Batch no allocation when GR

I need to allocate Batch no. for individual quantity during GR i.e If I do GR for 10 pcs then need to allocate 10 different batch no. to them.How i can do it when I do GR more than one pcs simultaniously.

Hi Partha,
While doing GR your GR qty is 10 Pcs and if you want separate batch no for each pc then you need to split your GR qty from 10 pcs to 1 pc each line item of GR. U can split this by using distribute qty button which is located above detail items window in T.Code MIGO .
Kindly note you canu2019t assign / generate multiple batches nos for one single line item of GR.
Regards,
Ajay Nikte

Similar Messages

  • Can I label each batch of photos when adding to PHOTOS?

    I hate PHOTOS already. I can't seem to find a way to label each batch of photos when uploading to PHOTOS as I did in iPhoto. Is there any way to do this? I might want to search for a group of photos like "The Smith Wedding" if I were a professional photographer and don't remember the date . It was simple in iPhoto. How do I do it in PHOTOS where it seems everything is organized by date only ??? Darn few preferences for me to tweak in this app. I'll send feedback to Apple if there is no way to do this.

    Your answer was patronizingly obvious, and not at all helpful. I am just disturbed that Apple has removed a simple, obvious function. As a Mac owner since 1984 I can tell you that simple, obvious function has always been and should continue to be the hallmark of the Mac OS. I wanted to be sure that simple functionality is really gone before I send a feedback to Apple. BTW Totoff answered the question but it's still a clunky and not obvious function.

  • Automatic owner allocation when moveout issue

    Hi Experts.
    I am facing the problem with the Automatic Owner Allocation When a moveout is done from a premise.
    For the above sceneraio i have configured the following steps:
    1.Set the radio button Owner Allocation with Automatic Move-In.
    2.Allocated the owner to premise by using the Tcode ES51.
    3.Activated the Work flow "WS20500047".
    I am able to trigger the work flow but work flow ended with error
    "Work item 000000392219: Object MOVEINDOC method MOVEINOFOWNERCREATENODIALOG cannot be executed"
    "Move-In Document could not be created".
    Could you please help me out how to resolve this issue.
    Thanks & Regards
    Kiran

    Hi Dear,
    Have you maintained the refference Contract number at Workfllow level ? Just check this. Eventhough if you are facing the same problem then its purely related to Workflow.
    All your configurations are perfect.
    Thanks,
    Josh.

  • Bug report & possible patch: Wrong memory allocation when using BerkeleyDB in concurrent processes

    When using the BerkeleyDB shared environment in parallel processes, the processes get "out of memory" error, even when there is plenty of free memory available. This results in possible database corruption.
    Typical use case when this bug manifests is when BerkeleyDB is used by rpm, which is installing an rpm package into custom location, or calls another rpm instance during the installation process.
    The bug seems to originate in the env/env_region.c file: (version of the file from BDB 4.7.25, although the culprit code is the same in newer versions too):
    330     /*
    331      * Allocate room for REGION structures plus overhead.
    332      *
    333      * XXX
    334      * Overhead is so high because encryption passwds, replication vote
    335      * arrays and the thread control block table are all stored in the
    336      * base environment region.  This is a bug, at the least replication
    337      * should have its own region.
    338      *
    339      * Allocate space for thread info blocks.  Max is only advisory,
    340      * so we allocate 25% more.
    341      */
    342     memset(&tregion, 0, sizeof(tregion));
    343     nregions = __memp_max_regions(env) + 10;
    344     size = nregions * sizeof(REGION);
    345     size += dbenv->passwd_len;
    346     size += (dbenv->thr_max + dbenv->thr_max / 4) *
    347         __env_alloc_size(sizeof(DB_THREAD_INFO));
    348     size += env->thr_nbucket * __env_alloc_size(sizeof(DB_HASHTAB));
    349     size += 16 * 1024;
    350     tregion.size = size;
    Usage from the rpm's perspective:
    The line 346 calculates how much memory we need for structures DB_THREAD_INFO. We allocate structure DB_THREAD_INFO for every process calling db4 library. We don't deallocate these structures but when number of processes is greater than dbenv->thr_max then we try to reuse some structure for process that is already dead (or doesn't use db4 no longer). But we have DB_THREAD_INFOs in hash buckets and we can reuse DB_THREAD_INFO only if it is in the same hash bucket as new DB_TREAD_INFO. So line 346 should contain:
    346     size += env->thr_nbucket * (dbenv->thr_max + dbenv->thr_max / 4) *
    347         __env_alloc_size(sizeof(DB_THREAD_INFO));
    Why we don't encounter this problem earlier? There are some magic reserves as you can see on line 349 and some other additional space is created by alligning to blocks. But if we have two processes running at the same time and these processes end up in the same hash bucket and we repeat this proces many times to fill all hash buckets with two DB_THREAD_INFOs then we have 2 * env->thr_nbucket(37) = 74 DB_THREAD_INFOs, which is much more than dbenv->thr_max(8) + dbenv->thr_max(8) / 4 = 10 and plus allocation from dbc_put, we are out of memory.
    And how we will create two processes that end up in the same hash bucket. We can start one process (rpm -i) and then in scriptlet we start many processes (rpm -q ...) in loop and one of them will be in the same hash bucket as the first process (rpm -i).
    I would like to know your opinion on this issue, and if the proposed fix would be acceptable.
    Thanks in advance for answers.

