Sub-contracting through Production Order

Hai..
We have a routing with 8 operations. The 6th operation is an external operation (PP02 control key). When the production order is released a Purchase Requisition is created. It is a subcontracting PR. But the PR does not have any component assigned to it. Also the PR line item is blank. It just shows the operation description in the Mtrl description field.
Now am not sure what item is sent to the subcontractor and what item is received back.
Please advice.
Regards
Sampath

Hi,
There is no real difference between purchasinf an item directly from the vendor and purchasing it through a subcontract order. The only real difference is that you have to indicate that it is a subcontract PO and not a normal one and you need the BOM to be set up for the material to be subcontracted (to list the component/s that you will be sending to the vendor).
If you have set it to get this item from stock, be careful, because if you have these items in stock, it will simply expect a stock transfer. If you don't have them in stock then MRP will try to source them for you and this will need to use the special procurement key to ensure that a subcontract PO is created instead of a normal one.
Perhaps you would be better indicating that it is a non-stock item and have the requirement (PR) generated automatically from the PP order.
My PP is a bit rusty and so I am not able to be specific as to which entries you would need to make and where but bascally the PP order needs to be set up to procure it directly from the vendor as a subcontract item.
The MM process then takes over and (normally using transaction ME2o) manages the issue of the item/s to the subcontractor and the GR of the finished product into stock.
Steve B
Steve B

Similar Messages

  • Operations Sub Contracting in Production Orders

    Dear All
      I need to do a operation subcontarcting.The requirement goes as follows
    There are 3 operations 10 Moulding in house ,20 - Subcontracting To vendor for operation &
    30 - With the received Material from Subcontractor One more Moulding operation is done.
    The bom contains only one raw material its assigned to 1st operation.
      i checked the querries posted in Sap and have done the following steps
      i have maitained 20 the operation as PP02 with purch organisation and material group
    assigned i have got a purch requstion while creating a order.
       Since we are using only one material for all operations i issued it to the po and Done final confirmation for 10 th operation.
      Then iam trying to to convert Purch Request to PO thru ME58 iam not getting it executed but while trying to create it through ME21N iam getting an error components
    not possible to get any components.
    My doubt i have already issued the raw material required how to send the raw material again to the sub contractor and i want your help in creating PO through ME58
    Shankar

    Hi shankar,
    For your case (in service subcon), check routing with operation 20 (PP02), subcontracting check box have tick, pls remove tick mark and save production order, now you convert PR to PO
    FYI, already discuessed many times for this topic, pls refer below SDN forum link
    https://forums.sdn.sap.com/click.jspa?searchID=7249879&messageID=4487712
    https://forums.sdn.sap.com/click.jspa?searchID=7109743&messageID=4056008
    https://forums.sdn.sap.com/click.jspa?searchID=7109743&messageID=4480137
    https://forums.sdn.sap.com/click.jspa?searchID=7109743&messageID=4487712
    Regards,
    Sankaran

  • Sub Contracting for Production Order

    Hi All,
    Scenario is like this, I release Production order & deicde to sent it to sub contracting & PO Created is wth Acct assignment F with no material master.
    after this how do i account sub-contacting bills with MIGO i'm not able to make a GR.
    should i maintain a material master in purchase order, how do i send material to sub-contractor.
    Regards

    Hi,
    You have to maintain material master for both - Ordered Material & the material in the BOM of ordered material. Also you have to maintain procurement key as X - Both procurement types possible. When the planned order is created for the final product, you can convert the Planned order to PR with item category L - Sub Contracting, system prompts the material to be supplied to subcontractor in Material Component list (BOM Material). You may transfer the material to the sub-contractor via transfer posting (MB1B) movement type 541. When you post GR for final product, the BOM material is consumed for the Final product via movement 543.
    Hope the query is fulfiled.
    Reward proper points if the answer is helpful.
    Regards,
    Prashant Kolhatkar

  • Sub-contracting through Project system.

    Hi
    Can some one please help me in understanding how Project system (PS) is supporting sub-contracting scenarios.
    I am looking for activity sub-contracting and also sub-contracting with Project stock materials.
    I am aware of normal sub-contracting through production order and also sub-contracting through MM. I am specifically looking for sub-contracting in PS.
    Thanks and warm regards,
    Jagadeesh

    Hi,
    If requirements for subcontract items (or services) are generated automatically from PS just make sure that the right document category is used (subcontract) then any requisitions or planned orders etc. will have the right category.
    There is no difference between PP, PS and PM effectively, they all use subcontracting in the same way it is just how the requirement is triggered that is slightly different.
    If you need details on how to trigger the right type of requirement through PS then you may need to use one of teh financial forums that cover PS? (is there one?)
    Steve B

  • Operation wise cost through production order

    Hi Experts,
    Is There any standard report to get Operation wise cost through production order.if it is there please provide the details.
    Thanks & Regards,
    Prabhakar

    HI,
    I don't know a standard report but table CKIS contains the costing details line item wise with the corresponding operation number (CKIS-VORNR).
    So a query/quick view using KEKO + CKIS should be sufficient.
    Best regards, Christian

