Requirement quantity - in cj20n

Hello All,
Our business requirment is - "Requirement quanitity should not be entered/ modified in project builder"(CJ20N).
In Project builder we can enter requirement quantity at 2 places.
1. Hilighting activity and select component overview -> we can enter material and quantity. we were able to grey out this field.
2. Select the Component in the structure -> General data tab - > Requirement Qty.
we were not able to achive the second point. where are the config setting can any one suggest the solution.
Thanks,
Srihari.G

Hello Ahmed,
Yes, I used the same earlier.
But this is only graying out the option 1 in my question, not option 2.
There are 2 fields settings " Detailed view of materials" and " Material overview" in define field selection for components.
In the "Material overview" - we have requirement quantity field - so that we have greyed out.
In the "Detailed view of material" - the is no requirement quantity field to grey out.
There may be some other way ....so that we can grey out the field in both the places in the cj20n.
Thanks,
Srihari.G

Similar Messages

  • Changing the Requirement Quantity in Reserations

    Dear PS Experts,
    In a Project, I created a reservation of 5 units of item A. Then I issued 2 items against the reservation.
    Later on I tried to change my reservation requirement quantity to 6 and SAP allowed it. Then I changed the same quantity to 1 which is below the issued quantity even that was allowed.
    My question is why are the above changes allowed after material issue takes place ? (is it a common business requirement)
    Else, is there an SPRO setting where we can restrict the above?
    Cheers
    Deepal

    Hi,
    That is the standard SAP functionality only. This is not a strange behaviour of the system. If you create any reservations manually, the system will allow to change at any point of time. While creating the production order or MRP created planned orders will create the reservations. That reservations you can't change.
    Regards,
    V. Suresh

  • How to make field requirement quantity mandatory in maint order?

    Hi Experts,
    I would like to make filed RESBD-MENGE - requirement quantity field in component tab of maintenance order mandatory. But I am not getting the IMG settings for this. I checked this screen settings for components for PM/CS orders. But I didn't  get this field in that screen. Can anybody help me out on this?
    Thanks and Best Regards,
    Praveen.

    Hi,
    I need this to activate for all order types. I think this can be accomplished by user exit IWO10009, which will trigger during saving event. I didn't try for this but i used this exit previously for checking during saving event for some other field. I think this can be used here also so that while saving the system will check the field and if the field is empty, system will give the error message. some coding may required to check the field.
    If you have any alternative idea kindly share.
    Thanks and Best regards,
    Praveen

  • Requirement quantity and quantity withdrawn are not matching

    From a production order the requirement quantity of one component is 4 and for another component, it is 2. But the withdrawn quantity for the first component is 5 and for the 2nd component it is 0. This has caused a COGI error.
    Also the total quantity and the delivered quantity is shown as 6.
    How can this be corrected and prevented from happening in the future.

    Hi Jeby,
                Thanks very much for your reply.
    Batch management is not used for both the components.
    For both the components the storage location is mentioned in the components overview of the production order. When I checked in the material master the same storage location is existing in the materiala master also

  • Round Requirement quantity of component for subcontracting

    Hello,
    I need to round a requirement quantity of component   in subcontracting PO automatically? So in MD04 it shows as rounded quantities not just the base on BOM cmponent quantity ( Only for component what we send to vendor not the kit we recieving back ).
    Any help will be appreciated!
    Best Regards,
    Owais
    Edited by: Owais on Jul 8, 2011 3:13 PM

    Hello,
    It just help planners to plan better.
    We already cofigured so the components gets pick at rounded value on WM side. Its just MM side, if we can round the value for subsequent requirements. (Component requirement QTY - ERFMG)
    Any Help!!!
    Thanks.

  • Incorrect requirement quantity in MD04

    Dear experts,
    Transaction WC27 runs in 00:05 everyday,it expended 1 hour.In this period,if I make some document with transaction MFBF(e.g. HALB A +100, exploded materail ROH B -200).In MD04,requirement quantity will change( B requiement quantity will reduce 200).Now in our system,requirement quantity still do not change( B requiement quantity is 200 ).
    Remarks:system version R/3 470.
    Could you help me?
    Thanks and regards,
    collysun

    Hello,
    Have you solved the issue?
    thanks,
    Siddu

  • CN 752: Requirement quantity & & smaller than quantity withdrawn & &

    Dear Gurus,
    I have found a strange behavior in SAP PM order processing.
    Even after withdrawing the spare parts, system is allowing to change the required quantity.
    If someone is increasing the quantity thats fine.
    But if someone is decreasing the quantity, system should not allow it.
    System is giving below information message:
    CN 752
    Requirement quantity & & smaller than quantity withdrawn & &
    I want to give error in such scenario.
    I have tried setting an error message for above message, but its not working.
    Any help in this regard will be highly appreciated.
    Please help.
    Thanks & Regards,
    Mihir Popat

    Hello,
    Thank you very much for your inputs.
    I have checked that, but it is still not working for me.
    I have debugged the standard code and found that it is hard coded over there as information message for message CN 752, and system is not checking any table while issuing the message.
    However for message CN 750, system checks the table and decides accordingly, whether to give warning or error.
    Hence, it is clear that it will be information message only.
    I will be mapping my requirement with user exit CNEX0026, where i will check the withdrawn quantity and required quantity and decide on whether to give error or not.
    Thanks to all for your help.
    Closing the thread.
    Regards,
    Mihir Popat

  • Reservation: withdrawn quantity exceeded requirement quantity

    Hi Gurus.
    Please help.
    Is there a way to check why withdrawn quantity exceeded requirement quantity in reservation? System should get standard message M7362 when this happens. Settings in OMCQ are correct.
    Thanks in advance...

    Hi,
    The message might relevant for the scenario of GI to reservation, which issued quantity greater then reserved quantity in reservation.
    You may check your reservation with MB25 for listing your reservation document and I suggest to use MB26 for collective and more accurate GI processing of relevant reservations.
    Cheers,
    Girang

  • Required Quantity are not copy from BOM

    Dear SAP GURU,
    I encounter this situation when i try Convert Plan Order ---> PO , Or Try create Process Order Manully.
    But the issue here , when i look into the Material component list , the quantity for all required quantity are "ZERO".
    I suspecting the Table is locked and that's why when convert to PO is "ZERO".
    Can anyone tell me how to investigate this issue please?
    tq

    Unable to understand your query, can you upload some screenshots of what error you notice (i.e. process order, BOM, etc.) to some portal n paste the link here to have some understanding of the issue

  • Capture ERFMG - Requirement quantity for a component

    Hi All,
    I have a requirement where in i need to capture the requirement quantity for a component(ERFMG).
    The problem is the value exists only at runtime in the following structure MDPM.
    I am writing the code in an exit   EXIT_SAPMM06E_013 where in i cannot capture this value from this structure.It is not storing in a database table also . how can i get this value  ?
    Kindly help.
    Priya.

    Hi,
    Thank you for your post!
    It is exactly what I have done but as I above mentioned:
    Subsequent problem
    The system schedules the dates correctly on the component level, but re-schedules the dates for the project the day you schedule and erase the complete old scheduling dates except for the activities with constraints.
    If I have an "old" scheduled project and I add some new components anywhere in the complete project structure additional needs. I go then to the project definition level and schedule the complete project. My result is that on project definition and WBS elements no changes but on all activities (without confirmation) the system put the start date the day which I re-schedule the project.
    That what I want  to avoid and let the initial planned schedule date on activity level the same as before re-scheduling the project.
    Do you have any further advices?
    Thank you in advance for your input
    Best regards

  • Issue about requirement quantity in production order

    Hello:
    Requirement quantity shows negative number when I am creating production order, as I checked its BOM it is ok,what's wrong?

    Allen,
    Check in CS03 in the item level details of that component for Co-Product check box activation. Also check in BOM whether its maintained in negative quantity. This component would also be defined with Co-product check box in MRP views.
    If the above are not true then manually someone would have changed., so would suggest you to just try creating a production order manually to check.
    Regards,
    Prasobh

  • Active ingredient and requirement quantity in COR6N

    Hello dears,
    I'm implementing the usage of ative ingredient unit of measure for batch management.
    I set up customizing point for "Define Calculation of Proportion Quantity from Base Quantity" and "Define Calculation of Product Quantity from Base Quantity", then I added a characteristic to the batch class and added the same to the material master. Everything is working fine, the system can convert the quantity in the GAI unit of measure in MMBE transaction, and in COR1/COR2 I can allocate the batch according to the active ingredient UoM.
    The problem will happen when I am in COR6N - Goods movements tab to perform the goods issue: here, in tabs "Requirement quantity" and "Quantity withdrawn", the quantity is not calculated correctly according to the anctive %: eg, the value in the batch is 0,80 but in COR6N the system use 0,84.
    So I have two questions:
    - do you know why the system has this behaviour? Did it happen to anyone?
    - is there any customizing behing the determination of those fields? Because in two different client system I'm having different behaviour: in one case (the system where we execute customizing) I have only the issue I said above; in the second case (the system where the customizing is copied to) the behaviour is completely different: the quantity shown in Requirement qty field is the opposite, as if the system is using 1,20 instead of 0,80
    Thanks a lot in advance for your advice.
    Giovanni

    Hello,
    Have you solved the issue?
    thanks,
    Siddu

  • Component Required Quantity Field Mandatory In PM order

    Dear All,
    I want to make required quantity field as mandatory in PM order component tab.
    Plz help
    Rgards

    Dear Friends,
    Requirement for not changing the qty arises in the situtaion like,suppose a person has created the maint order for certain qty,and released either by him or by his superior.there is a possibility that component quanity can be changed by the lower level people.(like supervisor or technicinan).In this case ,it can be controlled by authorisation .ie Dont give order change authorisation to those people,so that componenet quanity cannot be changed by anyone other than authorised people.
    This problem i am facing in my every projcet,and handling thro roles and authorisation only rather than going for making the quantity field mandatory with some devellopment and alll.
    I hope it is clear.
    Thanks and Regards
    V.Dhanasekaran

  • Tables for MRP requirements quantity.

    Dear Experts,
    I have requirements where in I want to know the table from which I will get the the material requirements quantity.
    Example is as below;
    I have given PIR through MD61 of "ABC" material as 100 qty.
    After this through MD02 i will generate requirements which will appear in Stock Requirements list MD04.
    If stock is available then accordingly it will create PR/Planned order.
    Here my requirement is that i want to display pure requiremnets that is 100 qty irrespective of what stock is available.
    In which table i will get this pure requiremts.
    Please help.

    Hi,
    Please check in table:
    PBED - PIR items
    MDKP
    MDTB
    Also you can use FM:  MD_STOCK_REQUIREMENTS_LIST_API. Best is use this FM.
    Regards,
    Alok Tiwari
    Edited by: Alok Kumar Tiwari on Dec 14, 2011 11:28 AM

  • Requirements quantity doubled in BW for PP cube using 2lis_4_p_comp

    Hi Guys,
    I am facin the following problem:
    For some process Orders loaded from R/3 to BW, the requirements quantity of some of the Components in the Order has got doubled. But for other components in the Same Order, the quantity shows correct values.
    The data is being loaded by delta process.
    I tried running RSA3 for the same Process Order. Now, in RSA3, it shows correct qunatity.
    I am not sure, why the Req. quantity values got doubled in earlier delta loads.
    Do let me know if anybody has faced this prob. b4.
    Request you to kinldy reply at the earliest.
    Thanks,
    punkuj

    Hi Oscar,
    The setup was run a long time back..
    The orders that I am facing problems with are created recently.
    So, I dont think duplication while running the setup is possibe.
    Thanks,
    Punkuj

Maybe you are looking for

  • GF4 4400Ti Crash to Desktop OR BSOD

    Okay ive been thinkering alot with my pc lately since as of last week i cant play anything else than NetHack wihtout my computer crashing....... do i need to say im in a near panic state .. anyway here are my computer specs Athlon XP 1800+ 512mb DDR

  • 6680 and 2gb MMC

    Hello I've seen many adverts for 2gb MMC's that are compatible with the 6680 so took the plunge and bought one. It is from a reputable manufacturer who also made the 512k cards I've been using for some time. My problem is that when I insert the 2gb c

  • Parameters in webdynpro ABAP

    Hi all, where i can set the "  WDDISABLEUSERPERSONALIZATION" parameter for iview? I am very new to Webdynpro ABAP .  Trying to find out the above parameters but fialed . Thanks, Rameshb.

  • Numbering lines based on two columns

    Hi Everyone, I´d like to know if there is a way to achieve the numbering presented on the second table below with only native Oracle functions, like ROW_COUNT() over partition, etc. I´m using Oracle 10g. The logic used is: Starting from 1, increment

  • Identity Button not working

    Some encrypted websites like newegg needs to refreshed in order to correctly display the Identity Button. Sometimes its just the globe, then i refresh and its green. Happens a lot more now that im using FF 22. I was just buying some games on steam an