Hi all,
I want to do the header level confirmation using CO15 but the activities are not getting posted.  Work center formula is correct. Prices are maintained corectly in KP26. I have checked it with CO11N but not getting posted with CO15.
Regards,
Yogesh

Dear,
yes it is possible else how system will calculate the actual cost. Please refer the OSS Note 174593 - CO15: No activities from owner confirmation
When you enter a header confirmation, internally the system generates " confirmations" for each activity. Thus it is possible to determine the costs for each activity. However, these "confirmations" are  written to the AFRU database table, in relation to an operataion.
Setting Transaction OPK4: order type -> control key, Transaction OPKC:control key -> actual costs update:"immediately online", "immediately in the update program" . Also check the COFC for it.
Regrds,
R.Brahmankar

Similar Messages

  • Can you initiate voice activated calls through BT Headset?

    This is the million dollar question.
    Does the iPhone 3Gs allow you to initiate voice-activated calls through a Blue Tooth Headset?
    Can anyone here who has the 3Gs verify that they can do this?

    I have the jawbone prime and also can not get the voice control to work. This was confirmed in the review over at www.mobiletechreview.com
    THIS *****!!!!
    I've been waiting a long time to have quality voice control on the iphone. Bluetooth connected voice control is the only real safe way to make a call while driving.
    How can Apple be so stupid to not include that option. It's bad enough they didn't include voice control in the iphone 3G, but not to include the simple option of using a bluetooth headset...dumb.
    It's just dumb.
    FIX THE PROBLEM APPLE!

  • Activity Confirmation and Reserve not cleaned

    Hi.
    When I do the final confirmation, through CN25, of an activity of internal processing of a network, which contain a material, if I mark the field “Clear open reserves”, the reserve is not lowered and is created a register in the CO1P (Low for explosion). Why is this register created? Why isn´t the reserve eliminated?
    Thanks

    The reserve will not be erased with this indicator, because it will activate the indicator of Final Issue
    Best Regards...

  • Regarding activity confirmation against order

    Hi all,
    I am confirming production order.
    Case1 - Confimration using CO11N where I put actual activity quantity in the blank activity
    Case 2 - Confirmation using CO15
    I dont see any activity confirmation in AFRU in 2nd case. I think system is not proposing and carrying out the activity confirmations.
    Help me in this case.
    Regards,
    Yogesh

    Dear Yogesh,
    1) Yes, if you go with order level confirmation then you cannot change activity timings
    what ever defined in routing same will picked while confirmation
    2) where as if you go with CO11N, then you can change you activity timings
    This is Std SAP
    Regards
    Madhu

  • Progress Analysis, Plan/actual % comparision based on activity confirmation

    hello guyz,
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The  second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

    the problum is still there kindly provide assistance...
    I have to monitor the project progress based on activtiy confirmation, can anyone guide how can i see progress of project based on percentage with plan/actual dates comparison.
    The business scenario is:
    One top level WBS under which 2 WBS assign, each 2nd level WBS have one network assigned. The second level WBSE represent individual site where i have to perform various internal activities without cost involvements, only dates and number of durations to be maintained in each internal activity with finish start relationship.
    The structure is:
    Root WBS (level 1)--SITE 1 WBS (level 2)--
    SITE 2 WBS (level 2)
    > (Network 001) -
    > (Network 002)----
    > 001 0010 (1st Internal activity 2 days) -
    > 002 0010 (1st Internal activity 2 days)-
    > 001 0010 (2nd Internal activity 4 days) -
    > 002 0010 (2nd Internal activity 4 days)-
    > 001 0010 (3rd Internal activity 1 days) -
    > 002 0010 (3rd Internal activity 1 days)-
    > 001 0010 (4th Internal activity 3 days) -
    > 002 0010 (4th Internal activity 3 days)-
    In the above project structure i have entered the start planed dates for each network / site. The system automatically calculate the planned end dates after scheduling.
    In execution phase, i have also maintained actual dates on activity confirmation only.
    Now i need assistance to see the project progress for each network site.
    Regards
    Saqib Usman

