A POC in SAP PI

Hello All,
I have to do one POC in PI.
The requirment is....for ex if we have three different mapping ussed in a single scenario and the maaping is either XSLT or JAVA mapping. Then we have to dump the output of every mapping on the file system and then this output will send to other mapping.
I have found three method.
1) By using BPM and File adapter
2) By writing the Java code so that after calling every style sheet a java program runs and we can write the output.....but i donot know hoe to do this...
3) To find the table in SAP where all the payload get stored and from there picking the data and then writing on to the server....In this the problem is wat is the table name...where i can found it and on what basis i will pick up the data...
Plz help

hi hemant,
I ll suggest to go with BPM...
for the 3rd option i dont think that this can be possible..
bez mapping is a java componenet and accessing abap table from java part is not possible.
if u go through u ll find that SXSPEMAS, SXMSPMAST, SXMSMSTATT, SMPPRE13  are tha main abap table which storing all the info regarding message flow in sxmb_moni.
but here u ll not find any of the table which storing message pay load. please make a note that XI stores the payload in a hexadecimal format and cant be retrieved just by accessing a table field. u have to fetch the message payload using the XI message MSG_ID. The class CL_XMS_PERSIST provides a method called READ_MSG_ALL which reads a message using the message GUID and version.but this all are not possible in java componenet .
may be using abap mapping this can be possible, i am not sure..
regards,
navneet

Similar Messages

  • Generate CSR in SAP SSO 2.0

    Hi,
    We are working on a POC for SAP SSO 2.0
    I need to know whether the Secure Login Server can generate Certificate SIgning Request. (.CSR)
    I am aware of its capability to sign certificates.
    I am looking at options for SAP SSO 2.0 to generate Certificate Signing Request (.CSRs)
    Please note : - I am aware that the Secure Login Client is capable of Connecting to Secure Login Server and generate an X.509 Certificate.
    I am looking at options , where I am not going to Install the Client.
    Consider it some what similar to SAP Passports used at https://service.sap.com
    Regards,
    Ashish .A. Poojary

    Hi Stephan,
    We are basically looking at authenticating on SAP Systems (AS Java and AS ABAP ) using X.509 Certificates.
    Out first target is to acheive X.509 Authentication on SAP AS Java Systems. (NetWeaver 7.31 SPS09)
    We were able to achive this target.
    The next step was to decide a process for generation of X.509 Certificates for Users.
    That's when we came across SAP SSO 2.0
    With Installing Secure Login Client 2.0 SP03 Patch 1 , the client was able to provide the X.509 Certificate ( Short Lived Certificate)
    But as I said , I do not want to bring in the dependency of Client Installations.
    I was hoping if there could be any API / Interface which would help the User themselves to Create the X.509 Certificate just like the one in the Image I have posted below.
    Something which SAP Service Marketplace has in place today for generating SAP Passports (X.509 Cert)
    The image relates to a similar interface , but with Microsoft Active Directory
    Let me check the Web Client. Shall let you know after testing it tonight.
    Thanks and Regards,
    Ashish .A. Poojary

  • SAP Lumira Query with SQL

    Hi we are doing a POC on SAP Lumira using Freehand SQL for our business users.
    We are trying to connect SQL Server 2012 / Oracle 12.
    Taking both the routes I am hitting the same roadblock.
    Java Class not found in classpath .com.microsoft.sqlserver.jdbc.SQLServerDriver.
    I downloaded both JDBC Driver 4.0 & 4.1 and tried to setup the jar executable but still I am getting the same error.
    Am i placing the driver in correct location.
    C:\Program Files\SAP Lumira\Desktop\plugins\com.businessobjects.connectionserver.standalone_3.2.4.B_20141030-231603\ConnectionServer\drivers\java
    I even tried completely copying the folder content of 4.0 & 4.1 to the following location after seeing salesforce folder there. We are able to connect to Salesforce without any issues.
    C:\Program Files\SAP Lumira\Desktop\plugins\com.businessobjects.connectionserver.standalone_3.2.4.B_20141030-231603\ConnectionServer\jdbc\drivers
    But I still end up with same error after installing the drivers from the preferences in LUMIRA.
    What am I missing do I need to EDIT any SBO file or Classpath XML file add the String for SQL Server for it to work correctly.
    Any help or guidance is appreciated.
    Best
    Monty.

