Backgroud wp restarted before job finished!

We schedule a job which runs in the backgroud,but the workprocess
restarted itself after a period of time.No error report in st22,but
only info in trace file of sm50 as below:
at Mar 31 16:38:00 2007
WP has reached abap/heaplimit = 50000000 bytes
Sat Mar 31 19:28:05 2007
ERROR => User BWREMOTE reached avail. heapsize = 1907 MB: see
ST22 [abstor.c 1681]
A *** ERROR => heap memory WP28: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP29: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP30: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP31: 1907 MB [abstor.c 1686]
A *** ERROR => heap memory WP32: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP33: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP34: 0 MB [abstor.c 1686]
A *** ERROR => heap memory WP35: 0 MB [abstor.c 1686]
It shows that abap/heaplimit is reached ,but the process should be
restarted after the job finished if it had reached this limits .
About the info "reached avail. heapsize",the process ,which is a backgroud
one, can use the extend memory after the heap memory allowed by one
process is used up.And now why is it restarted,could somebody help me?

Hi
This problem is related to memory(heap size)?.Change the memory settings.May be the amount of memory you have allocated is not sufficient as a result as the load increases the wp restarts.This is a typical behaviour.Check if your available heap size is less or equal to maximun heap size.
Hope you know how to change memory settings (heap size)?If no,then let me knoe the OS ,DB,no of WP and i will tell you the approx memory parameters you can set and the process to set it.
Reward suitable points

Similar Messages

  • KMC Migration Tool stopped. How to restart avoiding the finished steps?

    Hi,
    I'm using KMC Migration Tool for upgrading EP 6.0 SP 2 (6.20) to EP NW04 SPS15 (6.40). We have experienced some network problems, and the process of DB migration has stopped between the end of the migration of task AP - completed suscesfully (the last step of the Migration the DataBase, many hours!!) - and the begining of the synchronization the fsdb Repositories (only a few minutes). When I tried to restart the process of DB migration, the KMC Migration tool tried restarting all the migration tasks from the begining of the DB Migration.
    How to restart avoiding the finished steps? How can I avoid to repeat the migration of the DB from the begining, especially if it has executed suscesfully? Can I synchronize the FSDB repositories manually at the end of the EP migration? How can I do it?
    If I had to restart the process, is it necessary to restore the target DB, or the process does not insert records from the last execution?
    Many thanks for your help,
    Best regards,

    Hi,
    CM repositories in FSDB mode can have a manual backup before configuring the local root. The XML file provides the description of behaviors and persistence levels for the file system. To have a manual backup the auto sync has to be deactivated or else there will  be a  huge meta data loss.
    what i feel is like you have to restore the DB before manual bacup(.if the Auto sync is activated). However, i dont  think so  that you can resume the migration.
    Regards,
    Anand

  • HT201210 A message appeared on our Ipad wanting to know if we wanted to upgrade to 6.0 but just before it finished it locked up and now I can't get it to come on.  When I connect it to Itunes it tries to restore but then I get a message that says it isn't

    A message appeared on our I Pad wanting to know if we wanted to upgrade to 6.0 but just before it finished it froze up.  Then when I tried to restore it conneting to ITunes it said it wasn't eligible to be restored.  ????

    What to Do When Your iPad Won't Turn On
    http://ipad.about.com/od/iPad_Troubleshooting/ss/What-To-Do-When-Your-Ipad-Wo-No t-Turn-On.htm
    iOS: Not responding or does not turn on
    http://support.apple.com/kb/TS3281
    iPad Frozen? How to Force Quit an App, Reset or Restart Your iPad
    http://ipadacademy.com/2010/11/ipad-frozen-how-to-force-quit-an-app-reset-or-res tart-your-ipad
    iPad: Basic troubleshooting
    http://support.apple.com/kb/TS3274
    iOS: Resolving update and restore alert messages
    http://support.apple.com/kb/TS1275
    iPad: Unable to update or restore
    http://support.apple.com/kb/ht4097
     Cheers, Tom

  • Background job finished but Error sending data

    Dear all,
    report is running in my prod server . once this report completed sapuser get mail . when i check the job status it shows
    Job started
    Step 001 started (program GP4CF9U420G825I4P7DU8XY49WH, variant CUSTOMEROUTSTD, user ID S2K_BASIS)
    Spool request (number 0000012259) created without immediate output
    Error sending data (4)
    Job finished
    one more clarity i required
    this report should goes to 4 SAP users . how can i configure this report to 4 sapusers
    kindly suggest me

