Hello to all,
My client is having sampling inspection at every hour based on sampling procedure. lot size 3201 to 10000, sample= 80 and for lot 10001 to 35000, sample= 125.
Defects to be inspected are classified as very Critical, critical, major and Minor.
I am not understanding, how to decide whetehr lot is to be Rejected or Accepted after capturing defect types in Result Recording screen. What shoulsd we capture in Result recording screen.
Can anyone tell me how this AQL sampling procedure will imapct decision on our lot.
I am looking for grass root level information from you all.
My question may look crude to you, but on getting some advice from you all I can redifine my question again.
Thanks you very much in advance for you all.
Vineeth

Hi,
I have a similar requirement, how you achieved that, could you please mention that code. Thanks.

Similar Messages

  • Difference between Sampling Procedure and Sample-drawing procedure

    Friends,
    I am new to QM and started learning QM Module. My doubt is what is the difference between Sampling Procedure and Sample-drawing procedure?
    The reason for my doubt is, we can determine the sample quantity with Sampling procedure itself. then what is the need of sample-drawing procedure?
    Also describe primary, pooled and reserved samples.
    Regards,
    IMIMINT

    Hi,
    Sampling Procedure 
    Definition
    A procedure that contains the rules for determining the sample size for an inspection. The sampling procedure also specifies the type of valuation to use for results recording (attributive, variable, or manual).
    Use
    You assign a sampling procedure to each characteristic in an inspection plan to calculate the sample size.
    Sample-Drawing Procedure 
    Definition
    A master data object in which you plan the drawing of physical samples. In the sample-drawing procedure, you specify:
    Which categories of physical samples must be drawn
    How many physical samples must drawn
    The size of each physical sample
    Whether the drawing of physical samples must be confirmed
    Use
    The system uses the information in the sample-drawing procedure together with the information in the inspection plan to calculate the physical sample sizes, and to create physical-sample records when an inspection lot is created.
    Primary Sample : It is the sample drawn from the lot directly.
    Pooled Sample : It is the sample whcih is combination of 2 or more primary samples.i.e. primary sample sfrom say 3 differetn drums is mixed and tested.
    Reserved Sample :sample which is preserved for the testing in future.
    or in other words
    Primary samples (1st stage)
    Physical samples drawn directly from a material or batch that will be inspected or used to create pooled samples.
    Pooled samples (2nd stage)
    Physical samples to be created by mixing the contents of two or more primary samples from the same material or batch.
    Reserve samples
    Primary physical samples drawn from a material or batch reserved for future inspection.
    Vishal
    Edited by: VISHAL JONNALWAR on Feb 4, 2010 6:43 AM

  • Quality management( difference between sampling procedure & sample drawing)

    Hi Experts,
    I am very new to quality management module & working in united states. i am trying to find difference between sampling procedure & sample drawing procedure.
    I see that sample drawing procedure is assigned to Inspection Plan & sampling procedure is assigned to characteristics, But i don't know the difference between these two, Please help me.
    Regards,
    Seshu

    Hi,
    SAMPLING PROCEDURE :
    A procedure that contains the rules for determining the sample size for an inspection. The sampling procedure also specifies the type of valuation to use for results recording (attributive, variable, or manual).
    Use
    You assign a sampling procedure to each characteristic in an inspection plan to calculate the sample size.
    Integration
    In a sampling procedure, you must activate the function for inspection points based on a sample-drawing procedure if you assigned a sampling procedure and a sample-drawing procedure to an inspection plan at the characteristic and header levels respectively.
    SAMPLE DRAWING PROCEDURE:
    Definition
    A master data object in which you plan the drawing of physical samples. In the sample-drawing procedure, you specify:
    Which categories of physical samples must be drawn
    How many physical samples must drawn
    The size of each physical sample
    Whether the drawing of physical samples must be confirmed
    Use
    The system uses the information in the sample-drawing procedure together with the information in the inspection plan to calculate the physical sample sizes, and to create physical-sample records when an inspection lot is created.
    Structure
    A sample-drawing procedure contains the following types of information:
    Header data
    The sample drawing header contains the following information fields and control indicators:
    Key that identifies the sample-drawing procedure
    Short text description for the sample-drawing procedure
    Authorization group that limits the access to the sample-drawing procedure
    Text for matchcode searches
    Long text indicator
    Indicator for calculating the number of physical samples on the basis of number of containers in the inspection lot (as opposed to the base unit of measure)
    Confirmation indicator to activate or deactivate the confirmation requirement
    Lock indicator to prevent the sample-drawing procedure from being used
    Usage indicator that shows whether the sample-drawing procedure is currently used in an inspection plan
    Sample-drawing item(s)
    A sample-drawing item contains specific instructions for creating physical samples with respect to a specific inspection lot container type and specific partial-sample numbers in the inspection plan. In a sample-drawing item, you can also specify:
    Which categories of physical samples you want to create (primary samples, pooled samples, and reserve samples)
    The physical sample container you use to draw each category of physical sample
    A factor to increase the quantity of physical samples to be created (for example, if you need to carry out more than one inspection)
    The number of physical samples to be created (fixed number or variable number based on a sampling scheme)
    Integration
    The sample-drawing procedure interacts with the following planning objects:
    Inspection plan
    You assign a sample-drawing procedure to an inspection plan to activate the functions for sample management.
    Sampling scheme (optional)
    If you want the system to determine the number of physical samples automatically on the basis of a sampling scheme, you can reference sampling schemes in a sample-drawing procedure.
    Hope it helps...
    Regards,
    Priyanka.P
    AWARD IF HELPFULL