    Hi Monty - please have a look at the Lumira PAM at support.sap.com/pam
    https://websmp201.sap-ag.de/~sapidb/011000358700001095842012E
    Pages 8- 9
    It references different JDBC drivers than you do - can you check?
    Source: SAP
    Source: SAP
    Just a thought.

  • API Reference of SAP Visual Business Geo Maps - SAP UI5

    Hi,
    I came across a blog post written regarding making SAP Visual Business available on SAPUI5 (since version 1.18) and also came across few demos at this link. 
    But I am not able to find any API documentation regarding this.
    We are working on a small POC using SAP Fiori/SAPUI5, in which we want to make use of maps.
    Could anyone please let us know as to where we can find more info regarding the API reference, documentation or some examples with sample code.
    Thanks,
    Vinay C

    Hi Ella,
    Indeed we have! We posted a guide on Client side development: UI5 Development with Visual Business
    This will explain the basics and is more usable then the plain API doc in the demo kit.
    Cheers Uwe

  • Planning to start HANA POC on BW

    Hi All,
    We are planning to do HANA POC with 'SAP NetWeaver 7.3 BW powered by SAP HANA' .
    Kindly suggest what are the basic steps and pre-requesite's to be considered.

    Sunil ,
    Find out the USE Case ....... If you are identifying Use Case means 50% job is done...
    See below blog , Hope it helps.
    Estimation for BW on HANA Migration ( Landscape Migration)

  • POC RA key to calculate reserves

    Dear all,
    I have introduced the POC method  ( RA type E with profit indicator Q) for projects and all my RA/settlement is working fine. All excess costs/billings will be calculated and posted to FI.
    Now I want to create at the same time warranty costs, which should not be involved in the calculation of the POC progress. But pending of the POC progress SAP should post a warranty reserve by the formula: planned waranty costs* POC progress = actual warranty reserve. Is this possible???
    Therefor I have created an extra line ID for waranty, assigned a cost element in OKG5 for planning and in KKA2 I get now a extra line in the planned data for warranty costs. perfect. I created the cost elements in OKG4 with category P - Costs of Complaints and Commissions for reserves and COS.
    I have created the FI accounts in OKG8 with RA category with RUCR.  - But still the RA does not give me actual reserves. It is always 0. Did I miss anything? What is wrong on my setup?
    Thanks a lot for your help.

    Hi sridhar,
    I am putting very short you need read lot of help for more information.
    1 okg1 create  new key
    2 okg2 version 0 (will be there) turn extended control on  and technical cost elements give a single cost element for the fields cost element category 31 RA. tick the indicator transfer to financial accounting.
    3 maintain the combination Ra version and Ra key and select the 03 method cost based poc method.
    4 maintain line id for costs, revenues
    5 in okg5 assign all the cost elements to line id costs,
      revenue elements to the line id revenues
    6 in okg4 assign the cost line id to k and revenue line id to revenue category.
    update the line id to cost elements
    7 define the posting rules for cosr ans wipr rucr.
    please include the cost element in your allocation structure or else it will throw you a error at the time of settlement.
    I tried put it very simple, But it requires lot of reading the sap help to understand in detail.
    Thanking you
    Vengaiah Chowdary

  • Need help in poc

    Hi Experts,
    i am sap xmii consultant.my company ask me to go client place to visit there i need to find following buiness process
    1) PROJECT:
       It's proof of concept(POC) of SAP XMII in  client.
    2) ASSESSMENT:
       We will do Assessment of the process and systems for client use.
    3) SCENARIOS:
       Scenarios that will consider on the Assessment.
       A) Chemical / Laboratory Integration.
       B) Plant maintanance Integration.
       C) Production Planning.
    4) DELIVERABLE:
       Deliverables will be
       A) 2 or 3 Layouts in portal screen.
       B) Powerpoint presentation with possible scenarios for main implementation and Business benefits.
    5) TIME FRAME:
       A) JULY 10 to 13  - Assessment and Installation.
       B) JULY 16 to 30  - Realization POC (Proof of Concept).
       C) JULY 31        - Presentation of POC.
    any one please suggest me how to workout this one. because i am new in Business process side. related documents please send me [email protected]
    wainting for reply.i will give good points.
    Thanks and Regards,
    sapbbm.

