAMEEXA)(
    HANDLE hProcess,
    HMODULE hModule,
    LPSTR lpFilename,
    DWORD nSize
    //unsigned int i;
    static HMODULE hModPSAPI = 0;
    static PFNENUMPROCESSES EnumProcesses = 0;
    static PFNENUMPROCESSMODULES EnumProcessModules = 0;
    static PFNGETMODULEFILENAMEEXA GetModuleFileNameExA = 0;
    if ( !hModPSAPI )
    hModPSAPI = LoadLibrary( "PSAPI.DLL" );
    if ( !hModPSAPI )
    return FALSE ;
    EnumProcesses = (PFNENUMPROCESSES)
    GetProcAddress( hModPSAPI,"EnumProcesses" );
    EnumProcessModules = (PFNENUMPROCESSMODULES)
    GetProcAddress( hModPSAPI, "EnumProcessModules" );
    GetModuleFileNameExA = (PFNGETMODULEFILENAMEEXA)
    GetProcAddress( hModPSAPI, "GetModuleFileNameExA" );
    if ( !EnumProcesses
    || !EnumProcessModules
    || !GetModuleFileNameExA )
    return FALSE;
    LV_ITEM lvi;
    CString str, str1;
    if ( !EnumProcesses( aProcesses, sizeof(aProcesses), &cbNeeded ) )
    return FALSE;
    cProcesses = cbNeeded / sizeof(DWORD);
    char szProcessName[MAX_PATH] = "unknown";
    for ( int i = 0; i < cProcesses; i++ )
    HANDLE hProcess = OpenProcess( PROCESS_QUERY_INFORMATION |
    PROCESS_VM_READ, FALSE, aProcesses);
    if ( hProcess )
    HMODULE hMod;
    DWORD cbNeeded;
    if ( EnumProcessModules( hProcess, &hMod, sizeof(hMod), &cbNeeded) )
    GetModuleFileNameExA( hProcess, hMod, szProcessName,
    sizeof(szProcessName) );
    str = szProcessName ;
    str1.Format(": %d ", hProcess );
    str += str1 ;
    m_list.AddString ( str );
    UpdateData(TRUE );
    CloseHandle( hProcess );

  • Multiple crashes fixed by turning off hardware and Flash acceleration; very slow now. Takes five seconds to exit and still listed as a running process

    A workaround was suggested by a member of the community to turn off both hardware and Flash acceleration. It worked fine (no crashes since), but runs very slowly. In particular, takes five seconds to exit and is often still listed as a running process. Very slow in connecting to Web pages, and very slow loading them because of the graphics. Very slow in loading video. I expected slower responses, but this is REALLY slow. I'm running 64-bit Windows 7 and an Nvidia GE Force 7800 graphics card with all the drivers updated and the plugins for Firefox mostly set on "ask to activate". Should I expect this much reduction in performance when the workaround I mentioned was put into place? If so, it's half a loaf at best. The only thing questionable is that I have two Youtube downloaders that I am trying, but I made the assumption that these were only applied when you downloaded something from Youtube.

    In case you are using "Clear history when Firefox closes": do not clear the Cookies
    If you clear cookies then Firefox will also try to remove cookies created by plugins and that requires to start plugin-container processes that can slow down closing Firefox.
    Instead let the cookies expire when Firefox is closed to make them session cookies.
    *Firefox/Tools > Options > Privacy > "Use custom settings for history" > Cookies: Keep until: "I close Firefox"

