Active ingredient and requirement quantity in COR6N

Hello dears,
I'm implementing the usage of ative ingredient unit of measure for batch management.
I set up customizing point for "Define Calculation of Proportion Quantity from Base Quantity" and "Define Calculation of Product Quantity from Base Quantity", then I added a characteristic to the batch class and added the same to the material master. Everything is working fine, the system can convert the quantity in the GAI unit of measure in MMBE transaction, and in COR1/COR2 I can allocate the batch according to the active ingredient UoM.
The problem will happen when I am in COR6N - Goods movements tab to perform the goods issue: here, in tabs "Requirement quantity" and "Quantity withdrawn", the quantity is not calculated correctly according to the anctive %: eg, the value in the batch is 0,80 but in COR6N the system use 0,84.
So I have two questions:
- do you know why the system has this behaviour? Did it happen to anyone?
- is there any customizing behing the determination of those fields? Because in two different client system I'm having different behaviour: in one case (the system where we execute customizing) I have only the issue I said above; in the second case (the system where the customizing is copied to) the behaviour is completely different: the quantity shown in Requirement qty field is the opposite, as if the system is using 1,20 instead of 0,80
Thanks a lot in advance for your advice.
Giovanni

Hello,
Have you solved the issue?
thanks,
Siddu

Similar Messages

  • CN 752: Requirement quantity & & smaller than quantity withdrawn & &

    Dear Gurus,
    I have found a strange behavior in SAP PM order processing.
    Even after withdrawing the spare parts, system is allowing to change the required quantity.
    If someone is increasing the quantity thats fine.
    But if someone is decreasing the quantity, system should not allow it.
    System is giving below information message:
    CN 752
    Requirement quantity & & smaller than quantity withdrawn & &
    I want to give error in such scenario.
    I have tried setting an error message for above message, but its not working.
    Any help in this regard will be highly appreciated.
    Please help.
    Thanks & Regards,
    Mihir Popat

    Hello,
    Thank you very much for your inputs.
    I have checked that, but it is still not working for me.
    I have debugged the standard code and found that it is hard coded over there as information message for message CN 752, and system is not checking any table while issuing the message.
    However for message CN 750, system checks the table and decides accordingly, whether to give warning or error.
    Hence, it is clear that it will be information message only.
    I will be mapping my requirement with user exit CNEX0026, where i will check the withdrawn quantity and required quantity and decide on whether to give error or not.
    Thanks to all for your help.
    Closing the thread.
    Regards,
    Mihir Popat

  • I forgot the apple id for my ipad 2, now it's locked and required active again?!

    I want to give my ipad 2 to my brother in law, so I easered it and update it to version 7.03, and creat a new apple id for my ipad two months ago, then go travelling for more than one month.
    My family try so many times of the wrong password on it, now it's lock and required to be active again.
    But I forgot the id!!!
    What can I do for it?

    Dan Chen-hujiu wrote:
    But I forgot the id!!!
    What can I do for it?
    Go Here  >  iForgot
    Dan Chen-hujiu wrote:
    ... update it to version 7.03,..  try so many times of the wrong password on it, now it's lock and required to be active again.
    The Apple ID and Password that was Originally used to Activate the iDevice is required
    Activation Lock in iOS 7  >  http://support.apple.com/kb/HT5818
    If you do not have that information you will not be able to use the Device

  • Hello my name is jose quant, and let me know how I can use CAMERA RAW adobe bridge because the bridge use and want to open a camera raw image, I get a message that says: MAIN BRIDGE aplicaion NOT ACTIVATED. BRIDGE REQUIRES A PARTICULAR PRODUCT HAS BEGUN A

    Hello my name is jose quant, and let me know how I can use CAMERA RAW adobe bridge because the bridge use and want to open a camera raw image, I get a message that says: MAIN BRIDGE aplicaion NOT ACTIVATED. BRIDGE REQUIRES A PARTICULAR PRODUCT HAS BEGUN AT LEAST ONCE TO ACTIVATE THIS FEATURE. I wonder what that means?
    I use a lapto (windows 7) 64-Bit operating system.
    Thank you,
    my email is: [email protected], if you send me the answer to my query

    You need to activate Photoshop.
    Mylenium

  • Requirement quantity and quantity withdrawn are not matching

    From a production order the requirement quantity of one component is 4 and for another component, it is 2. But the withdrawn quantity for the first component is 5 and for the 2nd component it is 0. This has caused a COGI error.
    Also the total quantity and the delivered quantity is shown as 6.
    How can this be corrected and prevented from happening in the future.