    The attached patch for db-4.7 makes two changes:
      it allows enough for each bucket to have the configured number of threads, and
      it initializes env->thr_nbuckets, which previously had not been initialized.
    Please let us know how it works for you.
    Regards,
    Charles

  • Status is failed when a batch is scheduled when the destination is PDF

    Hi,
    I have couple of batched which need's to be scheduled among those one of the batch which are ll running with PDF destination is getting the status as error so what would be the error for  this.
    It's an urgent task please let me know any suggestions
    Thanks

    check FrConfig.cmd file it will point to Setenv.bat file... make sure you have correct path there. when i made changes in there it is now accepting the folders
    OR
    There is a related Bug (known issue) for this. You'll have to use the hyperion service user(the user account which was used to install) to burst to a shared directory.
    How about creating a hard link and adding that as an ExportFolder. (I've never tried it). It may work because FR might think that as a local folder.
    When i said hard link was a referring to a link created using MKLINK command Mklink not a local folder.
    let me know if more inputs required.
    Thanks,
    ~KKT~

  • Batch reservation & Allocation in process order

    I am allocating batch to process order components(for active ingridient)While I am allocating the batch I am able to select the batch which has all of its quantity reserved,which is not desireble.Any solutions please??/
    Eg.In MMBE my batch stock(say for batch AA11) is as follows:Unres stck 100 & reserves 100
    If I am determing batch for a different process order where this component is used,I am able to select the same batch,even though it has no open quantities.
    Please suggest

    Hi Rele,
    Please check in CO09 transaction for the availability of this batch stock whether it is free or confirmed to any other component like.
    Regards
    R. Senthil Mareeswaran.

  • Memory allocation when using multiple instances of a static array.

    Hi,
    I have question regarding the amount of memory allocated using multiple instances of a class that has declared a static array, e.g.:
    package staticTest;
    import javacard.framework.*;
    public class StaticClass
         static byte[] staticArray;
         public StaticClass()
              staticArray = new byte[100];
    /* Another class */
    package statictest;
    import javacard.framework.*;
    public class MyApplet extends javacard.framework.Applet
         StaticClass staticLibA, staticLibB;
         public MyApplet()
              /* Here we use two instances */
              staticLibA = new StaticClass();          
              staticLibB = new StaticClass();
         public static void install(byte[] bArray, short bOffset, byte bLength)
              (new MyApplet()).register(bArray, (short)(bOffset + 1), bArray[bOffset]);
         public void process(APDU apdu)
              byte[] buf = apdu.getBuffer();
              switch(buf[ISO7816.OFFSET_INS])
    }When downloading and installing this applet on a gemXpresso 211 PKis (that has a ' Get free EEPROM memory' function) the card reports that the amount of memory is increased by a approx 100 bytes every time a new staticLibX is added in the MyApplet constructor. Is this correct? If yes, can someone explain to me how to declare a static array that only allocates memory once and are being shared by the instances.
    Best regards,
    Jonas N

    Hi!
    I have another issue about static variable. The following is my sample code:
    ========================================
    package com.Test01;
    import javacard.framework.*;
    import javacard.security.*;
    import javacardx.crypto.Cipher;
    public class Test01 extends Applet {
         OwnerPIN Pin;
         static DESKey[] keys;
    protected Test01(byte[] buffer, short offset, byte length) {     
    keys = new DESKey[4];
    length = 0;
    while (length < 4) {
         keys[length] = (DESKey)KeyBuilder.buildKey((byte)3, (short)0x80, false);
         length = (byte)(length + 1);
    public static void install(byte buffer[], short offset, byte length) {     
    new Test01(buffer, offset, length);
    ===========================================================
    If there are two instances, A and B, created in the package.
    My issue:
    1. Are keys[0]~ keys [3] kept while B is deleted?
    2. Does each instance have itsown object while "keys[length] = (DESKey)KeyBuilder.buildKey((byte)3, (short)0x80, false);"?
    3. follow item 2, if A and B share the same object, is the object kept while B is deleted?
    Thank you
    Best regards,
    kantie

