Actual Halb Material Cost

Dear Sir
Is there any table in SAP which can give information about the actual cost incurred against a Production Order .
Kindly help pl .
Rgds
B Mittal

Look at tables [COSS and COSP|https://www.sdn.sap.com/irj/sdn/advancedsearch?cat=sdn_all&query=cossCOSP&adv=false&sortby=cm_rnd_rankvalue], with object number from AUFK-OBJNR, and select actual costs via WRTTP = '04'. (Same values as in COEP, but these tables are smaller, and thus faster to read)
- You may use FM [K_COSSA_READ_MULTI|https://www.sdn.sap.com/irj/sdn/advancedsearch?cat=sdn_all&query=k_cossa_read_multi&adv=false&sortby=cm_rnd_rankvalue] to read the data.
- You can also get the Commitment from purchase requisition with WRTTP = '21' and the commitment from purchase order with WRTTP = '22'.
Regards

Similar Messages

  • Raw Material Costing with Actual Cost Component Split

    Hi All
    I have requirement to split inventory RM Value with material component and Freight cost, all config done and looks well if I check at CKM3N cost component view, material cost $100 and Freight $20, I GR the inventory with freight cost, since I'm using actual costing when journal freight cost go to Price Difference account. But after actual costing closing why the system can't split the variance update to freight cost component? is this the standard SAP behaviour?
    Please help for the solution
    Regards
    Luiz

    I see that you want to split your material cost and freight cost. you need to check the following:
    Is your current standard cost estimate support this structure i.e do you have seperate cost components for RM and Freight.
    If not first you need to change cost component structure and as mentioned by owen you to map the purchase condition type to the origin group and cost component structure.
    Then system will do the same for the actual costing

  • Material Cost difference at the time of MIGO

    Dear Experts,
    My problem is *MIGO is done for material against PO & posting is also done but some difference amount is posted to Material Cost Difference because of which my bill is not passing. *
    Can any body guide me?
    We have activated ML, actuale in material master Standared Price & Moving Price is same & cost run is for the month 1, 2011.
    How to make this material cost difference ZERO?
    Thanks
    Trupti

    Hi
    Thnx for the reply.
    Actually in material master standard price & moving price is as follows
    Standard Price          2,200.00
    Per. unit price         2,310.00
    Price control is S
    PO is raised with Rs. 2200 for 20 nos total po value is Rs. 44,000+ VAT 12.5%-5,500.00 =Total Rs.49500/-
    We do MIGO by 103 & 105 movement, after doing 105 FI document is created as per below given
    Inventory B/o Local     44,000.00
    GRN Clearing Account     46,200.00-
    Mtrl cost diff     2,200.00
    FI person is not ready to clear the bill because of this material cost difference.
    ML is activated in company.
    How can we resolve this?
    Thanks
    Trupti

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • Basic customs and  Scess on BCD being added in material cost

    Hi Friends,
    I have prepared a import order and a stk trpt po. I want to take receipt first in (A) plant and subsequently with stk po I will receive in B plant as I want to pay the duties only at the time of actual receive in my mfg plant. My stk po is having duties as CVDs and BCD cond types. When I do vl10d and vl02n for the outbound delivery , FI document craeted following entries for Eg. ->
    Bus. Area_ Acc. Description   Amount_
    2910(A)      HR Imported        100.00
    2110(B)      HR Imported        200.00
    2110          cvd cLEARING      50.00
    2110          CUSTOM CESS    40.00
    2110         CUSTOM SCESS   10.00
    Here HR imported for B.Area 2110 should be posted as 1004010=150 on the material cost instead of 200.00. As CVD amount will get availed.
    So I donot want this cost (CVD) to be added in material cost.
    Kindly suggest its configuration.
    Thanks
    Atul

    will be shifting to new forum
    Thanks

  • Raw material cost estimates

    HI experts,
    Currently we have the following scenario:
    There are some raw materials which are procured externally, and these materials are maintained with price control S
    Well, the problem is that the standard cost for the material consists of a few more components, for example:
    The standard price for the material X is 20 USD which consists of:
    - the price of the material itself : 15 USD
    - the import duty : 5 USD
    let's say if the actual import duty happened during IR is 6 USD, how can we get the variance from the difference between the import duty? I am unfamiliar with raw material cost estimate, but seeing that the import duty will be captured using condition type in PO, i assumed that we can use raw material cost estimates with this, and use the COPA report with record type B for this case.
    Could anyone give any suggestions regarding this case? It is better if it comes with step to step guide.
    Thank you very much in advance
    Regards,
    Erwin

