Absence Quota creation during Time evaluation - Orgnaisational Assg change

Hello Experts,
I have one emplyee for whom the Transfer action has been run - his personal subarea has been changed from 1633 to 1654
obviously the ps grouping for time quota type changed form 35 to 40.
so function QUOTA is creating different quota for this employee than what there exist right now for infotype 2006.
so during time evaluation below error is comming.
    Error entry no. 83 Error when creating absence quota
    A complex application error has occurred
Kindly let me know how to overcome this error.
Thanks Jay

The reason 'error no. 83' occurs in RPTIME00 is because function QUOTA
is trying to generate a quota type which does not exist for the employee
on a specific day. It must have existed some time before.  Normally,
the function QUOTA displays an error message concerning the
non-existing quota types. In this case, the 'error no. 83' can only
occur in the following scenarios:
1. If you deleted a quota type that was to be generated
2. If an employee has an organizational reassignment to a personnel
   subarea or employee subgroup which have different groupings for quota
   types and for these groupings the 'old' quota type does not exist.
Function QUOTA checks to determine if the quota types to be generated
are valid.  If the quota type is not valid anymore (see reason 2) then
you will get a warning message.
"the problem in these situations was the following:
RPTIME00 is trying to generate a quota for a validity interval
(defined in table T559D) during which the employee belongs to two
different groupings, due to the transfer.
In your case the quota type should be generated with a validity interval
that begins before the employee's organizational change.
Unfortunately, for the time between the validity begin up to the
transfer of the employee there is no entry in table T556A for this quota
type.
or check the config of this quota running Rptquota_check in se38
Therefore, it is possible to solve the problem by defining a dummy
quota type for the 'old' groupings of the employee (table T556A).

Similar Messages

  • Absence quota zero after Time Evaluation

    Dear friends,
    We are generating Absence quota automatically after Time evaluation. But CL/PL/SL leave quota generated is zero after TE.
    Even I am not able to edit Absence quota(IT2006) manually or through IT2013.
    Please guide me, what needs to be done.
    Regards,
    Nayak

    Hi Dracula,
    Thanks for your response. No am not able to simulate the situation, it happen just once in PRD server.
    I do agree that some one might have chaned the value. But if the quota is generated by time evaluation then you cannot changed the record directly in infotype (2006). Time evaluation generated quota can be changed on through infotype 2013.
    I do request all the expert please share your thoughts.  Please do let me know what could be the problem here.
    Regards
    Sandeep

  • Absence quota addition after Time Evaluation

    Hi Experts,
    This is regarding Time Evaluation.
    Time Evaluation Configuration is fine. Absence quota is getting generated in days.
    But while adding to the previous balance it's treated as hours and the net balance is coming as hours.
    Example, Absence quota from previous year = 15 hrs
                    Quota generated = 0.77 days
                   After generation the total is 15 + 0.77 = 15.77 hours.
    Please advise what could be the problem . Thanks

    Hi ,
    Thanks for your reply.
    Cause :
    Actually the employee had moved from one Personnel area to another but due to the settings same Absence quota was applicable to the employees in both cases.
    Now i am not able to delimit the record in 2006 from transfer date.
    Edited by: Tomesh Sahu on Jul 21, 2009 10:17 AM

  • Absence quota rounding in Time Evaluation

    Hi All,
    The monthly quota generation is 2.49962. I need to round this off too 2.50
    I have written this PCR and calling it after Function QUOTA.
    P2006 ZRND
    000010 D OUTAQTYP?
    000020 **
    000030 50 ROUNDNR70
    The rounding rule in T559L is as follows:
    70 Round Percentage 001 0,25000 0,25000
    70 Round Percentage 002 0,25000 0,50000 0,50000
    70 Round Percentage 003 0,50000 0,75000 0,75000
    70 Round Percentage 004 0,75000 99.999,99999 1,00000
    Incl upper limit and Roll up is ticked.
    The genreation is on daily basis.
    If I do it on monthly basis it works fine.
    BUt I need the same to be done on Dialy basis
    Please help.
    Thanks,
    Majid

