Hi folks.
please let me know what I need to do in order to allocate the schedule lines according the quota defined. I mean.. if I have a demand for 100 PC for each weak and a quota arrangement with 60% for vendor A and 40% for vendor B how can I get for each weak a schedule line with 60 PCs to vendor A and 40PCs to vendor B?
tks

Tks Baweja. But actually what is happening is that the system is allocating quantity only to a one vendor and not distributing the quantities for both. 
week    qty    vendor
1           60       A
1           40       B
2           60       A
2           40       B
3           60       A
3           40       B
4           60       A
4           40       B
5           60       A
5           40       B
What I found out was that to split the quota we have to set up it in the lot size procedure.
spro->production->materials requirements planning->planning->lot size calculation->check lot-size procedure->mrp lot size

Similar Messages

  • Sourcing using quota arrangement

    Hi,
    How to carry out sourcing using quota arrangement?
    We want to use quota arrangement to carryout sourcing?
    Pl guide.
    Thx

    Vaibhav
    Your question is too general. You have to be little more specific about your reqirement.
    Iam going to assume you are talking about sourcing to a single destination branch from multiple vendors using quotas. It is simple you have to create inbound quotas to branch from the vendors using tcode /n/sapapo/scc_tq1. Make sure the quotas are active and valid as of the current date. Then run heuristics and you will see the quotas taking effect .
    thanks
    aparna
    Edited by: Aparna.Ranganathan on Feb 3, 2011 6:43 PM

  • How to know if a MRP run element is using Quota Arrangement and lot size?

    Hi all,
    Two questions:
    A) How to determine if a source is actually pulled from Quota Arrangement?
    I am wondering if there is anyway from ABAP table or from Transaction (i.e. Purchasing Order) in which the source is pulled from a Quota Arrangement?
    We use scheduling agreement, PIR and source list, and as well as Quota Arrangement for our purchasing.
    I just want to know how, from system (table and transaction), to find out the source is from quota, not from PIR or others.
    B) Quota Arrangement still can work properly if lot-size procedure's splitting quota indicator not Checked?
    If my the lot-size procedure which I am using for a material does not activate the splitting quota indicator, it means split quota will not work during MRP run.
    But does this also mean that quota arrangement will not be working for this particular material even if I have create a a quota arrangement object (via MEQ1) for this material?
    Thanks
    Daniel

    Tomek,
    If I want to use the split quota, it seems there is some pre-requisite.
    If you go to MEQ1 and press F1's on the "Minimum qty split" column, and you will notice the following message.
    Allocation by quota using splitting quotas is only carried out via a requirement planning run, subject to the following preconditions:
    Through the appropriate entry in the field Quota arrangement usage (on the MRP data screen 2 or Purchasing screen) it must have been specified that a quota arrangement is to be applied in the planning run.
    The indicator for the splitting quota must be set for the the lot-sizing procedure used for materials planning purposes in Customizing.
    Hence, the quota arrangmeent still workable even if the lot-size does not have the spliting quota box checked?
    Indicator: Splitting quota in short-term horizon
    The indicator for splitting is used to determine that in the case of the selected lot size, the quota arrangement is to be applied using the splitting logic.
    Use
    If this indicator has been set, the lot is split up in the planning run according to the following formula:
                                quota for source X
    Quantity for source  X = --------------------- * requirement
                               sum of all quotas

  • How to calculate the quota base quantity in quota arrangement?

    Hi all,
    As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
    Regards,
    Ranjan

    Dear,
    Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
    Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
    This quota arrangement is also specific to material and plant level.
    Quota rating = quota allocate quantity + quota base quantity / quota.
    Quota based quantity used only when a new vendor introduced.
    In the as on date situation, the minimum quota ratings will considered as preferred vendor.
    The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
    In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
    Regards,
    Syed Hussain.

  • Assign Source of Supply User Exit with Quota Arrangements in ME57 and ME56

    Hi there,
    We are using Quota Arrangements to define Vendor rebate levels and we have enabled User Exit EXIT_SAPLMEQR_001 to provide a more informative popup to replace standard Source of Supply popup as need to display current allocation quantities and % allocation fulfiled.
    This User Exit is invoked during Assign Source of Supply during PReq processing (More precisely during Assign Source of Supply in ME51n and Automatic Source of Supply in ME57 and ME56) which all works fine.
    When used in ME51n and Source of Supply Assigned and PReq saved, the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is successfully updated with the relevant amount
    When using ME56 or ME57 to Automatically Assign source of Supply via the PReq list, the User Exit is invoked correctly and on selecting Vendor and saving the PReq is update correctly, however the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is NOT updated with the relevant amount
    I have searched SAP Notes and debuged with limited success but cannot find evidence as to why this difference is happening - I assume that it has something to do with User Exit but any advice gratefully received if anyone else has experienced this issue?
    Ben