  • ORABPEL-05002 for long running process

    Hi everybody,
    My question is related with a long running process I have designed and which, after running for a couple of days, ends by reporting the ORABPEL-05002 error:
    ===============================================================
    ORABPEL-05002
    Message handle error.
    An exception occurred while attempting to process the message "com.collaxa.cube.engine.dispatch.message.instance.PerformMessage"; the exception is: Transaction was rolled back: timed out; nested exception is: java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:152)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    ===============================================================
    Looking in the Manual Recovery screen, I can see an Activity I can recover. It's about an assign Activity where I'm doing a single boolean assignation.
    Of course, together with the ORABPEL-05002 error I got also the 'Transaction was rolled back: time out' message. Note that I have modified the transaction-timeout value to 180000. The error occurs during the night, with no heavy load of the server.
    Recovering the assign activity brings back the process in the running state.
    My process pattern:
    while (1 == 1) {
    do activity;
    wait_timeout();
    So, I have the following questions:
    1. Which is cause of this error?
    2. How may I automatically recover this lost activity? RecoveryAgent?
    Any suggestion is appreciated.
    Regards,
    amo
    P.S: the full stack of error messages reported in domain.log:
    ===============================================================
    <2006-09-18 08:08:34,101> <ERROR> <SRH.collaxa.cube.engine.dispatch> <DispatchHelper::handleMessage> failed to handle message
    javax.ejb.EJBException: Transaction was rolled back: timed out; nested exception is: java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
    java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
         at com.evermind.server.ejb.EJBUtils.makeException(EJBUtils.java:873)
         at ICubeEngineLocalBean_StatelessSessionBeanWrapper0.handleWorkItem(ICubeEngineLocalBean_StatelessSessionBeanWrapper0.java:1479)
         at com.collaxa.cube.engine.dispatch.message.instance.PerformMessageHandler.handle(PerformMessageHandler.java:45)
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:125)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    Caused by: java.lang.Exception: No Exception - originate from:
         at com.evermind.server.ejb.EJBUtils.makeException(EJBUtils.java:871)
         ... 10 more
    javax.ejb.EJBException: Transaction was rolled back: timed out; nested exception is: java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
         at ICubeEngineLocalBean_StatelessSessionBeanWrapper0.handleWorkItem(ICubeEngineLocalBean_StatelessSessionBeanWrapper0.java:1479)
         at com.collaxa.cube.engine.dispatch.message.instance.PerformMessageHandler.handle(PerformMessageHandler.java:45)
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:125)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    <2006-09-18 08:08:34,129> <ERROR> <SRH.collaxa.cube.engine.dispatch> <BaseScheduledWorker::process> Failed to handle dispatch message ... exception ORABPEL-05002
    Message handle error.
    An exception occurred while attempting to process the message "com.collaxa.cube.engine.dispatch.message.instance.PerformMessage"; the exception is: Transaction was rolled back: timed out; nested exception is: java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
    ORABPEL-05002
    Message handle error.
    An exception occurred while attempting to process the message "com.collaxa.cube.engine.dispatch.message.instance.PerformMessage"; the exception is: Transaction was rolled back: timed out; nested exception is: java.rmi.RemoteException: No Exception - originate from:java.lang.Exception: No Exception - originate from:; nested exception is:
         java.lang.Exception: No Exception - originate from:
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:152)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    <2006-09-18 08:09:05,236> <ERROR> <SRH.collaxa.cube> <BaseCubeSessionBean::logError> Error while invoking bean "activity manager": Scope not found.
    The scope "BpSwt2.30995" has not been defined in the current instance.
    ORABPEL-02094
    Scope not found.
    The scope "BpSwt2.30995" has not been defined in the current instance.
         at com.collaxa.cube.engine.core.ScopeContext.getScope(ScopeContext.java:213)