  • Sub contracting in CS order

    Hi Guys
    Any idea how to update the field subcontracting in CS order with BAPI or other functions?
    Batch input is not optional.
    Thanks in advance

    Hi,
    You have to maintain material master for both - Ordered Material & the material in the BOM of ordered material. Also you have to maintain procurement key as X - Both procurement types possible. When the planned order is created for the final product, you can convert the Planned order to PR with item category L - Sub Contracting, system prompts the material to be supplied to subcontractor in Material Component list (BOM Material). You may transfer the material to the sub-contractor via transfer posting (MB1B) movement type 541. When you post GR for final product, the BOM material is consumed for the Final product via movement 543.
    Hope the query is fulfiled.
    Reward proper points if the answer is helpful.
    Regards,
    Prashant Kolhatkar

  • Sub contracting and production time

    Hello Experts,
    My problem is related to sub contracting and how to reflect the time the subcontractor needs to produce the goods.
    My system works as follows. 
    I create a subcontacting for material A. This material has delivery time 5 days. I supply the subcontractor vendor with material B. This material has also delivery time 5 days.
    So, when I set the delivery date to ie 02.02.09 for component A, I get the requirements date for component B to 10 days less than my requirements date.
    This means that I need to have B in my stock 10 days before I get A into stock. I guess that this is caluclated using A and B's delivery time and in this case, the five days i meant to reflect the number of days from me to the vendor.
    This does not reflect my needs.
    I also need to be able to reflect the production time at the vendor. This is the number of days between he receive B and when he can ship A. As this works now, the vendor is given no time to manifacture A out of B.
    Second, the time it takes to ship B will be very different denpendent on which vendor who will receive it.
    Any ideas how this is done?
    rgds
    GAR

    Hi,
    Please define the Total replenishment lead time (in workdays) according to your requirement.
    There is no point in maintaining the Total replenishment lead time field (in MRP 3 view of material master) for materials procured externally.
    In external procurement, the system adds the processing time from purchasing (maintained in SPRO> Materials Management> Consumption Based Planning> Plant Parameters> Carryout overall maintanance of Plant Parameters-->Maintain --> External Procurement), the planned delivery time, and the goods receipt processing time ( both in the MRP 2 view of material master data or in Vendor master data) and uses this total as the replenishment lead time for an availability check with replenishment lead time.
    Hope this will help.
    Regards,
    Narayana.

  • Sub Contracting: CO product is lying with vendor instead fo own

    Hi expert
    when i am taking Co product with movement 545 (0).system  showing stock with vendor instead of own storage location,
    regad
    Nabil

    Hi
    USe of 545 O movemnet
    If a component is entered with a negative quantity for the subcontract order, the receipt of the by-product is posted to stock provided to vendor during goods receipt for purchase order or during the subsequent adjustment. 
    so now you need to do 542 movement manually to bring back the stock to unrestricted use

  • AFS Third Party Sub-contracting Through MRP

    HI Guru,
    I am working on SAP AFS 6.0 system.
    I am having one material which is always gets subcontracted from Vendor A1. the components of header material are supplied by Vendor X1 to Vendor A1. Based on the requirement of Header material MRP generates the SC PR (as Special Procurement Key 30 is used in Material Master).
    MRP run aslo creates the PR for components, but doesn't provides SC vendor tick & Delivery address as of A1.
    I know this can be done with MRP area functionality, which workes in Normal R/3, BUt MRP area concept doen't work in AFS.
    Is their any alternative to do mapping?
    thanks in Advance.

    Dear,
    Special stocks are not considered for MRP run. Subcontracting stock is a special stock(O), hence is not considered for MRP. If you want then you need to create MRP area with subcontract as vendor MRP area and need to use use the BADI MD_SUBCONT_LOGIC
    Method IF_EX_MD_SUBCONT_LOGIC~IS_GENERAL_SUBCON_LOGIC_ACTIVE .
    for materials in plant 1000 and MRP area 0010 IF im_mt61d-werks = '1000'
    AND im_mt61d-disgr = '0010'.
    > switch to the simple subcontracting logic
    CLEAR ch_scflg.
    > method has changed values -> set changing flag
    ch_changed = 'X'.
    Please refer this link for details and OSS Note 550219 and 170597.
    http://help.sap.com/saphelp_dimp50/helpdata/EN/c4/106956ae8a11d1a6720000e83235d4/content.htm
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Jan 19, 2011 5:56 PM

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • Delivery order for sub-contract processing scenario

    Hi experts,
    We got a requirement from our users to sub-contract certain production processing steps (or called external processing per SAP). Same part number would be used for the goods issue and goods receipt. But would like to make the delivery for the goods issuing as the delivery for normal sales parts. (Purchase order -> Delivery order -> Shipping and Packing)
    Sub-contract processing will generate purchase order like service order which only contains service fee item, and we found that no outbound delivery order can be created with reference to purchase order in standard SAP.
    Have you experienced such scenario before and could share to us please?
    Regards