    Hi Erwin
    1. The ideal design would have been Price Control V if the material is outright purchased... There by not leaving any scope for variances... You would agree that it is best to valuate inventory @ actuals as far as possible
    2. If you want to retain S, then release your Std cost as many times as the Base Price of 15 or Import duty of 5 usd changes... This will also avoid variances during MIGO.. However, it will throw up inventory revaluation figure each time u release new cost estimate
    Else, the variances will be updated to CO or COPA as per your choice in OKB9.... The record type will be B
    Are you not able to update variance to COPA?
    br, Ajay M

  • Raw Material Costing with Overhead, Product Cost Planning

    Hi,
    I have an issue applying overhead to purchased raw materials. We need to apply this overhead for only a certain materials. So, I have defined a overhead key/overhead Group, and assigned the group in the material master of the raw material. The overhead is 2% freight on raw material costs.
    In the std.costing variant, I have assigned the costing sheet under Overhead on material components tab of the corresponding valuation variant. I have also included the Freight OH in the cost component structure.
    However, when I run the costing with CK11N for the raw material, it is showing only the raw material cost, not the overhead.
    What could be the problem?
    I appreciate your help.
    Thanks,
    Ram

    Is the overhead rate a percentage type or quantity based?
    Have you maintained both actual and plan rates (1 & 2) under define % based OH rates or Qty based OH rates accordingly?
    Does the validity date (in define OH rates )cover the date of costing?
    Is the Costing sheet assigned to the valuation variant at plant level?
    Is the OH base in the costing sheet includes the cost element of the raw material?

  • Price list change according to raw material cost

    Dear Experts,
    We are currently working in a client where for those products for which the raw material is the main component as the cost of the raw materials varies with a high frequency (daily or weekly) the list price (the price we want to invoice to customers) should be updated accordingly and automatically with a specific mark up.
    Have you found a similar requirement in any client? If yes, could you explain us from a functional perspective how (SAP standard functionality or custom development with a detailed explanation of the solution) you solved this requirement?
    Is there any procedure to do regular massive updates of Finished Good price lists based on the actual variation (and/or expected variation) of raw materials cost?
    Thanks in advance for your help.
    M.Baig

    Hi Baig,
    It is possible to determine the price based on the raw material cost. I dont know whether you are using Moving average price or standard price for the raw material cost.
    Whatever be the  method, when you create the sales order, it is possible to take the raw material cost on the date of order creation using one of teh cost condition types like VPRS. You can use this condition type as statistical.
    You can also have another condition type which is the mark up on this cost.
    Now you can calculate your grossprice using another condition type which total up the cost in VPRS condition type adn the mark up %, either through just configuration or by means of a calculation type routine created in VOFM adn then assigning the same for the gross price condition type.
    I you have any concerns, pls lemme know.

  • Raw material cost not coming KE30 profitability report

    Dear Gurus,
    We have two material type for our finished product for one material type without having cost release for current period we can't release the billing document for accounts but in other material type we can release the billing document for account without releasing the cost for current period.
    This occurs with problem that in KE30 we are not receiving the raw material cost & administration cost. Please suggest what should I do to correct this?
    Thanks in advance.

    Hi,
    I already assigned costing key to material type (FERT,HALB) but bifurcation of COGM not flow to CO-PA.
    In T.code KEPR
    1.All F/V i maintained as 3 is it ok or i need to maintain it 1 or 2.
    2.In T.code KE4J
    Record type = F i maintained for FERT,HALB category materials & assigned in Costing key
    Earlier before release i assigned in T.code ke4i
    Condition type             Value fields
    VPRS                          Stock value
    Then some value flow to copa
    After i release i removed stock value from ke30 report and added material cost ,sub contracting cost,material overhead but no value flown CO-PA.
    Pl check
    Regards,
    Debashis

