Actual Transaction date in resource usage

i am confused cause we have batches the actual resource transaction dates is not within the batch actual dates , but in the same period , and its usage is correctly computed in the batch cost .
so is this normal ? and what if the actual transaction date for the resource assigned to this batch is in another period ?
IE:
If the batch actual dates are between (25-Jan) and (29-Jan) for example
And the step actual dates are between (26-Jan) and (28-Jan)
And the resource transaction date is (30-jan)
Is there any problem in that?
• If the answer is no, the second question would be:
What if the Bach actual completion date is in FEB and the other dates are the same?
Thank you in advance

Hi Ahmed,
For Resource Costs your Actual transaction dates will be used for Costing and for Material Costs the transaction dates in your allocations will be used. This two is not dependent on each other. If you have your ingredient transaction dates and product transaction dates in different periods then you will have variations in Costing. Batch completion date does not affect costing.
Hope this clarifies.
Regards,
Malcolm

Similar Messages

  • Project Online - offline project plan prompts for date range to be entered when accessing Resource Usage view

    When I save a project plan to my local computer from Project Online and open it up in an offline mode and access Resource Usage view I get prompted with Date Range dialog boxes with the first one saying "Show resources/assignments that start or finish
    after:" and the second one with "And before:".
    I don't have any filters that are setup in Project Online that are not available in offline mode to trigger these prompts.
    Please let me know what could be causing the date range prompts. Thanks.

    Hi,
    You probably retrieve an enterprise filter into your local file. Just open the organizer from MS Project, go to the filter tab (be sure to have your project selected in the drop down menu at the top left of right of the organizer) and delete the date range
    filter.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • ACE ANM Resource Usage Graph Data Retention

    Is there a way to get more than 30 days worth of data from the Resource Usage Graphs in ANM monitoring?

    Hi,
    The max is one month. I don't know of any way to get more than that.
    http://www.cisco.com/c/en/us/td/docs/app_ntwk_services/data_center_app_services/application_networking_manager/5-2-3/user/guide/User_Guide/UG_monitor.html#wp1326696
    Please visit section "Configuring Historical Trend and Real Time Graphs for Devices" for more details.
    Regards,
    Kanwal
    Note: Please mark answers if they are helpful.

  • Assigment transactions data via C# or SQL

    Hello.
    I need to select assigment transactions data (daily actual work per task for each resource in organization) via C# or SQL . This data are needed to build some tracking report. 
    How can I do this?
    As I understand, CSOM and PSI are unsuitable due to thier impersonation.
    I tried to use OData, but I could't find necessary implementation.
    I'll be very grateful to any help!

    Duplicate thread -
    please see How to restrict user to access only correct org data via TOAD/SQL Developer

  • Enhance BW Extractor - Transactional data ABAP CODING ERROR

    i need to enhance CRM extractor with additional field.
    This is transactional data so i used Exit_rs_001
    Here is the extractor result -
    Guid...date...........objectid...item guid
    1122......1.1.10....901..........8811
    1122......2.1.10....901..........8812
    1123......1.1.10....902..........8813
    1123......2.1.10....902..........8814
    now i need field Product id in it which is called from DB Table CRMD_SRV_REFOBJ
    itemguid...referencekey...product
    8811............01.................110011
    8812............02.................110012
    8813............03.................110013
    now i want to extract data--
    Guid...date...........objectid...item guid...product
    1122......1.1.10....901..........8811.........110011
    1122......2.1.10....901..........8812.........110012
    1123......1.1.10....902..........8813.........110013
    so i appended the extractor...with field zproduct
    FOLLOWING Code doesnot work:::
    DATA: L_S_INFOSTRU LIKE ziw_orderma_i.
    CASE I_DATASOURCE.
    FIELD-SYMBOLS: <PRO_01> TYPE ziw_orderma_i.
    CASE i_datasource.
    WHEN 'ziw_orderma_i.'. " Upper case
    LOOP AT c_t_data ASSIGNING <PRO_01>.
    SELECT PRODUCT_ID INTO <PRO_01>-zZPRODUCT
    FROM CRMD_SRV_REFOBJ UP TO 1 ROWS
    WHERE ITEM_GUID = <PRO_01>-CRMD_SRV_REFOBJ.
    ENDSELECT. " not whole primary key
    ENDLOOP.
    ENDCASE.

    actually
    coding doesnt give any error
    but in output in rsa3 i dont see any data
    it worked fine wit the same code for master data datasource in exit...2
    now same code different parameters doesnt work in exit..1 for transactional data.