    Hi ,
    Thanks for your reply.
    Cause :
    Actually the employee had moved from one Personnel area to another but due to the settings same Absence quota was applicable to the employees in both cases.
    Now i am not able to delimit the record in 2006 from transfer date.
    Edited by: Tomesh Sahu on Jul 21, 2009 10:17 AM

  • Time Evaluation to be changed from Annually to Daily

    Hi Friends,
    Good Morning !!
    I am facing an issue from my client...It is, we have generated the absence quotas for the employees in Production System upto 31/12/2007 and each employee's entitlement of leave upto 31.12.2007 is stored in their Absence quotas infotype 2006.
    Now, my client doesn't want his employees' to view their absence quotas upto the end of the year. (Employees can see their absence quotas through ESS and can apply for leave thru ESS). They want to display only the "Earned/Accrued Leaves" quota only upto the date i.e., they wish the system to generate the absence quotas "Daily" instead of "Annually".
    Now, I have generated the absence quotas through t-code PT60 for all the employees from their hiredate to the end of year.
    Now, I couldn't understand what to do to make the system to generate automatically absence quotas "daily" .....that too I have generated until the end of this year.....They want it now to change the config settings and make absence quotas generate automatically on daily basis......
    SAP System came to LIVE from April 2007.
    Can any expert help me what I need to do.......
    This is an urgent requirement please......
    Thanks in advance,
    Sai

    hai
    yes deleting the data is not easy because u may have employees who might have already utilized  some of the leaves.
    like in say earned leave if a person has used 5 leaves and now according to his accural for a these three months is only 3 then waht happens.
    you have to take a back up of all the records 2001. 2006  then generate and
    upload 2001 again.
    you have to validate these records. then only you can take a decision.
    u can delimit 2006  and then from now on tranfer on daily accural can be done.
    just try and see delimiting the records for this date and check any errors are coming.
    because when u delimit 2006 the 2001 record should not have morethan  the quota
    number.
    regards
    nalla

  • Absence Quota Requirment in Time Management

    Hi All
    I have a Requirement of a Casual Day where in prefixing or suffixing CL days with weekly offs or holidays is allowed. However, both prefixing & suffuxing will result in on extra day being counted as CL.   
    For more information : It is applicable to all Employee Sub Grouping for Time Quotas & Personnel Sub Area Grouping for Time
    Quotas .
    Please let me know how to configure this  at the earliest .
    Thanks in advance .

    Hi sir
    I tried using counting rule but it is not exactly matching the reqmt , hope there is some mistake in it .
    can you pls let me know how to configure it in the counting rule & deduction rule .
    Thanks

  • Delivery creation during transfer postings and posting changes

    Dear Experts,
    Whenever i am posting a transfer posting with movement type 412 'Q' in a HUM managed storage location it is creating a outbound delivery. Basically this is a posting change and the system should not create a delivery. I want to prevent the creation of a delivery in this case.
    What are  the settings that creates a delivery whenever a transfer posting is performed without reference to a STO or a PO. Any posting happening with MB1B or MB11 that results in a delivery. PLease let me know the exact settings to look out for.
    Thanks in advance for your feedback.
    Raj

    SPRO>LOGISTICS GENERAL>>HANDLING UNIT MANAGMENT> BASICS>MATERIAL MANAGEMENT>INVENTORY MANAGEMENT>SET QMCHECK AND DELIVERY TYPE FOR EACH MOVEMENT TYPE
    THIS IS THE NODE WHICH IS RESPPOSIBLE FOR THE SETTINGS OF DELIVERY CREATION
    ALONG WITH THE ABOVE NODE THE NODE FOR HU REQUIREMENT FOR STORAGE LOCATION AND DEFAULT VALUE FOR DELIVERY IS RESPONSIBLE FOR THE OUTBOUND DELIVERY CREATED IN YOUR CASE
    Edited by: Sap: IN on Aug 17, 2011 7:00 AM

  • Time Evaluation Schemas

    Hi All
    Please suggest me regarding Time Evaluation Schemas.
    We have schemas like TQTA, TM04, TM00 Etc. when we use PT60.
    What are the different uses of these schemas & what are the situations when we need to use these schemas.
    Which schema to use when & where?
    Please Suggest
    Thanks & Regards

