when i run ck11n , the additive costs are getting added to raw material consumption account, how can i split them .please advice
Thanks

Check the cost elements in OKTZ.
If there is any surcharge applicable on that material, we use CK74 to add "Additive Cost". When you run the CK11N, it shows separately in the last with separate cost element with values updated in CK74.
You might have assigned the Material consumption cost elemtn in CK74. Just check it
Hope this helps
Thanks

Similar Messages

  • Cost object for raw material consumption posting

    the raw material cosumption posting is done in the background when the goods issue is done. so where do we assign cost object for the primary cost element of raw material consumption account. since we create primary cost element for raw material consumption account, it will expect us to give cost object, so where we assign cost object for the raw material consumption cost element

    hi
    since the raw material cost is relevent for cost accounting u need to maintain primary cost elment accounts.When ever u confirm goods, the rm issue will take place automatically and will be debited to either product cost collector or production order. so u need not to assign any cost object for these consumption accounts why bcoz issues will take palce aganist a production order or product cost collector which is a cost object .
    regards
    siva

  • What are the possible cost objects for raw material consumption postings

    what are the possible cost objects for raw material consumption postings. i want to know whether it can be work order(maintenance order).

    For example, you are confirming a process order and issuing raw materials to the process order, the system in the background creates the consumption posting and will by default use the process order as a cost object.
    Similarly, when you are issuing materials to a work order, you will use MB1A and with movement type 261 and the system prompts you to enter the order number.  If you are using movement type 201, then the system prompts you to enter the cost center and so on.
    Thanks,
    Madhav Nanduri

  • Raw Material Consumption to Process Orders

    Hi Friends,
    I need help with changing the way how we consume raw materials in our manufacturing organization.
    Current Process:
    A.     Receive product A in Warehouse, movement type 101. Debit Inventory Account, and Credit GR/IR.
    B.     Move product A to a storage location (out of Warehouseu2019s custody). Movement type 311. No impact to P&L, as no accounting entries.
    C.     Consume product A in a u2018Process Orderu2019 from that storage location 311. Debit Consumption Account, and Credit Inventory Account.
    Product A is listed in Bill of Materials and has to be issued to process orders for final consumption u2013 to give production variance as we are on standard costing system.
    Desired Process:
    We want to have stronger controls in our organization. We want to hit P&L in step B, as soon as Warehouse issues items out. This can be done using movement type 201 GI for Cost Center.
    But we also desire to see final consumption happening in process orders, as all our BOMs and standard costs account for the consumption of product A.
    Please advice how do we issue items to a process order that have already been issued to a Cost Center. What is it that I am missing?
    Thanks,
    Meet A

    I believe we will stick with our current process. See Ajay's reply on the link below:
    Raw Material Consumption to Process Orders
    Thanks and regards,
    Meet A.

  • Product wise raw material consumption

    Raw material consumption is not coming correctly product wise (not matched with data extracted through MB51 material consumption report).What will be the possible error?
    N.B. Material Ledger is not active but variant configuration is on.

    Hi
    MB51 contains total movements list which may include material issued to Production as well as to Cost center/Mat moved from one store to other store and so on. where as RM consumption you may be trying to match with the GL In some of the above transactions only material documents are created and FI docs may or may not be created hence the two may not match.
    Regards
    Rajneesh Saxena

  • Day wise raw material consumption report query

    Hi,
    I was wondering if there was a way to extract the day wise consumption of all the raw materials that we use at the factory. The standard report in SAP B1 only gives me the total raw material consumption within a period of time and I need to drill down a couple of levels to see the individual raw material transferred.
    I basically wanted to use this data to establish the weekly consumption of my raw materials as the goods issue team enters this on a daily basis.
    Thanks in advance.

    Sorry for not having included it earlier. The website did not let me attach an excel sheet.so I've attached a csv file for you to take a look at but basically these are the only fields I need:
    Date
    Item No.
    Item Name
    Issue Qty [Out Qty]
    01-01-2014
    CSPLPIC001
    Raw Material 1
    740
    01-01-2014
    CSPLPIC002
    Raw Material 2
    950
    01-01-2014
    CSPLPIC003
    Raw Material 3
    793
    01-01-2014
    CSPLPIC005
    Raw Material 4
    980
    01-01-2014
    CSPLPIS001
    Raw Material 5
    487
    01-01-2014
    CSPLPIS002
    Raw Material 6
    927
    07-01-2014
    CSPLPMC001
    Raw Material 7
    907
    08-01-2014
    CSPLPMC002
    Raw Material 8
    669
    09-01-2014
    CSPLPMC005
    Raw Material 9
    41
    10-01-2014
    CSPLPIC001
    Raw Material 1
    599
    10-01-2014
    CSPLPIC002
    Raw Material 2
    473
    10-01-2014
    CSPLPIC003
    Raw Material 3
    619
    10-01-2014
    CSPLPIC005
    Raw Material 4
    477
    10-01-2014
    CSPLPIS003
    Raw Material 5
    408
    Please do let me know if there is any other information that you need.

