Bill of material related data.

Dear experts,
I want to know is their any standard  datasources to extract Bill of material related data(Material,Component) to BI.As the data in standard tables like MAST,STPO,STKO.
Pts will be assigned.
With Regards,
Meiyappan

Hi,
Check these links:
Hope these links would be of some help
http://help.sap.com/saphelp_erp2005/helpdata/en/ea/e9b7234c7211d189520000e829fbbd/frameset.htm
http://help.sap.com/saphelp_erp2005/helpdata/en/d1/2e4114a61711d2b423006094b9d648/frameset.htm
http://www.sap-img.com/sap-sd/sales-bom-implementation.htm
http://www.sap-basis-abap.com/sappp007.htm
http://help.sap.com/saphelp_nw04/helpdata/en/43/40b8aeaa5bba4d9a81c7332119a4b4/content.htm
http://help.sap.com/saphelp_nw04/helpdata/en/d9/6eeedf6d44f242902eafc361924026/content.htm
Sasi

Similar Messages

  • How to create BOM(Bill Of Material) item data from flat file?

    I have two flat files one is BOM(Bill Of Material) header data and BOM item data. BOM header is already created, now I want to create BOM item data with reference to the header data. Is there any standard direct batch input method in LSMW or Is there any standard BAPI or Is there any standard BDC report program to do the task? CS01 is the TCode to create BOM.

    Hi,
    The DI program works for create step CS01 and not for CS02.
    Perhaps this ( adding items in header by Tx: CS02 ) could be achieved by a Recording step in LSMW.
    Best Regards, Murugesh

  • BOM (Bill of Material) Master Data  in Business Content?????

    Hi all,
    Any idea about standard business content data source which contains the BOM - bill of materials data.....
    Best Regards,
    Navin

    Hi Navin,
    Check these links:
    Re: Extract BOM data from R/3 to BW
    Re: Loading Bill of Material
    Bye
    Dinesh

  • Material Master Data related with an Asset

    Hi Guys
    I was told that the material master data that I am creating needs to be related with an asset hierarchy, any one know where Do I relate material master data with the asset hierarchy?
    thanks
    Carlos

    Hi,
    Though you Material grade is time dependent and sequentially changing.
    You can create 4 different DTP with Grade selection (only 1 Transformation).
    For example, 1 DTP with filter Grade A, another DTP with grade B, so on.
    and executive all 4 dtp sequentially and activate master data after every DTP run.
    Hope it will workout.
    Thanks,
    Balaram

  • Loss qty related Bill of material move to scrap location automaticaly at the time of process order confirmation

    Hi experts,
    I need one  clarification, i am raise one process order in COR1 - Qty 1000 kg, reservation completed against the process order bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB21 with mvnt.type 311, store person also moved the bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB1B.
    Issue is at the time of confirmation i am enter the OK qty or packed qty in yield column - 950 kg , remaining 50 kg is enter in loss column.> Go to confirmation bill of material qty calculated at only for related in yield qty. Remaining loss qty related bill of material not consumed it is available in production storage location ( 0004 ),then one by one raw material and packing material qty moved to scrap location through MB1A - 541 Mvnt type.
    If any other way for easy reservation and goods issue against the process order main storage location to production storage location.
    I need at the time of confirmation enter yield qty related BOM qty consumed in 261 consumption, remaining loss qty related BOM qty taken scrap mvt.type  541 in automatically if it is possible for any customization at the time of loss qty enter related bill of material qty also posted in scrap  ?
    Kindly help me for the issue !
    Thanks & Regards,
    N.Umapathy

    Hi
    In Standard practice the scrap generated during the production process should be maintaid as negative qty and with differnent material codes which acts as BY Product.
    In your case when you maintain the scrap percentage for BOM components , it will copied to the production order with adtditional qty and it will be consumed when you do confirmation and Goods moevement and at the same time the Scrap material is generated/received  with movement type 531( not 541) as by product received out of production.
    You can maintain the same BOM component as By product in BOM system will generate the stock to a different SLoc but the cost will be wrong.
    Regards,
    Anupam Sharma

  • Extraction of bill of Material Data to BW

    Hello SDN,
    I want to extract the Bill of Material Data to BW. Is there any standard extractor to do this? If not, what is the alternate way to get this? Which tables in R/3 contains this data?
    Best Regards,
    Nene.

    Hi Nene
    if you want to extract the BOM data as master data to BW, there is no standard extractor in BW. I think you have to write an abap program in your source system which uses the BOM explosion function module. The result of this program is e.g. an csv file or an database table. Then use this result as an source for generic extraction.
    regards
    juergen

  • Material Availablilty Date and Open Billing

    Hi All,
    Can you please tell me what is material availablilty date and Open billing.
    In which table we can find these fields. We want to add in VKM4.
    Regards,
    Isha.