    > Step 001 started (program GP4CF9U420G825I4P7DU8XY49WH, variant CUSTOMEROUTSTD, user ID S2K_BASIS)
    > Spool request (number 0000012259) created without immediate output
    > Error sending data (4)
    I'd check SCOT/SOST for any errors. Also check the syslog (SM21).
    > this report should goes to 4 SAP users . how can i configure this report to 4 sapusers
    Create a distribution list (SAPoffice-Inbox - environment - distribution list) and enter that as addresse for the output.
    Markus

  • Error while restarting a job

    Hi All,
    I am in a crucial situation after we upgrade the Data Integratror to DI 11.7.3.
    We are frequently getting Heap errors. I know that this is not a new issue with DI. But the wierd one is the new error. Previously with DI 11.0 when ever we get heap error,  we were able to restart the job from the aborted step.
    But now, when we tried to restart the aborted job, we are always facing ACCESS_VIOLATION error. We cannot able to proceed due to this error.
    Can any body help me to solve this issue ?
    Additional Information:
    Source database : Sybase
    Destination database : Oracle 10g
    DI version : 11.7.3.0
    Please help me with any alternative solution so that i can try.
    Thanks in advance.

    Hello Sir,
    Many thanks for your reply.
    For your information, i noticied that there is no al_engine running after i got the access_violation error. And also i already using all the data flow as PAGEABLE.
    I can try compacting the repository now. But not sure how much improvement i can see by doing this.
    Please let me know if you have any other solution.
    Thanks again,
    Regards,
    Prasanth

  • Trouble updating to iOS 5 on my wife's iPhone 4 connected to our iM, right before download finishes downloading iTunes comes back with the error message Software corrupted during download.  Please check network settings and try again later.

    Trouble updating to iOS 5 on my wife's iPhone 4 connected to our iM, right before download finishes downloading iTunes comes back with the error message Software corrupted during download.  Please check network settings and try again later, however there was no problem updating my iPhone to iOS 5 through iTunes connceted to my dell laptop on the same wireless network.  What gives?

    Try disabling your firewall; both on your PC and the external Firewall/Router.

  • I am told I need to update Flashplayer.  I have downloaded the update 5 times and installed it successfully on FireFox but Safari still says I need to update.  I have gone so far as to restart before re-opening Safari.  What am I not doing?

    I am told I need to update Flashplayer.  I have downloaded the update 5 times and installed it successfully on FireFox but Safari still says I need to update.  I have gone so far as to restart before re-opening Safari.  What am I not doing?

    Enable plug-ins.
        Safari > Preferences > Security
        Web content:
        Is the box next to "Enable plug-ins"  checked?
    Best.

  • How to trigger a mail once BG job finished.

    Hi,
    Could anyone please let me know how to trigger a mail once Background job finished. I let you give one scenario where exactly I require this concept. Say, I execute t.code MB52 with particular variants in background to find stuck qty(s) of material(s) in given site(s).Now I want that system will trigger a mail to concern team once job finished.
    Thanks,
    AK

    You can try using workflow transaction SBWP.
    you need to create a distibution list in the above transaction and add the requested mail ids to it.
    then when you create a jon using transaction SM37 you have the option SPOOL LIST RECIPIENT where you can add the created distibution list
    so when ever the job has run sucessfully then a mail is sent to all the mail id's in the list.
    hope this helps.
    cheers
    sundeep

  • Production Order: warning when Basic finish date is before scheduled finish

    Hello experts,
    We will set in config OPU3 (scheduling parameters for prod order) Adjust dates = 2 Do not adjust basic dates, ... Essentially this will allow the shop floor controller to change scheduled date ie. production dates without affecting basic dates.
    With this setup the system may display in the header of an order the scheduling note "Basic finish date is before scheduled finish" as well as generate a scheduling log "Scheduled finish is after basic finish date" (message 36 mess class C7).
    These messages are not enough visible for our planners. I would like to find a way to generate a warning before save. I tried to add a record in OPJB: message class CO no. 533 "Scheduled date & is after the requirements date &" but this doesn't work.
    Note: I tried to add message class C7 no 36 in OPJB but got the error "Please enter a legal value".
    Have you been able to add message in table OPJB ? Is it a good idea or the only option is enhancement?
    Thanks for sharing your ideas.
    Francois P.
    Edited by: Francois Paquet on Sep 30, 2010 5:30 PM

    Hi Francois
    I'm trying to do the same (also for C7 035).
    Have you already found out how to do this?
    Arno

  • [SOLVED] Network restart before Arch can access internet via IPCop?