  • Schedule line date vs actual delivery date

    Hi All,
    Is there any standard report or work around available to compare customers schedule line date vs actual delivery date
    Thanks & Regards,

    Hi Abir,
    I think your talking about a "On time Delivery report" to track actual delivery against the quoted delivery.
    There is no standard report available in SAP for this.
    This is hard to track if you have maintained multiple schedule lines for a one single line item.
    (Where you maintain multiple delivery dates in schedule line level to quote  multiple delivery dates. If you have maintained multiple line items to quote multiple delivery dates, this would have been easy)
    Because you do your delivery based on your sales order line item. Not based on your schedule lines. Therefore in your delivery line item table (LIPS) you cannot see Schedule line number. Therefore you cannot compare quoted delivery against actual delivery date.
    Assuming you have maintained your multiple delivery dates in Schedule line level, this is how you have to proceed.
    - Use VL10E transaction to create delivery against schedule lines.
    - Create append structure in the LIPS table to accommodate to carry the schedule line item of sales order in each delivery document + Line Item combination.
    - Use this user-exit u2013include  MV50AFZ1. Can save the particular sales order schedule line in the LIPS, earlier created append structure field.
    Then you have the schedule line number available in the LIPS table, Now you can code your report to capture quoted delivery against actual delivery date.
    Hope this helps you !
    Anupa

  • I need to pass value for Actual GI date field in VL01N t code, I am using BAPI_DELIVERYPROCESSING_EXEC. can any one tell me how can i pass vaule ?

    I need to pass value for Actual GI date field in VL01N t code, I am using BAPI_DELIVERYPROCESSING_EXEC. can any one tell me how can i pass vaule ?

    Hi Abdul,
    Sorry for my unprecise answer, but you talk about a tcode, but you're using a BAPI Call. Maybe you want to call the transaction in batch mode?
    http://help.sap.com/saphelp_erp60_sp/helpdata/de/fa/09715a543b11d1898e0000e8322d00/content.htm
    Regards,
    Franz

  • How To... Update Master Data during upload of transaction data

    Can anybody let me know how this can be achieved.
    I have datasource (Legacy not R3) where I am getting both master data and text for number of infoobjects.
    I dont want separate datasources.
    The datasource is actually transactional datasource.
    I dont need text in the cubes or DSO I need the text tables of the infoobjects to be updated.
    I could find this on SDN but do anyone have document based on the below link.I was not able to find it.
    How To... Update Master Data during upload of transaction data
    Thanks.

    Dear Praveen
    I guess yr req is demanding the knowledge of Data Unification and Synchronization whose scope is a bit outer the area of BW.( its MDM actually )
    In BW we could very well fetch data out of different data sources (even across the different system) with no issues so why not u trying that. if there is any issue implementing that then please specify what kind of trouble you are interfacing...
    I got the below link which may be helpful
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e7bd6389-0a01-0010-eb95-d45835d446a8

  • BPC:NW - Best practices to load Transaction data from ECC to BW

    I have a very basic question for loading GL transaction data into BPC for variety of purposes, would be great if you can point me towards best practices/standard ways of making such interfaces.
    1. For Planning
    When we are doing the planning for cost center expenses and need to make variance reports against the budgets, what would be the source Infocube/DSO for loading the data from ECC via BW, if the application is -
    YTD entry mode:
    Periodic entry mode:
    What difference it makes to use 0FI_GL_12 data source or using 0FIGL_C10 cube or 0FLGL_O14 or 0FIGL_D40 DSOs.
    Based on the data entry mode of planning application, what is the best way to make use of 0balance or debit_credit key figures on the BI side.
    2. For consolidation:
    Since we need to have trading partner, what are the best practices for loading the actual data from ECC.
    What are the typical mappings to be maintained for movement type with flow dimensions.
    I have seen multiple threads with different responses but I am looking for the best practices and what scenarios you are using to load such transactions from OLTP system. I will really appreciate if you can provide some functional insight in such scenarios.
    Thanks in advance.
    -SM

    For - planning , please take a look at SAP Extended Financial Planning rapid-deployment solution:  G/L Financial Planning module.   This RDS captures best practice integration from BPC 10 NW to SAP G/L.  This RDS (including content and documentation) is free to licensed customers of SAP BPC.   This RDS leverages the 0FIGL_C10 cube mentioned above.
      https://service.sap.com/public/rds-epm-planning
    For consolidation, please take a look at SAP Financial Close & Disclosure Management rapid-deployment solution.   This RDS captures best practice integration from BPC 10 NW to SAP G/L.  This RDS (including content and documentation) is also free to licensed customers of SAP BPC.
    https://service.sap.com/public/rds-epm-fcdm
    Note:  You will require an SAP ServiceMarketplace ID (S-ID) to download the underlying SAP RDS content and documentation.
    The documentation of RDS will discuss the how/why of best practice integration.  You can also contact me direct at [email protected] for consultation.
    We are also in the process of rolling out the updated 2015 free training on these two RDS.  Please register at this link and you will be sent an invite.
    https://www.surveymonkey.com/s/878J92K
    If the link is inactive at some point after this post, please contact [email protected]