    Hi,
    TQTA: Generate Absence Quotas only, wtih this schema, we can update the IT2006. Time managemetn status is 7.
    TM04: Time Evaluation Without Clock Times, Time managemetn status is 9 or 1 in 0007IT
    TM00:Time Evaluation with Personnel Time Events/with clock times. Time managemetn status is 1 in 0007.
    For both TM04, TM00 schemas we are using the one T,code that is PT60. THis PT60 t.code create through RPTIME00 program.
    Schema TM00 processes time events that have been recorded at a time
    recording terminal, or the time pairs formed from the time events in
    pair formation. Attendances and absences are also imported.
    Schema TM00 is based on positive recording of time data, that is,
    recording all times that count as working time (actual times).
    Schema TM00 only evaluates time data with clock times (or full-day
    records). The main task of schema TM00 is to classify the actual times
    by comparing them to the planned specifications in the daily work
    schedule (start and end of planned working time, core times, breaks, and
    so on).
    The time worked by the employee is recorded in the Attendances infotype
    (2002), and not as clock-in and clock-out times. When processing
    clock-in/out times, the emphasis is on the length of time between the
    postings and not on the times at which the postings were made.
    You can use schema TM04 to process attendances and absences that specify
    a number of hours only, rather than concrete start and end times.
    The times stipulated in the daily work schedule are not relevant. Only
    specifications such as planned hours and minimum daily working time are
    evaluated from the daily work schedule.
    TM04 caters both for negative time recording (recording of exceptions to
    the work schedule) and positive time recording (recording all
    attendances or actual times).
    If negative recording is used, the planned hours are generated on the
    basis of the daily work schedule. Recorded absences and some attendance
    times are deducted (see schema TP01.)
    The "Time Management status" indicator in the Planned Working Time
    infotype (0007) shows whether all actual times are recorded for an
    employee, or only exceptions to the planned specifications.
    You can use schema TQTA to accrue absence quotas automatically in time
    evaluation. The functionality is limited to the task of generating
    quotas, that is, time balances or time wage types are not formed.
    The schema is designed for employees who do not normally participate in
    the daily time evaluation for the purposes of managing time accounts or
    forming wage types. Using schema TQTA to determine absence entitlements
    has the following advantages:
    o   Quotas can be recalculated flexibly.
    o   The need for a recalculation is recognized automatically.
    o   Processing is carried out for every day in the period, leaving no
        gaps.
    We have schemas like TQTA, TM04, TM00 Etc. when we use PT60.
    Regards
    Devi.

  • Use of Time Evaluation to generate Absence Quota

    Hi,
    We are planning to use time evaluation to generate absence quota. At the moment we are using RPTQTA00 report to generate Absence Quota. We have negative time management and since, the project has already gone live i have very limited scope to change the basic settings for example we do not have any employee subgroup to identify part time employees, PT & FT are in one employee sub-groups. We have only one ESG & PSG for time recording, time quota etc. The base entitlement is defined for the FT employees and it is reduced propertionately based on the employement percentage in IT0007. Now we are going to adopt a change in design, and planning to have specific work-schedule for PT employees. In that case, we will not have the scope to maintain %age in IT0007 for part time employees but exact no of working hours will be used. It means that system will treat the PT emploees as FT while generating absence quota and output the FT absence entitlement. As i said earlier we can not differentiate PT employees from FT employees based on ESG or PSG, i can not create a separate quota selection rule for part time employees. Hence, we are moving from running RPTQTA00 report to time evaluation for absence quota generation purpose.
    Now can anybody please help finding a alternate solution for the above, if it is possible to do it through report RPTQTA00 or we have to adopt the time evaluation. In case we are going to generate absence quota through time evaluation, can we only generate absence quota and skip anything that is related to payroll.
    Any comments/suggestion/advise will be very helpful to us.
    Thanks.
    Sujit

    We are not able to generate absence quota for part-time employees as when we do that, system is treating PT employees as FT employees and the FT base entitlement is referred while calculating absence quota. i can not define separate absence entitlement for PT employees as we have only one ESG and PSG, and based on this quota selection group is defined. The QUOMO feature is defined based on work contract - employee sub-group (there is no separate emp sub-group for PT employees) - Pay Scale Group. We are having this problem as we have specific work schedule for PT employees now (Ex. we create 3 days work schedule with 15 hours: 4.5,4.5, 6 hours) and we are not maintaining employement percentage for them. So system is treating PT employee as FT employee with 100% employement percentage. Please let me know if you need any specific info to understand my issue.
    Thank you so much for the response.

