0CO_PC_01 Cost Object Controlling: Plan/Actual Data

Hi Experts
I have a question regarding Cost Object Controlling: Plan/Actual Data (0CO_PC_01). I know nothing about the R/3 processes and tcodes behind this datasource.
For a given material and a given plant do I only get records with VTYPE(Value type for Reporting) 10, but I do not understand why - I need VTYPE = 70.
I therefore hope:
1. That somebody could provides input on why I only get VTYPE = 10 and how I get 70 instead.
2. That somebody can tell me the tcodes behind this datasource on the R/3 side.
Thanks and kind regards,
Torben

Hi Mr. V.
Thanks a lot for the input.
The problem is that we have got VTYPE 30 (target) for some materials, but not for specific material A and we really do not understand why. Do you know how I can verify if the variance is present for the given material A in R/3?
Thanks and kind regards,
Torben
Edited by: Torben Pedersen on Apr 3, 2009 12:00 AM
Sorry, it is VTYPE 30 i need, not 70 as stated by mistake at first.

Similar Messages

  • Table for cost center plan/actual data

    Hello gurus,
            What are the tables to get for cost center wise plan/ actual data? The data which was entered through KP06 was sitting in whcih table?
    regds
    ramachandra

    Hello Ramachandra,
    Actual and Plan Data can be found in COVP view.
    1) For Actuals, you should use the values 04 and 11 to the field WRTTP;
    2) For Plans, you should use the values 01 and 10 to the field WRTTP.
    If you need to get the totals, you should use tables COSP and COSS.
    Hope this help you.
    Cheers,
    Daniel.

  • Difference between COPC planning and cost object controlling

    I want to know why do we have to calculate the cost of a manufactured product by both COPC planning and Cost object controlling by order?
    Will the cost of a manufactured product be different in COPC planning method and cost object controlling method?
    if we use only cost object controlling to calculaute the cost of a manufactured product without using COPC planning wht will be the implications?

    Raja,
    Yes the cost can be different. The cost calculating thorught Product Cost Planning may be static, you calculate it by period it is more for planning prupose ans to set standard. The cost calculated through Cost Object Controlling is resulting from your actual transactions, and the are few variables that could increase or decrease the cost of product. For example the overhead cost (Increase of salaries) can directly affect your activity rate at the work center and impact cost of your product when the production order is complete. You need both costs (Cost Planning and Cost Object releated) so at the end of the period you can calculate variance betweeen your plan cost and your actual costs.
    Hope this clarifies your doubts.
    GG

  • Product cost planning & cost object controlling

    Hi All
    We are using KMAT material type for configurable materials.
    Product cost planning:
    My question is , Can we save cost estimate for the Kmat materials?
    ( I am assuming I dont have to run CK40N for these materails , As I am not going to have accounting tab for Kmat materails. and I do not know which materails and operations to use in super Bom and Super routing)
    Please let me know If the above statement is true.
    Cost object controlling:
    Can i use cost obect controlling by production order or PCC?
    *I am assuming I will be ale to use only cost object controlling by sales order....But I have nt worked on this previously...If I have to use cost object controlling by sales order , can you guys give me a link or steps that helps me in  configuring Cost object controlling by sales order*

    Hi,
    See comments in bold
    Product cost planning:
    My question is , Can we save cost estimate for the Kmat materials?
    ( I am assuming I dont have to run CK40N for these materails , As I am not going to have accounting tab for Kmat materails. and I do not know which materails and operations to use in super Bom and Super routing)
    Please let me know If the above statement is true.
    You have goto VA02-->Costing
    Sales order costing is big topic,please check this link
    http://help.sap.com/saphelp_bw33/helpdata/en/90/ba6da4446711d189420000e829fbbd/content.htm
    Cost object controlling:
    Can i use cost obect controlling by production order or PCC?
    *I am assuming I will be ale to use only cost object controlling by sales order....But I have nt worked on this previously...If I have to use cost object controlling by sales order , can you guys give me a link or steps that helps me in configuring Cost object controlling by sales order*
    Sales order costing is big topic,please check this link
    http://help.sap.com/erp2005_ehp_01/helpdata/en/90/ba6f9f446711d189420000e829fbbd/frameset.htm
    Thanks,
    Rau

  • Control Plane and Data Plane

    Hi there,
    I'm trying to figure out how to determine and how to differentiate between control plane and data plane especially in troubleshooting MPLS VPN. Any keyword that distinguish between them? It seems to be confusing for a newbie here :)
    Thanks in advance.
    maher