    Hi Ryan,
    Thanks for your reply. Iam an SAP XMII consultant. Now my Company has given me a task. It is, I should visit our client's factory and need to analyze the Business Process flow. Previously I was in the Development side and now they have given me a task in the Business Process line. Since Iam new to the business process side, I had asked help from Experts like you.                                                                                I need informations from you experts regarding the initial steps that have to be taken to implement SAP XMII in a Company. More precisely I would be pleased if you can tell me what are the business processes that have to be taken into consideration while implementing XMII in a Production Company.                                                                   Not only me, but many are there who will be benefited out of your answers. Those who would like to switch over from development side to the Business Process Side will be much benefited out of this query and your answers I think. That is why Iam posting this question in this forum.
        Is there any other option where I can post this query? If there's any, please let me know.
    Thanks and Regards,
    sapbbm.

  • Connection MDM Sever

    Hi Expect
    I am trying to do POC. SAP MDM to PI and PI to SAP MDM
    Please let me know what all connections i need to create
    Do i need to create port in PI also?? if yes what type of port...
    please provide any documents if any.
    regards
    Osman Abdul Aziz Jabri

    Hi,
          For connecting to MDM, you would first need to deploy the MDM adapter. Please go through the following links for deployment of MDM adapter and configuration requred for connectivity.
    http://help.sap.com/saphelp_nwmdm71/helpdata/en/48/97401a55493987e10000000a421937/content.htm
    http://help.sap.com/saphelp_mdm71/helpdata/en/48/d1f90613ba2b63e10000000a42189d/content.htm
    You can also go through this Webinar for MDM adapter
    FEATURED EVENTS
    Regards

  • EA-PLM extension activation

    Hi PLM Group/Folks,
    Currently we are doing POC for SAP PLM7.03 POC using SAP ERP6.0 EHP7.0.
    We have completed the installation of SAP ERP6.0 EHP7.0 and we would like to activate the PLM based Business Functions.
    I am a part of Basis Team who is working in this project.
    My question is for activating the PLM based Business Functions in SAP ERP6.0 EHP7.0 landscape. Is it enough if we activate EA-PLM via SPRO or SFW5. Apart from EA-PLM activation do Basis Team needs to do anything else.
    How about the PLM Functional role? Is there any neccesity for PLM based Business Functions activation from PLM Functional side.
    Regards,
    Anil

    Hi Ulf,
    Thanks for your reply.
    I have gone through the PLM 7.03 Master Guide.
    There i found information on  /PLMU/WEB_UI_3 on the business functions.
    Could you please let me know on EA-PLM extension. What functions are available with EA-PLM extension activation. This is because i found EA-PLM in SPRO->Activate Business Functions.
    As i am part of Basis Team i do not have much knowledge on PLM functionalities.
    Appriciate your inputs.
    Regards,
    Anil

  • Does sap provide fully loaded HANA sandbox for POC

    Hi,
    One of our potential customer looking out for a POC but they wonder wether SAP provides a fully loaded sap hana sandbox where could carry out a PoC.
    Any input will help.
    thanks,
    Tilak

    Tilak:
    What is the objective of your POC?
    If you are trying to stress test HANA with high volume of data - then you need to speak to your SAP rep to get a performance tuned sandbox. However, if you are not too much concerned about stress testing but would like to show-case the HANA solution to your IT department showcasing steps involved in modelling a HANA solution, etc.. then you can use the AWS Amazon  environment.  I have done few POCs in my own AWS environment with the latest and greatest backend and front-end patches.
    Hope this helps. Do let me know if you have any specific questions.
    Regards,
    Rama

  • Urgent - Big POC: SAP Adapter Java API !

