Batch management - Shelf life and Production date

Hi All,
I am working with batch management where i did all the setting of characterestics, Batch class and neccessary settings. i am working with three characterestics shelf life expiration, production date and last goods reciept.
I have to active shelf life and production date in Migo screen so that at the time of recieving my characterestics can store data. kindly help in customizing setting
Thank you in advance
Majid

Hi,
You need to activate shelf life expiration check in T.Code OMJ5 for movement type 101 and also plant.
This will activates the entry of Shelf Life expiration/Production Date at the time of goods receipt.
If you are using std. SAP Characteristic (LOBM) for Manufacturing Date,Best Before Date and Goods Receipt Date then the value of this characteristic will updates automatically in Batch ,depends on your goods receipt data.
Regards,
Dhaval

Similar Messages

  • Point of sales (POS) and Product data management (PDM)

    Hi guys,
    please any one can tell me what is Point of sales (POS) and Product data management (PDM) in SD module and give me structures on this

    As i know it is not supported.
    Oracle supports counter sales order. But if performance is considered invoicing and receipt is slow in Oracle. So this can have workaround...

  • Upgrade on SAP Plant Maintenance and Product Data Management

    Hi Gurus,
    I assigned to a upgrade project for Plant Maintenance and Product Data Managemet modules.
    Please guide me what are the steps to follow and provide more information on this ...
    Thanks in advance!!!!!!!!!
    Regds,
    RK

    Hello Kurni,
    In PDM/PLM latest version is PLM 7.0.
    There are many new functionalities available in this version.
    Earlier version can be accessed from SAP GUI, but the latest one can be accessed from Portal/NWBC.
    DMS side many notes have to be applied as you will be instaling EHP4.0 as part of the upgrade.
    ECM side some standard reports are missing in PLM 7.0, which were available in ECC6.0.
    Regards
    Prasad K

  • Total Shelf Life and Batch Management Indicator

    Can anyone pleas confirm if a value of zero is a valid value in the Total Shelf Life field (MHDHB) if you have set the Batch Management Flag (XCHPF)?

    you can well use batch management without using shelf life functionality.  Hence you will have batches without total shelf life.
    In customizing you define whether you use shelf life management in general, and per material you specify in the storage location view if you do it for this individual material.
    Please check the docu.

  • Minimum shelf life and delivery completed indicator at GR

    Dear Gurus,
    I have two questions:
    1. As per my knowledge minimum shelf life is "minimum number of days for which the material must be keep for GR to be accepted" , (i.e. if it is 10 days the material should accepted for GR only after 10days of production ) but if I do a GR for today produced material still I m not getting any error. Why?
    2. Since we can do GR for "delivery completed" indicator set items. Canu2019t we get an error message if we try to post GR for delivery completed item (e.g. what is the use of message numbers 433 and 025)
    Thanks,
    Chameendri

    Hi,
    Answer to Question 1:
    Total Shelf life - If total shelf life is maintained then the minimum shelf life will also to be entered mandatory. While taking
    GR for such item, it actually ask the user to enter the Manufactured date so that the system automatically calculates the
    expiry date.
    Minimum shelf life ( or Minimum remaining shelf life)- While taking the GR, it asks the user to enter the date of GR date so that it checks whether the
    days entered in material master has been satisfied. If the condition is not satisfied then it will not allow to take receipt for
    that item.
    Example A material has a minimum remaining shelf life of 20 days and a total shelf life of 30 days. You enter the goods
    receipt of a new batch on 23/02/12 and enter 11/02/12 as production date. The system calculates the shelf life expiration date 15/03/12 from the production date plus total shelf life (30 days). The batch still has a remaining shelf life of 18  days. The goods
    receipt is not accepted (short fall of 2 days from minimum remaining shelf life)
    Now if the production date is 14/02/12 then batch still has a remaining shelf life of 21 days The goods receipt is accepted
    Answer to Question 2:
    Not possible to restrict by activating system messages only
    So refer this  solution
    http://www.sdn.sap.com/irj/scn/weblogs?blog=/pub/wlg/17281

  • Tecra Battery Information Tool - Cycles and Production Date

    Hi everybody,
    I am searching for a Battery Tool, which reads out the whole Battery information. Aspecially the Production Date, First used Date and charging cycles. Is there a tool available by Toshiba or another Freeware tool? Is there another possibility to read that information?
    Generally, does the Toshiba Battery capture this information? I only know the possibility to watch all this information from IBM, they use the BatteryMaximiser, which shows all the info. I have been searching the web but did not find anything. Please help.
    best regards
    Matty

    Hi,
    I need the information for an exact classification of the Battery. You do not get enough information about the Battery condition in the normal Power Management or in the Power Saver. There are tools which show the original and the available Battery capacity, but it is not possible to say anything about the remaining lifetime of the Battyery. So the information is quite important for me.
    best regards
    Matty
    [Edited by: admin]

  • How to setup batch management in sap and how batch work?