  • While confirmation through COR6N

    Hi Expert,
    We are working in process order scenario. I have one problem while doing confirmation through COR6N (enter time ticket for process orders) there is one field "CONFIRMATION TEXT"  & that field is marked mandatory also and  user is filling some text as per business needs like "contractor name" But the main concern is that we don't have any pre-entered list of names of contractors in SAP  for which users are regularly making mistakes while typing the names.
    and the same field is incorporetd in ZMB51 report through table name "AFRU" field name "LTXA1" but some time user entered wrong name and thus report doesnot reflect correct, how to rectify this issue permanently, is there any option to choose text as a drop down list or like any exit/functional module.
    Note:- WE ARE ALREADY USING FIELD  REASON FOR VARIANCE FOR SOME OTHER PURPOSE.
    With Regards
    V. Kaushik
    SAP-PP Support Consultant

    Hi kaushik,
    It is possible to incorporate some more fields in the Time Ticket confirmation for process industries using the T. code OPK1 here you can choose suitability or wage group or other fields in the initial screen of COR6N, And by configuring your selection criteria for the pre-entered list of names of contractors in a field of suitability or wage group. You can make it mandatory using screen variant.
    In this way you will be able to drawn Z-reports as well as the standard reports too.
    This may be help you.
    Regards
    Anant

  • Sales Order Confirmation through Email

    Dear Friends,
    Can i ask you to give me a quick idea on what need to be done to establish the functionality to send the order confirmation through emails.
    Thanks in advance.
    Ravi

    Once you made sure that the output type definition is all set with all relevant data and ABAP work, go to the condition record of the same output. Maintain the mediums as 5 -- Extrenal Send and Date / Time as 4- send immediately when saving the order. Then go to the details of the record and maintain the relevant communication strategy. Save the record. This should trigger the mail automatically when you save the order.
    If you also want to print with the same output type, then you need to go back to order VA02 , repeat output and change the medium to 1.
    If you want to automatically print and also mail on single save / then you need to tweak the output program to trigger print and mail both at the same instance. This is possible by the output program. Then you need to keep the medium as 1.
    Hope this helps.
    Sai

  • Activity confirmation concept

    Dears
    Can you any body explain me the concept behind the activity confirmation in QM
    My understanding i  am sharing here i request some expert review on this
    1. The purpose of activity confirmation is for record quality cost
    2. If we have two different task to do a inspection for a material (1-Inspection by machine, 2-labor for cleaning after inspections) so we need to define two activity by the T code:KL01
    3. After defining activity price planing by t Code: KP26 (For the above created activity for one hour how amount is required)
    4.Now when RR is happening we have to do the activity confirmation(for example 1-Inspection by machine how may hour we utilize to make inspection,2-labor for cleaning how many hour we utilize this activity also to finish the inspection)
    5.Now QM cost report will give you for activity one  how many cost incurred so far ,and also for the second activity also
    Pls correct me if my concept is wrong
    Thanks in advance
    Faisal

    Hi expert
    any advice on this will be highly greatfull
    Faisal

  • Activity confirmation issue

    Dear Gurus,
    We are facing issue in confirmation of Activity such as power , steam. As in process industry output is variable.
    accordingly at the time of confirmation activity viz power , steam should varies is it possible?
    In transaction cor6 we can enter manually units actually consumed.
    My second query is
    In T-code CORK and COID  How to / where to enter actually consumed unit of Power and steam in screen? As users  are using all the 3 T-code for confirmation.
    Please guide me as we are facing cost variance in Process order confirmation due to activity.
    Regards,
    J.H.Pert

    COID is just reporting transaction.
    COR6N is single screen entry transaction
    CORK is header confirmation
    When you do confirmation using CORK, all the confirmable phases in the order gets confirmed to the yield qty mentioned in the screen, this also take care of activity confirmation.No option to post activity seperately.
    cor6 you can post actual activities seperately

  • Table for Activity confirmation

    Hi PP exper
    Kindly suggest me  from which table I will get  activity  confirmation detail  when I do the production order confirmation  example my activity 9000( labor)  30 hr , 9001( m/c)  15 kw etc
    kindly suggest me
    Regards
    Akil

    Hi,
    In AFRU.. we can get activity confirmation....suppose if we have many activity which unit are HR.. then we can not differentiate   which activity have confirmed .
    i want activity type and its confirmed
    example Activity type 9000( m/c power)  30kw 1000( labor) 6 HR, etc
    9000----
    30 KW
    1000----
    6 HR
    Regards
    Aqueel

  • Trying to create a Sales Order Confirmation through IDoc

    Hi,
    I am trying to create Sales Order Confirmation through ALE with message control.
    My recieving system is XI server.
    Can u please send me the steps to what to be done to trigger IDoc automatically.
    The condition types and access sequence created is for Output type customer but i am sending it to XI Server.
    please help me.
    Thank you in advance,
    Gangolu.