    Hi Jeby,
                Thanks very much for your reply.
    Batch management is not used for both the components.
    For both the components the storage location is mentioned in the components overview of the production order. When I checked in the material master the same storage location is existing in the materiala master also

  • HT204053 i have an iphone 5 , i restored it but now it stuck on the activation and required an icloud id and password to begin, but i dont know about id i purchased it from saudi arabia and now i am in pakistan. how can i activate this iphone 5

    i have an iphone 5 , i restored it but now it stuck on the activation and required an icloud id and password to begin, but i dont know about id i purchased it from saudi arabia and now i am in pakistan. how can i activate this iphone 5????
    please help!!!!!!!!!

    Unfortunately, you cannot do very much with your phone unless you get assistance from the previous owner, they should either provide you with the password to unlock it or remove their account from the phone entirely remotely through iCloud.com > Find My Phone.

  • Activating Wifi and especially Bluetooth requires so many clicks

    Activating Wifi and especially Bluetooth requires so many clicks and scrolls whereas competition (eg. Samsung) has it as a ready shortcut (2 clicks and no scroll). Is there a workaround for iPhone in order not to have a waste of time every time I need to activate Bluetooth?

    Some people need to turn it off for one reason or another. Just because you leave it on all the time doesn't mean someone else wants to. I too wish it was easier to turn off and on. Wifi is easy to turn off and on as it is listed in the top of the setting menu. Bluetooth is hidden in the general menu and you have to scroll down just to get to it. There used to be shortcuts you could download and put on your home screen but apple took that ability away citing security issues. I had those shortcuts but when 5.0 came out they were rendered useless.

  • There was start up glitch on desktop, which changed the computers configuration, which requires activation on Adobe Photoshop CS, but am not able to get throug activation system and phone support has been disconnected.

    here was start up glitch on desktop, which changed the computers configuration, which requires activation on Adobe Photoshop CS, but am not able to get throug activation system and phone support has been disconnected. How should I activate my software.

    You are entitled to the CS2 version that will work without activation, since the activation servers were taken offline. Read the instructions and follow them on this page.
    Error: Activation Server Unavailable | CS2, Acrobat 7, Audition 3

  • Required quantity and multiple drawing documents in the work centers

    Hi Gurus
    I have created BOM, which contain item - drawing document, quantity 1 pc.
    Irrespective of the total quantity of finished product the drawing document should be only one pc, as we use one document per work center.
    However, output of "Required Quantity" using CS03 shows as multiple drawing documents instead of just one drawing document.
    Please throw some light on this.
    Thanks in advance.
    Akshay N.
    SAP PP certi.

    Hi
    In the item details update fixed quantity indicator for the drawing item
    so it will be always fixed to 1.
    Regards
    Abhishek

  • MQC - Active ingredient

    Dear Experts,
    Please tell me how to map following requirement.
    I have one BOM for FG which have R1,R2,R3 & R4 as BOM component.
    Base quantity of BOM is 100 kg for which it needed R1 - 10 kg, R2 - 40 KGI, R3 - 25 kg & R4 - 15 kg
    R2 is active ingredient & its has 80% purity. Means in 100 kg its gives 80 KGI.
    Suppose I have one batch XXXXX of R2 which has 150 kg & have 75 % purity.
    My requirement is as follow:
    When I select this batch for R2 component in process order system should calculate quantity in KG for R2 in process order material tab.
    Please tell me step by step procedure.
    Regards,
    Raja S

    Hi.
    1. Ensure that in the material master you have the Prod/prop unit maintained correctly.
    2. Then in the MQC u need to use the CQSM for that particular material
    3. Also create the proper batch determination procedure for this material / process order.
    4. Then when you create the process order first you need to do the batch determination,
    5.Then you need to go to the MQC for calculation.
    6. Then save the order.
    Kindly try and let me know the feedback.
    reg
    dsk

  • URGENT........ACTIVITY TYPE AND THEIR ASSIGNEMENT TO WORK CENTER!!!!!!!!!!!