    Hi Maher,
    The control plane is simply the set of processes that are responsible for disseminating information on routes, labels etc within a network. This includes routing protocols whose job is to communicate information on routes between different routers. The information provided by these protocols is then used to building routing/forwarding tables.
    The data plane is simply an abstraction used to describe the actual flow of data packets using paths determined by the control plane. The control plane traffic carries control traffic (which is not end-user data) whereas the data plane traffic is actual end-user data.
    There is no single command that you can use to distinguish between the two. The commands you have on a router that can be used to view control plane operation are as such:
    sh ip route
    sh ip cef
    sh ip bgp ...
    sh ip ospf ...
    sh mpls forwarding-table...
    etc... and many, many more
    Typically, there isn't a clear demarcation between commands that display control plane info and those that display data plane information... You could use commands such as the following to get some idea of data traffic flowing through a router:
    sh interfaces
    sh policy-map interface
    etc.
    Hope that helps - pls rate the post if it does.
    Paresh

  • Cost object Controlling - Transaction KKBC_HOE

    Hello CO experts
    Can anyone let me know or provide me the documentation for CO summarization report.
    I defined hierarchy in the customization (SPRO) but it seems that it is not complete in all respects.
    I always get "Hierarchy does not exist".
    Thanks and Regards
    Subbu

    Hello Jayaraman,
    It seems that you are just missing the data collection step ( summarisation step), which is a prerequisite, before executing the summarised analysis report KKBC_HOE.
    Till the time , data is not collected in the defined hierarchy, we keep on getting the message as   "  Summarized object does not exist :"
    The steps are
    1.  Define / Create summarisation hierarchy - KKR0 - I believe, you have already done this step.
    2.  Data Collection for the above summarisation - KKRC -  for required hierarchy / subhierarchy / period -  ( Menu path - Controlling - Product Cost Controlling - Cost Object Controlling  - Product Cost by Period  - Information System  - Tools  - Data Collection  - KKRC - For Summarization Hierarchy )
    Request to test this for a specific material / period / order type initially , to avoid long run times, and once satisfied / successful, collect the full data by executing the job in background.
    3. Execute report KKBC_HOE
    Hope this helps.
    Please do not forget to award full points, if satisfied and successful.
    Cheers
    Shreekar Vaidya

  • PDF  Document for cost object controlling

    Hi Sap Gurus ,
                    please any body sent cost object  controling pdf document to me.please help me .
    Thanks & Regards
    Sri

    HI
    Below links has some details relating to PC-COC
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/COPCIS/COPCIS.pdf
    VVR

  • Please put a cost object with valid JV data for GL accoutnt (line 001)

    Dear All,
    When the user is trying to post ASKBN, They are getting an error saying "Please put a cost object with valid JV data for GL accoutnt (line 001)"
    So we tried to look up the error, and the WBS, Cost center, profit center and JVA details are all available in place. Still cant understand why this error comes. And why the system is asking to put JV details when they are available.
    On checking, WBS has an AUC and AUC has the cost center which has the JV details and PC details. So I think everything is in place.
    Can someone help please and let us know if we are missing anything else that needs to be checked ?
    Thanks,
    Hari Dharen

    Dear Hari Dharen,
    if something else in missung you'll get a error message if you run ASKBN in testmodus.
    regards Bernhard
    Edited by: Bernhard Kirchner on Oct 5, 2010 8:55 AM

  • Cost object  controlling

    can any one tell me what is valuated sales order, and non valuated sales order?
    and when we use these two scenarios?
    thank you,
    shankar chitupolu

    Valuated sales order, and Un-Valuated sales order, these two will occur in Sales order related production scenarios, and when we use "Product cost by Sales order" in cost object controlling.
    We use Product cost by Sales order:
    If we want to know profit margin for particular sales order,
    to track special sales costs,
    to know funds committed to the sales order,
    to know performance of sales order in costing point of view and
    to get affects of delay in delivery.
    This allows us to use Results Analysis.
    In Valuated sales order:
    Quantity and Value flow is combined,
    Assembly costs can be seen at multilevel make to order production,
    Inventory determination is simple,
    It is similar to MTS Production,
    enables more CO scenarios and logical decoupling of Co-PC and PP.
    In Un-Valuated Sales order:
    Quantity flow is separate from Value flow,
    Costs are not posted immediately to sales order,
    No variance for assigned production orders,
    not good for Multilevel production process.
    I hope U Got it...