  • How to use sampling procedure

    Hello Friends,
    I have to map the following scenario. Please advise the config & master data.
    1) My sample size should change if my acceptance & rejecetion level changes.
    2) If rejection increases then the sample size in the next lot should increase & the vice versa.
    Regards

    Hello Sir,
    Thanks for your valuable reply. I have progressed on this. I need some more help.
    Let us park DMR for a while. DMR is working fine. But I have some issues in results recording.
    Let us only work only with sampling procedure with sampling scheme.
    I have taken one inspection characteristic. It is quantitavie characteristic. It has lower limit as 10% & upper limit as 15%.
    what I have done
    1)
    I have created one sampling scheme = ABC
    Valuation parameter = variable inspection by S method
    sampling table = severity/AQL
    For normal inpsection (4) I have taken AQL as 2.
    Lot size = 100
    Sample size = 15
    K-Factor = 3
    2)
    I created one sampling procedure = XYZ
    Sampling type = Use sampling scheme
    Valuation mode = Variable inpscetion S - Method (two limits)
    without inpsection points
    assigned sampling scheme = ABC
    No multiple samples
    Inspection severity   4
    AQL value             2.000
    3)
    I assigned the sampling procedure in the plan with the characteristic.
    4)
    I did GR for 100 & sample of 15 generated.
    why I have done
    1)
    In sampling scheme
    valuation parameter = variable inspection by S method (because my characteristic is quantitative)
    2)
    In sampling procedure
    Valuation mode = Variable inpscetion S - Method (two limits) (because my characteristic is quantitative with lower & upper limit )
    My issues:
    1) Is my settings for a quantitative characteristic with lower & upper limit correct?
    2) During results recording system is asking to enter StdDev. What is standard deviation?
    3) How characteristic is accepted & rejected? I am not getting any pop up to select accept or reject?
    Regards

  • How to add records or how to maintain list in stored Procedure

    Hi,
    I am facing an issue in the addition of record in the type
    create or replace
    TYPE               "PROD_SEARCH_COUNT_TBL"                                          AS TABLE OF PROD_SEARCH_COUNT_OBJ;
    create or replace
    TYPE               "PROD_SEARCH_COUNT_OBJ"                                          AS OBJECT
    ( /* TODO enter attribute and method declarations here */
        V_Name Varchar2(500 Byte),
        v_Value Varchar2(500 Byte),
        v_count Number
    I want to add records to the type I tried following way
    prod_wcf_rec PROD_SEARCH_COUNT_TBL;
      SELECT PROD_SEARCH_COUNT_OBJ('Name1','Value1',1) BULK COLLECT INTO prod_wcf_rec FROM DUAL;
        SELECT PROD_SEARCH_COUNT_OBJ('Name2','Value2',2) BULK COLLECT INTO prod_wcf_rec FROM DUAL;
        SELECT PROD_SEARCH_COUNT_OBJ('Name3','Value3',3) BULK COLLECT INTO prod_wcf_rec FROM DUAL;
        SELECT PROD_SEARCH_COUNT_OBJ('Name4','Value4',4) BULK COLLECT INTO PROD_WCF_REC FROM DUAL;
    DBMS_OUTPUT.PUT_LINE ('-----------------------------Looping----------------------------');
    FOR i in 1 .. prod_wcf_rec.COUNT
    LOOP         
    DBMS_OUTPUT.PUT_LINE (prod_wcf_rec(i).V_Name||' - '||prod_wcf_rec(i).v_Value||' - '||prod_wcf_rec(i).v_count);     
       END LOOP;
       DBMS_OUTPUT.PUT_LINE ('-----------------------------Looping----------------------------');
    In printing I am getting last records only .So is there any way to add records to PROD_SEARCH_COUNT_TBL
    How to add records or how to maintain list in stored Procedure