    Hi Friends,
    I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
    I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing.  However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
    I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
    And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
    can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
    regards
    sandhya

    Hi,
    You need to do the following:
    1) Create an Activity type for the Assembly activity.
    2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
    3) Define a Cost Centre corresponding to the above Work Centre.
    4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
    5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
    6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
    7) Execute the Plan price calculation (T-code KSPI)
    After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
    Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
    Regards,
    Assign points if useful

  • Active Ingredient management error in valuation

    Dear gurus,
    We have a business process involving active ingredient management system, the process is as follows.
    1, PO creation
    2, GR against PO with automatic batch creation in Migo (with out entering characteristics)
    3, Material After tested the characteristic values for the batch are updated in MSC2N.
    4, MIRO for PO
    Now my problem is lets say i have maintained in Proportion/Product Unit tab "Plan value " for a characteristic as 95.
    We have batch wise split valuation and payment processed according to this batch. In PO we have maintained a OPU same as that of the characteristic.
    Since we are not maintaining any characteristic value in GRN the Qty in PO price unit in MIgo doc is updated according to the Plan value in material master which makes MIRO value to calculate wrongly.
    Please advice to solve this issue
    Regards

    Hai,
    The problem is if i enter the Characteristic value in migo then all the calculations are coming correct. But our business process requires to enter the characteristic value in MSC2N because of which calculations are incorrect.
    Regards

  • Requirement quantity - in cj20n

    Hello All,
    Our business requirment is - "Requirement quanitity should not be entered/ modified in project builder"(CJ20N).
    In Project builder we can enter requirement quantity at 2 places.
    1. Hilighting activity and select component overview -> we can enter material and quantity. we were able to grey out this field.
    2. Select the Component in the structure -> General data tab - > Requirement Qty.
    we were not able to achive the second point. where are the config setting can any one suggest the solution.
    Thanks,
    Srihari.G

    Hello Ahmed,
    Yes, I used the same earlier.
    But this is only graying out the option 1 in my question, not option 2.
    There are 2 fields settings " Detailed view of materials" and " Material overview" in define field selection for components.
    In the "Material overview" - we have requirement quantity field - so that we have greyed out.
    In the "Detailed view of material" - the is no requirement quantity field to grey out.
    There may be some other way ....so that we can grey out the field in both the places in the cj20n.
    Thanks,
    Srihari.G

  • Capture ERFMG - Requirement quantity for a component

    Hi All,
    I have a requirement where in i need to capture the requirement quantity for a component(ERFMG).
    The problem is the value exists only at runtime in the following structure MDPM.
    I am writing the code in an exit   EXIT_SAPMM06E_013 where in i cannot capture this value from this structure.It is not storing in a database table also . how can i get this value  ?
    Kindly help.
    Priya.

    Hi,
    Thank you for your post!
    It is exactly what I have done but as I above mentioned:
    Subsequent problem
    The system schedules the dates correctly on the component level, but re-schedules the dates for the project the day you schedule and erase the complete old scheduling dates except for the activities with constraints.
    If I have an "old" scheduled project and I add some new components anywhere in the complete project structure additional needs. I go then to the project definition level and schedule the complete project. My result is that on project definition and WBS elements no changes but on all activities (without confirmation) the system put the start date the day which I re-schedule the project.
    That what I want  to avoid and let the initial planned schedule date on activity level the same as before re-scheduling the project.
    Do you have any further advices?
    Thank you in advance for your input
    Best regards

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

Maybe you are looking for

  • Same genre appears twice in my iPhone 5s.

    Why does the same genre (Alternative) appear twice in my iPhone 5s. Both Genre listings in the phone show the same # of songs and minutes. What I've done thus far: 1. removed "Alternative" genre from all songs in music library 2. synced iPhone and bo

  • Some records stays in Event Polling Table forever and ever

    I have configured Event Polling Table at Oracle BI. It works fine and the entry cache are purged. But some records stays in EPT table for ever. Records without misstat1 are inserted by me (trigger). Records with OTHER=misstat1 are inserted by BI Serv

  • Reg: Interview Question

    Hi all I have an interview on below topics pls calrify 1. Project objective is to propose new SD pricing condition (it will hit CO Module), 2. carry out blueprint workshop discussion, 3. Configuration on CO module, 4. Prepare unit test scripts & carr

  • Upgrade EBS 11.5.10.2 from HP-UX to Linux R12.1.3 including the database

    Hello All I know there are other threads with the same question and i have been to almost all of them. Somehow i am still not able to understand it So i am posting it here. Sorry about that Upgrade EBS 11.5.10.2 from HP-UX to Linux R12.1.3 including

  • Where to Get Old Firmware?

    Hi, My daughter's trying to use her red 2nd gen Nano with a JBL Ontime. A bug introduced with later versions of firmware prevents the JBL working properly. JBL recommend going back to firmware rev. 1.0.2. I have Googled until my ADSL line is smoking,