Availability check to restricted stock

Dear all,
Order is created for the material which is marked for deletion but not archived. The material has some available quantity in the Unrestricted stock and it has to  be consumed before archiving the material.
If a order is created, the material has to get consumed for the available quantity in the Unrestricted stock and if the requested quantity is more than the available quantity, the order should create confirmed schedule lines only for the available quantity and no schedule line should be created for the quantity which is not available in the Unrestricted stock.
How this check can be obtained. Appreciate your ideas.
Thanks,
Shiva.

Hi Siva ,
Splitting of the schedule lines during availability check happens when system is unable to allocate existing stock to current sales order as they are allocated to other salesorders and STOs, in such situation system confirms a future date based on either RLT , or GR processing time of a PO etc..
The first step for you is to use transaction CO09 / MD04 and identify and remove dependecies and reservation  from other old sales orders and STOs. Once this happens you will be able to allocate the entire freed stock to a single sales order or STO.
You can also use backorder processing transactions  V_RA and Co06 to allocate stolen stock from various sales orders to a single sales order or STO. Rescheduling using V_V2 may also be helpful.
Regards
Arnab Maitra

Similar Messages

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • Consingement Stock during the availibility check

    Dear All ,
    During the availibility check I want to consider  the customer consingment  .
    E.G   if the plant level stock is 300 and customer consingement  stock is 30  then the ATP quantity should be 330 wen i am performing the Availibility check ...
    Pls help me in this regard
    Thanks in advance
    Regards
    Satish

    hi,
    you cannot take into consideration the stock available at consignee for availability check. the consignment stock is treated as special stock unlike unrestricted.
    For transactions such as make-to-order production, consignment or returnable packaging processing that create special stock, the availability check is performed against special stock.
    The following elements can be included in the availability check:
    Stock
    safety stock
    stock in transfer
    quality inspection
    blocked stock
    regards
    sadhu kishore

  • Set Availability Check to Exclude Planned Order

    Hi All,
    anyone know how to set the availability check so it will not include the planned order in the calculation ?
    I find one setting in SPRO, the path is :
    Sales & distribution ==>  Basic functions ==> availability check and Transfer of Requirements ==> Availability Check  ==> Availability Check with ATP Logic or Against Planning ==> Carry Out Control for Availability Check
    select one of the record, and update filed "Incl. Planned Orders".
    I've uncheck that field, but I can't get the appropriate result. When I create a new sales order, the availability check still take the planned order I created before into account.
    The problem is, my user want to prevent creating delivery before the goods are already put in the stock. So the planned order should not be considered in the availblity check.
    Thank you in advance
    Rudy

    Hi Rudy,
    Concept of availability check is to verify if the stock is available at the time of creation of sales order. If available, when it can be ready for delivery (as Packing, arranging for transportation, etc may have lead time) & if not available, when it would be available considering Packing, arranging for transportation, etc lead time.
    Availability check whether material is available on required delivery date (backward scheduling) or not. If not available on required delivery date, system will propose next available date (forward scheduling)
    1.     Define Checking Groups
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups
    You define checking groups with which you specify the type of requirements records the system is to create when processing sales orders or deliveries
    2. Define Material Block for Other Users
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Material Block for Other Users.
    3 .Define Checking Groups Default Value
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Checking Groups Default Value.
    4. Carry out Control for Availability Check
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Carry Out Control for Availability Check.
    5. Define Procedure by Requirements Class
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure by Requirements Class.
    6. Define Procedure for Each Schedule Line Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Procedure for Each Schedule Line Category.
    7. Determine Procedure for Each Delivery Item Category
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Determine Procedure for Each Delivery Item Category.
    8. Checking Rule for Updating Backorders
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Checking Rule for Updating Backorders.
    9. Define Default Settings
    Menu Path: SPRO>SD>Basic Functions>Availability Check and Transfer of Requirements> Availability Check with ATP Logic or Against Planning>Define Default Settings.
    Availability checks
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how – confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) – planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics – sales & distribution – sales – environment – availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks –
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups –
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above – checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing –
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out –
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups –
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 – summarized requirements and 02 – individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users – the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check – in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under –
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order – is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    Please Reward If Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Availability Check configuration

    Hi All,
    I want to configure availabiliy check but I am a bit confused with the config part. Soneone plz explain the config process.
    Also tell me what is the exact link ( in config ) by which the availabilty check gets triggered.
    Regards,
    Danny.