  • Help with a query regarding time dependent display of Plan/Actual data

    Hello,
    Let me try to explain what my problem is:
    I have a query that shows plan and actual sales figures on a timeline. Plan and actual data is identified by 0VERSION (P01 for Plan; P00 for Actual).
    0CALMONTH and Sales key figure is in rows. 0VERSION is in collums.
    The output looks as follows (simplified):
    CalYYYY/MM............P01....P00
    2006.09......Sales........90.....100
    2006.10......Sales......100.......95
    2006.11......Sales........90........0
    2006.12......Sales........95........0
    So far so good! But users aren't satisfied with that. They want only <u>one</u> collumn with sales figures. For past months (< 2006.11) they want to see actual figures (Version P00). For current and future month (>= 2006.11) they want to see plan figures (Version P01). And this only in one single collumn.
    So the output should look this way:
    CalYYYY/MM..........P00/P01
    2006.09......Sales......100
    2006.10......Sales.... ...95
    2006.11......Sales........90
    2006.12......Sales........95
    Is there any way/workaround to accomplish this?
    Your help will be very appreciated!
    Regards,
    Ulrich

    Hi,
    For this what you can try is , have the two Restricted Key Figs the way you have right now, but Hide them. Then Create a Third Formula Key Fig, in which you can put a Boolean Logic :
    (FV > 11) * Act KF +(FV<= 11)*Plan KF
    Where FV is a Formula Variable which takes on the Value from Month (1 for Jan , 2 for Feb etc)
    Try something on these lines.

  • Activity confirmation at target quantity in Cost object Controlling

    How can I confirm activity usage by back flushing target quantities based on actual quantity delivered into stock from a process order?
    Could you please advise how we can do the above?
    Currently we are confirming the activity based on the planned hrs. But how could it be possible in SAP to Confirm the activity usage based on the delivered stock from a process order
    The above is only relevant to Activity but not component materials.
    Thank you

    Hi Ravikanth,
    To post activity quantities by back flush for the actual quantities confirmed, please take a look at the following:
    1. In routing (Master Receipe), you can make settings that at each of the operations, you can back flush the activities.  It is controlled at Routing.  you can check in the routing there will be a check box for backflushing.  If need more details in this regard, you may also check with your PP guy.
    2. At the time of confirmation, system will propose the activity quantities based on the back flush, but here if you don't want to change anything, you can simply post it.  Else if you want to change the quantities, system will allow you the change.
    The process and system behaviour would be same for both By Production Order or By Process Order. Only the difference is you will have Master receipe in Process Order instead of Production Order and there is some added features like PI sheet for better quality management.
    Please let me know if you need futher details in this regard
    Surya

  • Reg:Cost Object Controlling

    Hi All,
    While am doing the T.Code: MFBF - REM Backflush (For Repetative Manufactring) the following Issue is coming
    E:M7:226 131 _ _ _ F
    Message no. M7226

    Hi Suryanarayana,
    Please Do me the favour, no MM guy is available right know
    see the following movement types i assigned on REM Profile
    Movement Types
    Goods issue     261                        Goods issue/reversal  262
    Goods receipt    131                      Goods receipt/reversal  132
    Scrap                 551                      Scrap/reversal              552
    By-product          531                      By-product/reversal        532
    Additional movement types relevant fot make-to-order  scenrio
    GR Individual SOrd        571                  GR Indiv. Order Reversal           572
    GI Ind. Stock/SOrd       572                 GI SO Stock/Sorder/Canc.         571
    GI PlntStock/SOrd        291                 GI Pl. Stock/SOrder Rev.            292

  • Progress Analysis, Plan/actual % comparision based on activity confirmation

    hello guyz,
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The  second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

    the problum is still there kindly provide assistance...
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

  • Report on Cost Object Hierarchy

    Hi Guys,
    My user needs a report for ACtuals cost based on Cost Object Hierarchies.
    ACtual cost dat is in a cube. But that cube does not have COst Object as Charachetristic.
    How can I do that?
    Any suggestions

    SOlved

  • Distribution of Price difference value to Other Cost Objects in Hierarchy

    Hi,
    I have a unique scenario for one of my client.
    Here we are using Cost Object Hierarchy for Cost Object Controlling. We have Two COH for Billets and Wire Rods.
    The Input for Billets production are Raw Materials and Input for Wire Rod Production are the Billets.
    Each Billet grade is consumed for the Specific Wire Rod Grade.
    At the end of the Month we do the settlement and we get the Price difference value of the Billets. We can also know the Per unit Price difference value.
    Now we want to send this Price difference per unit value of the Billets to the Wire Rod Production orders according to the quanity of Billets  consumed.
    We are not using ML.
    I am not getting any idea how to Proceed for thsi scenario.
    Any suggestion please.
    Regards
    Kami

    Hi
    W/o ML, you cant achieve this...
    if your Prod process is farily stable and qty variances are not much i.e. the only major reason for variances are the prices - Then you can adopt this workaround
    Re: sfg and FG @ MAP
    br, Ajay M