  • Stop excess raw material consumption against production order

    Hello
    Please Guide
    Is there any  control to Stop the excess or less consumption of raw material against the Production Order confirmation.
    Eg
    Prod order Qty - 10
    Ram material reqd A- 10 piece & B- 10 Piece
    So now Order confirmation Qty - 10
    raw material consumption A - 10 & B- 10
    so for A or B if i want to issue (261) excess or Less qty than system should not allow this. System response to be as an error message in case I increase or decrease the Qty of A or B other than 10 against the prod order confirmation of qty 10.

    Hi,
    You have to use user exit only to avoid it.
    1.CONFPP02 - for checking good issue during confirmation
    2.MBCF0002 - for Checking Confirmations during the Goods receipt.
    For this you need to Use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Sep 9, 2008 12:41 PM

  • Raw material consumption - subcontrat process

    I got a PO to investigate why raw material consumption is not posted in subcontracting scenario
    When i investigated i realized that user might have unticked 543 movement line in MIGO while posting Goods receipt of finished product ..
    Invoice is already paid for this PO vendor
    All postings ok except consumption of raw material.
    Only Consumption of raw material cant be posted manually isnt it
    How we correct these instances ?
    I can think of below, suggest if any better
    1. Credit memo
    2. reverse GR for finished product
    3. post GR again correctly checking 101 and 543
    4. Invoice

    Dear
    Below link will help you
    http://wiki.sdn.sap.com/wiki/display/SCM/Subcontracting+Process
    http://www.sap-img.com/materials/sub-contracting-cycle.htm
    http://www.sap-basis-abap.com/pp/subcontracting-in-sap.htm
    http://www.sap-basis-abap.com/sapmo005.htm
    http://sap.ittoolbox.com/groups/technical-functional/sap-log-mm/subcontracting-process-in-mm-2179995
    Regards
    Aamir

  • Reg. WIP Charges not added with Raw material cost

    Dear Sir
    In BOM Header material SEMIFINISHED(CUTPCS)  is attached and component material FABRIC -Raw material is attached,and then in MIGO using 261 Mvt type we are issuing fabric against production order,next using 101 Mvt type receiving CUTPCS now the cutting charge is not added with FABRIC only FABRIC cost is coming during Goods receipt.  this is our serious problem.
    Please help me.
    Thanks
    Rajakumar.K

    Not answered

  • Raw Material Consumption Report

    Dear Forum,
    The users want to generate the report from the system that would give the item wise details of the Raw Material Cosnumption for the Period selected. How could we generate the same and also the users want to reconcile the same with the GL Account.
    Your help would be much appreciated.
    Regards

    hi
    first take out which movements ur using for consumption like 201 261 etc
    now goto mb51 here select those movements and materials u need with prorper business area,dates and execute
    now u will get the report for the consumption
    just match this with the GL accts
    u can use transaction type WA also
    regards
    kunal

  • Cost price calculation of raw material

    I want to know how cost price of raw material is calculated in sap.  Is it when ever price changes we have to go to each material code and change the price  or we can have our own policy?
    Edited by: gururaj gadgoli on Sep 18, 2008 1:05 PM

    Dear,
    For Raw material costing please have a look at :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b8/9c76a0c89c11d189990000e8214595/content.htm
    and also
    http://www.sap-basis-abap.com/sapcostd.htm
    http://www.sap-img.com/materials/price-control-v-or-s-in-material-type.htm
    Regards,
    Syed Hussain.