    Hello Jerry,
    source will be determine based on the following points:
    Outline Agreement
    Info record
    Quota Arrangement
    Source List
    For more information, <a href="http://help.sap.com/saphelp_47x200/helpdata/en/75/ee11b255c811d189900000e8322d00/content.htm">Click here</a>
    Hope this helps.
    Regards
    Arif Mansuri

  • Subcon Quota Arrangement behavior during MRP

    Dear Gurus,
    Currently, we have a scenario wherein during subcon process there can be 3 Vendors active. During MRP, we would like to have an output as per below:
    Requirement: 1500
    Vendor A: capacity 500 - priority 1
    Vendor B: capacity 700 - priority 2
    Vencor C: capacity 500 - priority 3
    If I run MRP, I would like system to have PR's Vendor A with 500 then as the Vendors capacity is only 500 the remaining requirement should be passed on the succeding vendors. So from my example, Vendor B should have 700 and Vendor C should have 300.
    Is this possible using Quota Arrangement. I was trying to test but I cannot get my desired result.
    Please note that the settings in the material master is already set to Quota usage 4 and the lotsize is weekly with splitting quota activated.
    Thanks,
    Raymond
    Edited by: Raymond on Oct 10, 2011 11:17 AM

    Hi,
    Yes I have maintained below in MEQ1 just for testing but I cannot get the desired result:
                      Quota Percentage        Maximum Lot size      Priority
    Vendor A:   100                                 500                           1
    Vendor B:    100                                 700                          2
    Vendor C:                                           500                          3
    Set-up Weekly lotsize with splitting quota and quota usage 4.
    But during MRP execution, I think the system splits the requirement quantity into 2 and distribute to Vendor A and Vendor B then if it reached maximum lotsize it proposed to vendor C.
    our requirement is first to consider Vendor A then Vendor B then Vendor C according to maximum lot size and priority.
    Any idea if this is possible?
    Thanks,
    Raymond

  • KANBAN with Quota arrangement

    Dear Guru,
    Ist possible to use Quota arrangement in KANBAN external Procurement (Scheduling Agreement)?
    If so, please advice me how to do it... i am new to KANBAN.
    Regards,
    Senthil

    Hi Kumara,
    As per my knowledge Quota Arrangement is not possible to use in KANBAN with Schedulling Agreement.
    However pls find below the process steps for KANBAN WITH SCHEDULING AGREEMENT:
    You can carry out KANBAN with Replenishment Strategy- External Procurement in following two ways :
    1.     External procurement from Vendor to Main Stores:
    Basic rules and Prerequisites:
    u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
    u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
    u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
    u2022     Backflush is not required and Material is issued against a Pick List for Production Order.
    Process steps:
    1.     Create supply area for Main stores. TC: PK05
    2.     If required, extend the material to main storage location. TC: MMSC
    3.     Make the necessary changes in the material master as explained above.
    4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
    5.     Create Kanban control cycle. TC:PKMC
    6.     Print the barcode. TC:PK17
    7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to main stores.
    8.     View the demand source view. TC: PK13n
    9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
    10.     Once the material reaches Main stores scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
    2.     External procurement from Vendor directly to shop:
    Basic rules and Prerequisites:
    u2022     MRP type should be u2018NDu2019 in MRP1 view of material master.
    u2022     Availability check should be u201CKPu201D in MRP3 view of material master.
    u2022     Backflush indicator is must. It can be defined in the routing or in the material master itself. If Backflush indicator is set in the material master, then the material will be backflushed through out the plant (Material issue not required against production order). However if you want the material to be backflushed only when it is used for certain products, then Backflush indicator should be set in the routing ( in the component allocation against operations).
    u2022     Confirmation should be done for each operation in the production order either individually (CO11n) or collectively (CO15). Confirmation posts goods issue of components (relevant to confirmed operation/s) to production order
    u2022     Maintain KN01 storage location in the field - production storage location of MRP2 view in the material master. Back flushing will take place from this location. Field - Storage location for external procurement should be KN01 in the material master.
    u2022     Material received from vendor is directly posted to unrestricted stock. Inspection at vendors place or vendoru2019s process control to ensure rejection free material. Inspection set up in Material master should be inactive.
    Process steps:
    1.     Create supply area for kanban stores (KN01). TC: PK05
    2.     Extend the material to Kanban storage location. TC: MMSC
    3.     Make the necessary changes in the material master as explained above.
    4.     Create scheduling agreement. Put kanban indicator (X) in the additional data of item.
    5.     Create Kanban control cycle. TC:PKMC
    6.     Print the barcode. TC:PK17
    7.     Set the kanban status to EMPTY by scanning the barcode. TC: PKBC. A Schedule line will be generated for the supply of material to kanban store.
    8.     View the demand source view. TC: PK13n
    9.     When the material is received at Gate, perform goods receipt into blocked stock (movement type 103). TC: MIGO
    10.     Once the material reaches shop, scan the barcode to FULL. TC: PKBC (At the background GR with 105 movement will happen).
    Hope this helps.
    Revert if any doubt and reward points if useful.
    Regards,
    Tejas