  • Batch - Incorrect Function when deployed

    Hi everybody.
    I'm trying to deploy a Windows 8 Custom Start Screen (the metro screen).
    I created a Batch file to do it :
    POWERSHELL -NonInteractive -Command Import-StartLayout -LayoutPath .\CustomScreenLayout.bin -MountPath %SystemDrive%\
    The binary file is in the same folder. 
    The batch and the bin works perfectly fine when I launch it manually post installation. But like I have over 100 computers to install and don't want to do it everytime.
    Does someone have an idea ?
    Thanks in advance (and sorry for my english).
    Jon

    WHen I import the CustomScreenLayout.bin I just copy the file to local machine during WInPE (Post-Install)
    xcopy /y F:\AppsFolderLayout.bin C:\Users\Default\AppData\Local\Microsoft\Windows
    Keith Garner - Principal Consultant [owner] -
    http://DeploymentLive.com

  • Batch model hangs when Windows is locked

    I'm running the batch model with 5 sockets.  When the Windows screen is locked, the model hangs after all of the test sockets have completed at the batch model step titled "Sync With Controller -- AfterPostUUT."  This call is part of the ManagedModelSupport.dll.  I have TestStand 2012 SP1 running on Windows Server 2008 R2 SP1.
    I have attached some screenshots.
    Solved!
    Go to Solution.
    Attachments:
    BatchModelHangingScreenShots.pdf ‏192 KB

    Im shore IT is thrilled to have computers that never lock
    Are you running the program with Admin privileges?  It is possible that going to sleep without admin privileges may terminate some threads.  
    Additionally, have you attempted to run a batch model shipping example and locking the computer?  What are the results of such a test?  

  • Batch number issue when posting goods receipt for Subcontracting PO

    Dear expert,
    I always heard there will be issues while posting goods receipt for subcontracting PO. If the component is managered by batch.
    No batch number will be proposed during PGR in MIGO...
    I dont quite understand where is the issue??
    My understanding:
    We have batch managered components and End Product. All have batch numbers, then we PGI the stock to 'SC stock' via 541 movement type.
    Then Vendor will finish the end product and send us back the end product.
    We consumption the components use 543 O movement type? And GR the end product..
    So while goods receipt, the sytem just need pick the existing batch number for both components and finish products..
    Where are the issues???
    Thanks.

    Hoo Laa wrote:
    I have questions for people always mentioning there are issues with batch determination while post goods receipt for subcontracting orders.
    >
    > I am thinking maybe they didnt active the batch determination for 543 movement type..
    >
    > Thanks.
    Hi Hoo,
    You are right!!
    Setting of batch number determination has its importance in Mvt Type be it 541, 543....
    The issue you might have observed would be with Batch Determination in Goods Issues which folks find it bit tough to achieve n make it work for them.
    Cheers!!
    Shiva

  • Auto creation of Batch master data when external batch no entered in PR

    Dear All,
    At persent we can auto create batches at production order creation level, Goods receipt level.
    In same way how we can achive auto creation of Batch master data at Purchase Requisition level.
    Regards,
    Manoj

    There is no auto-creation of batches that are entered in ME51N. SAP issues message ME178 telling you that the batch entered does not exist.
    You have to maintain the batch in MSC1N first, then you can enter it in the PR.

  • Labels Batch No allocation in Purchase requistion while MRP Run

    Dear Experts,
    While running the MRP PR are generated for labels as per BOM to purchase department, but in our case labels are purchased by purchase department, So can i give the batch number to purchase department through PR, so that they can print the labels as per the batch number mentioned in PR.
    Regards,
    Phalgun Patel

    Dear Phalgun,
    Thanks for your appreciations.
    In PR you can maintain texts at Header level or at Item level. Go to transaction ME52N - Change PR & Enter your required PR no.
    Now if you want to maintain some common texts for your complete PR then enter Header Texts. For that you can click on the Expand Header tab below the bucket trolley or press Ctrl+F2. Texts tab will be opened. Now you can enter the texts in the field of Header texts.
    If you want to enter the texts specific to any Items, then you have to enter texts at Item level. For that you have to select that item and click on the Collapse Item Details or press Ctrl+F7. There also you can select the individual items from drop down which are present in the PR. Select Texts tab and there you can enter the required texts, in your case you can enter the required Batch No. for those items. Here you have different options like item texts, Item Note, Delivery texts etc. etc. You have to double click on those options where you want to enter the texts.
    Further for your information, to copy those texts in to PO, you need to do the customizing with the help of your MM Consultant. Also you can print those texts on your output.
    Hope now this will be clear to you.
    Regards,
    Hiren Ramani