    Every time you BULK COLLECT into a collection type the value is overwirtten. So you need to try something like this.
    SQL> create or replace type prod_search_count_obj as object(v_name varchar2(500 byte), v_value varchar2(500 byte), v_count number)
      2  /
    Type created.
    SQL> create or replace type prod_search_count_tbl as table of prod_search_count_obj
      2  /
    Type created.
    SQL> declare
      2    prod_wcf_rec prod_search_count_tbl;
      3  begin
      4    select obj_val
      5      bulk collect into prod_wcf_rec
      6      from (
      7            select prod_search_count_obj('name1','value1',1) obj_val from dual
      8            union all
      9            select prod_search_count_obj('name2','value2',2) from dual
    10            union all
    11            select prod_search_count_obj('name3','value3',3) from dual
    12            union all
    13            select prod_search_count_obj('name4','value4',4) from dual
    14           );
    15
    16    dbms_output.put_line ('-----------------------------looping----------------------------');
    17    for i in 1 .. prod_wcf_rec.count
    18    loop
    19      dbms_output.put_line (prod_wcf_rec(i).v_name||' - '||prod_wcf_rec(i).v_value||' - '||prod_wcf_rec(i).v_count);
    20    end loop;
    21    dbms_output.put_line ('-----------------------------looping----------------------------');
    22  end;
    23  /
    -----------------------------looping----------------------------
    name1 - value1 - 1
    name2 - value2 - 2
    name3 - value3 - 3
    name4 - value4 - 4
    -----------------------------looping----------------------------
    PL/SQL procedure successfully completed.
    SQL>

  • How to assign sampling procedure at plant level.

    Hi Team,
    Pls suggest me "How to assign sampling procedure at plant level."
    Error message is  -  You can not use sampling procedure here.
    Not all sampling procedures can be used in this context.
    Example:
    Only the sampling procedures for an attributive inspection based on the
    number of nonconforming units are allowed.
    However I have assigned 0.05% sampling procedure in IDES system plant, which is accepted. However I am not allowed to assign this in client system..
    Pls suggest me solution.
    Thanks

    Hi,
       During creation of inspection plan you can assign SP at plant level, IP always at plant level
    Q.Error message is - You can not use sampling procedure here.
    ---> pl check the MIC where Sampling procedure in clicked or not
           pl revert
    Cheers,

  • How to map AQL sample

    Hi all,
    Help me to map below AQL plan in QM.this plan my client is using
    NORMAL INSPECTION
    Lot size     Nom        Sample size           Level 1.5                 Level 2.5                     Level 4.5
                                                                           (Accept/Reject)        (Accept/Reject)           (Accept/Reject)
        2       A                            2                   0 / 1                            0 / 1                               0 / 1
        8                  B                            3                  0 / 1                             0 / 1                               0 / 1
    500                 k                            32                   2 / 3                            3 / 4                               5 / 6
    For TIGHTEN INSPECTION
    Lot size     Nom        Sample size           Level 1.5                 Level 2.5                     Level 4.5
                                                                           (Accept/Reject)        (Accept/Reject)           (Accept/Reject)
        2       A                            3                   0 / 1                            0 / 1                               0 / 1
        8                  B                            5                   0 / 1                             0 / 1                               0 / 1
    500                 k                            80                  2 / 3                            3 / 4                               5 / 6
    Thanks

    you only assign one level against a charcteristic.
    SAP already provides many standard AQL sampling plans. The ones for you probably want are S221214L, S221214M and S221214N. 
    If you don't have these, you can created them manually.  You should have a sampling procedure for level 1.5.  Another for level 2.5 and another for 4.0.  You will need  a sampling scheme created for each of these where you maintaing you normal, reduced and tightened sampling tables.
    Whether the normal, tightenned or reduced sampling is used is depenedent on the quality level.  This is usually tracked by vendor/material for incoming inspections, and by material for inhouse production.  You can adjust the current quality level for a given combination using QDL2.
    FF