  • Quota Arrangement in MRP Planning

    Dear All,
    I am facing problem in foll Scenario:
    I am trying to use Quota arrangement in MRP Planning.
    I have maintained foll values:
    Quota Usage in Material Master.
    Quota for the material against 3 vendors in Percentages.
    I have not maintained any Lot size procedures cause we are not using any batch management or Lot sizing in our company.
    MRP Type is reorder type planning.
    PIR is maintained for all the 3 vendors against the material being used.
    No source List is maintained.
    But during MRP Run only 1 PR is getting generated against a single Vendor - which is appearing 1st in the Quota arrangement.
    Kindly please suggest me why is this happening... and whether there is some note of configuration missing.
    Regards,
    Jyotsna Loomba

    Hi,
    It is easier to use an example.
    Lets say we have two vendors that we want equally used and they have been set up in a quota arrangement for a long time. The quota base qty will show how many have been ordered from each. So lets say that at the moment we have the two vendors both set up with a quota of 1 (to keep them equal) and the quota base qty is the same for each (lets say 10,000).
    We now want to add a third vendor and they too should get an equal share of the orders. If we just add them the system will see that vendors A and B have each had orders for 10,000 and the new vendor has had 0 and so the system will give every order to the new vendor until they too have a total of 10,000.
    By manually entering 10,000 to the quota base qty of the new vendor we are tricking the system into thinking that the new vendor has had the same number of orders as the existing vendors and so from now onwards they WILL all get an equal share.
    I hope this helps with the clarification of the use of quota base qty?
    As for the data you have just provided, the system would give the next few orders to Vendor V2.
    the reason is that the other two vendors get a quota rate of 1 each and V2 has a quota rate of 8 and so V2 should get 8 times the qty of V1 and V3. The quota base qty of 80 against V2 and 20 against each of V1 and V3 means that V2 will get the next orders until their qty reaches 160 (at the proportion of 1, 8, 1).
    So if V1 is getting all of the orders at the moment then there is something wrong with the set up of the quota arrangement. This could only really happen if you have set some maximumquantities or lot sizes etc. If you have not done this then I would check that V2 and V3 have valid info records etc.
    Steve B

  • How to Disregard Quota arrangement in LTP run

    Is it possible to disregard any quota arrangement usage set on the Material Master MRP2, when running Long Term Planning MS01/02

    Hello....
    Note 206684 has the following information:
    o  When you use quota arrangement, the special procurement key of
       the quota arrangement item must correspond to the special
       procurement key for the source list entry (recognizable, for
       example, in table EORD). If, for example, the special procurement
       in the material master is changed, when the source list entry
       already exists, not corresponding special procurement keys can
       occur and a new source list entry must be created.
    Check if it helps you to solve.
    Bye
    Gabriel

  • Quota Arrangement || Allocated Quantity

    Hi All,
    I am currently dealing with two issues related to Quota Arrangement which are as follows:
    I have a product in APO on which inbound quota arrangement is set. The product is procured from a vendor and purchase requisitions are created on it. The validity of the quota is from 01.01.2000 to 31.12.2014. Now as per the business requirement we need to extend the validity till 31.12.2015. In APO we can't extend the validity of the quota. The other option is to delete this quota and create the new quota arrangement  of desired validity. But the challenge is 32,654 quantity is already allocated to it( in Allocated quantity field, which is as per my understanding the sum quantity of purchase requisitions and purchase orders). If I delete the quota what will be the affects of it ???. How should I proceed with this issue ???
    I have integrated a new product in APO and I am trying to arrange a quota for the same. I created it successfully. There are purchase requisitions and purchase orders created on it. However, I can see 0 in the allocated quantity field. Can anyone help me in understanding the reason behind 0 Allocated Quantity ???
    Thanks,
    Swapnil