    Hi,
    I'm trying to get from an SAP BAPPI values using SAP Adapter Java API.
    I had tested at BEA and it worked fine.
    the code is:
    try {
    InitialContext ic = new InitialContext(env);
    // Create an object that provides the services established during
    configuration
    ApplicationView applicationView = new
    ApplicationView(ic,SapConstants.APPVIEW_NAME);
    // First, get the schema for the request document and use it to
    construct a default document.
    IDocumentDefinition requestDocumentDef =
    applicationView.getRequestDocumentDefinition(SapConstants.APPVIEW_SERVICE);
    IDocument requestDocument = requestDocumentDef.createDefaultDocument();
    requestDocument.setStringInFirst("/Material.GETDETAIL/MATERIAL",
    "000000000000001667");
    requestDocument.setStringInFirst("/Material.GETDETAIL/PLANT", "0001");
    // Problem at this line
    responseDocument =
    applicationView.invokeService(SapConstants.APPVIEW_SERVICE,
    requestDocument);
    On site, the plateforme has no Internet connexion. limitation
    Is there type limitation: here it's only a String.
    I get this error message:
    <Material.GETDETAIL><MATERIAL>000000000000001667</MATERIAL><eda:control
    xmlns:eda="http://www.iwaysoftware.com/iwse" clip="yes"
    by="SAPIFRService"><eda:expire>2003-01-10T19:53:14Z</eda:expire><eda:attempt
    1</eda:attempt></eda:control></Material.GETDETAIL>
    DEBUG 09 Jan 2003 19:53:14,468 BEA_SAP_1_0.AppViewSapDev - DEEP
    [SAPIFRService] localWorker: Agent review SNIP <eda:control
    xmlns:eda="http://www.iwaysoftware.com/iwse" clip="yes" by="SAPIFRService">
    [parent=Material.GETDETAIL]
    DEBUG 09 Jan 2003 19:53:14,484 BEA_SAP_1_0.AppViewSapDev - DEEP
    [SAPIFRService] localWorker: Agent review result <Material.GETDETAIL>
    <MATERIAL>000000000000001667</MATERIAL>
    </Material.GETDETAIL>
    DEBUG 09 Jan 2003 19:53:14,484 BEA_SAP_1_0.AppViewSapDev - DEBUG
    [SAPIFRService] localWorker: SafIFRAgent rootname: Material.GETDETAIL
    ExecuteThread: '10' for queue: 'default': com.ibi.sapjco.SapDriver: connect
    ExecuteThread: '10' for queue: 'default': com.ibi.sapjco.SapConnection:
    Initializing connection ...
    ExecuteThread: '10' for queue: 'default': Create callable statement: {CALL
    IDOC_INBOUND_ASYNCHRONOUS(?)}
    DEBUG 09 Jan 2003 19:53:14,515 BEA_SAP_1_0.AppViewSapDev - DEBUG
    [SAPIFRService] localWorker:
    IFRXML=<Material.GETDETAIL><MATERIAL>000000000000001667</MATERIAL></Material
    .GETDETAIL>
    java.util.NoSuchElementException
    at java.util.Vector.lastElement(Vector.java:449)
    at
    com.ibi.sapjco.SapIdocXmlParser.endElement(SapIdocXmlParser.java:189)
    at
    org.apache.xerces.parsers.AbstractSAXParser.endElement(AbstractSAXParser.jav
    a:559)
    at
    org.apache.xerces.impl.XMLNamespaceBinder.handleEndElement(XMLNamespaceBinde
    r.java:853)
    at
    org.apache.xerces.impl.XMLNamespaceBinder.endElement(XMLNamespaceBinder.java
    :643)
    at
    org.apache.xerces.impl.dtd.XMLDTDValidator.handleEndElement(XMLDTDValidator.
    java:2978)
    at
    org.apache.xerces.impl.dtd.XMLDTDValidator.endElement(XMLDTDValidator.java:9
    18)
    at
    org.apache.xerces.impl.XMLDocumentFragmentScannerImpl.handleEndElement(XMLDo
    cumentFragmentScannerImpl.java:1145)
    at
    org.apache.xerces.impl.XMLDocumentFragmentScannerImpl.scanEndElement(XMLDocu
    mentFragmentScannerImpl.java:988)
    I'm on site so could you send me the answer directly : [email protected]
    Thanks
    Christophe

    Hi,
    I don't know how much it will help but it must add some value.
    please check these links
    http://help.sap.com/saphelp_nw04/helpdata/en/57/0b2c4142aef623e10000000a155106/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/78/759f3cad1e3251e10000000a114084/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/50061bd9-e56e-2910-3495-c5faa652b710
    Regards
    Aashish Sinha

