Backflushing only for Production Order Quantity

HI All
I have a situation of positive yield i.e If the Production Order is for 100 BO then at the time of Confirmation we have 105 BO that are actually produced.
We have unlimited over delivery tolerance. Hence we can confirm for 105 BO. But here is what happens.
At the point of confirmation the system proposes an additional line to backflush more quantity for the components then was orginally requested for to produce the 100 BO.
ie, it adds a new line to backflush the needed component quantity for the extra 5 BO of finished goods.
Is there a way we can prevent this in standard SAP. We only want it to backflush for the orginal component quantity needed to produced 100 BO and classify the extra 5 BO as true yield .
Regards
Aju Paul

Dear,
I hope this is the only simple solution, other solution is do the confirmation w.o any component.
Then in MB1a, follow the menu path
Create issue w.r.t order
enter order,
system will prapose the qty as per the component planned qty in order which is nothing but component qty ratio * 100(order qty).
hence you will issue the correct qty of component w,r,t 100 and not 105.
I hope you got the point.

Similar Messages

  • Automatic batch management for Production order receipt

    Hello ,
    I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
    To start with I have following questions .
    1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
    2. IF yes , is Batch management activation status be at material or plant level .
    3. As I need automatic assignment , should I be selecting Internal batch management .
    4. What should be selected for valuation for Goods movement in Inventory management.
    5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
    6. What would be standard Class / characteristics to be maintained for automatic determination.
    Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
    Appreciate all your expert advise.
    Regards,
    Lawrei

    Thanks Adler for your comments .
    With reference to your point , need further clarifications
    1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
    I see that in config node
    +Define Batch Creation for Goods Movements+
        +Using this function, you can define for each movement type whether a new+
        +batch is created for a goods receipt and how it is created.+
    Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
    & what about below config node
    +Define Batch Creation for Production Order / Process Order+
        +In this step you can make the following settings in batch management for+
        +the existing production control profiles:+
    Is it possible in this node .
    Please advise.
    Regards.
    Lawrei

  • Restrict print out of Purchase order only for Production system

    Hi,
    I want to restrict print out of Purchase order only for Production system, don't want to take it in devep or quality.
    is there any identifier to find the system is production or development.
    can anyone tell me how to restrict it,
    is there any function module, not based on client system.
    Thanx in advance
    Kesav

    Hi Kesavarathinam Vaidyalingam ,
    yes, I also use thomas' suggestion using
    t000-cccategory = 'P'.
    to determine productive client.
    Just one small hint: I found this condition as true in a test system: The admin had done a system copy to create a fresh test client - but forgot (or did not see a good reason) to change t000-cccategory = 'P. to  t000-cccategory = 'T'.
    Regards,
    Clemens

  • Error during goods receipt of Finished goods for production order

    hi friends
    pls help me iam struggle this issue and mentioned the issue .
    when i do goods receipt for production order system getting error like
    No price could be determined for material/batch FG/ plant ZTP
         Message no. CK 465
    Diagnosis
         The system could not calculate a price for material/batch FG/ in plant
         ZTP for valuation view 0, because none of the valuation strategies in
         valuation variant 007 was successful.
    System Response
         User-defined error management enables you to specify whether the message
         is an error message, a warning message or an information message.
         o   If you have defined the message as a warning message or an
             information message, the costing item will be entered in the cost
             estimate with a value of zero.
    If you have defined the message as an error message, the cost
    estimate contains an error or errors.
    -   In the case of a material cost estimate, the system sets the
        status KF.
    -   If it is a cost estimate without quantity structure, or base
        object cost estimate (that is, a unit cost estimate),  the
        system cannot proceed with costing until you have corrected the
        errors.
    If the system issues a termination message, the cost estimate cannot
    be processed, and processing is terminated.
    procedure
        o   Check the master data for material/batch FG/ in plant ZTP.
        o   If you have authorization for Customizing, check the valuation
            strategy for materials in valuation variant 007.
        Note
        If the message is a warning message or an information message, there is
        a danger that materials with errors will be ignored by the system.
        If, because of this, you issue a warning message and at the same time
        include materials with a zero value in cost estimates, you can make the
        following settings for these materials in the costing view of the
        material master:
      1.  Enter a very low price in the planned price 1, 2 or 3 fields
          manually, for instance 0.01 USD. These prices are used for costing
          purposes only; they are not read by other applications.
      2.  Enter the highest price unit possible, for example 10000.
          Note: If you enter a new price unit that is higher than the costing
          lot size, the system increases the costing lot size accordingly.
      3.  Change the valuation strategy, such as strategy 4, where you could
          enter the planned price field in which you entered the low price.
          The system now costs as follows:
          Using the valuation strategy, the system finds planned price 1, 2 or
          3. Due to the low price and high price unit, the system rounds the
          value to zero. However, the cost estimate still obtains status KA
          (free of errors), and no error message is issued.
          This procedure can be used for all materials that have caused error
          message CK465 to be issued.
    with regards
    dinesh
    Edited by: code acess on Nov 8, 2010 4:06 AM

    hi ragavendra,
    this is dinesh .i maintained the costing view and planned price. but again i have same error.so please reply me where i missed the data
    with regards
    dinesh
    Edited by: code acess on Nov 9, 2010 4:01 AM