  • Material cost estimation in COPA

    Hello  Everyone
    I have question regarding how details of cost Estimate will flow to COPA Report.
    Variance of Product cost will flow in COPA through PA Transfer Structure and its flowing on my report.  However, I want to flow COGM (break up of the cost components) on COPA reports.
    I have done below steps but itu2019s not flowing.
    I have maintained Define Costing Keys for Accessing Material Cost Estimates. ( I have maintained 3 key with different Period Indicators.
    A. Released Standard cost estimate matching goods issue
         B. Current standard cost estimate to entry in Mat
         C. Material cost estimate matching posting date.
    Assign costing  key in material ledger and i activate material ledger in actual costing/ material ledger.
    I have chosen table lookup with MBEW on source fields in u201COriginu201D tab with        MATNR, BWKEY and BWTAT as field and in  assignment I have take VPRSV.
    Maintain another with same field name in Source and selected KALAWI in Target fields.
                And assigned the costing keys to key for accessing material cost to step1
    I have assigned Cost Component structure to operating concern. ( I have created
    Value fields which shows the details for COGM in Cost sheet and maintained the same in it.)
    I have maintained external material group and assigned to Material master.
    After doing all the above steps Material Ledger TAB is getting populated on the Material Master but when I run the Standard Cost Estimate its not showing details for Cost of sales in COPA.
    Please do let me know if I need to do any additional steps with.
    Thanks in Advance.
    Srinivas

    Hi Srinu,
    By activating Material Ledger without knowing about it and without knowing it's relevancy to the client's business process....YOU DID A BLUNDER MISTAKE
    Materia Ledger along with Actual Costing need to be activated if you want to go for Actual Costing inaddition to Standard Costing.
    """Once activate Material Ledger for any Plant, you willl not be able to de-activate""".
    In which client are you doing this? It it in only Golden Master, just immediately deactivate ML. If you have already copied the customization request to Unit Testing Client, you cannot do anything there, but don'g transport it to Quality Server.
    When you activate ML, many things right from basics will change...for example Price Indicator in Material Master (S or V). Hell lot of descipline is required during Period-End closing etc.
    YOU SHOULD NOT ACTIVATE MATERIAL LEDGER UNLESS THE BUSINESS PROCESS REALLY NEEDS IT -- this only suggestion from my side...
    First you deactivate and come back to know about Costing Key...
    Srikanth Munnaluri

  • Report to fetch the labour cost and material cost

    Hi Gurus,
    The requirement is to create a report to fecth the actual cost from the maintenance order. ie.. material cost , labor cost and some other costs which are directly posted to the order. Can anybody let me know from which tables I can pull the material cost , labor cost ..etc posted against maintenance order?
    Regards,
    John

    Hi
    can you check in PMCO table
    regards
    thyagarajan

  • Material Cost display on Order

    I have created a value category Z1 - Material and assigned a cost element. Then In the maintenance order I have selected a material in component tab. The material has same cost element that is assigned to value category Z1. But cost of material is still not appearing. Moving avarage price is appearing in the purchasing data. Which setting is still remaining?
    Regards,
    VM

    Objective is to have planned and actual cost display of material and exrternal services on the maintenance order :-
    I am writing the setting which I have done so far:
    1. Define value categories Z1 and Z2. Z1= Material and Z2=External Services.
    2. Assignment of cost element on value category. Z1= say '1234' and Z2= say '5678' these cost elements I have received from CO.
    3. Material and services which I am selecting on the PM order have the same cost elements as assigned in cost elements.
    4. Now define new cost variant ZPMO for PM orders.
    5. Define new valuation variant 016.
    6. In this valuation variant setting will be like this:
        a. Material tab - Strategy sequence should be like this, 1. value price according to price control in mat.
                                                                                    2. MAV
                                                                                    3. Standard price.
        b. Activity type- Strategy sequence should be like this,  1. Plan price for the period
           CO version plan/activity - 0
        c. External processing - net quotation price
    7. Costing parameters are assigned to PM orders.
    After these settings I am creating PM order. External Service's planned cost is displaying on the order but material cost is not displaying.
    I have checked the CONTROL tab cost variant ZPMO is assigned there in Costing variant for planned costs
    as well as actual cost. RA key(000001) is also displaying.
    Still some setting is remaining. I think it may be something very basic. Can any body tell me about it ?
    Regards,
    VM

