Add Cost Of Packaging To FERT Material

Hi All
I am trying to include a cost for packaging in the effective price for FERT materials.
Is there anyway to do this through config? the packaging will be a set price.
Thanks

hiii
U can maintain the packing condition in pricing (fior local and import).
While entering the condition will come , here u can enter the value for packing .
FInally it'll show u the total effective value with packing .
If i m wrong .. some body correct me ..

Similar Messages

  • SO Product Costing - Difference between HAWA & FERT Material

    Hi All,
    I have the same settings for two Materials on the below fields: one is a HAWA and other is a FERT material;
    Material Master:
    1. Ind./Collective Indicator (either 1 or 2, but same in both Materials)
    2. Qty Strcuctre (either Yes or No, but same in both Materials)
    3. Price Control (either S or V, but same in both Materials)
    BOM:
    Both the HAWA and FERT has their own BOM with its components relevant for costing
    Costing Variant:
    1. Both follow the same Costing Varinat PPC4
    2. There is no User exit active on Costing
    With all the above settings remaing same between HAWA & FERT Materials, and when I do SO Product Costing,
    1. BOM is exploded for FERT materials and its compoenents are costed individually to arriev at the costing of the Header Material - FERT. (in simple terms, costing happens with Qty Structure)
    2. BOM is not exploded for HAWA materials but the costing refers directly to the Material Master data price of Header Material -HAWA. (in simple terms, costing happens without Qty Structure).
    Can anyone explain the reason for this difference of BOM explosing happening for FERT but not for HAWA. (Note: Qty Structure does not work for HAWA even when it is set ON in its Material Master & BOM exist for HAWA Mat.)
    Thanks & Regards,
    Vasu

    Hi Lakshmi,
    Yes I accepte that FERT should carry price control "S".
    Can you pl help as why HAWA materials are not costed with Quantity Structure when its Material Master has Qunatity Structure Indicator On and has a BOM.
    Br,
    Vasu

  • Returnable transport packaging for Subcontracting material

    Dear All,
    I have a doubt regarding a new process to be followed in our company. We need to issue raw material to our subcontractor for processing. We also intend to send packaging material to the subcontractor along with the raw material. Ie We are sending the raw material to the subcontractor along with the packaging material ( say, in boxes).
    I would like to know how to address this issue.
    What We tried
    Standard SAP is allowing the vendor's Packaging material to be "received" from the vendor when we Purchase material from the vendor using movement type 501 'M'. After this, we are able to see this as a "special stock" as RTP ( Returnable Transport Packaging ) in T code MMBE. After this we can issue the packaging material  back to the vendor using movement type 502 'M' . There is also a provision to send " our" packaging material to a customer through a Sale order, and receive it back from them.
    But is there any standard process for sending "our" packaging to a subcontractor and receiving it back from them ?
    We also tried including the packaging material in BOM, and sending it through 541 movement  but in this case, when we perform Goods receipt ( 101 movement of the parent material ), the packaging material gets consumed, which should not happen. We want them back in stock.
    We also tried using the option "Non - Ordered item" for the packaging material while performing Goods Receipt of the parent material. But this would increase the stock of the packaging material without us even issuing the same to the vendor initially. ie  More stock will be there than is actually present.
    So how else do we address this issue ?
    Regards,
    Velu

    Hi Velu,
    This scenario can be automated as well in BOM.
    While maintaining the BOM for the subcontracting material, include the packaging component as twice, but one with negative quantity. PFB screen shot.
    Also turn of the costing relevancy indicator and maintain material provision indicator as "K"(customer material) for both the line item.
    So while doing GR for the sub contracting, system post automatically 543 and 545. Hope this is useful, if it is so, your rewards are awaited .
    Regards,
    Chinna

  • CK11N - how to add costs.

    Dear Experts,
    In the transaction CK11N, how can i add costs to a material which i am costing?
    E.g:
    I want to put $300 for (labor costs due some activity) in the price of the material.
    I need also the transactions that i have to go through to get it done.
    If somone has any documents that could help me up with this whole concept it will be really helpful.
    Thanks in advance.

    Hi Leandro,
    Standard Cost Estimate which we do for a Material in CK11N is based on the master data of BOM and ROUTING maintained for that material and other few factors.
    If you want to add the labour cost, you ideally should do it by way of crating an Activity Type and creating an Operation in Routing for that Product. Pls talk to your PP Consultant.
    Creation of Activity Type : KL01
    Planning of Activity Type in a Cost Center : KP26
    Cost Element Planning : KP06
    Activity Plan Price : KSPI
    Assign this Cost Center in the Work Center
    As Aparna suggested, If you are trying to use the concept of "Additive Costs" then use CK74N.
    Pls revert back for further explanation...
    Srikanth Munnaluri

