Accounting indicator for costing in Sales Order

We need to find a trigger in the CRM sales order to define a separate costing approach, e.g. to generate an internal order in ECC. In Service, the "accounting indicator" triggers an internal order in ECC.
We need something similar for sales orders. Any experiences?

Hi Binoj,
yes the KOB1 is fine thanks for that.
How we will show the labor in WIP.
Ex:  if 100 units confirmed and not completed then WIP ma will show the mat value then where we can see the wip labor portion
kindly suggest.
Thanks,

Similar Messages

  • Business Content for Product Cost by Sales Order

    Hi,
    We need to do reporting on costs associated to Sales Orders. The corresponding R/3 Area is "Product Cost by Sales Order" in Cost Object Controlling. We have looked at the standard cube for Cost Object Controlling (0PC_C01) but this cube only contain costs related to manufacturing orders, whereas we need to look at costs associated with sales orders after Result Analysis.
    Have you guys any ideas which content that might support this, if any?
    Many thanks!
    / David

    Hi Christian,
    please refer to SAP Note 584791: <a href="https://websmp208.sap-ag.de/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=0000584791&nlang=E">BW-BCT-CO: Costs not extracted on sales orders</a>.
    Unfortunately there's no DataSource providing the data you need for your analysis scenario. A custom development is needed (<i>awful!!</i>)
    <b>Note 584791 - BW-BCT-CO: Costs not extracted on sales orders</b>
    <b>Symptom</b>
    In R/3, costs are posted directly to sales orders. The costs have to be analyzed in the BW system. In the standard system, however, this data is not extracted into the BW system.
    <b>Other terms</b>
    0CO_OM_OPA_1; 0CO_OM_OPA_6
    <b>Solution</b>
    1. There are currently no DataSources for costs on sales orders in the standard BW Business Content. Unfortunately, there are currently no resources scheduled for a new development in this area either.
    2. Therefore, the DataSources and the Business Content must be created in the customer project within the framework of consulting as a customer solution concerning the generic extraction options of the BW Service APIs or function modules you have programmed yourself for extracting data.
    3. Technical background information about costs on sales orders:
    The transaction data is available in the following R/3 tables
    COSS and COSP - Totals records or COEP - Line items.
    This concerns records for the VB* object numbers.
    The master data of the sales orders is contained in the VBAK and VBAP tables.
    The 0CO_OM_OPA_1 and 0CO_OM_OPA_6 DataSources only extract costs for orders with master data in the AUFK table. These types of requests always have OR* object numbers. Therefore, these DataSources cannot be used for sales orders.
    However, you may be able to assign requests from the AUFK table (for example, maintenance orders or production orders) to a sales order through the AUFK-KDAUF table field.

  • Cost object Sales Order

    Hello All,
    We are currently in the design fase for cost object/element controlling . We are looking into business content and notice that there appears to be no datasource for extracting data for cost object sales order. We are considering custom datasource on COVP.
    Does anyone have an alternative? We need this data from the CO documents.
    Best regards,
    Almar

    HI Almer
    Did you checked the datasource 0CO_OM_CCA_40, it extracts data from COVP
    Below are the details from SAP Help
    This DataSource contains information on the actual costs that were posted to cost centers. These costs could have been posted to the cost centers as primary cost postings or internal allocations.
    The system identifies the costs of a cost center in object currency in records with 0CURTYPE = 10 (company code currency). (See also SAP Note 367738.)
    http://help.sap.com/saphelp_nw70/helpdata/en/b2/a4e5c536054c0bb7df9f6c22667694/frameset.htm
    Regards,
    sathya

  • Substitution for "Cost of sales Accounting" not working with cycle-trx KSC5

    Hello togehter,
    I have a problem that it seems that a created Substitution for "Cost of sales Accounting" is not executed in our System when running a cycle for Indirect Activity Allocation (Trx. KSC5).
    Now I want to debug the Indirect Activity Allocation but I don't know how those Substitution Steps are generated as code that I can set a breakpoint when executing the cycle with Trx KSC5.
    I want to try a trace when activating the substitution with transaction OBBZ but I'm not able to analyze in which Forms/Functions the Code is generated.
    I also saw some OSS Notes that there are problems with "Cost of Sales Accounting" but I don't know concretely what to do to solve that special problem.
    Kind regards
    Udo

    thanks for your answer.
    I added the filed FKBER in table VWTYGB01.
    Now I can select field "functional area" for CO Substitution.
    nevertheless substitution does not work and set functional area on Dummy FB 9990 for CO postings to CO-object without Functional area.
    Thats curious because I maintained exactly the same Substitution on an other SAP System (IDES Test System) and here it works.
    Any ideas?
    Are there further settigs required after maintenance of table VWTYGB01??
    Thanks in advance