  • TABLES FOR MASTER & TRANSACTIONAL DATA

    Hi all ,
    can some body help me with TABLES FOR MASTER & TRANSACTIONAL DATA
    DP,SNP,PP/DP.
    Thanks

    Hi,
    You can find out it as per your requirement.
    Use transaction SE80 - ABAP workbench  -->
    select Repository Information system  -->
    Select ABAP Dictionary  --> Data base table -->
    In the right hand side window you will get screen in that give details as below
    Standard selection screen
    Table name : enter *
    In the Application Component:
    You will get Tree structure to Select Application Componenet
    in that expand the node of SCM --> SCM APO --> SCM-APO-MD for Master Data
    Here you will get application  -- Double click on the required Application
    e.g. Duble Click on SCM-APO-MD-PR for Product
    Here you will get list of table related to application componenet Product
    <b>/SAPAPO/MATKEY                 Product</b>
    Some of the Master Data Tables:
    /SAPAPO/APNTYPE                APN Type
    /SAPAPO/APNTYPET               Alternative Product Number Type
    /SAPAPO/APO01                  APO Planning Version
    /SAPAPO/APO01DEL               Deletion Log File Versions
    /SAPAPO/APPLOCS                Location Master: Relevant Location Types for Application
    /SAPAPO/APPLS                  Application Types : SAP Application Types
    /SAPAPO/CD_LOC                 Customizing Change Documents Location
    /SAPAPO/CD_PPRFL               Customizing: Change Documents: Product Profiles
    /SAPAPO/CD_PRDHD               Customizing: Change Documents: Product
    /SAPAPO/CD_PRDLC               Customizing: Change Documents: Location Product
    /SAPAPO/CD_PRDLW               Customizing: Change Documents: Storage Type Product
    /SAPAPO/CD_PRDWH               Customizing: Change Documents: Storage Type Product
    /SAPAPO/CONSPROF               Model Consistency Check: Check Profile
    /SAPAPO/CONSPROT               Model Consistency Check: Check Profile Descriptions
    /SAPAPO/CUSTCHK                Model Consistency Check: User-Specific Checks
    /SAPAPO/CUSTCHKT               Model Consistency Check: Descriptions of User-Spec. Checks
    /SAPAPO/GRPTYPE                Product Group Types
    /SAPAPO/GRPTYPET               Description of Product Grouping
    /SAPAPO/LOC                    Locations
    /SAPAPO/LOC_SUB                Mapping Table for Sublocations
    /SAPAPO/LOCCOMP                Table Obsolete Since SCM Release 4.1
    /SAPAPO/LOCMAP                 Mapping Table for Locations
    /SAPAPO/LOCMOT                 Location: Means-of-Transport-Dependent Attributes
    /SAPAPO/LOCPROF                Version-Dependent Location Profile for Penalty Determinati
    /SAPAPO/LOCT                   Locations Short Text
    /SAPAPO/LOCVER                 Location: Version-Dependent Fields
    /SAPAPO/LTTYPE                 Location Resources
    /SAPAPO/LTVER                  Location Resources: Version-Dependent Fields
    /SAPAPO/MARM                   Units of Measure
    /SAPAPO/MATAPN                 Alternative Product Number
    /SAPAPO/MATBOD                 Product BOD Assignment
    Hope this information will be helpful for you work on and find out Important tables for your own BP

  • CMOD exit_rsap_saplr_001 for transactional data ABAP CODE

    Hi please confirm that you want to convey that i can write the actual code in CMOD exit_rsap_saplr_001 for transactional data?? if i put 20 data sources enhancement code in there is'nt that too bulky and will cause the failing all extractor if one code is wrong if you still suggest that i can go ahead with 20 similar codes as below . please see my code below which i have used for all 20 datasources with little modification
    if you can recommend some changes in code to improve performance would be great
    case i_datasource.
    WHEN '0CUSTOMER_ATTR'.
    loop at i_t_data into l_s_BIW_KNA1_S.
    l_tabix = sy-tabix.
    clear i_knvp.
    select single * from KNVP into i_knvp where KUNNR = l_s_BIW_KNA1_S-KUNNR.
    if sy-subrc = 0.
    l_s_BIW_KNA1_S-ZZPARFN = i_knvp-PARVW.
    l_s_BIW_KNA1_S-ZZCUSNOBP = i_knvp-KUNN2.
    modify i_t_data from l_s_BIW_KNA1_S index l_tabix.
    endif.
    endloop.
    endcase.
    Thanks
    Poonam

