AFS Third Party Sub-contracting Through MRP

HI Guru,
I am working on SAP AFS 6.0 system.
I am having one material which is always gets subcontracted from Vendor A1. the components of header material are supplied by Vendor X1 to Vendor A1. Based on the requirement of Header material MRP generates the SC PR (as Special Procurement Key 30 is used in Material Master).
MRP run aslo creates the PR for components, but doesn't provides SC vendor tick & Delivery address as of A1.
I know this can be done with MRP area functionality, which workes in Normal R/3, BUt MRP area concept doen't work in AFS.
Is their any alternative to do mapping?
thanks in Advance.

Dear,
Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP. If you want then you need to create MRP area with subcontract as vendor MRP area and need to use use the BADI MD_SUBCONT_LOGIC
Method IF_EX_MD_SUBCONT_LOGIC~IS_GENERAL_SUBCON_LOGIC_ACTIVE .
for materials in plant 1000 and MRP area 0010 IF im_mt61d-werks = '1000'
AND im_mt61d-disgr = '0010'.
> switch to the simple subcontracting logic
CLEAR ch_scflg.
> method has changed values -> set changing flag
ch_changed = 'X'.
Please refer this link for details and OSS Note 550219 and 170597.
http://help.sap.com/saphelp_dimp50/helpdata/EN/c4/106956ae8a11d1a6720000e83235d4/content.htm
Regards,
R.Brahmankar
Edited by: R Brahmankar on Jan 19, 2011 5:56 PM

Similar Messages

  • Third Party Sub contract

    Dear gurus,
    1.Created PO for  main vendor to supply components to another SC vendor.(PO no:01).
    2.Material supplied to SC vendor(So we have to do MIGO)
              (Excise credit taken)       
    3.Createed PO for SC vendor for SC-operations(PO no.02)
    4.After finishing the required operations now SC vendor send  the final prodcut to plant.(along with 57F4 challan).
    Can any body suggest to how to get creation of 57F4 challan in this type of cases.
    points will rewarded.
    regards
    Soma

    hi
    plz refer following doc
    http://help.sap.com/bp_chemv1500/Chem_DE/Documentation/Q86_BPP_EN_DE.doc
    or follow following
    CREATE PO FOR SEMIFINISHED MATERIAL WITH ITEM CATEGORY L ME21N.
    EXPLODE THE BOM IN PO. IF BOM IS NOT CREATED, YOU CAN PUT COMPONENTS MANUALLY IN PO. FOR BY-PRODUCTS, ENTER COMPONENT WITH -VE QUANTITY.
    TRANSFER GOODS TO SUBCONTRACTOR MB1B  (MVT TYPE 541)
    CREATE SUBCONTRACTING CHALLAN WRT GOODS MOVEMENT J1IF01
    MAKE GOODS RECEIPT ONCE MATERIAL IS RECEIVED MIGO.
    AT THE TIME OF MIGO, COMPONENTS WILL BE CONSUMED AND BY-PRODUCTS WILL BE RECEIVED (DUE TO -VE QUANTITY IN PO).
    RECONCILE S/C CHALLAN J1IFQ
    MAKE IR MIRO
    PAY VENDOR F-53
    ONCE FULL QUANTITY IS RECEIVED, CLOSE S/C CHALLAN. J1IF13
    here u have to make chalan for subcontracting
    reward if helpful
    regards kunal

  • Sub-contracting through Project system.

    Hi
    Can some one please help me in understanding how Project system (PS) is supporting sub-contracting scenarios.
    I am looking for activity sub-contracting and also sub-contracting with Project stock materials.
    I am aware of normal sub-contracting through production order and also sub-contracting through MM. I am specifically looking for sub-contracting in PS.
    Thanks and warm regards,
    Jagadeesh

    Hi,
    If requirements for subcontract items (or services) are generated automatically from PS just make sure that the right document category is used (subcontract) then any requisitions or planned orders etc. will have the right category.
    There is no difference between PP, PS and PM effectively, they all use subcontracting in the same way it is just how the requirement is triggered that is slightly different.
    If you need details on how to trigger the right type of requirement through PS then you may need to use one of teh financial forums that cover PS? (is there one?)
    Steve B

  • Third Party Process (PR through Sales Order)

    Hi all,
    I have to configure the third party scenario (PR through Sales order) for one of my client.
    So can anybody tell me what are all pre-requisite / settings from the configuration point of view as well as from the transaction point of view.
    Thanks
    Shubham