  • Please help me how to maintain log for procedure execution

    Hi Experts,
    How to maintain the log for procedure execution
    I want to maintain the log for procedures as below.
    Once the procedure starts it should show status as RUNNING and PROC_END_TIME should be NULL.
    Once the procedure completes it should show status as COMPLETED and shold show the PROC_END_TIME.
    Once the MAIN_PROC completes then only the status of that procedure should show COMPLETED.
    STEP_ID RECORDS_INS_UPD  RECORDS_DELETED PROC_NAME PROC_START_TIME                PROC_END_TIME              JOB_STATUS ERROR_MSG
    1 500             0  MAIN_PROC 1/4/2014 5:47:38.000000 AM                         RUNNING
    2 100             0  SUB_PROC1 1/4/2014 5:49:30.000000 AM                         RUNNING
    3  0             0  SUB_PROC2 1/4/2014 5:47:38.000000 AM 1/4/2014 5:47:38.000000 AM COMPLETED
    I have tried the below code but it's not working properly.
    CREATE OR REPLACE PROCEDURE procedures_log
       p_seq                NUMBER,
       p_rec_ins_upd        NUMBER,
       p_rec_deleted        NUMBER,
       p_proc_name          VARCHAR2,
       p_start_time         TIMESTAMP,
       p_end_time           TIMESTAMP,
       p_job_status         VARCHAR2,
       p_error_msg          VARCHAR2
    IS
    PRAGMA AUTONOMOUS_TRANSACTION;
    BEGIN
        IF p_seq = 0 THEN
            INSERT INTO proc_log
                STEP_ID,
                ORG_ID,
                TABLENAME,
                RECORDS_INS_UPD,
                RECORDS_DELETED,
                JOB_NAME,
                PROC_NAME,
                JOB_START_TIME,
                JOB_END_TIME,
                JOB_STATUS,
                ERROR_MSG
            VALUES
                p_seq,
                p_rec_ins_upd,
                p_rec_deleted,
                p_proc_name,
                p_start_time,
                p_end_time,
                p_job_status,
                p_error_msg
        ELSE
            UPDATE proc_log
            SET
                RECORDS_INS_UPD = p_rec_ins_upd,
                RECORDS_DELETED = p_rec_deleted,
                JOB_END_TIME = p_end_time,
                JOB_STATUS = p_job_status,
                STEP_ID = p_seq,
                ERROR_MSG = p_error_msg
            WHERE UPPER(TRIM(PROC_NAME)) = UPPER(TRIM(p_proc_name))
            AND STEP_ID = 0
            AND JOB_STATUS = 'RUNNING';
        END IF;
        COMMIT;
        EXCEPTION
            WHEN OTHERS
            THEN NULL;
    END;
    Please help me.
    Thanks.

    ramya_162 wrote:
    Hi,
    I don't want to maintain multiple records for one procedure.
    The log table will grow huge.
    Please help me.
    Thanks.
    You have two options.
    Either a running log, from which you periodically delete old records, or maintain a standing record  for each process you are tracking.
    Ok, let's take the second, since that seems to be your preferred method.
    Going back to your original post, you gave us code and said "I have tried the below code but it's not working properly."
    Please define "not working".  That statement is totally devoid of actionable or diagnostic information. 

  • Sampling procedure-Square root n+1

    Hi All,
    I need to calculate the sample size based on the Containers & Square  root n+1.
    How to configure the system & how to maintain the master data to get the sample size.
    User also insisted only the sample size has to be calculated, but he will enter only one composite result entry
    Regards
    Subbu

    Hi Subbu,
    you can use Physical Sample to control the sample Size.
    You must to define a Sample Drawing Procedure (QPV2) as relevant for Container Number, then assign the formula 'Square Root n1´ ( TRUNC(SQRT(P2)1) ) in the partial sample. In this scenario, I suggest you to configure the "Container number' as a mandatory field during the goods receipt once the system will need this information to calculate the sample. For a single result recording, you can define a pooled sample.
    I hope it can help you.
    Best regards,
    Robson

  • How to maintain Vertion Control in PL/SQL

    Hi all..
    How to maintain Vertion Control in PL/SQL. I created one procedure/function/
    package. After sometime, i made changes to it. How to maintain
    that changes. Writing manually in it, what are the changes i made is the
    only option OR is there any other option is there...?
    Thanks in advance,
    Pal

    Hi,
    Version control is there for tables in oracle, but i don't think it is available for plsql code. Best method will be to use the third party software. Using Flashback DB you can try source control certain extent.
    Regards,
    Satheesh Babu S
    http://aaryaan.com/

  • How to maintain the integrity of datbase??