    Hi
    I hope to check how batch managment work in sap?
    If we setup batch management in mm03 for one matieral,
    Will the batch number be created automatically or the number should be created first then we scan it?
    when we do goods movement for this mateiral, will system automatically select which batch number is smallest then move that one, or we select one mateiral and scan its batch?
    How batch management control the first in and fisrt out (FIFO) ?
    Thanks
    alice

    Hi
    I think that you have had your question answered so if you are happy with this can you please award points if you want to but mainly can you please mark your question as answered so that it is easier to navigate around the open questions in the forum as the number of pages are growing and growing and it takes too long to go through everything especially if a satisfactory answer has already been given and people like me who want to help will give up and so some people may not get any help.
    Thanks for this
    Frenchy.

  • Managing Org  units and Master Data in project structure

    How are Org units and Master data managed at the project structure? What would be the appropriate place holders for them in the structure. Should we manage it at the top of the project structure or within the  business scenarios/processes. On what basis should we decide this? How would this impact in case of a global template rollout?
    Please share your experiences regarding this.
    Thanks.
    Mike

    any talented  guy do this way.
    i think  that ur working  in E2E project work
    before  singoff ur business process u should give to ur users  master data templets..they collect for  masterdatas in before realization phase...that time  u should know  how many specifications is there and  in spections how  many in quantitative and how many qualitative u will indentify. if any query let me  back.
    Edited by: Lakshmiananda prasad on Oct 6, 2009 11:48 AM

  • MRP run - misalignment for planned order between Date and Production Date

    Hi All,
    We've just integrated SAP for a new plant.
    The MRP runs based on Routing Lead Time for Make materials instead on Material Master Lead Time, for Capacity Assessment purpose.
    When requirements dates lay in the past, MRP performs forward scheduling starting from current date and properly defines Production End Date according to Routing.
    By checking MD04, for the proposed Planned Order, the basic date is same as Current Date (= same as Requirement Date) instead of being same as Production Date.
    It works as it if checks stil the MAterial MAster LEad time instead of Routing. In fact if I updated the LT of MM the MD04 provides the right Date.
    For future requirements, the MRP works properly, by having basic dates (both start and end date) aligned with Production Dates of Planned Order.
    How can I do the alignment w/o updating In House Production LT?
    Thanks,
    D

    Hi Caetano,
    we have already done this configuration in OPU5 but it doesn't provide any benefit.
    Below how we configured it:
    Scheduling level: Via detailed scheduling
    Adjust dates: adjust basic dates, adjust dep. reqmts to operation date
    For capacity scheduling: Always basic dates, dep. reqmts to operation dates
    Scheduling type: Backwards.
    Regards,
    D.

  • Basic dates and production dates in planned order

    Dear all,
    I have a planned order (for material A) which has "order finish date" same as "End of production date".
    I have another planned order (for material B) where "End of production date" is eariler than "order finish date".
    Scheduling margin key is same in both the cases.
    Why they are different? Can you please help?
    Regds.,
    Chaitanya

    Dear
    Please Check in the MRP 2 And SchedMargin key it defines the floats
    SCHEDULING MARGIN KEY
    Takes effect only for Lead Time Scheduling
    Configure scheduling horizon OPU5
    which lead time scheduling and capacity planning should be carried out. scheduling horizon is the period in working days. If a planned order has its basic start date within this period in future, lead time scheduling is carried out using the selected routing.
    The production times are calculated from the float times of the scheduling margin key in the material master record and the time from the individual operations.
    If the planned order has its basic start date further in the future than this scheduling horizon, the basic dates are calculated from the in-house production times in the material master and are transferred to the production times
    with Regards
    Pushpalas

  • Basic dates and production dates

    dear all,
    i have made a PIR using MD61 for 01.04.2010,
    after that, i run the MRP using MD02 to make the planned order, so when i open the MD04 tcode, the planned order has been created for 01.04.2010 too...
    the problem is when i convert that planned order to production order, when i check the finish date of the production order, it has been change to 02.04.2010, why the start dates and finish dates changes in the production order???
    best regard,
    MARUFAT

    Hi,
    i have check in OPU3, the schduling type is backward, and the automatic scheduling is tick
    i also check in MRP view, the scheduling margin key is 000 so there is no float time problem, and the GR processing time is 0,
    i run the MRP RUn MD02 using planning type 1 using basic dates
    but when i convert the planned order into production order, the finish date always change,
    so, if the finish date in the planned order is 01.04.2010 , after i convert into production order, the finish date change into 02.04.2010
    what makes me confuse is that the scheduling time is backward, but why all the finish date of the planned order after i convert to production order change into +1 days after the finish dates ??
    can you help me to solve this problem?
    regard
    MARUFAT