  • View labor and material costs in plant maintenance work order

    Hi
    I am aware we can bring in the costs in the work order through Activity types and assigning the costs to the acitvity type.
    Is there anyway we can bring in the actual cost for the work performed by the associate? should we link the work center to HRMS?
    Please advise. I need your valuable input for all the points below.
    Main points that need to be addressed:
    1. Each associate that is capable of confirming hours to a work order needs to be assigned an hourly rate that is reflective of the actual cost for the work performed by this associate. These hours are then tracked through the work order to give a cost for labor assigned to that particular job.
    2.Any materials used in the performance of the required task(s) dictated by the work order will be assigned to that order. These materials can be assigned through SAP purchase requisitions, tool crib spot buys, or procurement with a purchase card.
    3.Standard reports need to be created so we can track the total maintenance costs for any level of the equipment hierarchy as currently set up in SAP. When this report is created it should show the total maintenace costs for all the levels of the equipment hierarchy broken down into labor cost and material cost.  I am using Tcode IW37N and IW40 . Is there any suggestion?

    Greetings Chandra,
    1) You will need to create Work Centres for your associates and create the Activity Types. You can default the Activity Type for each Work Centre and maintain the rate for the activity via t-code KP26 planning.
    2) Planned and unplanned Purchase Requisitions for Components with category N will debit the order with material costs. But what do you mean by "tool crib spot buys" and "procurement with a purchase card"? You may need to develop a solution to do such postings to the Order (or for purposes of Cost controlling, manual activity allocation similar to confirming work may be desired such as Manual Activity Allocations via CO transactions (KB21N), unless you can cover that with Purchase Requisitions and POs with "F Order" account assignment.
    3) MCI8 Cost Report should be suitable for you, once you set up the Value Categories & Cost Key Figures.
    See
    PMIS Cost Analysis Reporting Overview
    Maintenance Cost Key Figures in MCI3 and MCI8 Reports
    PM Order Value categories and costs display

  • Negative Material cost in cost component of the Product

    Hi,
    We are in ECC 6.0 and using Material Ledegr and Actual Costing. We have cost component structure - Material cost, Packing cost, Overheads, etc. The total cost of the product is positive. However, at the cost component level Material cost shwoing as negative.
    e.g.
    Material-Cost      (-10.00)
    Packing-Cost          0.00
    Overheads        40.00
    Total cost         30.00
    It seems the negative Material cost is coming from Lower levels. I have checked this in T-code CKM3N and in Table CKMLCR/CKMLKEPH. There are no reversal of material movements.
    Will you share your views on this issue for how to identify the root cause and take preventive action?
    Thanks & Regards,
    ADI

    Hi ADI,
    The note 671767 explains possible root causes of negative cost
    components. They are usually caused by:
    1.  Negative cost components due to by-products
    2.  Negative cost components due to WIP problems
    Regards,Declan

  • How the Material costs and Overheads flow from Logistics to COPA

    Hi,
    I know that Revenue will flow to COPA from SD Condition types which we assigned to value fields in KE4I.
    But i am not clear how the Material cost will flow to COPA?
    How the Overheads will flow to COPA?
    Kindly help me in understanding the flow...
    Thanks
    KB
    Moderator: Please, read available SAP material for basic questions

    Hi,
    check this link:
    http://help.sap.com/saphelp_erp60/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    Go to: "Flows of actual values" to get the big picture of CO-PA value flow.
    best regards, Christian

Maybe you are looking for

  • Opening mail application from the dock sometimes doesn't open window.

    In Mountain Lion, sometimes when I open Mail on the dock with a single left mouse (or touchpad) click, the Mail application opens, as shown in the menu bar, but a mail window doesn't open. I must then click or double click on it to get it to open a w

  • Files (fonts) appear as Unix files when viewing on an SMB share

    We have a UNIX server running Linux which our Mac users are connecting via SMB.  We moved our company fonts to this server from an OSX Server.  All of our machines are running 10.6.6 or later.  Very intermittantly without any rhyne or reason some use

  • Import remarks with multiple lines

    Hi, How can I import using DTW for Item remarks with multiple lines?

  • USB Charging not working after 1.2.0

    Charging via my car charger or an outlet works fine, but using my computer doesn't seem to work anymore. This is a potentially a huge issue as I rely on the mid day charges to keep my phone working during busy days. Any solutions out there? Thanks! P

  • Is is possible to link to data mgr & client in same app?

    I have a Linux application that needs to access 2 datastores, one local and one on another machine. Is is possible to link the application to both TT Data Manager(libtten.so) for the local and the client driver (libttclient) for the remote?. If not,