  • Cost of Inventory for Special Stock- (Sales Order Stock)

    Dear All,
    We manufactures "x" materail under Make to Stock and Make to Order Scenarios. We carried the standard cost estimate through CK11N and released through CK24N. There is a value of "X". Also we carried the sales order cost estimate that is value "Y". But we have observed the inventory value updated during confirmation of the production is at "Z" value. We have identified this Z value is the value of special stock previous periods.
    I would like to know the procedure of valuation of inventory under scenarios
    Regards
    Anilkumar

    Hi,
    thanks for your info.
    Can i say the changes will be done for those special stock.?
    Actually my problem is related to a Return Sales order process where we need to change the MAP before DO and GI, otherwise the Material document would not capture the correct MAP during GI.
    and the solution from the senior is select the variance "special stock -Sales order" and enter the sales doc# in MR21.
    The problem that we are not yet having any special stock for this return Sales order, but this MR21 works for us and after that, the material document is able to capture the correct MAP.
    Any idea what or where the MR21 is updating for the "Special Stock-Sales order" if we don't have any Sales order stock for the paticular sales document?

  • TCode for calculating cost by sales order number - EK02 condition value

    In our case we have order item based cost. For each order item we push the calculator button and calculate the cost. The system adds the EK02 condition by this way. But is there a transaction code where we enter the sales order number and the system calculates the cost and adds the EK02 condition?

    Hi,
    T-code is KVBI  and or explore sales order costing
    SAP Menu >> SD >> Sales >> Product cost by sales order 
    Kapil

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Routing data for configurable products (Sales order costing)

    Hi
    I am runnign sales order cost estimate for configurable product. here I want to confirm the activity quantity with cost estimate.
    Pls let me know where can I check the activity quantity information . Pls help
    Thanks
    Sneha

    Hi Sneha
    I am bit confused with the terms you used..
    you cannot confirm activity qty while doing cost estimate... Activity confirmation happens during Production Confirmation
    Are you talking about missing activity qty/cost in sales order cost estimate?? Contact your PP consultant... You should have a routing attached while creating the sales order.. If that is there, then Activity cost would show up in the sales order cost estimate
    Br, Ajay M

  • How to identify Sale Order costing is required for Items in Sales Order

    Howstandard cos estimate*w to identify Sale Order costing is required for Items in Sales Order?
    On which criteria we can conclude Sale Order Costing is reqd ?
    ? * means what and wat is the purpose and how to chk for the Item in Sales Order, either it is required or not**.

    Hi Dharamveer,
    The best way is to make the order qty is equal to the quantity delivered. This way, when some one looks at this order in future - they think that the order was for X and the delivery was for X qty is completed. They will not know the background of the issue unless they go through change log. Even in change log, they see that the Ord qty was adjusted, but may not understand why?
    The good practice is to make order qty equal to already delivered qty.
    Create a new line for the remaining qty and reject the same with appropriate reason for rejection. This way, any one can understand the background , the reason for rejection easily. Hope it helps !

  • Sales order costing - tracking of actual costs at sales order item level

    Hi
    We are going with sales order costing for services
    Service material is non-valuated hence the scenario is non-valuated sales order stock
    PP module is not implemented.
    I am having following questions
    1. How to track the actual costs at sales order item level? Is Internal order/CO production order is required to be created for the same?
    2. Can I do activity confirmations directly from cost center to sales order item.
    3. Can Raw material is issued directly against sales order item.
    4. Is Sales order is a real or statistical account assignment object?

    dear friend,
    please look here:
    http://help.sap.com/saphelp_47x200/helpdata/EN/42/d7248ab27111d19e9a080009b0db33/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/EN/90/ba6cfb446711d189420000e829fbbd/frameset.htm
    reagrds,