  • Calculating batch sizes using past and future data

    Hello all,
    I have been a business analyst for the past 10 years on SAP working in many of the different areas surrounding supplychain.
    I am looking for a way of ensuring that the business that I am working in are ordering parts in the most efficient batch sizes.
    Is there a way in which I can use past consumption, order data and future demand to determine any adjustments that need to be made in the current batch sizes that we use.
    Thanking you in advance,
    Mark

    check this:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d27eb44af11d182b40000e829fbfe/frameset.htm

  • How to manage spare parts and production parts seperately

    Hello,
    I want to keep some spare parts for services only ,though some of them also used in production .
    then how can I implement this in SAP system,how the stock of spare parts not influence the forecast of the production( means these parts only can be used in services)
    how to separate these parts in Warehouse in system and physically.
    Thanks,
    Helai

    Helai,
    If it were MY company, I would
    1.  Put the spares into a diff storage locn
    2.  Enter Safety stock for the quantity I want kept in 'spares' inventory
    3.  Use an availability check in which Safety stock is not relevant for ATP for these parts.
    However, this does not meet all of YOUR stated business requirements.  For this, you have to use MRP areas, and have the 'spares' storage location assigned to a different MRP area.  You can then plan them completely separately from your production parts.
    [MRP Area|http://help.sap.com/saphelp_erp60_sp/helpdata/EN/c4/106956ae8a11d1a6720000e83235d4/frameset.htm]
    Regards,
    DB49

  • How to manage rdf schema and instance data in multiple tables?

    Hi,
    I need to store the rdf schema in one table and rdf instance data in another table.
    1. How I can do this?
    2. How to configure the joseki-config.ttl to work for multiple models? Some example will help me to understand the solution.
    3. Is there any possibility to create a single model for multiple tables?
    Please let me know.
    Regards
    Siddu

    Hi,
    For schema data, you can create a model TBOX using Jena Adapter (behind the scenes, application table TBOX_TPL will be created).
    For instance data, you can create a model ABOX using Jena Adapter (behind the scenes, application table ABOX_TPL will be created)
    Data loading can be done in multiple ways. Please see the following document for details.
    http://download.oracle.com/docs/cd/E18283_01/appdev.112/e11828/sem_jena.htm
    Your joseki configuration can be something like
    oracle:defaultModel [ oracle:firstModel "ABOX"; oracle:modelName "TBOX"; oracle:rulebaseName "OWLPRIME"; oracle:useVM "TRUE" ] .
    Hope it helps,
    Zhe

  • Report for recieved, expiry dates of shelf life of materials

    Dear Gurus,
    I did nt find the solution in MB5M, because i want report for shelf life of materials based on recived date, expiry date, please share.

    Hi,
    When ever a material is having a shelf life , based upon the manyfactring date and the receiving date , the remaining shelf life can be found . If you want have a report which says the shelf life and receve date of a perticular batch and what should be the remaining shlef life or whather expired , once come into the plant , if not utilized , can be done through a ZREPORT or a query for the same .
    Regards,

Maybe you are looking for

  • VBA Word Find and Replace characters but excluding certain characters

    I am trying to write VBA code in Word that I will eventually run from a VBA Excel module. The aim of the project is to find specific strings in the open Word document that have length of either one or two characters and are of a certain format, and r

  • EJB 3.0 with NetBeans 5.5 help required

    Hi I created a simple HelloUser application in NetBeans 5.5 with the following steps. Build is successful with out any exceptions....but not able to get the lines given for testing* in the Hello application...Please help me how to get the lines which

  • Virtual PC 7.0.3 in PowerMac G4 DA with OS X: how to make it boot from CD?

    I'm facing an issue with Virtual PC in my PowerMac G4 Digital Audio, with Mac Os X 10.5.8. I've just installed Virtual PC 7 and upgraded it to 7.0.3. Everything seems to be running ok, except for one issue: it doesn't boot from CD. So, the Virtual PC

  • HELP!  Iphone 4S and Outlook 2007

    I have outlook 2007 and an iphone 4s and here are a few issues: 1) I can delete messages on my phone and they will delete on my outlook, however if I delete on my outlook it won't delete on my phone. 2) If I put an event in my outlook calendar it wil

  • Flash mx 2004 como justificar texto dinámico?

    Hola necesito justificar texto dinámico con flash mx no he podido dar con la solución alguien sabe como hacerlo?