    Hi Gangolu,
    Have a look at url. Hope this provides some inputs.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6bd6f69a-0701-0010-a88b-adbb6ee89b34
    Thanks
    Lakshman

  • Reversal of Production Order Confirmation through IDOCS

    Hello all,
                  The time for each operation in a  production order is logged in KabaBEnzing tool called Autotime. This is sent to SAP through IDOCS and the order confirmation is created. There is a scenario where the supervisor could have entered the wrong time against an operation. Is it possible to reverse the confirmation through IDOCs. If yes, please let me know what should be the approach? Also, I heard that SAP does not accept negative time to do the reversal. How true is this?
    All helpful answers will be rewarded.
    Thanks,
    Kalyan

    Hello,
    I saw your message and we are doing the same thing.  Did you find any answers to your questions.   We are using Kaba for our shop system and now we would like to sent negative numbers back to sap because of supervisor adjustments.  I have not found any way to set Sap to allow it.  What conclusions have you came up with the situation.
    Thanks again,
    Jeff

  • Error in activity confirmation using CATS

    Dea all,
    While doing activity confirmation using cats in the transaction CATA following error is occuring:
    CATS: Transfer to Project System
    No records for transfer to PS
    kindly help.
    regards,
    sudhir

    Hi
    First record the time in CAT2 t.code
    Then transfer the time to project system using CAT5 t.code.
    Do you followed the above t.codes?
    In selection screen what are the selection parameters have you maintained?
    Thanks
    S.Murali

  • How can i get into my iphone without activating it through itunes id

    How can I get into my iPhone without activating it through itunes id

    If the iPhone has Find My iPhone activation lock enabled then you will not be able to activate the iPhone without entering the correct Apple ID and password it is locked to. Sorry but there is no way to bypass this.

  • Quantity not posted to object error in while activity confirmation

         Hello All,
    i am getting below error while activity confirmation , please help me on this below.
    Note : Activity and cost center and KP26 no changes are made compare to preview year and current year , for the fiscal year 2014 i didn't get any error , only for the fiscal year 2015 i getting  below error.

    Dear Hari,
    If the activity type of the confirmation has set the flags as
    mentioned (indicator MANIST in table COKL is set) the system will simply
    NOT post any quantity on the sender cost center/activity type during
    the confirmation.
    So all quantities which are currently missing (as these were not
    updated by the confirmation) must be posted with transaction KB51N.
    If you implement the coding corrections of #760437 you have the
    possibility to change the message BK263 from "I" to "A" in transaction -
    which is however not recommended.
    So the advised procedure is:
    -post all mising quantities with transaction KB51N first
    -then run the report ZRKMANIST_RESET to remove the flag MANIST (which is
    the reason why the confirmations did not post quantities on the
    sender cost centers)
    After this procedure, the quantities will again be updated when you
    post confirmations.
    Best regards,
    Jason

Maybe you are looking for

  • BIP report Output has issue due to & in the data

    Hi All, we have created a BIP report in R12.some columns have '&' in the value. Because of this ,the concurrent program is ending with warning. Please give me some ideas to rectify this issue. Thanks in advance. Regards, P.Kalidoss

  • How to bind arrays to PL/SQL stored procedure using OCI?

    Hi, We are having problems trying to bind arrays to PL/SQL stored procedure using OCI. Here is the situation: - We have a stored procedure called "GetVEPFindTasks" with the following interface: PROCEDURE GetVEPFindTasks ( p_ErrorCode OUT NUMBER, p_Er

  • Lenovo 3000 N100 Network issue / Wireless Stack initializa​tion failed, error code 117

    Hi, Lenovo 3000 N1000 with 1GB Ram, Win XP SP2, purchased in May 2006. WLAN network with WPA-PSK key worked without any issues so far and is still accessible with PC. After transferring music via from my notebook to my mobile Bluetooth all network ad

  • About Fact Tables and Image Tables

    Not sure, if this is correct forum for Oracle BI 10.x EE, but still I couldn't find another forum, quickly, hence posting here. Pardon me. Here is the main Q's I need little help. Our company is implementing Oracle BI 10.x. We don't have much experie

  • How do I get lost apps after iOS 5 installation?

    I updated itunes and updated our ipads.  I have lost all of my wifes business apps during this process.  How do i get it all back to normal?  We do have 2 computers authorized to her itunes account.  One is her work computer, which she uses and it is