    Hi,
    here is some stuff regarding third party purchasing,
    may be it will use ful,
    u2022     The item category group (BANS) in the sales:sales org.data screen of the material master controls whether or not the material will always be a third party material.  In this case, the item category in the sales order will be defaulted to u201CTAS.u201D   If the material is also procured internally, then the item category group can be set to u201CNORM,u201D and the material can still be used for third-party processing if desired.
    u2022     The item category in the sales order (TAS) informs the system that      procurement data must be maintained for the order.  In addition, this item  category results in a purchase requisition being automatically created with its item   category defaulted (S).
    u2022     The purchase requisition is created as a result of a sales order.  For each schedule line (quantities for sales orders broken up by dates of delivery), a purchase requisition item is created, provided that the item category on the
    sales order is u201CTASu201D for third-party.  The purchase requisitions created can
    be viewed and even edited from the schedule line screen (Edit-
    Procurement  Details).
    u2022     Changes in quantities, dates and account assignments in the purchase order result in the automatic changing of the sales order.
    u2022     A desired vendor (informational field) can be specified in the sales order in the procurement data for the order.  In addition, a fixed vendor may be assigned in this data if known at the time of the sales order. This then becomes the supplier for the third-party items. If the vendor is not specified in the sales order, the purchase requisition goes through the normal source determination.
    u2022     The account assignment in the purchase requisition can be either the sales order (C), or aux. account assignments (X). 
    u2022     Once created, the third-party purchase requisition follows normal
    purchasing procedures.
    u2022     Customer delivery information is copied onto the purchase requisition from the sales procurement data.
    u2022     If you create delivery schedules or change quantities during the purchasing process, these automatically get copied back to the schedule lines on the
    sales order.
    The goods receipt indicator can be found in the purchase requisition which can be edited from the sales order (Click on Item line- Hit Schedule Lines button -Hit Purchase Requisition Button).  This indicator determines whether or not the customeru2019s goods receipts are monitored.  When the indicator is off, invoice verification is done against the purchase order quantity, and the delivery of goods to the customer is not input into the system
    chenna
    Edited by: lakshmi reddy on Oct 6, 2010 2:23 PM

  • How SAP handles AFS Third Party Orders in ECC system?

    Hi All,
    There is a user exit EXIT_SAPLJ3AM_003 which exist in 4.6C version of SAP for AFS.
    This user exit is for Third Party order processes. This is called within the include LJ3AMFD1 of the main program SAPLJ3AM.
    But this User exit is missing in ECC version of SAP for AFS.
    Basically when the Dierct ship Sales Order is created, corresponding PR is created for it and using this User exit certain fields in this corresponding Purchase Requisition is filled from Sales Order but this user exit is missing in ECC system.
    Could anyone please let me know how SAP handles the Third party Orders in ECC AFS system?
    Thanks,
    Ameesha

    Hi Ameesha,
    Did u find out any solution for it? bcoz, am also hving the same issue!!
    thanq

  • Direct Ship orders - Purchse Requisation ME51N - AFS - Third Party orders

    Hello,
    There is a user exit EXIT_SAPLJ3AM_003 which exist in 4.6C version of SAP for AFS.
    This user exit is for Third Party order processes. This is called within the include LJ3AMFD1 of the main program SAPLJ3AM.
    But this User exit is missing in ECC version of SAP for AFS.
    Basically when the Dierct ship Sales Order is created, corresponding PR is created for it and using this User exit certain fields in this corresponding Purchase Requisition is filled from Sales Order but this user exit is missing in ECC system.
    Could anyone please let me know how SAP handles the Third party Orders in ECC AFS system?
    Thanks,

    changed the requirement

  • Can we Monitor third party Windows servers through Cisco Prime

    Hi Team,
    We are  using  Cisco Prime assurance and  are currently monitoring Cisco UCCE Components through it.
    Meanwhile we have   few third party  windows servers , which we would like to monitor it through Cisco Prime , just to maintain a single monitoring tool.
    If yes, please share the steps or link.Also highlight the limitations in that.
    Regards,
    krishna

    Seems Cisco Prime Assurance Manager is now obsolete and end of life already.
    It is replaced by Cisco Prime Infrastructure. CPI supports third party/vendor devices to some minimum extent with limited management details collected via SNMP Templates.
    -Thanks
    Vinod
    **Encourage Contributors. RATE Them.**

  • Sub-contracting through Production Order

    Hai..
    We have a routing with 8 operations. The 6th operation is an external operation (PP02 control key). When the production order is released a Purchase Requisition is created. It is a subcontracting PR. But the PR does not have any component assigned to it. Also the PR line item is blank. It just shows the operation description in the Mtrl description field.
    Now am not sure what item is sent to the subcontractor and what item is received back.
    Please advice.
    Regards
    Sampath