  • How to restrict the GR for Production Order when Goods Issue is not done

    Hi Gurus
    How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
    Pls suggest best solution.
    Abhijit.

    Hi,
    You can club together the GI nad GR at the time of confirmation..
    I.e Backflush for the components and auto GR for the Product.
    So that you can stream line the Process.
    The best Option would be to use the User Exit:
    Enhancement - MBCF0002
    Functional Module - EXIT_SAPMM07M_001
    Include - ZXMBCU02
    Refer below link for further details..
    How to stop the goods receipt before issueing the goods for production orde
    Regards,
    Siva

  • GR quantity more than production order quantity triggering cost difference

    Hi Gurus,
    We have observed a scenario where the cost(price) dfference account getting hit whenever the GR quantity is greater than the production order total quantity. The dollars posted to this acount are directly propotional to the difference between the GR quantity and the production order quantity.
    The total quantity specified in production order is 1 M2U and GR quantity is 1,000 M2U.Material price is $195.65.
    Accounting Document;
    Inventory account           - 195.65
    Offset account                - 200.00
    Cost difference account  -    4.35
    If we do GR for less than or same quantity as in the production order, this account is not getting triggered.
    Any idea what is causing this scenario? I really appreciate if you can share with any SAP note related to this.
    Thanks,
    Mano.

    Hello Gurus,
    One  more observation is,
    The palnned costs and actual costs are always different when dealing huge quantities. But the cost difference account is only getting triggered if the actual quantity is  more than the palnned quantity.
    And,
    when the difference between atual quantity and palnned quantity is huge then
    Planned costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Significant cost variance is booked to the cost variance account.
    When the difference between actual quantity is less than/equal to planned quantity is not so huge then
    Actual costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Is this a standard behaviour?
    Thanks,
    Mano.

  • Batch Split during GR for Production Order Confirmation

    Hi All,
    We need to do batch splitting during GR for Production Order Confirmation.We are using CO11N for confirming the Production Order and in the PP settings auto GR is activated once the Confirmation is done.
    Currently it is generating only single batch number for the complete quantity, but our requirement is that we need that system should create separate batch for each piece.
    For ex.: Production Order is for 100 pce, when we do Production Order confirmation, system is automatically doing the GR by 101 movement type and it is creating one single batch for full 100 pce. But we want the batch number should be generated for 1 pce i.e. we want to split the 100 pce into 100 batches with 1 pce each.
    Please let me know what can be done for this requirement.
    Regards,
    Ankit

    Dear,
    In OPK0 you need to active the screen Mill: Goods Receipt (8485) for confirmation profile for the single-screen entry.
    Best way is use BAdI /SAPMP/SPLIT_CO11N for the Enter Time Ticket for Production Order transaction (CO11N)
    you must activate BAdI implementation /SAPMP/SPLIT_POPUP and/or /SAPMP/SPLIT_CO11N for this BAdI
    I have use the same BADI it will ask you number of split according to that it will split the GR line item.
    Please refer this link,
    http://help.sap.com/saphelp_dimp50/helpdata/EN/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    Regards,
    R.Brahmankar

  • GR quantity less than Production Order quantity

    Hello all
    I am working at a client where they produce Make-To-Order items specific to a Sales Order by triggering an Assembly Order (Production Order).
    Now I am facing a tricky situation & hence want some advice from you guys.
    In a generac scenario when an order comes for a MTO material ABC, a Production Order is triggerred for that item.
    I can navigate to this Production Order from the Sales Order > Schedule Line tab (Just FYI)
    Now once the Production Order is confirmed for each Operation on the floor using CO11N, the material is receipted in the Inventory & the requirement gets fulfilled.
    Now sometimes the Production Order is Goods Receipted for a Lesser quantity as compared to the Production Order Quantity.
    e.g. Sales Order Quantity = Production Order Quantity = 3 EA & the Delivered Quantity (GR qty) = 1 EA
    In such a case, in MD04 the system still shows an open requirement for 2 EA on the same Production Order Number
    Is there a way to trigger another Production Order for the remaining quantity automatically ?
    If anyone can share their thoughts proposing possible solutions to handle such a scenario, it would be a great help.
    I am an SD consultant & hence cant think ways to handle the scenario & propose it to the Business.
    Any help will be appreciated
    Thanks
    Vin

