Alternate Item in BOM

We are manufacturing a assembly using alternate raw materials say RM1 or RM2 or RM3.
We want to define these three raw materials alternately in such a way that;
1.     If stock of RM1, RM2 & RM3 is available, then system should consume the RM1 first always.
2.     If required qty is 100. Stock of RM1 is 40, RM2 is 30 and RM3 is 100. In such condition, system should consume                the 40 qty of RM1, 30 qty of RM2 and 30 qty of RM3.
3.     If stock of RM1 is zero, then system should consume the stock of RM2.
4.     If stock of RM1 and RM2 is zero, then system should consume the stock of RM3.
Please guide how to create a BOM to fulfill above requirements.

Dear Sachin,
In my understanding the system allows to maintain the priority,strategy and usage probability for the items grouped under
alternative item group.
Priority:This determines the priority for planned withdrawal of items.
Example:
Two items are assigned to an alternative item group (A1) with the following values for priority:
Item 0060 Value for priority: 02
Item 0065 Value for priority: 01
The system reads item 0065 first.
*Usage probability*MRP plans these alternative material components according to probability of use.
In this field you enter a percentage to show the probability of using an object in production. Material requirements for the BOM
components are planned according to the usage probability.
The system does consumes the items as per the stock availability automatically.
So in your case even stock determination will not work,as this decides only in what sequence the stock should be consumed for
a material(from which storage location to which storage location).
Check and revert.
Regards
Mangalraj.S

Similar Messages

  • Alternate Items in BOM

    Hi All,
    I have the following scenario, i am creating a BOM in which for one material there are two alternate items. Here i mean if Material A is the main item, and if this not available then we need to use both Material B and Material C.
    We have alternate items but this is a case of two items been required to replace one. How do I set the BOM in tis case?
    Do i need to go with Alternate BOM...? That is BOM 1 with Material A and Alt BOM 2 with Material B & C.....Is this the only way..?
    Thanks for your review and feedback
    Regards,
    Srinath V

    Hi ,
    For This situation may be it is convenient apply Phanton?
    -The Father Product (X), have as component
    the Prod A and it is replaced by A1 , using option Discontinuation DATA
    The Prod B and it is replaced by B1 using option Discontinuation DATA.
    Phanthom X
                item A
                Item B
    Phantom X1
               Item A1
               Item B1
    Constraints
    Only we can use simultaneously A with B
    or A1 with B1, (We can't use A with B1 or B with A1)
    How we must config Built of Material ( Discontinuation Data or Alternative Item Group, using discont group,followup group) and MM02( discontinued parts)
    We need use item A/B until the stock was consumed, so we wil use Item A1/B1, and MRP must to calculate needs based on items A1,B1
    Thanks for you attention!
    Regards

  • PR generation of Alternate item of BOM

    Dear Gurus,
    I have a BOM with alternate item group maintenance among 2 item material. Those item group has maintained with proper priority and usage. Now I have a requirement of header item and the priority 2 material has some stock. Therefore, I would like to consume the priority 2 material first and then the PR will generate of priority 1 material, by demand - stock quantity of priority 2 material against of BOM.
    Looking for any help from all gurus.
    Thanks in advance,
    SAP PP

    Dear SAP PP,
       In this case, I think you should use production version to resolve it. You can create 2 production version in MRP4 view of material master data. You can assign Alternative BOM for each production version. When you create production, maybe you can choose production version what you want. Of course, one is what you need.
    I hope it can help you.
    Paul

  • Alternat items in bom

    Hello All,
    I have two items A & B. Both items I can use for manufacturing of X. Now i want to consume first all available stock of "A" then "B". How it is possible?
    rgards,
    Mayura Welankar

    Hi ,
    You can use alternative items in item details screen of BOM.
    search in forum you can see lots of threads on the same.
    check this thread , too
    Re: Alt bom components with ATP check - production order resets usage prob. 
    Hope it helps you .
    Regards
    Ritesh