  • Necessity of zone, bin number in batch number allocation

    We need to allocate a batch number at the time of GR posting - does the warehouse zone, bin number in any way form the criteria for the batch no allocation

    Hi,
      you need to do an iterative approach to see if the test socket is active based on a point before you set the number of threads to wait for with the rendezvous - Runstate.TestSockets.Count contains a number that says how many are available (enabled and disabled) and then the list (array) of all the testsockets is in Runstate.root.Parameters.ModelData.TestSockets[x] and you're looking for the disabled item in there.
    So for each in Runstate.Root.Parameters.TestSockets[item].Disabled count the number of falses and use that for the number of rendezvous threads to setup.
    Of course, as the previous poster noted - this doesn't help if you've already committed to a number of rendezvous threads and you're finding you're skipping over a rendezvous step.
    Options here are to look at the top level again, and if there's a step going through cleanup because it failed, then that's a pre-condition on the rendezvous step, but that would prevent all instances of that front levelling up.#
    You could pre-create 4 rendezvous items though - a wait for 1, wait for 2, wait for 3 and wait for 4. Then use the flags to select which one things need ot wiat on.
    Again - that doesn't help if say 2 are already waiting and a third one suddenly goes to failure so skips ove the "wait for 3" rendezvous.
    Within reason, you should have an idea how long a rendezvous takes anyway - use the timeout on the rendezvous step so it will drop out if there's one missing.
    That help?
    Thanks
    Sacha
    // it takes almost no time to rate an answer

  • Same Batch is allocated for mutiple outbound deliveries

    Hi All,
    We have a Batch with quantity as 1, but system assigns this batch for more than one outbound delivery while picking. User has to manually remove this batch and select a different batch.
    For example, Batch # XYZ was first picked up for delivery for delivery order # 1234 on 26 May. PGI was subsequently done on 30 May. However, now we have 3 different delivery orders (originating from 3 different order numbers) with the same batch numbers of # XYZ. These 3 delivery orders were created on 30 May 2011.
    Can anybody help to solve this issue ?
    Thanks & Regards,
    Vikas

    maybe you had more stock of this batch on May 30th.
    And the stock was issued internally or corrected by physical inventory.
    Please check the movement for material/batch combination with MB51

  • Internal Batch Number Allocation

    Dear Gurus !
    I want to allocate internal batch numbers after releasing the production order Kindly let me know How can I do this.
    Regards
    Debjeet

    Hy Dabajeet,
    Batch Creation can be done
    - At the time of order creation
    - At the time of Order release.
    - No auto batch generation at the time order creation/Release.
    And that is you can set with T.Code OPKP (Prd. Scheduling Profile).
    I don't think there is any such std. setting which will give you facility to generate auto Batch No. after Order release.In this case you have one option and that is create manuall Batch No, by Pressing Create Batch tab in Goods Receipt screen of order.
    Regards,
    Dhaval

Maybe you are looking for

  • No screen lock with os4 !! reminds me of htc tilt !!!

    i have a major issue with the new software 4.0 seems they left out the screen lock option by pressing power button to lock the screen i always either hang up , put on hold or open a app while talking !! I'm very disappointed with apple i have many pr

  • QTEK 9100 better known as wizard Windows  Mobile 5 Phone

    I made a big mistake buying a moblie Phone QTEK 9100 better known as Wizard in other countries than Switzerland. This This is a Windows Mobile 5.0 Device with all you can think except that it does not work at all with my Mac.It is not compatile with

  • It's possible to disable custom color from color picker?

    Hi guys! I've searched in the threads about color picker but I found anything about it... It's possible to disable the option to select a custom color? I work in a enterprise who makes softwares to brazilian clients, and not everybody understands eng

  • WRT600N not able to connect using windows 7 desktop.

    all other computers on network still working fine.  Did power cycle and tried to run disk in compatibility mode.  Not establishing Ip and cant get into the manual setup with 192.168.1.1 either.

  • Custom Infotyp and LSO

    Hi @all, i've got a serious problem here. The task is to Implement a custom Infotyp called TrainingTarget/goal, this IT is supposed to show up when you enter TA lso_psv2/or lso_pvct when you create a new Infotyp. I build the Infotyp via pm01 and cust