  • Incorrect assignment of cost estimate number to the material key

    Hi,
       While doing GR for a particular PO we are getting error msg that "Incorrect assignment of cost estimate number to the material key"
    First we thought that this error might be missing of standard prices for materials. Even though creation of standard prices has not solved the problem.Could you please explain me clearly
    1) what are the reasons for this error.
    2)what is the soltuion for this?
    Thanks in adavance
    regds
    ramachandra

    Hi,
    I assume that Material Ledger is active, isn't it?
    Message C+451 is usually caused if there are some entries in ML without any entry in the MM tables (MBEW, QBEW, EBEW).
    These inconsistencies can be identified with the help of program MLHELP_CHECK_MULTIPLE_CKMLHD. Correction can always and only be done by SAP Support. So if this report shows inconsistencies, you should create a message for component CO-PC-ACT.
    Regards,
    Antje

  • Restricting issue of goods to cost center with respect to material type

    Dear Users,
    I have a requirement like we want to restrict issue of goods to cost center with respect to material type i.e., we want to issue goods to cost center only through reservation and that too only for specific material types. Is there any standard solution for this, please provide your suggestions.
    Thanks,
    Manoj

    Hi Ajay,
    Thanks for valuable input.
    I also thought in the same line , but user has the following concern on this:
    Assessment Cycle: As per Users, it cannot be used because this will allocate based on allocation basis. But they need, the values that was posted at the time of transaction and as per materials. So it wont be accurate through Assessment cycle,
    OKB9: They have different Cost center for different valuation area for the same GL Account.
    Hence through OKB9 also, we cannot post directly to COPA.
    That's the reason the above option were not adopted.
    My other concern to this is:
    In CKM3, we have two lines under consumption, one for Normal sales PGI and other is Cost Center.
    After doing revaluation of consumption in CKMLCP, we see one line under Cost Center :Revaluation of Consumption Figure"
    My question, where can I see that figure whether in any table or in Cost Center report??
    If that is also available we can try to match those values and post to COPA.
    Let me know your thought on this.
    Thanks and regards
    Kami

  • Bridge cc will not open after trying to add patch aom package (adobe output module) to workspace

    bridge cc will not open after trying to add patch aom package (adobe output module) to workspace. this patch was recommended by adobe help to allow creating pdf presentations. the help stated bridge cc was shipped without this and to download aom package win 64. I tried that, and either did something wrong or? I deleted bridge cc 64 bit, then went to cc and downloaded bridge cc (not sure if it is 32 or 64) and the program still does not open. any ideas?

    There are lots of threads on this.  Do a web search.

  • Add cost centre field in va02

    Dear friends,
    How to add cost centre  fields in transaction va02 on screen? is it possible using user-exit?
    or is there any steps to create user-exit?
    Thanks,
    regards,
    Vishal Bhagwat.

    Hi Vishal,
    Your requirement could be implemented using a user-exit:
    Hope the below  reply helps:
    Transaction Code - VA02 Change Sales Order
    Exit Name Description
    SDTRM001 Reschedule schedule lines without a new ATP check
    V45A0001 Determine alternative materials for product selection
    V45A0002 Predefine sold-to party in sales document
    V45A0003 Collector for customer function modulpool MV45A
    V45A0004 Copy packing proposal
    V45E0001 Update the purchase order from the sales order
    V45E0002 Data transfer in procurement elements (PRreq., assembly)
    V45L0001 SD component supplier processing (customer enhancements)
    V45P0001 SD customer function for cross-company code sales
    V45S0001 Update sales document from configuration
    V45S0003 MRP-relevance for incomplete configuration
    V45S0004 Effectivity type in sales order
    V45W0001 SD Service Management: Forward Contract Data to Item
    V46H0001 SD Customer functions for resource-related billing
    V60F0001 SD Billing plan (customer enhancement) diff. to billing plan
    No of Exits: 15
    USER EXIT
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sapgenie.com/abap/code/abap26.htm
    http://www.sap-img.com/abap/what-is-user-exits.htm
    http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
    http://www.easymarketplace.de/userexit.php
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sappoint.com/abap/userexit.pdfUser-Exit
    http://www.sap-img.com/ab038.htm
    http://help.sap.com/saphelp_46c/helpdata/en/64/72369adc56d11195100060b03c6b76/frameset.htm
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sap-img.com/abap/what-is-user-exits.htm
    http://expertanswercenter.techtarget.com/eac/knowledgebaseAnswer/0,295199,sid63_gci982756,00.html
    Kindly Award Points If You Find The Reply Helpful.
    Cheers,
    Chaitanya.