    When moving subcontracting part to your subcontractor you can do it via:
    1. simple goods movement
    2. delivery
    1 Simple goods movement (transfer posting)
    - /w reference to PO (MB1B + 541)
    - w/o reference to PO (MB1B / MIGO + 541)
    2 Delivery
    Using the before mentioned ME2O you can create the delivery w/o reference to PO
    Please note that even if you use the MB1B541PO reference solution, system just suggests the component qunantity on the PO w/o making a real link between PO and goods movement. You can example do the MB1B541PO reference "as many times" as you want...
    So, as per my best knowledge there's no solution for your requirement.
    I guess one reason of system's behaviour might be that provision of compoenents doesn't depend on one single PO - if you want to reduce your shipment cost you will send out lots of components at once, more than the amount needed for one call-off.
    Regards,
    Csaba

  • Regarding Costing in External processing operation in production Order

    Hi Everybody,
    We are trying to do sub contracting through external processing operation in production order. In brief, we are creating a production order which contains just one operation and when the prod.order gets released, it creates a purchase req through external processing operation. Pur.Req is being converted to Pur.Order with all the Raw's which we are going to send to Sub Contractor..
    The costing issues we are facing are
    1. First we receive GR against Pur.Order, once its done, the Raw's which we sent to Sub.Contractor will be backflushed.. but we dont receive the Finihsed part until we confirm the production order.... there is a Gap between this two processes.. so how can we make sure that there wont be any differences in terms of FI..
    2. Second issue is, some times even if we ordered 10 pcs, subcontractor can only send 5pcs and 5 pcs afterwards.. but every month end FI dept tries to close the books, so how can we deal with this issue if i receive 5 pcs in this month and remaining 5 in the next month...
    If any body dealth with this kind of situation.. your hints will be really valuable,
    Adavnce thanks
    srikanth

    Dear Srikanth,
    Please note the following:
    1. First we receive GR against Pur.Order, once its done, the Raw's which we sent to Sub.Contractor will be backflushed.. but we dont receive the Finihsed part until we confirm the production order.... there is a Gap between this two processes.. so how can we make sure that there wont be any differences in terms of FI..
      - a) Issue your raw materials through T.Code. - MB1B, Mvt. Type - 541. This will transfer materials from your stock to vendor stock (provided you have initiated vendor material provision and activated 541 mvt. type for PP)
        b) After you receive the material back from vendor, run the T.Code MB01, which will cause Mvt. Types 543 and 101. Now the material has come back to your Production order, but not in Storage location stock.
       c) Then carry on normal CO11N and MB31 for your production order.
    Hope this will solve your problem.
    Revert back if you still have any question.
    Regards,
    Angshuman Kar

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Characteristics of Item Cate. u2013 u201CLu201D(Sub-Contracting) (Q2-4)

    Dear Sirs,
    When I displayed the Characteristics of Item Cate. u2013 u201CLu201D (Sub-Contracting) through "IMG - MM - Purchasing - Define External Representation of Item Cate.", I found that a checkbox - "PO Item Linked" was checked in "Invoice Receipt", meaning that invoice must be processed for PO. If I create a "Return" or "Free Goods" item using this Item Cate., is the invoice also required to process ?
    Tks,
    KH Fong

    Hi,
    When you are doing subcontracting process you can not have "returns" indicator selecetd in PO with item category "L".
    For free goods, invoice verification is not applicable.
    Cheers,
    Satish Purandare

  • Creation of subcontracting PR through maintenance order

    Dear experts,
    Can anyone tell me how to create the automatic subcontracting pr from the maintenance order.
    my requirement is to send the defective item from the maintenance to external vendor.
    how to see the subcontract  check box in the maintenanc order screen.  what is the settings i ve to do.
    when i try to check the MPI INDICATORS, i m not able to edit .
    please guide me how to get the solution that for this subcontracting external process. 
    i m using the control key as PM02 IN THE operation tab page.
    do i ve to send that material as non valuated material ?
    what are all the steps to be covered.     can you guide me step by step
    thanks and regards
    vinoth devapriyan

    Hi Vinoth,
    SAP supports Sub-contracting from Maintenance Order from EHP 5. If you are using EHP 5, then you have an 'Check Box' option in the Refurbishment Order Type to define sub-contracting is allowed. Then you can send a Defective Material & get back a Repaired Material.
    If you are working on a EHP that is less than 5, then you have do the sub-contracting flow seperately. Following are the steps.
    Create a Sub-Contracting PR. While creating the PR, you need to define 'Recursive BOM'. Here the Parent material will be with Valuation Type 'Defective' & child Material will be with Valuation Type 'Repaired'.
    Create a PO. Issue the Material (defective) from ME2O against movement type 541 to the Vendor.
    Post GR with Movement Type 101.
    Now the Material will get into stock against Valuation Type 'Repaired'.
    Note : Do not provide 'Account Assignment' as Maintenance Order (or) Cost Center in the PO. It should be blank. Other wise the Order will be debitted twice (once when consuming the material & second when posting GR).
    Hope this helps.
    Regards,
    Ajai