  • SAP Netweaver Mobile 7.1 POC

    Hi all
    I am trying to build a proof of concept box (pc cube or laptop) to run in VMWARE for demonstration purposes only.
    I am planning to install the following:
    + Solution Manager 4.0
    + ERP 2004 : ECC 5.0
    + Netweaver 7.0 Stack
    + Netweaver Mobile 7.1
    + xMAM 3.0
    I still need to do full a sizing investigation, but I need to know the following before I start:
    + Can the ERP and the Netweaver stack be installed in the same VM
    + What version of VMWARE is best for the task?
    + Can I use VMWARE Workstation or Server?
    + RAM allocation for the VM (rough guide)
    + HDD requirements for the VM (rough guide)
    Ta... J

    Hi,
    SAP Netweaver mobile 7.1 is using the same DVDs as SAP Netweaver PI 7.1. Only difference is that you choose the option for Mobile System when starting the installation in SAPinst.
    Everything is included in the installation and no separate installation is required.
    Regards,
    Shitij

  • POC Weight in SAP-PS (Decimal Numbers)

    Hi Fellows,
    At present, I´m trying put weight to an activity, however I can not input decimal numbers.... The question is: How I can input decimal numbers in POC Weight?
    Thanks in advance

    Hi Paulo, I checked that note, however that note it´s to show decimal number in progress analisys reporting, otherwise I need to put decimal number in the following filed
    The technical information of field are

  • SAP ICH Multi ship to location scenario in POC

    Hi All,
    In SAP ICH 5.0 Purchase Order collaboration  scenario it possible to map Purchase Order having more than one ship to location?
    For example:Purchase Order having Purchase Organization say X and ship to location Y and Z both Y and Z are Production plant in SAP ICH.
    Is it possible to create PO with Purchase organization X and ship to location Y, Z both are Production plant in SAP ICH 5.0?
    Thanks,
    Nikhil

    Hi Nikhil,
    Can you please let me know where we mentioned the "ship to location" during PO creation.
    Thanks and regards,
    Pabitra

  • Run SAP PI Interfaces 24X7. How

    How I can run PI Interfaces 24X7 to achieve Business Continuity.
    The solution provided as u2013
         Install Separate additional PI System u2013 called as Federation PI.
    Is this solution really applicable?
    Details:
    1.     Our Current Production Landscape holds only One PI System
    2.     These interfaces hold Critical, Sensitive Finance, employee Data posting to ECC etc.
    3.     HA options are available and Planned Outages are communicated with Non-SAP Process teams.
    4.     No performance issues.
    5.     PI Scaling is in progress to balance load on PI System.
    Requirement: We seek PI Production System up and running 24X7 for all above interfaces with out any interruption.
    Below Issues: Makes our PI Production System Shut-down for certain period
    1.     Planned outages
    2.     Un-planned outages
    3.     Upgrades
    4.     Allowed Down-time
    5.     SPOF
    Solution: Federation of SAP PI
    1.     A very good solution u2013 so that we can switch to another PI System when first PI system is down for any reason.
    2.     We need to maintain IR, ID objects of interfaces that we planned for 24X7 in both PI Systems.
    3.     Communication Channels are active in only One PI system.
    4.     Manual activation of Communication Channels is required when we plan to switch Second PI Server.
    That Implies
    5.     There is minimum amount of downtime is present.
    6.     So, 24X7 of runtime is not achievable.
    My Only one Question:
    Is there any automated procedure for this runtime procedure..!!?
    Switching in between PI Systems might be possible.
    But, how we can implement activation of CC in Second PI System with out manual interaction?

    Hi,
    Currently we are about to start the POC for my client, and the scenarion is like this
    We have a ECC system( which will send the IDOC ) and it will be received by my central PI system.( which is is in UK).
    The client is present in multiple locations( UK,AUS,US), they want to install the additional PI boxes in AUS and US and they want to have a federation with central PI system which present in UK.
    we have two scenarios.
    1) The IDOC will trigger from ECC and then it will go to central PI system and then it has to go to local PI system and then to the third party system.
    2) The IDOC will trigger from ECC system and then it has to go to the local PI and then to the central PI box and then to the third party system.
    Can you please let me know how can achieve these two scenarios and how to install local PI boxes in federation with the central PI box.
    Regards,
    Pradeep J

Maybe you are looking for