         at com.collaxa.cube.engine.core.WorkItem.setCubeInstance(WorkItem.java:259)
         at com.collaxa.cube.engine.core.WorkItemFactory.init(WorkItemFactory.java:68)
         at com.collaxa.cube.engine.core.WorkItemFactory.create(WorkItemFactory.java:58)
         at com.collaxa.cube.engine.adaptors.common.BaseWorkItemPersistenceAdaptor.load(BaseWorkItemPersistenceAdaptor.java:147)
         at com.collaxa.cube.engine.data.WorkItemPersistenceMgr.load(WorkItemPersistenceMgr.java:75)
         at com.collaxa.cube.engine.CubeEngine.load(CubeEngine.java:5185)
         at com.collaxa.cube.engine.CubeEngine.load(CubeEngine.java:5173)
         at com.collaxa.cube.engine.CubeEngine.expireActivity(CubeEngine.java:2136)
         at com.collaxa.cube.ejb.impl.ActivityManagerBean.expireActivity(ActivityManagerBean.java:145)
         at com.collaxa.cube.ejb.impl.ActivityManagerBean.expireActivity(ActivityManagerBean.java:116)
         at IActivityManagerLocalBean_StatelessSessionBeanWrapper52.expireActivity(IActivityManagerLocalBean_StatelessSessionBeanWrapper52.java:645)
         at com.collaxa.cube.engine.dispatch.message.instance.ExpirationMessageHandler.handle(ExpirationMessageHandler.java:43)
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:125)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    <2006-09-18 08:09:05,274> <ERROR> <SRH.collaxa.cube.engine.dispatch> <DispatchHelper::handleMessage> failed to handle message
    ORABPEL-02094
    Scope not found.
    The scope "BpSwt2.30995" has not been defined in the current instance.
         at com.collaxa.cube.engine.core.ScopeContext.getScope(ScopeContext.java:213)
         at com.collaxa.cube.engine.core.WorkItem.setCubeInstance(WorkItem.java:259)
         at com.collaxa.cube.engine.core.WorkItemFactory.init(WorkItemFactory.java:68)
         at com.collaxa.cube.engine.core.WorkItemFactory.create(WorkItemFactory.java:58)
         at com.collaxa.cube.engine.adaptors.common.BaseWorkItemPersistenceAdaptor.load(BaseWorkItemPersistenceAdaptor.java:147)
         at com.collaxa.cube.engine.data.WorkItemPersistenceMgr.load(WorkItemPersistenceMgr.java:75)
         at com.collaxa.cube.engine.CubeEngine.load(CubeEngine.java:5185)
         at com.collaxa.cube.engine.CubeEngine.load(CubeEngine.java:5173)
         at com.collaxa.cube.engine.CubeEngine.expireActivity(CubeEngine.java:2136)
         at com.collaxa.cube.ejb.impl.ActivityManagerBean.expireActivity(ActivityManagerBean.java:145)
         at com.collaxa.cube.ejb.impl.ActivityManagerBean.expireActivity(ActivityManagerBean.java:116)
         at IActivityManagerLocalBean_StatelessSessionBeanWrapper52.expireActivity(IActivityManagerLocalBean_StatelessSessionBeanWrapper52.java:645)
         at com.collaxa.cube.engine.dispatch.message.instance.ExpirationMessageHandler.handle(ExpirationMessageHandler.java:43)
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:125)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    <2006-09-18 08:09:05,275> <ERROR> <SRH.collaxa.cube.engine.dispatch> <BaseScheduledWorker::process> Failed to handle dispatch message ... exception ORABPEL-05002
    Message handle error.
    An exception occurred while attempting to process the message "com.collaxa.cube.engine.dispatch.message.instance.ExpirationMessage"; the exception is: Scope not found.
    The scope "BpSwt2.30995" has not been defined in the current instance.
    ORABPEL-05002
    Message handle error.
    An exception occurred while attempting to process the message "com.collaxa.cube.engine.dispatch.message.instance.ExpirationMessage"; the exception is: Scope not found.
    The scope "BpSwt2.30995" has not been defined in the current instance.
         at com.collaxa.cube.engine.dispatch.DispatchHelper.handleMessage(DispatchHelper.java:152)
         at com.collaxa.cube.engine.dispatch.BaseScheduledWorker.process(BaseScheduledWorker.java:70)
         at com.collaxa.cube.engine.ejb.impl.WorkerBean.onMessage(WorkerBean.java:86)
         at com.evermind.server.ejb.MessageDrivenBeanInvocation.run(MessageDrivenBeanInvocation.java:123)
         at com.evermind.server.ejb.MessageDrivenHome.onMessage(MessageDrivenHome.java:755)
         at com.evermind.server.ejb.MessageDrivenHome.run(MessageDrivenHome.java:928)
         at com.evermind.util.ReleasableResourcePooledExecutor$MyWorker.run(ReleasableResourcePooledExecutor.java:186)
         at java.lang.Thread.run(Thread.java:534)
    ===============================================================