  • Cost Center wise List of Material Consumption

    Dear Sir,
    Kindly guide us , as which Tcode or Report is available to see the Material wise Consumption List  during a period for a given Cost-Center .
    Full marks are assured for the suggested solution
    Regards
    B Mittal

    Hi,
    You can use T.Code: KSB1 (Display Actual cost line items) in which you can restrict the report by providing the material consumption cost elements and don't give any cost center, which displays all the cost center for the given cost element.
    Regards

  • WM-PP- Raw Material consumption

    Hi
       i have a doubt, in the WM PP process with out 261  movmenttype (goods issue) is it possible to do grn against production order.
       I Configured the WM PP.... Here i given steps which has i followed the steps
      Once material staging completed
       1 .created production order ,release and saved
       2  . i did material staging
       3     i did proceed.
      4 . confirmation
      5     GRN against production order
      6.  I did FG for TR and TO
    A)if this steps correct menas Where i check the material consumption???
    B) What i have to maintain the storage type in control cycle?
    with regards
    dinesh
    Edited by: code acess on Oct 10, 2011 8:09 AM
    Edited by: code acess on Oct 10, 2011 8:24 AM
    Edited by: code acess on Oct 10, 2011 9:12 AM

    hi murugan ,
                       in the control cycle the based on material,plant,supply area.
                      i maintained the storage type as 100, staging indIcator is '1" PICK LIST ITEM.
                      I following the steps bellow
    1 .created production order ,release and saved
    2 i did material staging
    3 i did proceed.
    4. i found the TR (automatic generated) through LX09 , FOR MOV TYPE 319
    5. now stock is showing the storage type 100
    5. I Created the TO and confiramtion, Based automatic generated the TR ( 319 mov type thru t code lx09)
    4  after production confirmation
    5  GRN against production order
    6. I did FG for TR and TO
    my problem after complated the process stock is showing the storage type 100
    pls suggest me
    with regards
    dinesh

  • Restricting excess raw material consumption ducring confirmation

    Dear Experts
    Scenario
    The production of the finished product comprises of many raw materials. The goods issue is done by backflushing. After few days , it is noticed that some of the raw materials consumed are a bit more and some are less .
    The Plant manager insists that this needs to be restricted . Please advise how do we restrict this phenomenon . Your guidance will be highly appreciated . Thanks
    Kind regards
    Aman

    Aman Khan wrote:
    Also please advice if we generate a z report what fields and tables  can we consider .
    If you want to create a report program which will show the unplanned issues and over issues of components, you need to read the bom components from table RESB also, but the is problem users can add extra/new components manually in CO02 so you need to look at field STLNR to see if it came from BOM or manually added and then you need to get all the goods issues done to the production order using MSEG, use the quantities of STPO and subtract them from issued quantities of MSEG (mvt type 261) you will get the report you want. Use SE16N and look at all the fields you will understand.
    Edited by: Jeevan Sagar on Feb 11, 2012 2:22 AM

  • SFG cost same as the Raw Material price consumed

    Hi all,
    Is it possible for us to have the SFG price same as the price we consume? Reason being is that they want to carry the same cost to the next stage, let say consumption cost is RM 500, the SFG produced need to be RM500. Say RM->SFG1->SFG2->FG, so SFG has to carry to actual cost consume and issue to SFG2 and SFG2 will consist of cost of SFG1 + RM.

    Hi,
    What kind of Process is this ?MTO or ETO or MTS?
    Thanks,
    Rau

Maybe you are looking for

  • How do I add an existing account to a team account?

    I subscribed to CreativeCloud as a freelancer. Now I have an empoloyee and I wish to move to a team account and add my existing account into it. Can I do that?

  • Internet is working but router is not

    Hi... I just changed yesterday from Road Runner Cable internet to a local company that services my community called "EnTouch Systems." The internet works fine when I plug directly from the wall to the computer (modem that does the phone and internet

  • Create a database link to access SqlServer 2005 view from oracle 11gr2

    Hi All, Greetings for the day. Though I have seen quite a few posts but just wanted to cross-verfiy and double check hence posting. Oracle Database : 11gr2 OS :SOLARIS SPARC 64 Bit SQL Server Database : Sql Server 2005 OS : Windows 2003 32 Bit The re

  • Win 8.1 not remembering dual monitor setup after reboot

    Hello, I am running Windows 8.1 64-bit Enterprise N with the following hardware: HP ENVY TouchSmart 4-1245tu Sleekbook with Intel HD 4000 Graphics Dell Monitor HDMI Out from laptop to VBGA In on monitor (HDMI to VGA Convertor used to connect with sec

  • AirPort Express and Canon MX310

    Hello I am trying to setup my Canon MX310 via AirPort Express: Today i bought the AirPort Express and everything works fine. But printing does not work at all: I usually connected my printer directly via USB to my iMac. When i did that the first time