  • How to define alternate items for Spare Parts

    Hi SAP Gurus,
    My Client wants to implement Alternate items for Spare Parts. It is not a Manufacturing unit.
    Actually Client wants their Service Partners to know that
    ex., Material A is an alternate item to Material B and can be used for servicing without ordering for Material A.
    Whether there is any Possibility to define alternate item in the Material Master.
    Off course I have gone through the thread and document of Alternate items in BOM.
    I would appreciate for providing Clarity on the subject.
    Best Regards,
    R.Velmurugan

    Hi Velmurugan,
    As per your requirement  i think you can achieve alternate item group functionality ( as your client is not manufacturing)
    You can maintain alternate material in MRP 4 view followup material field or basic data 1 old material Field than develop a ZReport extract the same as of client not manufacturing  any thing.
    Otherwise refer this document if you to go to Follow up material Functionality.
    Concept of Discontinuation Data - Material Master and BOM
    If you have any other query kindly revert back otherwise close the thread.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Alternate Item In case of Creating reservation(MB21)

    Dear Experts
    Can any one help me out from creating reservation with alternate item only Sngle item of Group. ,when we r defining the Alternate item in BOM according to group and afterwords i m creating reservation from (MB21 with reference to BOM)that particular BOM .then out put is taking all item of group. but we want only single Item of particular group and  create the reservation.
    Rgds
    Pankaj Agarwal

    Dear Experts
    Can any one help me out from creating reservation with alternate item only Sngle item of Group. ,when we r defining the Alternate item in BOM according to group and afterwords i m creating reservation from (MB21 with reference to BOM)that particular BOM .then out put is taking all item of group. but we want only single Item of particular group and create the reservation.
    If Any solution then Pl tell .
    Rgds
    Pankaj Agarwal
    Edited by: Pankaj Agarwal on Feb 11, 2008 10:33 AM

  • Mass Maintenance of BOMs with Alternate Item Groups

    We plan to create BOMs containing Alternate Item Groups (+ usage probability + priority) to cover alternative parts usage.
    What is the SAP solution for Mass maintenance of BOMs with Alternate item groups?
    Is it possible to use (or customize) CS20 (or another transaction) to do following tasks in Mass :
    - identify the BOMs containing a specific material number (where used)
    - add a new item line with a new material nbr in the BOM (with same quantity, subitems, Alternate Item Group, ...)
    - when required, change the usage probability of the members of the group to set the new material usage on 100% and all other alternates usage on 0%. When not required, add the new one with 0% and don't change the existing members of the group.

    Dear.
    Ask your ABAP Team to write BDC or LSMW program.
    This will help you.
    Regards
    Utsav

  • Alternate Item Group functionality in BOM

    Hi PP Gurus,
    I was looking into the Alternate Item Group functionality in BOM and found it interesting for my business requirement.\
    But I am facing one problem as below:
    I have 3 components for Eg. A1, A2, A3 in my header material 'A'. All the three component materials are same but quailty of the 3 is different and also the standard price.
    My requirement is whenever I am creating Production material for header material 'TEST_Header_Material, the system should look into A3 first (Cheapest), if not available then A2 (Cheaper) and if not then A 1(expensove of all the three).
    For base quantity for A = 1EA, I have entered 1 EA for A1, A2, A3 in BOM. I have stock of A1=9, A2 = 6 and A3 = 2.
    When I am creating Production Order for A = 10 EA, ,yrequirement is that the system should consider A3 first, then A2 and then A1 based upon the prority and hence should withdraw A3=2, A2=6 and A1=2 for meeting the quantity for finish product A in Production Order. But actuall the system is considering A3 but confirming it as 0, then looking into A2 again confirming it as zero and then looking into A1 and  again confirming it as 0. And thus giving Missing Part list though I have sufficient quantity to cover the requirement.
    That means system is only considering total quanitty.
    Can you please advice?
    Thank You.
    Rahul.