  • System status REL is active , Message no. BS013,CO88 COST-BY-SALES-ORDER

    Hi Experts,
    I meet error when i do the production order settlement"CO88" ,
    Which the production mode is cost-by-sales-order undifferentiated mode.
    the error information as bellow:
    System status REL is active (ORD XXXXX)
    Message no. BS013
    Diagnosis
    Object ORD XXXXXX has system status REL (Released).  According to this status, transaction 'settelemtn' is not allowed.
    Procedure
    You can only carry out the requested function if this is allowed according to the status of the object.
    Pls. Help in resolving.
    Best Regards,

    Dear Szymon and Mukthar,
          Fisrtly,Thank you for your help!
          I have changed the status "TECO"(the status is "TECO PCNF DLV  PRC  GMPS MANC SETC"),then I settlement the production order.
         The system still error:
    "Debit from actual settlement" not allowed (Sys. status REL, object VB0000000015000010)
    Message no. BS051
    Diagnosis
    The status check for the status object VB0000000015000010 indicated that the procedure "Debit from actual settlement" cannot be performed because Sys. status REL forbids it.
    System Response
    Procedure "Debit from actual settlement" is not performed.
    Procedure
    If procedure "Debit from actual settlement" is to be performed, the Sys. status REL of object VB0000000015000010 must be reset.
    Other statuses than Sys. status REL can also prevent the procedure. This message does not tell you all statuses which currently prevent procedure "Debit from actual settlement".
    Regards!
    Gang.Tian
    remark:
    I use the MTO mode, the receiver of settlement is SALES ORDER.(the settlement rule is SDI)

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • MTO-Product cost by Sales Order

    Hi Guys,
    My client is manufacturing Energy Meters, they want Sales order based Production Planning and costing etc.,
    in MTO scenario, Product cost by Sales Order
    1. Sales Order will be created
    2. BOM is created
    3. some of raw material in the BOM list are available in the stores
    My question is that
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order.
    Correct me if am wrong,
    if the system is not checking the available qty, then there is no Planned Order, everything will be new PR for the whole sales order Qty.
    Expecting your valuable reply
    Thanks for your help in advance.
    Regards
    Elan

    Dear ,
    When I run MRP, the system will create planned order and PR, the system will check the availablie qty which are in the stores or not for the planned order
    Answer is Yes .In Sales Order Based Production Order -MTO  , you will be having pre-determined BOM and Routing , before creation of FG Sales Order .
    Based on Planning Strategy 20 : If you are using 20 planning startegy , then you will frist roll the cost in Sales Order Level  by going to VA02-High Lisght Line item -Extras-Cost -based on BOM and Routing  , Sales order will be costed and flagged with green .Then Sales Order will be credit relased in VKM3 for MRP run in MD02.
    Now , in MD02 , you need to select NETCH , 2,1,1,3,2  while executing MRP on FG item .Here , MRP system will explode the BOM till the lowest level and does net requirement calcuation for BOM Component (as depedent to FG) .If the stock alwardy available , then it will  show up as Stcok in Order Report (MD4C/MD04-Planned Order -Order Report ) under Reseravtion number or else it will generate PR for componenet where as planned Order for FG.
    Creation of PR or Plnned Order depends on Procurment Type -E/F as well as selection of indicator Create PR in MD02.Basically , for MTO Sales Order item , it will FG  with procurement type E and compoenet will be F if there there is no farther sub-assblmy .So it should generate Planned Order for FG and PR for shortage qty of component .
    Hope this is clear
    Regards
    JH

  • Product cost by sales order - conceptual clarity required

    Hi,
    We are a manufacturing company with both Make to Stock and Make to Order Scenarios. In cost object controlling, we have made the settings for product cost by order. Now, the question is whether product cost by sales order is a mandatory setting in MTO scenario. I understand this is a conceptual question but i never got the clarity after reading help files, threads and blogs.
    I'll put down my understanding - pls correct me.
    If i do the product cost by sales order, there will be a statistical cost object ie sales order. Now every cost incurred (with a component split) will be recorded stastically in the sales order in case of production orders created from S.O.s
    If I don't do the setting i cannot get a component wise split for the cost of sales order to do any analyses. but still I'll have the COGS which i'll capture to COPA and take the profitability.
    Can you please give me some more clarity on this scenario? Are there any other factors/ advantages/mandates in product cost by sales order?
    Best Regards
    Vimal