    Dear Sethuraman,
    P - Type of procurement (Internal manufacturing, External Procurement).
    S - Special procurement type. For example consignment / sub-contracting.
    Vendor - Number of Vendor Master
    PPI - Your internal plant from which you will be manufacturing the material.
    Ver. - Production version.
    Quota - The quota percentage in which the required quantity is to be splitt.
    Allocated Qty - Total quantity from all purchase requisitions, purchase orders, release orders, and scheduling agreement schedules allocated to a given source of supply. (The quantities of quota-allocated planned orders are also taken into account.)
    Maximum Quantity - Max qty which is to be assigned to this vendor.
    Quota Base quantity - If you get a new vendor in the quota arrangement, the quota base quantity is to be entered here to avoid all requirements being assigned to the new vendor.
    Max & Min Lot Size - The lot size related to this vendor.
    Rounding Profile -
    1X - Mark tick here of the vendor is to be assigned only one lot during a MRP run. (may be due to capacity restriction).
    Maximum Release quantity - Max qty the vendor should be assigned per MRP period.
    No. - Number of periods for which the Max release qty relates.
    P - Period to which this qty relates.
    Pr - Priority determination sequence
    Determining the Quota Base Quantity
    The quota base quantity is used only when you include a new source in an existing quota arrangement.
    Read SAP Help for more details Determining the Source Under a Quota Arrangement - Purchasing (MM-PUR) - SAP Library
    Split Quota issue
    Thanks & Regards,
    Ramagiri

  • Quota arrangement allocation

    Hi
    Can a max qty be allocated for a year in Quota arrangement?
    Can a max qty be allocated for a month in Quota arrangement?
    What is the relation between allocated qty, max qty and max release qty?
    Regards
    Soumen

    Hi
    Quota arrangement
    Distribution of the total requirement of a material over a certain period is to be assigned to particular vendor on the basis of quotas.
                                       Quota allocated quantity + Quota base quantity
    Quota rating   =       -
                                                                   Quota
    Vendor with least quota rating will be given preference.
    Quota arrangement usage
    Key that specifies which business functions use a quota arrangement.
    If a certain material is to be procured alternately from different sources of supply, these individual sources can be assigned quotas. The quotas indicate the percentages of a total requirement that are to be procured from each of the various sources over a period.  
    A quota arrangement is set up for a specific timeframe. A quota arrangement item is created for each source of supply within the period. Only consecutive validity periods can be specified for a material.  
    The business application areas in which the quota arrangement is used, and the quota-allocated quantity, is updated progressively  
    The entire quantity of a requisition is assigned to a single source of supply. The total quantity of a requisition is split among different sources.  
    Splitting among different sources is carried out if a lot-sizing procedure for which the splitting quota indicator has been set is assigned to the requested material in the latteru2019s master record.  
    The sources involved are taken into account in an order that results from their quota relationship. The order dictated by the quotas can be overridden by the prioritization. 
    The quota-allocated quantity and the quota rating have no significance where a quota arrangement is applied with splitting. 
    The lot quantities are calculated on the basis of the quotas. 
    The minimum splitting quantity indicates from which quantity upward a (residual) requirement is to be split among different sources. If the quantity required is less than the minimum quantity, only one source is selected.
    Minimum and maximum lot sizes are taken into account only in the case of requisitions that are generated automatically in the course of a planning run. The maximum quantity is also checked in the case of manually created requisitions.  
    The maximum quantity represents a limit value allocated by quota to a source of supply. If this limit value is reached or exceeded, a quota arrangement item is no longer suggested as a source.  
    The minimum lot size defines a minimum quantity for an order proposal. If, on the basis of the quota arrangement logic, a source is determined for which a minimum lot size has been entered, and if the quantity required is less than the minimum order quantity, the order proposal is generated with a quantity equal to the minimum lot size.
    The maximum lot size represents the greatest possible order proposal quantity. If a requirement exceeds the maximum lot size in the quota arrangement item, several order proposals are suggested with quantities equal to the maximum lot size, until the total quantity required is covered.  
    The minimum or maximum lot sizes maintained in a quota arrangement item override the entries in the material master record and are valid solely for the assigned source. If the minimum or maximum lot sizes are maintained only in the material master record, the values entered there apply to all sources. 
    Regards
    Ram