    The Leopard machines on our LAN have working internet on boot, my Arch box does not?
    Even though I have the IPCop server's IP in the Arch /etc/resolv.conf.head file, I still have to do a sudo /etc/rc.d/network restart before I can use the internet.
    Does anyone know how I can solve this one?
    Thanks for your time.
    Last edited by handy (2008-12-13 13:41:04)

    tomk wrote:Post your /etc/rc.conf. If '/etc/rc.d/network start' works but network-at-boot-time doesn't, that's where the error is.
    As a workaround I've put /etc/rc.d/network start in my /etc/rc.local & now I don't have to type it manually.
    tomk wrote:Incidentally, dhcpcd messages don't show up in dmesg - you should be looking in messages.log or everything.log.
    I looked in all the logs that had been changed after a boot.
    Here is my rc.conf:
    # /etc/rc.conf - Main Configuration for Arch Linux
    # LOCALIZATION
    # LOCALE: available languages can be listed with the 'locale -a' command
    # HARDWARECLOCK: set to "UTC" or "localtime"
    # TIMEZONE: timezones are found in /usr/share/zoneinfo
    # KEYMAP: keymaps are found in /usr/share/kbd/keymaps
    # CONSOLEFONT: found in /usr/share/kbd/consolefonts (only needed for non-US)
    # CONSOLEMAP: found in /usr/share/kbd/consoletrans
    # USECOLOR: use ANSI color sequences in startup messages
    LOCALE="en_AU.utf8"
    HARDWARECLOCK="UTC"
    TIMEZONE="Australia/Sydney"
    KEYMAP="us"
    CONSOLEFONT=
    CONSOLEMAP=
    USECOLOR="yes"
    # HARDWARE
    # Scan hardware and load required modules at bootup
    MOD_AUTOLOAD="yes"
    # Module Blacklist - modules in this list will never be loaded by udev
    MOD_BLACKLIST=(net-pf-10 pcspkr) ## turns off ipv6 & pc speaker
    # Modules to load at boot-up (in this order)
    # - prefix a module with a ! to blacklist it
    MODULES=(sky2 snd-mixer-oss snd-pcm-oss snd-hwdep snd-page-alloc snd-pcm snd-timer snd snd-hda-intel soundcore fglrx)
    # Scan for LVM volume groups at startup, required if you use LVM
    USELVM="no"
    # NETWORKING
    HOSTNAME="archtypical"
    # Use 'ifconfig -a' or 'ls /sys/class/net/' to see all available
    # interfaces.
    # Interfaces to start at boot-up (in this order)
    # Declare each interface then list in INTERFACES
    # - prefix an entry in INTERFACES with a ! to disable it
    # - no hyphens in your interface names - Bash doesn't like it
    # Note: to use DHCP, set your interface to be "dhcp" (eth0="dhcp")
    ###lo="lo 127.0.0.1"
    # eth0="eth0 192.168.0.2 netmask 255.255.255.0 broadcast 192.168.0.255"
    eth0="dhcp"
    ###INTERFACES=(lo eth0)
    INTERFACES=(eth0)
    # Routes to start at boot-up (in this order)
    # Declare each route then list in ROUTES
    # - prefix an entry in ROUTES with a ! to disable it
    # gateway="default gw 192.168.0.1"
    ROUTES=(!gateway)
    # Enable these network profiles at boot-up. These are only useful
    # if you happen to need multiple network configurations (ie, laptop users)
    # - set to 'menu' to present a menu during boot-up (dialog package required)
    # - prefix an entry with a ! to disable it
    # Network profiles are found in /etc/network-profiles
    #NET_PROFILES=(main)
    # DAEMONS
    # Daemons to start at boot-up (in this order)
    # - prefix a daemon with a ! to disable it
    # - prefix a daemon with a @ to start it up in the background
    DAEMONS=(syslog-ng @iptables @network @netfs @crond @alsa @portmap @sshd @transmission-daemon @stb-admin @fam @gpm)# @tor @privoxy # @hal - hal's out on account of worker
    # End of file
    Last edited by handy (2008-12-13 12:30:42)

  • TS3274 I get on the internet with my Ipad3 and when I start typing in the search box the ipad guess' what I want before I finish typing and goes to the internet. How do I fix that?