  • Time Management Operation to Update Absence Quota Used

    Hi Gurus,
    Is there any standard operation available to update absence quota used. I'm already using UPDTQA to update Absence Quota Entitlement, but is there any standard operation tha i can use to Update Absence Quota used.
    Thanks!!
    Rajiv
    Edited by: rajiv patel on Mar 27, 2008 6:38 PM

    Hi,
            I have many doubts about Quota generation with time evaluation. I need to discount two hours,for example,to a certain quota type at one particular situations and employees.
    I think I can do it using function QUOTA and operation UPDTQ. To do it I have to select the option "Increase" or "Replace" in table V_556A_B,isn´t it? .But my problem is that I need firstly a quota entitlement generated with RPTQTA00,for example:
    •I have to generate a entitlement of 30 hours for all employees of a certain personal division ("No generate" selected in V_556A_B and RPTQTA00 ).
    •After that,when I run time evaluation on fridays for example,I have to discount 2 hours of this entitlement of 30 (Increase or replace in V_556A_B,and use then Quota and UPDTQ).
    My real problem is to generate the quota by RPTQTA00 because I´ve checked "Increase"or "Replace" (V_556A_B) to permit quota generation (modification) with Time Evaluation.
    I hope my explanation was ok and somebody can help me please.
    Thanks a lot

  • Attendance type in time evaluation

    Hi All,
    Need solutions for the below issues.
    1) Clock in and clock out information for an employee is stored in SAP in IT2011, if clock in or clock out information is missing for an employee it should trigger a mail to employee and his manager.
    2) Currently using one attendance type : On duty would be raised by employee when is on business trip. System should consider this as working.
    During time evaluation it should consider if any attendance type and clock in and clock out details for an employee. and generate the absence quotas.
    There is no integration with payroll.
    3) If the accumulated earned leaves cross 90 days, rest of the leaves to be encashed, is there any standard sap solution for this or need to write a PCR or custom development to be done.
    Please let me know ho to do.
    Regards
    Vish

    1. The TD20 PCR in time schema evaluates time pairs and errors out if times are missing. The errors are stored in the FEHLER table. Maybe you can write a custom program to read this table and send messages.
    2. The On duty will be entered in IT2002 I guess. The positive TE schema will read both IT2011 and IT2002 and so should not be a problem.
    3. You need to write a PCR to accomplish this. There are useful doc on this forum. This doc by Vivek is very helpful:
    http://scn.sap.com/docs/DOC-55755
    Regards
    Pramod

  • Time Evaluation with multiple time events

    Dear Friends,
    I have an issue in our current project. Kindly try to help me with a solution.
    We are working on Time Management module with Positive Time Recording method and evaluation- India. (Payroll module is not implemented)
    My issue is:
    Evaluation with multiple time events in a day: In our project, we have a scenario like the employees record multiple clock in and clock out times for one day and are uploaded into infotype 2011. But during time evaluation, only first Time event that is P10 (Clock In) and the last Time event P20 (Clock-out) in a day should be considered for evaluation, ignoring any multiple time entries in between duration in the table TEVEN (Infotype 2011).
    Pls let me know how this requirement can be met. Do we need to define any new PCR’s or create any functions? If yes, pls tell me the process in detail as I am new and implementing Time management (Positive Time recording with Evaluation) for first time. Try to help me as soon as possible.
    Thanks & Regards,
    Chiranjeevi
    Edited by: chiran reddy on Feb 15, 2008 2:20 PM

    is it not possible to enter only the first p10 and last p20 from the time systems into 2011.

  • How to get the hire date in time evaluation?

    Hi all,
    Good day. I need to add a checking on employee's year of service before I can assign the time wage types to ZL table. What is the operation or function that can be used to figure the hire date or years of service of an employee in time evaluation? Greatly appreciate for your help.
    Best regards,
    Tan

    Hi,
    Thanks for your reply. I understand that the hire date can be stored in IT0041, but how do we retrieve it during time evaluation? Is there any operation or function that we can use?