    Dear Rahul,
    Priority:In this field, you define the priority of the item within an alternative item group. This determines the priority for planned
    withdrawal of items. Two items are assigned to an alternative item group (A1) with the following values for priority:
    Item 0060 Value for priority: 02
    Item 0065 Value for priority: 01
    The system reads item 0065 first.
    Also check these links,
    concept of alternative items
    Re: Alternative item in BOM
    Re: NOTE 149332 : Error for material components with usage probability 0
    Re: Discontinuation&Production Order
    Regards
    Mangalraj.S

  • PP - Phantom Assembly Alt Item in BOM not loaded in Planned Order

    Hi all,
    I have a scenario where in my finished product, I have several components organized in Alternate Group, and for each group, I define a component as Prime (100% usage) and others as Alternate (0% utilization). Among these there are some components that are configured as Phantom (Special Procurement 50), and these Phantom items, when they are Alternate in the BOM, ie, 0% Probability of Use in Alternate Item Group, it is not loaded in the list of components in Planned Order. Only the Phantom that is as Prime in BOM is showed in the Planned Order, together with their subcomponents.
    The other components that are not phantom, usually appear within the Planned Order, those that have 100% utilization, and those who have 0% utilization set in the BOM. Obviously, all requirement is pointed in the Prime Item, but I can change according to availability of material in MDVP or manually in CO02.
    When the Production Order is created directly by CO01, without conversion of planned order, the list of components typically brings all the Phantoms, independently of the Probability Use %.
    Someone tell me if there is some kind of configuration to allow the Phantoms Optional also be uploaded to the component list of planned orders without having to change the percentage of use in BOM.
    Thanks in advance.

    Hello MCantos,
    When you have maintained the usage probability as 0% for a alternative component, that means you do not want that partular material to be planned further. In short this is just an Engineering Relevant Material (is not required in Production activity).
    When this alternate material with usage probability 0% is phantom material, you want its components to be proposed. But you yourself have answered that this phantom material has usage probability 0% and this means it is not required in Production and thus its components as well are not required. Thus system is not exploding the BOM and proposing the material at the time of Production activity.
    Hope I answered your query. Please check your usage probability for phantom assembly part and if required correct the same so that you can achive what you want.
    Thanks,
    Rahul.

  • Different scrap quanitity for alternate item

    Hi Guys,
    I have alternate item in my BOM header. That is two alternate raw materials are used for manufacturing the SFG and have different scrap quantity , in this case how to create BOM?
    Thanks and regards
    Thamizh_g

    Hi,
    For the alternate items you can maintain the scrap % in material master as Assly scrap in MRP-1 view & component scrap in MRP-4 view. Also you can maintain the scrap qty in BOM also, in the BOM item level you can maintain the operation scrap. But BOM will be having the highest priority.
    Regards,
    V. Suresh

  • How to change a plant in sales order for main item of BOM

    Dear Gorus,
    Please tell me how we can change plant of main item of a BOM?
    Actually, I have maintained a LUMF BOM. The main item and components of this are maintained for two different plants.  BOM is also maintained for both the plants and it explodes smoothly in sales order once I provide the plant. But as per our reqirement sometime we need to change the plant. Here system does not allow to change the plant of main item of BOM as it is in gray mode now.
    Please guide me how can I change the plant? Is it possible by configuration or should I go for userexit?
    If the userexit required please tell me which userexit I have to use because I already discussed and checked with my ABAPer. we could not find the right userexit.
    Thnaks in advance.
    regards,
    Sanjay

    Dear Sanju,
    Could you please explain what you have done for the same?
    Thanks & Regards
    Piyush

  • Item Category do  ot change for sub-item in BOM

    Hi Friends
    I create main item using MM01, Gen item cat. grop in basic data 1 in ERLA and Item cat. group in Sales org. 2 is LUMF
    and similarily i created other items useing MM01 (for making sub item of main item) Gen Item Cat grop in basic data 1 is NORM and Item cat group in Sales Org. is also NORM.
    When i create sales order (OR) and enter main item only, when i press enter (green button at right top), BOM automatically explode and Item Category of main item change to TAP main item become in display mode BUT ITEM CATEGORY of sub items do not change (it remains the same as TAN), i should also change to TAE
    and also when i save this document it shows error at bottam that prising PR00 is missing. When i edit and give price of each sub item, i can save document and all prices which i am giving just now is automatically added in net value at header lavel.
    Please any one can advice me where i am doing wrong
    Rajesh
    Email: [email protected]