    Hello
    Thanks for all your replies.
    As of now the 1st scenario is no more an issue. The business process is modified to fix the problem.
    Now my main problem is the 2nd scenario which I will explain better here.
    In our scenario MTO items when placed in a Sales Order triggers a Production Order.
    This Production Order needs to be confirmed for each operation & at the final step the MTO item is pushed into the inventory.
    The Production BOM & the operation overview for the MTO item is as shown below:
    E.g.
    Operation Overview:
    Operation            Work center                  Control key
      0010                    Prod                               PP01
      0020                    Pack                               PP01
      0070                    Confirm                          PP03
    Routing:
    Item                Material             QTY        Unit            Operation
    0010               ABC                  100         G                0010
    0020               XYZ                  10           G                0020
    Now as shown above, the business users who produce the MTO item will confirm operation 10 & consume raw material ABC at the Work Center = Prod.
    Then at the Work Center = Pack, the packaging material is used & operation 20 is confirmed.
    Finally after the packing is done, at the Work center = Confirm, the operation 70 is confirmed when the MTO item is receipted in the Inventory.
    Before it is receipted at the Confirm work center, a user monitors the quality of this produced item. If it is good only then it is receipted in the inventory.
    Now depending on when the Sales Order is fulfilled, this MTO item will be shipped.
    Issue:
    Now when the MTO item produced passes thru the high level quality check, it gets receipted in the inventory at operation 70.
    However in a case where the some or all the qty of the MTO item ordered doesn't pass the quality check, they will be scrapped physically.
    Thus my understanding is that e.g. 3 qty of the MTO was ordered & 1 got rejected, then the user confirming the step 70 will enter YIELD = 2 ea & Scrap = 1 ea and do the final confirmation.
    This means that the original demand of 3 ea is still incomplete. 1 Ea still need to be made as a Sales Order Stock.
    Now the function needed is that the system should automatically generate a Production order for the remaining 1 Ea as a Sales Order stock.
    I dont know if this can be achieved by receipting the 1 EA as REWORK on the CO11n screen at operation 70.
    Also I am not sure if Production Order Split case would work in this case.
    I would need some input from all the PP gurus. Any solution which be close to what functionality is needed will be greatly appreciated.
    Thanks
    Vin
    Edited by: vinit parkar on Mar 3, 2010 5:04 PM

  • Report to check open reservations for production orders where GI not posted

    Hi experts,
    Can we get reservation details from any report/ table for production order where material has not been issued, report should also display the value of the reserved material.
    I could not find desired details in RESB (it has price but not value) and MB25.
    Thanks in advance, useful ansers will be rewarded.
    Thnx
    Anand

    Hello Anand,
    there is no report but you may use the production order info system with list "components" and create a layout contaning the issued quantity and/or the final issue indicator. With a correct sorting, the list should show all orders with non-issued components at the top.
    Regards, Andreas

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Different GL accunts during GR for PO and GR for production order

    Hi
    For posting GR for PO and GR for Production order we use movement 101 only then how we can define or e different GL accounts for both the transactions ?

    Hi,
    As per my undestanding
    If you want to hit different GL for same material type for e.g. GR for PO and GR for Production order.
    you can define split valuation, Suppose material A has two Split valuation External Procurement or Inhouse Production.
    Now For valuation type External Procurement assign valuation class 1000 and for Inhouse Production 2000.
    Now in GBB for valuation modifier BSX assign two separate GL
    Like
    GBB     BSX     1000           120000(External Procurement)
    GBB     BSX      2000           130000(Inhouse Production)
    Solution 2 :-
    Define other movement type for Production create and create a new event key and assign GL to that one.
    Hope HElp U !
    Regards,
    Pardeep Malik

  • Changing of production order quantity not allowed

    Dear Gurus
    My client is converting production order from planned order .These  planned orders have been generated from sales orders during mrp run. What my; client wants is that the production order quantity generated from the planned orders nobody can change that in either co02 or in co01. How can this be possible?
    Regards
    Sandip Sarkar

    Dear Sandeep,
    u can do this Via SHD0
    Plz find the below link & make the required field as output only
    [https://www.sdn.sap.com/irj/scn/wiki?path=/display/snippets/transactionVariant-AStepbyStepGuidefor+Creation]
    Regards
    kumar

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH