Active version in work center

Hi Gurus,
We have maintained various versions in SPRO under production-basic data-work center-capacity planning-active version of available capacity.
For a particular main work center we enter the active version in capacity header tab in the work center.
If I create a maintenance work order for that particular work center then
Do this active version gets copied to maintenance order ? ( currently it is not getting copied )
Do we have settings where in we can make this as a default value in maintenance order ? ( whatever set in work center will be copied to maintenance order )
My client have to enter version in every maintenance order created. The quantum is very large.
So client would like to have this active version copied from work center to maintenance order,  like wise master data from an equipment gets copied to notification or order while being created.
Kindly reply at the earliest.
regards,
Maneesh

Hi ,
       In standard SAP there is no field in maintenance order operation or order that captures Active version of Work Center capacity .., In which field ur currently entering manually ?
If u have defined any custom field in order operation to capture this data , then try to use user exit  : IWO10016 PM Order: Cust. enhancement to check operation user fields   to get this data automatically  in Order operation from work center ..
regrds
pushpa

Similar Messages

  • Assignment of activity group to work center

    Hi,
    We want to assign activity type to work center more than six,
    how we can assign activity type more than six to work center?
    i have created activity type group in klh1,
    in activity group i have assigned activity type more than six,
    How we can assign activity type group in work center?
    Regards
    Gajjen

    HI
    It is not possible to assign more tha six actvities to a cost center as per SVK defined in the WC.
    Check with the business process field for assign  with your CO guy in thw WC.
    A business procedure within an enterprise that uses resources and can involve activities from a number of different cost centers in a controlling area.
    When executing a business process, activities can be utilized for several cost centers of a controlling area.
    Check and revert
    Regards
    Anupam Sharma

  • Activity cost at work center

    Dear Exports,
    I have a requirement in my project
    1. In a work center we have 3 activities. 1. Labour time
                                                                       2. Machine Time
                                                                        3. No. Kgs treated.
    I am able to give labour & Machine reates  by giving price at kp26. and number of minitus in routing.
    But my client wants machine hour rate : no. labours worked X Time worked  X rate per hour .
    i.e he wanted to give time in labour time activity and no of employees worked in machine time the formula must claculate
      Labour time X Machine time(No of Workers worked) X KP26 Price(Per Labour hour).
    Can Any body help me please...
    Rao

    Check if there is an existing WC formula that you can use or create your own formula for the work center.
    My challenge (at a different business, so I don't have the exact work in front of me, but I have notes) was  Crew size x Machine Hours x Activity rate.
    In the routing Operation Details is a section General Data.
    There is a field: Number of Employees, field name ANZMA,  That is where we populated Crew size
    Use an existing formula if possible
    Which formula do I use??                                   
        Work Center Basic Data (CR02)  determine standard value key                         
        Go to  "Define Standard Value Key" in IMG (OP19); select std value key and click detail button          
         Note the Parameter used                                        IMG path:  Production>Basic Data>WorkCenter>General Data>Standard Value >Define Standard Value Key
        Go to "Define formulas for work centers" in IMG (OP54); select formula that uses the field parameters required          IMG path:  Production>Basic Data>WorkCenter>Capacity Planning>Work Center Formulas>
                         Define formulas for work centers                                        
    Not there?  Create the formula     
         In English - what do you want to calculate?
         Find parameters for the fields in the calculation
         Write formula (op54)  Copy from existing formula if possible - spaces in the equation are necessary
                             OP17 is where to create new Parameters.
    This is all configuration - with some high leve security (in our system).  Configur and TEST CAREFULLY

  • How to set active version for work flow

    hi ppl,
              I have 3 versions of my work flow i want to set the second version to be the active version how do i do this ? . plz help me out.

    WF builder choose your second verion & choose <i>Workflow -> Activation -> Generate and Activate runtime version.</i>
    This will make it second version as active verion.
    <b>*Reward each useful answer</b>
    Raja T

  • Active version

    Hi Experts,
    Can anybody please explain me,
    What is the importance of Active version field in Capacity header of work center. How to maintain Active version.
    Please explain with suitable example if possible will more helpful to understand quickly.

    Hi,
    Active Version in Work center Capacity Header view is used to indicate the Available capacity of the work center. Which inturn is used for capacity calculation and also for scheduling.
    You can create different version to check and have one as active version. Go through the below details to understand better :
    Maintenance of Available Capacities  
    Purpose
    In this process you maintain the available capacities for work centers.
    Prerequisites
    You have assigned the capacities, whose available capacities are to be maintained to the work center already. You have also entered the general data for these capacities.
    Process flow
    Proceed as follows for every capacity in the work center:
    As required reference or copy an available capacity that already exists.
    If you are referencing an available capacity, you can only work directly in the referenced capacity. Continue as in step 4.
    If you copy an available capacity, you can edit this copy. Continue as in step 2.
    Maintain the standard available capacity for the capacity.
    Maintain available capacity versions for the capacity. Proceed as follows for each interval of available capacity in an available capacity.
    Edit the general interval of available capacity data. Specify whether it should have a one day or seven day cycle period. Edit the general data of the interval of available capacity. Specify whether it should have a one day or seven day cycle period.
    b) Edit the shifts in the interval of available capacity. Proceed as follows for every day of the cycle:
    I) Specify the number of shifts.
    II) Edit the data of the shifts.
    If you want to use this version in scheduling and capacity planning, activate this version.
    Hope this will help you.
    regards
    radhak mk

  • Multiple Work Center for single internal activity ?

    If more than one work center used for single internal activity how can work center be allocated  ?

    Hi Yogesh,
    I understand that, you have a project activity in which different groups of people are working and you want to plan costs for all these groups of employees under the same project activity.
    To achieve this, create different activity elements under that activity and assign specific WCs and Work duration to all these activity elements so that system will calculate aggregated costs and scheduling dates accordingly.
    Hope this helps

  • Production output releated to work center

    Hi Sap Guru,
    I am working in steel industry there coil manufacture for different workcenter they get different output of Finshed production.I want my production order output depend upon workcenter such as 100% input if using for any work center then in confermetion it output of Finished product should be fix 90% if i want to use other work center it wil gives output 80% because scrap is generated depend upon work center.
    Please guide me whre this scenarion we map.
    Thanks in advance

    Hi ,
    Just my 2 cent advise , you should use production version with different Alternative Bom with different operation scarp rate.
    Because based on what i know , Operation scrap Is defined in the BOM item. But you will need different operation based on different work center. by using operation scarp It shows the percentage of the component that is lost as scrap in a specific operation.
    Example :
    Production version A --- Work Center A ---Alt BOM 1 with Scrap rate 0%
    Production version B --- Work Center B ---Alt BOM 2 with Scrap rate 10%
    Production version C --- Work Center C ---Alt BOM 3 with Scrap rate 20%
    Of course all need based on business requirement need , so there's some others configuration need as well.
    TQ.

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

  • Activity Types for a Work Center

    Dear Experts,
    I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
    Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
    The Msg No. is CR 091.
    Please guide me to find out where I am missing something?
    Thanks & Regards,
    Rohit.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • Table with all versions of capacities (work center)

    Hi,
    I've created a work center with capacity. This capacity has 2 versions (01 normal capacity" the activ version" and 02 minimum capacity).
    I'm surching a table where I can display the work center A with capacity A1 with the versions 01 and 02. (not only with the activ capacity 01 I need to display all the versions from this capacity)
    Thanks
    Dede

    Dede,
    You will have to use a combination of tables, perhaps a SQVI to join tables
    CRHD - Work Center Header (link work center to capacity ID)
    KAZY - Capacity version
    KAPA - shifts and intervals
    In KAPA the times are displayed in seconds
    Hope that helps,
    ~Sunil

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

  • How can I activate an old version of Photoshop that I've loaded on my new tablet? The web activation doesn't work, and when I call the number, it says it's not being used anymore. Meanwhile, I'm down to 13 days till it stops working due to not being activ

    How can I activate an old version of Photoshop that I've loaded on my new tablet? The web activation doesn't work, and when I call the number, it says it's not being used anymore. Meanwhile, I'm down to 13 days till it stops working due to not being activated. HELP?  I really need to continue using this product for my home business.It works fine not activated but the threat is that it will stop working in 13 more days if I don't get it activated, and none of the activation methods they list seem to work.

    The new serial number is to the right of your chosen download.

  • How to reuse standard Activity subcomponents - Appointments, Tasks, Phone Calls and Emails within a custom work center?

    Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
    We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
    Ø  Open Question:
    a.      Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center?  We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
    b.      Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
    We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
    Regards .. Dheeraj Saini

    Whenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • URGENT........ACTIVITY TYPE AND THEIR ASSIGNEMENT TO WORK CENTER!!!!!!!!!!!

    Hi Friends,
    I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
    I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing.  However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
    I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
    And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
    can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
    regards
    sandhya

    Hi,
    You need to do the following:
    1) Create an Activity type for the Assembly activity.
    2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
    3) Define a Cost Centre corresponding to the above Work Centre.
    4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
    5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
    6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
    7) Execute the Plan price calculation (T-code KSPI)
    After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
    Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
    Regards,
    Assign points if useful

Maybe you are looking for

  • Can not update...no mini icon

    I am unable to update my mini...no icon appears...I have gone to Preferences and changed to manually update, I have taken off a large number of songs..in preferences when I click "ipod" it says no ipod connected, yet my ipod reads do not disconnect..

  • Epson printer 3880 will not print

    iMac 2009 OSX 10.8.5 After upgrading from Snow lipard to Mountain Lion bouth my Epson R1900 and 3880 will not print in Adobe Lightroom 5. I have checked in the PPD file and the R1900 is listed but the 3880is not. I ran update from the apt stor and al

  • FTP setup with Actiontec MI424WR router

    I've been banging my head against the wall for a few hours now. I have a FTP server/device on my network (which I can access just fine internally).  However, I'm not able to access it from outside my network. I've forwarded ports 20 & 21 (TCP/UDP) to

  • Timesten running slower than Oracle RDBMS

    Hi, I've installed timesten, & just wanted to compare the performance of following pl/sql block on timesten with same block on Oracle. declare temp_date date; temp_date1 date; my_id number; my_data varchar2(200); cursor c1 is select MASTER_ID, MDATA

  • Update stceg field in mdkp table

    Hello ,   Can anybody tell me the name of function module or BAPI which update data in MDKP table.    In md06 transaction i want to update the process indicator flage for 3000 materials based on plant so any function module or BAPI which updates this