    Hi,
    There is no real difference between purchasinf an item directly from the vendor and purchasing it through a subcontract order. The only real difference is that you have to indicate that it is a subcontract PO and not a normal one and you need the BOM to be set up for the material to be subcontracted (to list the component/s that you will be sending to the vendor).
    If you have set it to get this item from stock, be careful, because if you have these items in stock, it will simply expect a stock transfer. If you don't have them in stock then MRP will try to source them for you and this will need to use the special procurement key to ensure that a subcontract PO is created instead of a normal one.
    Perhaps you would be better indicating that it is a non-stock item and have the requirement (PR) generated automatically from the PP order.
    My PP is a bit rusty and so I am not able to be specific as to which entries you would need to make and where but bascally the PP order needs to be set up to procure it directly from the vendor as a subcontract item.
    The MM process then takes over and (normally using transaction ME2o) manages the issue of the item/s to the subcontractor and the GR of the finished product into stock.
    Steve B
    Steve B

  • Re: Third Party software invocation through a Java Application

    hi,
    use the java.lang.Runtime.exec() to execute the command and pass as an arguement the necessary file that you wish to invoke.
    eg
         // for eg if filename extension is .pdf
    String pdf = "C:\\Program Files\\Adobe\\Acrobat 4.0\\Reader\\AcroRd32.exe";
         String [] cmd = {"start", pdf,"c:\\sample\\sample.pdf"} ;
         Process process = Runtime.getRuntime().exec(cmd) ;now put that code in a if condition dependent on the type of file extension..
    hope that helpzz
    cheerz
    ynkrish

    I wrote a sample program :
    public class Trial {
         public static void main(String[] args) {
              try {
                   String pdf = "C:\\Program Files\\Adobe\\Acrobat 5.0\\Reader\\AcroRd32.exe";
                   String [] cmd = {"start", pdf,"c:\\test\\intro.pdf"} ;
                   Process process = Runtime.getRuntime().exec(cmd) ;     
              } catch (Exception ex) {
                   System.out.println("Exception caught " + ex);
                   ex.printStackTrace();
              }// end catch()
         }// end main()
    }// end class
    I am working on Windows 2000 and JDK1.3.1
    The error i got is
    Exception caught java.io.IOException: CreateProcess: start "C:\Program Files\Ado
    be\Acrobat 5.0\Reader\AcroRd32.exe" c:\test\intro.pdf error=2
    java.io.IOException: CreateProcess: start "C:\Program Files\Adobe\Acrobat 5.0\Re
    ader\AcroRd32.exe" c:\test\intro.pdf error=2
    at java.lang.Win32Process.create(Native Method)
    at java.lang.Win32Process.<init>(Unknown Source)
    at java.lang.Runtime.execInternal(Native Method)
    at java.lang.Runtime.exec(Unknown Source)
    at java.lang.Runtime.exec(Unknown Source)
    at java.lang.Runtime.exec(Unknown Source)
    at Trial.main(Trial.java:6)
    Vijay Hegde

  • Hi third party subcontracting

    Hi
    Can any body can help me in configuration of third party sub-contracting scenario.
    With regards
    GNK

    Hi,
    Here you can treat this two procedures are diffrent
    For Contractor
    Create P.O >> send semifinish goods to vendor
    For sales Point
    Sales order >> PR >> PO >> Vendor invoice reciept >> Customer invoice Issue wrt order.

  • Third party subcontracting

    Hi Expert,
    I have some subcontractor related problem.
    In subcontracting process component to be supplied by " Third party" not by our company,we create the purchase order and given the delivery address to the subcontractor address. in this process which movement type is use for transport the material to the vendor and which movement type is use by system to consume the supplied material. what is the procedure please explain in detail.how many PO have to be created in this process.
    Please explain step by step with T-code ,item category and with movement type

    Hi,
    The third party sub con scenario involves two PO's as below,
    1. The third party PO , u need to create third party PO for ur component material to be supplied by third party to ur SC vendor.
    The PO will be std NB , wr in delivery adrs tab u will check the check box for SC vendor and maintain the SC vendor
    and when u do the GR for this PO , the material will be with SC vendor stk, u can chk in MMBE. The movement type will be 101 only for doing GR
    2. The second PO is the finished material PO which u will place for ur SC vendor - which will std doc type NB , with item category L.
    The finished material will have BOM maintained.
    The main point in third party sub con scenario is the transfer posting ie goods issue will not be done ie 541 movement type for component material will not be done. Since the third party PO has already supplied material to SC vendor.
    Here u do direclty GR for SC vendor PO, at that time 101 will recieve ur finished material and 543 will consume ur component material which u have supplied to ur SC vendor via third party vendor.
    And u can chk after this in MMBE the sub con stk will get reduced for component material.
    Pls go through this step , u will get it.
    Pls reply for any clarification