    Hi  Vimal
    Prod Cost by SO is done in the case of MTO.. Here, you have 3 possible scenarios
    A. Only Qty i.e. GR from Prod order is tagged to Sales Order.. Sales order is not a CO Object....
    This scenario is as good as MTS... Only that GR is tagged to SO....
    Your costs are collected on Prod order....
    PGI uses GBB-VAX i.e. does not post to sales order... Billing updates revenue and COGS to costing based COPA
    B. SO is cost obj with non valuated stock (SAP recommends this)
    C. SO is cost obj with valuated stock...
    B -
    Prod Order is settled upon sales order.. GR from prod order does not update any acc doc
    Sales order is settled to COPA.. Here you can use a PA Trf Str where in you have replicated your Cost Comp Str... i.e. You can create as many assignment lines in KEI1 as your CCS in OKTZ and assign each one of them to a separtae value field
    No question of variances in this case
    C
    Prod order is not settled upon sales order.... GR from Prod order updates acc doc.... However, variance from prod order can be settled to the sales order if you create variance account as a cost element... Else, it is settled to COPA
    Upon PGI, the COGS is posted to Sales Order as a single line item
    Here, in your PA Trf Str, you would create an Assignment line and tick "Qty Billed/Delivered".... This would update the Billing Qty to COPA upon settlement of Sales order
    This Qty update will trigger KE4R.... i.e. You need to assign CCS to VF in KE4R for PV=01 and Rec Type = C.... This would update the CCS in COPA as per the Sales Order cost estimate
    The Costing Key in KE40 should refer to "Sales order cost estimate" and not "Std Cost estimate"
    br, Ajay M

  • No Adjustment account found for cost element

    Dear Gurus,
    I am getting Three errors  msg "No Adjustment account found for cost element" when i try to run the conformation of production order create  ( T Code : C015 )"  and I am not able to save the record . like
    1 ).No adjustment account found for cost element
    Message no. K5112
    Diagnosis
    Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
    System Response
    No adjustment account could be determined for cost element  in company code XXXX
    Procedure
    Maintain the standard or enhanced account determination. Information on maintenance can be found in the program documentation.
    Execute
    2) . No adjustment account found for cost element XXXXXXXX
    Message no. K5112
    Diagnosis
    Neither standard account determination nor the enhanced function found an adjustment account for the reconciliation posting.
    System Response
    No adjustment account could be determined for cost element XXXXXXX in company code XXXX.
    Procedure
    Maintain the standard or enhanced account determination. Information on maintenance can be found in the program documentation.
    Execute
    3 ) No account is specified in item 0000000002
    Message no. F5670
    Diagnosis
    No account was specified for account type "S" in item "0000000002" of the FI/CO document.
    System Response
    The Financial Accounting program cannot process the document.
    Procedure
    A system error has probably occurred in the application you called up. Check the data transferred to item "0000000002" of the FI/CO document.
    Could anyone please help me with this.
    Regards
    SAP CO

    Hi,
    iam not able to understand of this  SAP Notes: 531606 and 1027645
    Could you pl give me full details for come out this problem.
    Regards
    SAP CO

Maybe you are looking for

  • Multi layered drill down

    Post Author: twowheeler CA Forum: Xcelsius and Live Office Hello, Is there a way to do a multi layered drill down without having the Enterprise version?  I have the trial version of Xcelsius 2008. e.g., I have expense bar chart for a 5 hospitals.  If

  • Change log on name

    Hi 'yall, For lack of a better place to post my question, how can I change my lon on name?  The log on box is greyed out in "My Settings". Thanks in advance, MikeS

  • SQL Server 2012 Always On ?

    Hi all, If the PB application uses a Sql Server 2012 database well configured for high availability ("Always On"), is there something to deal with in PowerBuilder or is it totally transparent on client side ? In previous version there were a FailOver

  • Can not start installation of Solaris 8

    (-: frenchee having pb with english speaking, please be nice : I still try to solve it ;-) On my Ultra1 creator, there is "ultrapenguin" a release for ultrasparc of Linux RH 5.2. I put the CD which I downloaded from "sun download center" ; I start th

  • Facetime connects then instantly drops off?

    New to facetime, tried to call my new ipad mini from my iphone 5, it connects then instantly drops the connection. All softeware up to date and dialing over wi-fi. Any ideas? Thanks