    HI,
    Please check in customizing.IN assign item category menu
    S.doc typeitem cat. groupUsageHigh lvl itemiem cate.
    ORERLA   TAQTAE.
    IN MM01 ERLA and LUMF can not be assigned to same material.They are alternative item category group.
    ERLA  is used when you want to price Main item  in BOM and sub-item are not priced.
    LUMF is used when main item in BOM is not priced but sub-item(individual component) are priced.
    In SAles org vie 2- you have assigned LUMF,that is each sub-item is priced.hence you are able save the document.Since  You have  maintained price in VK11 for each sub-item and item category of sub-item is not getting vhanged from TAN to TAE.
    But if you maintained ERLA in Sales org view 2 and redo all steps,your problem will be solved.
    vrajesh

  • What  is use of  Item Category N(non-stock item) in BOM creation

    Dear Experts,
                       What  is use of  Item Category N(non-stock item) in BOM creation ?
    regards
    rajakarthik

    Hi,
    This item category is used for components which are not kept in stock if they are used in a bill of material (BOM). Non-stock items can be entered in the BOM with or without a master record. To enter a non-stock item without a master record, you must simply enter a descriptive text.
    When you use this item category, the system automatically creates a purchase requisition for these components,
    Special functions
    The following functions are supported for non-stock items
    • You maintain purchasing data for non-stock items in the bill of material.
    • In the planning run, the system generates purchase requisitions
    instead of dependent requirements for components that are procured directly. When you configure your R/3 System for MRP, you can define whether direct procurement is triggered by the planning run or by production order management.
    • Product costing processes take valuation data from the BOM item.
    The system determines the release strategy on the basis of the price data you enter. The material group is required to produce a purchase requisition.
    Pavan

  • Items in BOM which need not be procured/produced

    Hi All,
    SAP does not seem to have the ability to have zero quantity in a BOM. I have certain materials which are in the BOM but i am not procuring/producing them. But I get a order every time i run the MRP. How can i have the material listed in the BOM but not have its presence effect the orders created?
    thanks in advance.

    Hi,
    Definition of BOM:
          BOM is a formally structured list of components that makes up a product.
          The list contains object no together with the quantity and unit of mesure.
          The definition itself fails in your case.
          So why you are defining the item as bom item.
          For defining the Bom item Qty and unit of measure is mandatory.
          Regards,
         nandha

  • Class Item in BOM

    I'm using Class Item (Item Cat: K) in my BOM, and I have doubts in the followings:
    1. Can a class item be replaced by more than one material?
    2. When I enter the characteristics in the header material, if there are more than one materials suits that, the system always pick the first one. Can I do the setting like: the system would prompt for user to choose among those suitable materials?
    Pls kindly give some lights on that. Thank you.
    Ken

    Let me mention my situation in details:
    Characteristic: ProductCat
    Possible value:  A / B
    Class: Class200
    only one characteristic ProductCat assigned
    Three material assigned to Class200
    SubItem1         (ProductCat = A)
    SubItem2         (ProductCat = A)
    SubItem3         (ProductCat = B)
    BOM:
    MainItem     
    -- Class Item K  Class200
    When I explode in t-code CU50,
    Enter ProductCat B in MainItem, SubItem 3 is chosen.
    Enter ProdcutCat A in MainItem, SubItem 1 is chosen. (Why not SubItem2 ???)
    I can use "Find Object" button, then "Find in initial class" to choose SubItem2. The SubItem1 is then replaced by SubItem2. That's what I need.
    Can I do the same when creating QT in VA21?
    During the item cat BOM explosion in VA21, SubItem1 is always selected. I want to let user to choose SubItem2.
    Pls give me some advice. Thanks a lot!
    Ken