    These are the possible cause to the problem and their solutions:
    Poor performance of the dehydration database If you are using Oracle Lite as dehydration store, please switch to use Oracle 9i or 10g. If Oracle 9i/10g is already in use, check the database parameter 'process' and 'session' to make sure it can handle the expected throughput.
    OC4J has too few available connections to the dehydration database. Increase the maxConnection number of the BPELServerDataSource at the BPEL_HOME/integration/orabpel/system/appserver/oc4j/j2ee/home/config/data-sources.xml (for developer edition) or IAS_HOME/j2ee/OC4J_BPEL/config/data-sources.xml (mid-tier installation).
    Size of message is too big Two ways to deal with this problem:
    Increase the transaction timeout at PEL_HOME/integration/orabpel/system/appserver/oc4j/j2ee/home/config/server.xml (developer edition) or IAS_HOME/j2ee/OC4J_BPEL/config/server.xml (mid-tier installation)
    Decrease the auditLevel from BPELConsole -> Manage BPEL Domain -> Configurations tab. Doing so will reduce the amount of data saved to the dehydration store.
    Cheers
    Anirudh Pucha

  • Steps to complete the pay run process

    I need steps to complete the pay run process in detail.

    Yes! I have got the answer from Metalink "WHITE PAPER : R12 Payment Process Request - Functional and Technical Information"

  • How to get Application name of a current running process in LiveCycle??

    Hi,
    I want to get the Application name of current running process in LiveCycle as a output value.
    I have 3 applictions, the 3 applications are calling same SubProcess, so I want get the name of the application from which the sub process has been called.
    I want to retrieve the Application name and asssign this value to a output variable.
    I have searched for the solution I found a method getApplicationName() but inorder to get the current running process's Application Name this might not be useful..
    So suggest the way to resolve this..
    Thanks in Advance.....
    Regards,
    Kalyan Urimi

    Use an input/output string variable in the subprocess and set its value in each calling process as respective Application name.
    May be if this could help.
    Thanks,
    Wasil

  • How to stop the running process chain

    How to stop the running process chains or infopackges...just qm status change is enought?

    BI - SM 37 - Kill the Job
    ECC - SM 50 - Kill the job

  • Is it possible to run process chain from the certain process/point?

    Hello
    Is it possible to run process chain from the certain process?
    How?
    Thanks

    Hello,
    yes it possible! use the following steps.
    1. Goto the process which you want the chain to start from.Goto display messages>> Chain tab. In the generated instance note the variant and instance.
    2. Goto table RSPROCESSLOG and give variant and instance and get logid details.
    3. t codese37>> run FM RSPROCESSFINISH.
    4. give the deatils u have got in RSPROCESSLOG table here and say execute.
    This will solve ur problem.
    Hope this helps!
    Reg
    Deepmala

Maybe you are looking for

  • Ipod shuffle wont restore to factory settings

    trying to sync ipod shuffle with itunes to load music. i get a message saying it is in recovery mode and factory settings need to be restored. i click the button that says restore factory settings and it just keeps giving me the same message.  Any th

  • How do you fill the workspace background in elements 9?

    How do you fil the workspace background in elements9?

  • SAP Best Practice HR: DX Toolbox

    Hi Suresh,Saquib   This post is in continuity to my previous post, can u provide some advantages/disadv's of using  <b>ZBPHR_ZDTT - SAP Best Practice HR: DX Toolbox</b> tool to upload PA infotypes

  • Debugging queue related issues

    can the  forum provide me blogs and docs for debugging queue(inbound and outbound) related problems in XI,

  • Base64 binary encode a .JPG

    I need to take a .JPG that is stored in a table as a <BLOB> and base64 binary encode it. The reason for doing this is so that I can include it as a single string of text in an XML file. And I have no idea how to do it!!! Help me please. Thanks in adv