  • Uploading of Quota arrangement using LSMW

    Dear Members,
    I want to upload Quota arrangement using LSMW.
    Pl advise.
    Thanks & Regards,
    Sanjay Kohli

    I am trying to upload quota arrangement using IDOC method, since there is no Standard/Batch Input Method as well as Bussiness object method available for it.
    I am not using Batch input recording method since no of vendors will varies depending on the plant & material comination.
    I am unable to load it using IDOC as I not able to identify process code for I DOC message Type LIPEQU.
    I slhall be thakful in case you can provide the same or alternative method to upload Quota arrangement in addition to Batch Input recording.
    Regards,
    Sanjay Kohli

  • While Creating PO with Quota Arrangement Quantity is not picking by % given

    HI ALL.
    created Quota arrangement with 2 vendors.
    And assigined Percentages like 30 and 70 for this.
    Created Purcahse requisition and purchase order.
    But quanity with vendor percentages is not executing.
    Regards.
    Paramesh.
    Advance Thanks.

    Hi
    Can you give more information. How you create the PR & PO manually or via MRP.
    Quota arrangement works for automatic source determination and it has the highest priority.
    Also Splitting quota is only possible with MRP.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/75/ee116c55c811d189900000e8322d00/content.htm]
    Hope it helps
    Karthik

  • Scheduling Agreement and Quota arrangement

    Dear all,
    Kindly share with me the individual steps involved in in creating Scheduling Agreement as well as Quota arrangement procurement process with T.Codes and also the relevant configurations involved.
    Thanks a lot.

    Hi,
    Here is all about Quota arrangement :
    Following are the configurations.
    1) To specify number range for quota arrangement
    SPRO > IMG > MM > Purchasing> Quota arrangement> Define number range (Int or Ext)
    2) Set Quota arrangement usage indicator:
    SPRO > IMG > MM > Purchasing> Quota arrangement> Define quota arrangement usage
    On Application side following are the prerequisites
    1) Create Quota arrangement
    SAP Menu> Logistic> MM > Purchasing> Master Data> Quota arrangement > Maintain
    2)specify procurement type : Int / Ext
    3)Where appropriate specify the special procurement type For ex stock transfer
    4) Enter the vendor or supplying plant
    5) Specify the quota you want to assign to this source
    Please understand terms as below,
    Quota Rating = Quota allocated Qty +Quota Base Qty /Quota
    Quota Base Qty: Quantity used for manual control of the quota Arrangement (For example new source is included)
    Quota: Number that determines how requirement are apportioned among various sources .Decided by a Purchasing people based on confidence on source.
    I source determination source with lowest quota arrangement will always be assigned
    Example
    Source Quota    allocated Qty      Quota Rating
    M             1                   100                     100
    N              2                   150                     75
    O             3                     75                      25 *
    In above case vendor O will be assigned as low Rating *
    Now quota Base Qty will come into picture when new supplier is introduced. As you have seen that vendor with low quota Rating is assigned .In case of new supplier as no allocated qty earlier its Quota rating will always be low & all Qty will be allocated to him. To prevent this Base qty is added to allocated Qty so that accordingly it will determined accordingly
    If Quota base Qty is 100   & quota is 2
    For new vendor X rating will be
    Quota rating = 100 + 0 / 2 = 50
    I hope this gives you entire clarity.
    Vivek

  • Quota Arrangement in LTP

    Hi Gurus
    In LTP Business Process my requirement is like this
    1) One Fert Material Contains one ROH in BOM of Qt1
    2) The ROH contains 2 vendors
    3) I want to give the quta of ROH in 40% and 60%
    SO in LTP i need 2 planned orders for ROH even if i my requirment for Fert is single
    Pl explain me the settings required for the same
    K.Prabakaran

    Hi,
    In MEQ1 , pls check the foll.
    1. Min Qty splitting - the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run.
    Check whether order qty is more than this min qty.
    2. Also check the valid from and to dates.
    Allocation by quota using splitting quotas is only carried out via a requirement planning run, subject to the following preconditions:
    Through the appropriate entry in the field Quota arrangement usage (on the MRP data screen 2 or Purchasing screen) it must have been specified that a quota arrangement is to be applied in the planning run.
    Regards,
    Sheik
    The indicator for the splitting quota must be set for the the lot-sizing procedure used for materials planning purposes in Customizing.