  • Characteristics of Item Cate. u2013 u201CLu201D(Sub-Contracting) (Q2-4)

    Dear Sirs,
    When I displayed the Characteristics of Item Cate. u2013 u201CLu201D (Sub-Contracting) through "IMG - MM - Purchasing - Define External Representation of Item Cate.", I found that a checkbox - "PO Item Linked" was checked in "Invoice Receipt", meaning that invoice must be processed for PO. If I create a "Return" or "Free Goods" item using this Item Cate., is the invoice also required to process ?
    Tks,
    KH Fong

    Hi,
    When you are doing subcontracting process you can not have "returns" indicator selecetd in PO with item category "L".
    For free goods, invoice verification is not applicable.
    Cheers,
    Satish Purandare

  • Third-party e-mail using bellsouth account on FiOS ISP

    My elderly parents were just set up on FiOS as the ISP. They have bellsouth.net as a third-party e-mail through my account. Even when I change the outgoing SMTP to outgoing.verizon.net and try port. 25, 465 or 587, outgoing e-mail through Outlook Express still doesn't work.

    If you are using outgoing.verizon.net, then you need to set it to "My server requires authentication" and enter your verizon.net username and password. Port should be either 25 or 587.
    If you are using a 3rd party outgoing server on a Verizon connection, then it would be set up as normal but on a port other than 25. Any other port the 3rd party allows should work, but 25 will not.
    If a forum member gives an answer you like, give them the Kudos they deserve. If a member gives you the answer to your question, mark the answer as Accepted Solution so others can see the solution to the problem.
    "All knowledge is worth having."

  • Third party software in PXI

    Spoiler (Highlight to read)
    Hi All,
    Can I control third party CAN hardware through PXI USB port? If yes, how to install drivers in PXI?
    I wish to use ValueCAN for CAN communication.
    Gaurav k
    CLD Certified !!!!!
    Do not forget to Mark solution and to give Kudo if problem is solved.

    Copying from iPod to Computer threads...
    http://discussions.apple.com/thread.jspa?threadID=868833&tstart=0
    http://discussions.apple.com/thread.jspa?messageID=797432&#797432
    Also these useful internet articles...
    http://www.engadget.com/2004/11/02/how-to-get-music-off-your-ipod/
    http://playlistmag.com/help/2005/01/2waystreet/
    iPod: Frequently Asked Questions
    http://docs.info.apple.com/article.html?artnum=60920
    Patrick

  • Sub contract entry

    Dear All
    We are sending the material for sub contract through challan. At the time of receipt out of 5 component rejected 1 component due to poorquality. How can enter this entry in sap std.
    Shall we send back for recetification in the same challan/or have to prepare a new challan.
    Guide me the process.
    ksk

    Hi,
    If you send 5 component to Vendor through challen.
    At the time of reciept you recieve 5 components out of which 4 components are ok & 1 is rejected due to poor quality.
    What you can do is you can inward the 5 component in MIGO & do the quality rejection through 122 mvt type for 1 component & send back the same material to vendor for reprocessing. Once he proceess the component again inward the component & then complete the challen .
    rgds
    gsc

Maybe you are looking for

  • Proper data download to excel

    hi all, i am getting right output.But while downloading iam not getting the data for name1 field from lfa1 table to be displayed & also while downloading the negative sign is not coming for the amount values. Modify the below code. REPORT zvenageing1

  • Doubt in 1Z0-051 course book

    Hello, I am preparing to write Oracle Database 11g: SQL Fundamentals I Exam Number: 1Z0-051. I am refering the book OCA Oracle Database 11g: SQL Fundamentals Exam Guide (Exam 1Z0-051). In the second chapter dealing with select statements it mentions

  • How to Sleep an IMac using the Magic Mouse

    I received a Magic Mouse as a Christmas present. It works really nice but I must be doing something wrong as it is battery hog. It is just the middle of January (less than a month of use) and the 2nd set of batteries are now down to 40%. I noticed it

  • Can't find My datasource in QA from Dev

    Hello Gurus, I have transported generic datasource from Dev to QA, when i check in source systems(After replicating in RSA1 in QA), still i Cant find it! when I assign Source systems(for datasource) at infosource in QA, Iam able to find my Datasource

  • Viewing photos from EXT drive in iPhoto, please help!

    Is there any way to view my photos in iPhoto if I store some of them on an external drive (without having to copy them into the iPhoto library on the internal drive)? There's a lot more room on my external drives and my computer is full; this would s