    I get on the internet with my Ipad2 and when I start typing in the search box the ipad guess' what I want before I finish typing and goes to the internet. How do I fix that?

    Yes if you purchase the tethering data plan for your iPhone. See:
    iPhone: System requirements for Personal Hotspot

  • I purchased a soundtrack on iTunes (Windows 7) and five of the songs that downloaded get cut off before they finish playing...any idea how to get it fixed?

    I purchased a soundtrack on iTunes (Windows 7) and five of the songs that downloaded get cut off before they finish playing...any idea how to get it fixed?

    If your country's iTunes Store allows you to redownload purchased tracks, I'd delete your current copies of the dodgy tracks and try redownloading fresh copies. For instructions, see the following document:
    Downloading past purchases from the App Store, iBookstore, and iTunes Store
    Otherwise, I'd report the problem to the iTunes Store.
    Log in to the Store. Click on "Account" in your Quick Links. When you're in your Account information screen, go down to Purchase History and click "See all".
    Find the items that are not playing properly. If you can't see "Report a Problem" next to the items, click the "Report a problem" button. Now click the "Report a Problem" links next to the items.

  • HT1711 some of the songs in my Itunes library jump to the next song before it finish.  What can I do to fix this problem?

    Some of the songs in my Itunes library jump to the next song before it finish.  What can I do to fix this problem?  Please help!!

    Hi bibijc!
    I have an article here that addresses your issue, and can give you some helpful troubleshooting steps for resolving the issue:
    Troubleshooting songs that skip
    http://support.apple.com/kb/ts3217
    As a secondary troubleshooting step, you may also need to recreate your iTunes library. This can be done by following the instructions in the following article:
    iTunes: How to re-create your iTunes library and playlists
    http://support.apple.com/kb/HT1451
    Thanks for coming to the Apple Support Communities!
    Regards,
    Braden

  • Mail after job finished

    Hi All,
    I am scheduling the RMMRP000 and want to send the mail to group of SAP user once job is finished.
    I have created the Distribution list with all respective SAP user and while scheduling the job i am assigned spool recipient but mails are not send to all user after once job finished. If i am assigned only one user not group its sending mail once job finished.
    pls let me know how i can do it for group of SAP user.
    Regards,
    Amit
    Dear All,
    Any Idea......any clue
    Edited by: sathishreddy on Apr 12, 2010 7:05 PM
    Edited by: sathishreddy on Apr 12, 2010 7:06 PM

    Hi All,
    I am scheduling the RMMRP000 and want to send the mail to group of SAP user once job is finished.
    I have created the Distribution list with all respective SAP user and while scheduling the job i am assigned spool recipient but mails are not send to all user after once job finished. If i am assigned only one user not group its sending mail once job finished.
    pls let me know how i can do it for group of SAP user.
    Regards,
    Amit
    Dear All,
    Any Idea......any clue
    Edited by: sathishreddy on Apr 12, 2010 7:05 PM
    Edited by: sathishreddy on Apr 12, 2010 7:06 PM

  • Restart/resubmit job chain waiting of a file event

    Hi Experts,
    how can I restart/resubmit a job chain waiting of a file event?
    In my case the variables OriginalPath and FinalPath are used in job chain parameters as an Default Expression (waitEvents...). If I restart the job chain I get the message "Could not evaluate default value for parameter...".
    We are using SAP-CPS Build M28.20-37214.
    Regards
    Mathias

    Hi,
    You probably want to restart it because there was a failure somewhere in the chain. In this case it is easier to not let the chain end in error, but to let it go to status Console using the "Request Restart" postcondition.
    Then when the step is restarted, or the chain is restarted from the beginning, it is restarted within the original chain and it reuses the already determined parameter values.
    Regards,
    Anton.

Maybe you are looking for