    Dear Danny,
    Hope the material pasted here helps you... :
    Availability Check & Transfer of Requirements
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). To examine stock on hand (T-Code - CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    ATP
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can also be used to deactivate the availability check. This option was created especially for the assembly order so that when the bill of material is exploded in the assembly order, the individual components, if necessary, can be classified as non-critical parts as far as procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the availability check. It is proposed in the material master record on the basis of the material type and the plant, and copied into the sales and distribution documents. _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules define by transaction, which stock and inward and outward movement of goods should be taken into account for the availability check. _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible settings for this at schedule line level are dependent on the settings in the requirements class which is determined from the requirements type of the material. _ Delivery item category
    The delivery item category can be used to control whether an availability check takes place in deliveries. Requirements type
    The various requirements are identified by their requirements type. The requirements type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for planning, requirements planning strategy and requirements consumption strategy. In addition, it is specified at a global level whether an availability check is to take place for the material in the sales and distribution documents on the basis of the ATP quantity (ATP = available to promise) and whether requirements are to be passed on. A finer degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Configuring entries of the Availability Check
    IMG > SD > Basic fncs > Availability check and TOR > Availability check with ATP logic or against planningAvailability check > Define checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    TOR
    IMG > SD > Basic fncs > Availability check and TOR > TOR
    A line item in the sales order creates a schedule line. The schedule lines in the sales order transfer the requirements through to MRP. You can select the docs on which you want the TOR to happen. For ex, not for quotations.
    The TOR aims to ensure the ordered materials are available for the requested delivery date. The TOR can be set for individual or for collective requirements (materials sales/plant view).master
    The TOR is dependent on the following data:
    The reqts type, reqts class, checking group and schedule line category.
    The reqts type and class are determined in the strategy group MRP3)(material master
    For TOR to be carried out, a few criteria need to be met:
    Plant assigned to line item level, schedule line category should be switched on at TOR, TOR must be switched on at the reqts class level, checking group must be defined and allocated to the material master record (sales/plant view in the availability check field)
    The reqts class is the controlling factor for the availability check and the TOR for all sd types.
    Configuring the TOR:
    1) Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
    2) Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
    3) Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
    You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
    4) The TOR and Availability check can be selected/de-selected at the schedule line category level.
    5) Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
    6) Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
    Availability Overview = CO09 > order qty, sd doc no, item no, requirements class.
    sd no or dly no, lineStock requirements list = MD04  item, schedule line placing the demand
    Stock overview = MMBE > total stock per company, then plant followed by storage location, and finally a breakdown per batch.
    Transfer of requirments:
    for TOR to happen the folowing control elements must be defined
    1. requirmrent type.
    2.requirement class.
    3.checking group
    4.schedule line category.
    apart from the above the TOR must be switched on at
    1.reqt class level.
    2.schedule line level
    3.checking group level.
    4.plant must defined at the document item level
    once order is raised the requirments are transfered from order to MRP by TOR,
    various reqts are identified thru reqt type, reqt type are identified in the system thru
    1. strategy group--MRP1 --mmr
    2.MRP group.
    3.material type.
    4. ITEM category +mrp type
    5.item category
    once reqt type is identified it points to reqt class.
    reqt class contains all the control factors suchas planing strategy,consumption strategy etc
    basing on the item category group+ mrp type-- schedule line categories are identified.
    if it is relevant for availability check, then the system does ATP CHECK(warehousestockplanned ordersproduction ordersconfirmed receiptsconfirmed goods issues) and decides whether goods are availabile on
    the requested delivered date of the customer, if not system does a backward scheduling and confirms when material is available (materual availability date),
    so if material is not available then system proposes 2 dates
    1.customer delivery date
    2.material availability date.
    for availability check to happen the following pre-requistes must be there:
    1.availability check must be swithched on at the requirment class level
    2.schedule line level itmust be switched on
    3.reqt type must be defined
    4.checking group must be defined.
    5.plant must be defined
    6. the system takes by default checking group if not defined as material type and plant.
    from SD the following componenets are importants
    1.checking group:defines whether indivual orcollective req are to be passed
    2.checking rule: defines scop of the check(what type of stock+with or without RLT)
    3.schedule line category: this fine tunes whether availability check should be carried on at the sales document level or not.
    4. delivery item category.
    for config:
    SPROSALES&DIST-BASIC FUNCTIONS--TOR&AVAILABILITY CHECK.
    In material master the below mentioned must be defined also
    1.strategy group.
    2.scheduling margin key.
    3.in house production time.
    4. RLT time.
    5.MRP group
    Hope this above helps...
    Give points if userful...
    Thanks,
    Jignesh Mehta

  • Creation of Sale Order for configurable material with availability check.

    Hi,
    We have a scenario in which the material is configurable. The configurable material (X) has few variants (Ex: X1, X2, X3, X4, X5). While booking the sale order, we use the material number (X).
    Further, the material planning is done for the variants X1, X2, X3, X4, X5. The standard variants are planned for production in advance.
    1.     While booking the sale order, we want the availability check of the stock (type matching to happen). What needs to be done in configuration?
    2.     While booking the sale order, there is a possibility that the configuration selected will not match with any of the standard variants due to some additional requirements of the optional features, in such cases how to link the standard variants to the sale order & create requirement for additional requirements.
    Regards,
    Umesh

    Hi Umesh,
               1.Create material master for configurable material and variants in mm01.
               2.Maintain BOM for the configurable material in CS01
               3. Configur the variant configuration steps
                  a. Create charecteristics T.code CT04
                  b. Create values and assign classes
                  c. assign the values to charecteristics
                  d . Maitain dependence  T.code CU01
                  e.create configuration profile t.code CU41
                  f.stimulate the configuration profile.
    4. Do the availability check configuration through this path
    IMG --> Sales and distribution > Basic functions ,> Availabilty check and Transfer of requirements.
    5. Maintain the Availbility check field and MRP views in the material masters other wise you sit with PP people and do that
    I hope it will help you
    Regards,
    Murali.

  • Availability check - sales order

    Hi experts,                              
    I've gone through the relevant info, but still hit the issue below. Pls help. Thx.                                                       
    Issue: How to include the created order (not delivered ) when running availability check?                                                       
    Example:                              
    Stock (storage location C) - 1pc                              
    sales order A - 1pc (confirmed in schedule line)                         
    sales order B - 2pcs (1pc confirmed, 1pc unconfirmed)                                                       
    Those two orders are created agaisnt storage location C. No other stocks against storage location C are available, such as on-order stock.                              
    In my understanding, order B cannot be confirmed as order A has been created firstly.                                    
    Background: As the customer just sells the purchased product, he places PO firstly, then sales order following. Thus, he requests new sales order creation to be based on the stock qty, created sales order qty, PO qty to be received & delivered sales order qty.                                                       
    For this sales scenario, availability check with ATP is activated, but not against product allocation. And the check boxes "incl.purchase orders", "include sales reqmts", "include deliveries" are checked in OVZ9 only.                              
    ps. "Check sales requirements" has been checked in Availability check control while "No storage location inspection" has not been checked.

    Dear Cathy
    Can you please reconfirm that the combination of availability check and checking rule in OVZ9 in which, you have selected the box "Include sales reqmts"  is the same value what you have maintained in material master MRP3 view for availability check ??
    If the availability check is same in both the cases, then try to create a fresh order and post the outcome.
    thanks
    G. Lakshmipathi

  • Availability Check in Sales Order

    Hi,
    We had configured MRP Area for a Storage Location. In MTO Scenario (Strategy Group 20) we had enabled 'Automatic Planning' indicator in 'Define Requirements Class' 040.
    We then created a Sales Order (Order Type OR) specifying the above Storage Location. The Storage Location has sufficient Unrestricted Stock also.
    After saving the Sales Order, PR is getting created automatically despite Stock availability in this Storage Location.
    Is there a way to perform Availability check on Unrestricted Stock in the above scenario ? Request any other way to handle this requirement.
    Thanks.
    Raj

    Hi rajkumar
    1st of all , in MTO scenario  , we need a special stock and not a unresticted use stock . bcoz in MTO , 1st sd condultant will raise the sales order then they will send it to MRP controller then they will send to PP consultants and if any material is to be procured externally then  PO is raised and then finally a special stock is created
    secondly , the scenario what you said may be applicable in MTS. scenario. so check the requirement class for MTS , weather the automatic planning is on or not. and the strategy group for MTS is 10 or 11and the requirement class is 41.
    Regards
    Srinath

  • Restricted batch-Availability Check

    Dear Mates,I have restricted particular batch in Traxn :MSC2N which are all self life expired.My issue is while creating Sales order system undergoes availability check and during availability check system also check for the stock in the restricted batch and since been it is marked as restricted system could not able to confirm the stock for that sales order and hence forth unable to proceed further.Could anybody suggest me how to prevent system from undergoing availabity check for Restricted batch?If anymore clarification required plz write to mne

    >this is more of Availability issue
    HI,
    You are very much correct.
    Go to OVZ9,
    select the availability checking group and checking rule for the material that are handled in batches and make sure if you have selected Include Restricted-use Stock
    If it is selected, then just deactivate the same and check once again.
    Post your feedback
    Hope it helps you
    regards,
    Sagar

  • Availability Check required without "Safety Stock"

    Hi,
    I have a fert material "FG' whose prodn order i am creating.
    This FG has a child Component "RM"
    Available Stock for RM = 20
    Safety Stock for RM =     20
    No Receipts / No Reservations exists for RM.
    I want the production order not to consider SAFETY STOCK. Hence in OPJJ i removed the Tick "Include Safety Stock".
    When i create production order, as per the above setting, it should show " Material Avaliable", but instead it is showing Material Shortage.
    Plz guide.
    Thanks in advance,
    Harris

    Hi,
    Here is my Availability settings.
    Availability Check = Z2
    Stocks     
    Include Safety Stock     
    Stockin Transfer     X
    Incl. Quality Stock     X
    Incl. Blocked Stock     
    Incl. Restricted - Use Stock     
    W/o Subcontracting     
    Replineshment Lead Time     
    Check without RLT     X
    Storage Location Insp.     
    No stor. Locn inspecn.     
    Missing parts processing     
    Checking period: GR     0
    Receipts in past     
    In/Outward Movements     
    Incl. purchase orders     
    Incl. purchase req.     
    Incl. dep. Reqt.     X
    Incl. reservations     X
    Incl. sales reqt     X
    Incl. deliveries     X
    Incl shipping notifcn     
    Incl depe. Reservations     X
    Incl. rel. ord reqs     
    Incl. Planned orders     
    Incl. Production orders     
    This Availability, Z2 is maintained in MRP3 view also.
    Regards,
    Harris
    Edited by: Harris Panchal on Nov 17, 2010 2:27 PM

  • Reserve stock in availability check

    Dear Gurus
    I have one requirement. I have searched forum but I didn't get anything which helps me.
    I have a material A with 5 quantity in storage location 1064. When I create sale order of this material with 3 quantity system reserves this stock against this sale order.It will remain reserve until i reject this order. Thee are many open sale orders against which stock is reserved. I have to find out orders with VA05 and reject them. If i create new order of same material with 3 quantity system will only confirm 2.
    My requirement is that when i press availability check button system should only check available stock, no stock reserve. When i create delivery system should copy available stock. In short there must be only availability check, No stock reservation.

    Dear moazzamjii
    My requirement is that when i press availability check button system should only check available stock, no stock reserve.
    If this is your requirement you go to OVZ9 in that just flag the iinclude sales requirements in the in/out movements.
    Check and revert
    Thanks&Regards
    Raghu.k

  • Stock confiramtion at sales order level for future date- Availability Check

    Hi all
    Here is the scenario
    This setting is available in the system:
    Stock is available
    Sales order created with Requested delivery date in future-> not confirmed
    Sales order created with Requested del date today -> confirmed
    The requirement :
    how and where to change this setting in IMG so that also orders with Requested Delivery Date in future are confirmed if stock is available.
    As this is urgent request to respond quickly.
    Regards
    Devender

    Hello Devender,
    You can achieve the mentioned scenario by configuring ATP. You can do ATP with RLT or ATP without RLT.
    In ATP with RLT, system will check and confirm the quantities from existing stock only and if quantities are insufficient then the system will consider inline POs or manufacturing time to confirm remaining quantitites.
    Else you will be getting schedule lines for only items in stock and remaining will be unconfirmed as ATP without RLT will be activated i.e., system will check and confirm the quantities from existing stock only.
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMGSDBasic fncsAvailability check and TORAvailability checkAvailability check with ATP logic or against planningDefine checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    Reward points if helpful.
    Regards,
    Priyanka

  • Availability check for sales order stock

    Hi,
    We use sales order stock in sales order which creates purchase requisition automatically.Movement types for GR 101E, for GI 601E. Material master data has on MRP2 view as GR processing time 2 days for example. I create sales order with requested delivery date today.After saving SO, PR is created and I create PO with delivery date today and post goods receipt document for today. System gives as confirmation date today + 2 days. although the material is in stock.
    We use also project stock in sales order which creates purchase requisition automatically.Movement types for GR 101Q, for GI 601Q.I run the same scenario for the same material. As soon as I create the purchase order system confirms the open quantity in sales order for today. (Scope of availability check is the same for both sales orders and includes PO)
    What can be the reason?
    Thanks

    Hi Murat,
    i guess the problem is with the 'Check without RLT' indicator' in Availability check control. For the MTO (checking rule AE) i guess this indicator is not set but for the Project systems (Checking rule PS) this indicator is set. This makes the difference. Do the changes as desired in transaction OVZ9.
    Please check and revert back if you are still facing the same problem.
    regards,
    Kathir

  • Availability check control - how to include stock in transit (frm 351 mvmt)

    We are trying to adjust the config on the availability check control settings to include intransit stock (settings in OVZ9 spro t-code). 
    This is stock that we have processed into intransit in the receiving plant via movment 351. (MARC-TRAME).
    Is there a way to change the availability check settings to include this stock?  I would like my sales orders to see this instranit stock as available.  I have tried using the StockIn Transfer flag (under Stocks category) and also tried using Incl.rel.order reqs falg (In/outward movments category). 
    Appreciate any feedback.
    Edited by: Peter Boese on Jan 14, 2009 10:37 PM

    Hi,
    Exclude the stock in transfer from availability check in tcode opjj.
    Regards,
    nandha

  • Sufficient stock but cannot perform availability check

    Hi,
    There is sufficient stock when I checked from MMBE, but it can't seem to perform the availability check on the sales order for make-to-stock. Why?
    Thanks.

    Dear Wooi Ling Ng
    Assuming your schedule line category is CP, go to VOV6, select CP and see whether "Availability" is ticked.  If not, tick that field and retry.
    thanks
    G. Lakshmipathi

Maybe you are looking for

  • Generating a pdf using InDesign CS4

    Hi there I am having problems generating a pdf using version CS4 - I have done this hundreds of times but on this occasion after selecting the preset I want, the file begins to generate / export and once the last page is reached - I get the message A

  • Need to find 'Main Reference Object' field in idoc CRMXIF_ORDER_SAVE_M02

    Hi experts, pic link: http://img56.imageshack.us/my.php?image=screenhunter001fv3.jpg I cant find "Main Ref. Object" field in Idoc CRMXIF_ORDER_SAVE_M02... It is under Service Order created in tcode CRMD_ORDER... Service Order -> Transaction Data -> O

  • Tabs and shortcuts

    Why do my 'tab' key and shortcuts not work properly in Mavericks?

  • PO from Bid Invitation Contains Faulty account assignment

    Hi All- We are working on SRM 5.0 Extended Classic Scenario SP6. Currently we are facing the following issue: Process Steps: 1.) Create a Shopping cart with one line item and account assignment. 2.) Shopping cart goes to the sourcing cockpit 3.) The

  • Bluetooth, Headphones, iHome, and Podcasts

    Please forgive me if there's a thread complaining of my problem and I just haven't found it.  I did a search of Bluetooth and Podcasts and none seemed to fit my problem.      Problem: The podcasts app is constantly backtracking my podcasts.      Circ