  • Add Cost Center

    How can i add a cost center in Zenworks?
    I dont want to use the collection data form.
    I want to add cost center to a dynamic workstation group. Seems impossible.
    If i add it to a group in Edirectory. Will Zenworks read that attribute?

    frigge,
    It appears that in the past few days you have not received a response to your
    posting. That concerns us, and has triggered this automated reply.
    Has your problem been resolved? If not, you might try one of the following options:
    - Visit http://support.novell.com and search the knowledgebase and/or check all
    the other self support options and support programs available.
    - You could also try posting your message again. Make sure it is posted in the
    correct newsgroup. (http://forums.novell.com)
    Be sure to read the forum FAQ about what to expect in the way of responses:
    http://forums.novell.com/faq.php
    If this is a reply to a duplicate posting, please ignore and accept our apologies
    and rest assured we will issue a stern reprimand to our posting bot.
    Good luck!
    Your Novell Product Support Forums Team
    http://forums.novell.com/

  • Add Cost to Asset

    What are the per-requisites inorder to add cost/cost adjust to an existing assets?

    Hi,
    Can you please provide more details on what exact steps you have followed? The following steps need to be performed:
    1. Prepare the asset line in mass additions, click on the 'Add to Asset' button.
    2. Select the existing asset that is capitalized, to which cost needs to be added.
    3. Enter all other required and optional details for the new cost line.
    4. Change the asset line status to 'Post'
    5. Run post mass additions program to complete the cost addition process.
    To check if the cost has been successfully added, query the original asset in the transactions window. You should be able to see the new cost line under sources.
    Regards,
    Udit

  • Ke85 Add Cost Center Characteristic Value

    Hi Report Painter Expert,
    I m facing problem in KE80 report , every cost center assign with profit Center, but Sustaining cost i.e HR Cost center, Finance Cost Center, IT Cost Center and Marketing Cost Center should be display in front of Sustaining  cost , we cannot assign Profit Center . so kindly tell me where we have add the Cost Center Characteristic available in KE85.  lot of Component is there like Profit center, Account Number , but we want add Cost Center in Ke85, there is no Cost center available in KE85.
    Note : Till now we have not activated NEW GL and Document splitting. FYI.
    we are working on Classical GL.
    Yr Quick action will be highly appreciated.
    Kind regards
    Pranav Kr. Gupta
    SAP FICO Consultant.

    Hi
    In ke85 you can't get CC as far as I know. In new gl, you get both of them in same tables
    In classical PCs its not possible unless you define your own totals table with both cc and PC and then build report based on that. That's a huge effort
    Br. Ajay M

  • Activate the FIELD Cost Center while issuing the Material to Order by 261

    Dear All,
    How to activate the FIELD Cost Center while issuing the material againest Order IN MB1A?
    Thanks and regards,
    Satyajit

    Hi all,
    I'm having problems with activating the cost center field too. I've already checked OMBW and OMJJ. For OMJJ, cost center field was required. For OMBW, Cost Center field was Supressed. However, when I checked the Change Logs, no changes were performed since last year. The user who raised this issue had the cost center field activated until December 1, 2008 but now it's deactiavted. So I don't think it's OMBW responsible for this since there was no change since last year.
    Please share your knowledge on this.
    Thanks!

  • How to deliver add-on installation package to clients

    Hi,
    We have successfully released the add-on installation package. Now how could we deliver it our clients. how could we deliver the package to others.
    regards
    chinta

    sorry bro,
    it did not help me.
    i would like to know how i could deliver my package to my clients.
    i have a pat file with me, i have a password of it, i have successfully released the package.
    but how i could deliver it to my clients..
    say if you want to use my package how could i give it to you. bro.
    regards
    chinta

  • How to add new object class to a material ?

    Hi experts,
    I have to add new object class to a material ( classification class ) and then add new characteristics values for the material ....But i do not know which FM to do this , If you please to give me the solution for this problem
    PS: rewards immediately
    Thanks,

    Hi,
    Check this  CALL FUNCTION 'CLVM_CLASS_BOOK' Run it for IN UPDATE TASK
    Reward if useful,

  • Is it possible to bill together a FERT material and service item.

    Hi All,
    I have request from the user where in they want to bill together a service and fert material.
    Scenario.
    1. Sales order creation with material one FERT and other service ITEM.
    2. Delivery creation for both item. Stock should be reduced for FERT item and system should not ask for stock for service item.
    Single PGI document for both.
    3, Single billing for both FERT and service item.
    Please confirm is it possible to implement.
    Any guidance is highly welcomed.
    Regards
    Jalaj

    2. Delivery creation for both item. Stock should be reduced for FERT item and system should not ask for stock for service item.
    Single PGI document for both.
    Yes delivery will be created for both FERT and Text items and system would reduce the stock to FERT item only not for Text item(TATX) because at the time creating sales order it self for text line item qty would be Zero so at the time of PGI system will not reduce any qty.this is standard only.
    Please note for text items we don't maintain the material master and order qty also you can observe is in grey mode.
    And coming into billing why you want bill the text item? usually in standard for text items the pricing is not relevant this you can observe in the definition of TATX(VOV7).
    And finally you can combine the both the materials in single billing.
    1. Goto VF04 select order related billing and delivery related billing or
    2. by entering vf01 enter the delivery and order and try to save it.
    Please check the above and let me know your results.
    thanks,
    Srinu.

Maybe you are looking for