    Hi,
    I wanted to know that waht are the things which must always be considerd when you maintain the integrity of database and also how to maintain the security that balance the user requirement? I am asking in general point of view.
    hope for your precious advise.

    Data integrity is normally ensured by ensuring that the schema design is properly normalized (i.e. there is 1 and only 1 place where a particular piece of information belongs) and by creating referential integrity constraints. It is also a good idea to create packages that operate on the tables and expose only these packaged procedures to app developers. When there are bugs, it is a lot easier to fix a single stored procedure than to modify every application out there. Stored procedure interfaces also simplify life for developers because they don't have to be concerned about remembering to insert all the appropriate relationships, just passing in the right parameters to the function.
    Your question on security, unfortunately, is incredibly broad. Generally, practice the principle of least privilege-- give users the absolute minimum of privileges they could need to do their job. Precisely what sort of security policies you need really depends on the application and the organization. Large US companies have things like Sarbanes-Oxley to worry about which drives a lot of requirements, systems with sensitive data (i.e. payroll) probably need more security than something like the product database.
    Justin

  • How to maintain the characterstics of the values tab of limits maintain.

    Hi SAP ALL,
                     Hi how to maintain the characterstics point of valu scales maintain activally i want the P R release authorsiation limit increase.
    Thnaks

    The Class Type of PR & PO Release is 032 and for Class Go to SPRO-MM-Purchasing-Purchase Order-Release Procedure-Release Strategies and Here you will find the Class.
    Else Go to Release Strategies-classification using the same above path and Change the Chareceteristic Values and Save.
    Regards,
    Ashok

  • How to maintain Status at the line item level

    Hi Folks,
    How to maintain the status at the line item level. I could able to find the path in the IMG for Header level. I will be looking forward for the path or the procedure for maintaining the status at the Line item level. Do the needful. Thank you.
    Regards,
    Amrita

    Hi Amrita,
    Goto SPRO>Customer Relationship Management>Transactions>Basic Settings>Define Item Categories, Select your Item category and click on Details. Witin profiles set type Assign Status profile you created against field Status profile.
    Hope this helps.
    Regards,
    Chandrakant

  • How to maintain trend info on CITADEL SQL Query

    Hi All,
    I'm using ms excel via ODBC connection to extract data from CITADEL via SQL queries. In LabVIEW DSC Module there are an option in the function "Read Historical Traces" thats maintain trend info of tag if no data is recorded in the selection time.
    When i try to get CITADEL data via SQL if no data is recorded in that period the result is a blank column. How to maintain trend info or in this case?

    Good afternoon, Bruno
    Follow this link, please verify readiness if the procedure is correct if the problem persists please contact us.
    Citadel Database Querying and Exporting Data to Excel
    http://zone.ni.com/devzone/cda/epd/p/id/2001
    Overview of Citadel Historical Database Archiving Methods
    http://zone.ni.com/devzone/cda/tut/p/id/3751
    Accessing Citadel 4 Data with Microsoft Excel
    http://zone.ni.com/devzone/cda/tut/p/id/3813
    Can I Change the Default Timeout for the Read Historical Trend (s) in DSC VI?
    http://digital.ni.com/public.nsf/allkb/513C871B883E34A386256D040071C97F?OpenDocument
    Sincerely,
    Mauro Vera
    Mauro Vera
    Applications Engineer
    National Instruments

  • How to maintain Customer distribution model in ALE

    hi FRIENDS..
      i wish to know what will be the transaction code of maintaining the customer distribution model, and how we maintain it.  and also distribute custome model in IMG sreen... please reply me...i will surely award you  nice points....
    bye...
    naim

    U can create/maitain distribution model using BD64.
    Or else u can create it using SALE transaction code.
    U need to give sender/reciver/msg type.
    ==============================================
    procedure:
    click on Create Distribution model button-->give the technical name
    select the DModel Technical name>add msgtype>
    it will ask sender/reciver/msgtype.
    pass those parameters and generate partner profiles through environment menu
    =================================
    to distribute a model view to partner syste,:
    Select mview
    edit>modelview>distribute
    Message was edited by: Eswar Kanakanti

Maybe you are looking for