  • Cross Day work issue in Time Evaluation for positive recording.

    Dear Experts,
    We would like to know whether anyone else has faced the below described issue before or has any suggestions for the same.
    Issue Background: We are uploading time events from the clocking recording system into SAP using an interface program. The clocking events are loaded without indicator 'M' and based on whether they belong to current day then assignment is '=' and '<' for previous day assignment.
    Issue Description: Some operational staff have planned daily shifts from 00:00 - 08:30. Hence they can clock-in before 00:00 on the previous day and since there is no 'Next Day Indicator' in SAP, we split the time events so that if the clock-in is at 23:00 previous day then the time pairs are formed as
    23:00 - 24:00 Current Day with Day assignment '='
    00:00 - 08:30 Next Day with Day assignment '='
    When we run the time evaluation, the day assignment for Next day pair 00:00 - 08:30 is automatically changed to '<'. This makes the Next day without any events and the time evaluation throws error in the next day.
    Now instead of automatic upload, if we manually upload the same time events, the records are as follows:
    23:00 - 24:00 Current Day with Day Assignment '+' and Origin Indicator 'M'
    00:00 - 08:30 Next Day with Day Assignment '+' and Origin Indicator 'M'
    Now if we execute time evaluation, the behaviour is as per expected and the time evaluation doesn't change the day assignment for any records.
    Work Around Proposed: Keep atleast 1 sec difference between the time events say the above records can be uploaded as follows:
    23:00 - 23:59 Current Day with Day assignment '='
    00:00 - 08:30 Next Day with Day assignment '='
    But we would like to avoid this if possible.
    Summary: In brief we would like to know whether why time evaluation has different processing for Origin indicator 'M' and SPACE.
    Many thanks for your inputs in advance, thanks.
    Regards,
    Roshan.

    Hi,
    see thread
    Time evaluation -early clockin for shifts starting at midnight ?
    maybe of interest
    bg
    Edited by: bg on Sep 16, 2010 9:26 AM

  • Not able to generate the absence quota WITHOUT Time Evaluation

    Hi ALL,
    When i try to generate the absences quota for employees without time evaluation using program RPTQTA00, I am not able to generate it.
    And i am getting "E You have not selected any generation rules".
    Kindly if any one come across this issue please throw some light and do a favour.
    thanks all

    Hi,
    Pls check the follwing tables if u have made correct assignments
    v_t559l
    v_554s
    v_556c
    Check Quoma Feature
    Check what status u selected in IT7
    Check if ur using correct Schema
    If ur Using RPTQTA00 then use No Generation,and if ur using PT60/RPTIME00 change it to Increase.
    Check if u have maintained correct quota groupings.
    Revert back if its not solved
    Regards

Maybe you are looking for

  • (Urgent help needed) how to read txt file and store the data into 2D-array?

    Hi, I have a GUI which allow to choose file from the file chooser, and when "Read file" button is pressed, I want to show the array data into the textarea. The sample data is like this followed: -0.0007     -0.0061     0.0006 -0.0002     0.0203     0

  • Will installing mac os 10.6.3 wipe off my hard drive?

    Hello I have a macbook running on a Mac OS X 10.5.8 and want to upgrade it to 10.6.3. I have the operating system disks. I haven't backed up my hard drive. Can I install the new operating system without fear of wiping off my hard drive? Please only a

  • Ipod and TV

    I am considering buying a new 5th gen ipod 60GB and I need to know-If I hook the Ipod up to my stereo and TV can I see my playlists on the TV Screen. Also - what is the best accessories to buy - the AV Cable and Remote - Or the Docking Station? Thank

  • The iPhone "iPhone" could not be restored. An unknown error occurred (2006).

    The iPhone "iPhone" could not be restored. An unknown error occurred (2006).

  • Hierarchy - description

    Hi experts, i have InfoPackage to create hierarchy from txt file. In hierarchy folder (selection) i have description of hierarchy and technical name and new name of hierarchy after loading ( tech. name ). My question - I would like to change descript