    Check this simple code for Z...include into the FM EXIT_SAPLRSAP_001 where zcomp is new field added into the datasource 8zsales2.
    data : l_s_/BIC/CE8ZSALES2 like /BIC/CE8ZSALES2,
    l_tabix like sy-tabix.
    case i_datasource.
    when '8ZSALES2'.
    loop at c_T_DATA into l_s_/BIC/CE8ZSALES2.
    l_tabix = sy-tabix.
    fill the new field
    select comp_code from /BI0/MCOMP_CODE into l_s_/BIC/CE8ZSALES2-zcomp
    where comp_code = '1000'.
    if sy-subrc = 0.
    *l_s_ZFIAA_IS001_TXT50 = ANLA_TXT50.
    modify c_t_data from l_s_/BIC/CE8ZSALES2 index l_tabix.
    endif.
    endselect.
    endloop.
    endcase.
    Edited by: Rohan Kumar on Jan 16, 2008 8:21 AM

  • ChaRM Transaction Data Log Not Updating in 7.1

    Upgraded to 7.1 and still using 7.0 CRM_DNO_MONITOR and CRMD_ORDER to completed change requests in flight in existing projects.  The Transaction Data tab's Object and the Fast Entry tab's Overview show entries for action taken prior to upgrade.  However there are no new entries for actions used or transports created after we started using 7.1.  Is this still supported?  Where can I see updates the the CR/CD for audit and reference purposes?

    It depends a bit on your final intention. Bascially you have a shared state that you want to access asynchronously from different places. If you know that the actual object is only created once (terminilogie here is a bit shaky as every wire split would create a copy of the LVOOP object but I hope you know what I mean), you could use a global or Action Engine to store the state. Using a DVR for this state and adding the DVR to your object class data is however a more scalable approach as it will allow you to instantiate more than one object of that class and each one will contain its own DVR that will reference the same value for the specific object instance even if you split the object wire, creating actually two copies of that object (but for the purpose of this discussion they would be still the same object instance).
    Queues could work if you create a single element queue but you would always need to use Preview Queue rather than Dequeue in order to maintain the value in there.
    Rolf Kalbermatter
    CIT Engineering Netherlands
    a division of Test & Measurement Solutions

  • Actual finish date and % of completion in Open Ps

    I am unable to download Actual finish date and % of completion while downloading project from SAP PS to MS Projects using Open PS.

    From SAP Note 1332046:
    07.Question: After downloading a project from SAP PS into MS Project, why is the Planned Finish Date in MS Project different when compared to project in SAP PS?
    Answer:
    When downloading projects with actual data, the actual work that has been completed by an activity element on an activity in SAP is assigned to the resource of a task in MSP.If there is remaining work and if the actual finish date in SAP PS is before planned finish date, the remaining work
    will be equally distributed till the planned finish date. If there is remaining work and if the actual finish date in SAP PS is on or after planned finish date, the remaining work will be equally distributed till the forecast finish date for the activity. If a forecast finish date is not
    available for the activity, remaining work will be equally distributed till the forecast finish date for the activity element. If a forecast finish date is not available for the activity element also, then MS Project does the allocation of remaining work.That is, if the actual finish is on or
    after the planned finish and there is work remaining, while entering confirmations in SAP a forecast finish date should be supplied so that when downloading the project to MSP, the remaining work will be scheduled properly.
    I do not understand. If we must mark the final confirmation it shouldn't be remaining work. I still do not understand why my finish dates do not fit with the actual finish date in SAP.

  • Import Transaction Data - Duplicate records

    Hi,
    I need to upload a file of transaction data into BPC using data manager package. I've done the transformation and conversion files which validate successfully on a small data set. When I try to upload the data file using the real life file, it fails due to duplicate records. This happens because multiple external ID's map to one internal ID. Therefore, whilst there are no duplicates in the actual file produced by the client, the resulting data produced after conversion does contain duplicates and will therefore not upload.
    Apart from asking the client to perform the aggregation before sending me the file, is there any way to get BPC to allow the duplicates and simply sum up?
    Regards
    Sue

    Hi,
    Try adding the delivered package /CPMP/APPEND and run it. This should solve your problem.
    Thanks,
    Sreeni

  • 'Resource Usage' field in Planner workbench

    Hi,
    Currently the 'Resource Usage' field in Planner Workbench > Item > Routing Operation > Resources doesn't not display decimal places.
    What do I need to change in profile option or preference or anywhere else so that atleast 1 place after decimal is display. In the database column this field has data with decimal places.
    Thanks

    Hi Geert,
    Thanks for the advice.
    I put '1' decimal place in Capacity Plan but it didn't work. Then I entered same value in all decimal places in all tab in Preferences, then it worked.
    Thanks
    Dee

Maybe you are looking for