    Hi Isha,
    As Ravi said, you can found Mat.Avail.Date in table VBEP, the feild name is MBDAT.
    When system check the availability then there are some steps which system follows like before delivery --> what is Good issue date --> before that what is transportation planning date --> before that what is loading date --> before that what is material availability date
    so system 1st take material availabilty date then step by step, finally it declares the delivery date.
    System But as per my knowledge "Open billing" is not suppose to be feild, It should be a status in any table like In VBUK, VBUP, VBRK
    Hope this helps,
    Regards,
    MT
    Edited by: M T on Feb 24, 2010 12:13 AM

  • Able to Remove Bill of Material when there is existing Production Order

    Hi All,
    Is this logical?
    A bill of material (AAA) is created with a couple of components attached. Then production orders are raised against this Bill of Matierial (AAA). SAP B1 still allows user to delete the Bill of Material (AAA).
    According to the usual standard in SAP B1, the master cannot be deleted when there is document attached to it.
    How is this so?
    My version is SAP B1 8.8 SP 0 PL21
    Regards
    Jessie

    Hi Jessie,
    Yes, it is very logical, since SAP treat BoM not as a master data in usual way master data as you know. Keep in mind that even in BoM table, OITT and ITT1, SAP use the item master data code as a BoM code. If your finished goods is AAA, then the Code field in OITT and Father in ITT1 also same with AAA.
    Which means, it is the Item master data - Item code is the actual reference to Production Order. Try it by yourself, if you already assign AAA in Production Order, you can't delete it from Item master data. When you assign the item master data in production order as the finished goods, system actually only copy respective raw materials from BoM and copy it into the production order. Consider it as a template, not a transaction - master data relation.
    Best Regards,
    Hendry Wijaya

  • Invoice split based only on payer, material, invoice date

    Dear Friends,
    I have an issue which I don't know how to move further..
    Task:  avoid Invoice split during collective invoice creation in VF04. Invoice should be grouped by: payer, material, invoicing date.
    What I'm doing: clearing all fields which could cause invoice split in copy routine rv60c903 ( this one is used for this type of invoices ) in VBRK. Then changing partners - sold-to, ship-to, bill-to in enhancement., so that they are equal for all invoices with the same payer party. And also VBRK-ZUKRI is filled accordingly with the grouping parameters: VBKD-PERFK and VBRP-MATNR.
    What I can't understand: when I run SIMULATE in VF04, the invoices are grouped correctly, BUT when I run the actual Collective Billing button, for each delivery a new billing document is created.. I can't understand this!
    Thanks a lot in advance!

    Hi
    As Madhu tells you, check your settings in customizing (tcodes VTFA and VTFL). Second, take in account always the SAP Note 11162 - Invoice split criteria in billing document and related notes. Finally, set your own algorithm to rule the splitting defining ZUK structure to determine the value of VBRK-ZUKRI (remember that this field is a char 40) in your own VOFM subroutine.
    I hope this helps you
    Regards
    Eduardo

  • Loading Bill of Material

    I am trying to load into BW data from Bill of Material and cannot find a standard extractor.
    I need to load the characteristics,keys and their values in relation with each material.
    I found out the 0BOM,0BOM_ALT and 0COMPONENT but not sure which one is the right one to use. Any help or documentation will be of help. Our system has just upgraded to BW3.5.
    Thanks a lot
    Stephanie

    Hi Stephanie,
    I believe you will have to create generic extractor (function module -->CS_BOM_EXPL_MAT_V2) or alternatively create generic extractors on header (STKO) and item (STPO) tables.
    also, have a look at the link below -->
    Re: Loading BOM
    Hope it helps,
    Sree

  • Issue in creation of plant related data at receiving server using BD10

    Hi all,
    This is regarding Material master creation using B10.I am using MATMAS05 message type for sending data from one system to another.Data is sent and received successfully.When i go in mm03 i can see all the views created successfully accept views related to PLANT.Please guide to resolve the issue.
    When i entered into Log-
    1)"The field MBEW-BKLAS is defined as a required field; it does not contain an entry".
    2)"No material master data exists for material AB_08.04.09(30) in plant 4001".
    My segemnt is as follows-
    ZMATMAS05                      matmas05
           E1MARAM                        Master material general data (MARA)
               Z1KLART                        KLART----
    My extention
               E1MARA1                        Additional Fields for E1MARAM
               E1MAKTM                        Master material short texts (MAKT)
               E1MARCM                        Master material C segment (MARC)
                   Z1AUSPM                        E1AUSPMDistribution of Classification:----
    My extention
                   E1MARC1                        Additional Fields for E1MARCM
                   E1MARDM                        Master material warehouse/batch segment (MARD)
                   E1MFHMM                        Master material production resource/tool (MFHM)
                   E1MPGDM                        Master material product group
                   E1MPOPM                        Master material forecast parameter
                   E1MPRWM                        Master material forecast value
                   E1MVEGM                        Master material total consumption
                   E1MVEUM                        Master material unplanned consumption
                   E1MKALM                        Master material production version
               E1MARMM                        Master material units of measure (MARM)
               E1MBEWM                        Master material material valuation (MBEW)
               E1MLGNM                        Master material material data per warehouse number (MLGN)
               E1MVKEM                        Master material sales data (MVKE)
               E1MLANM                        Master material tax classification (MLAN)
               E1MTXHM                        Master material long text header
               E1CUCFG                        CU: Configuration data
           E1UPSLINK                      Reference from Object to Superior UPS
    Thanks.
    Edited by: sanu debu on Apr 27, 2009 7:10 PM

    CREATE CONTROLFILE SET DATABASE "NEWDB" NORESETLOGS ARCHIVELOGAlso when you are setting a new database, the option should be RESETLOGS and not NORESETLOGS.
    'D:\APP\ADMINISTRATOR\ORADATA\NEWDB\ONLINELOG\O1_MF_2_7FK0XKB8_.LOG
    D:\APP\ADMINISTRATOR\ORADATA\NEWDB\DATAFILE\O1_MF_SYSTEM_7FK0SKN0_.DBFWhy underscore(_) at the end of the datafile name. Any specific reason ?

  • WEB ADI INTEGRATOR FOR Bill of Material

    I am developing a WEB ADI integrator for Bill of material upload. The integrator will populate the data in a temporary table, validate it & write the error messages back to the table . On succesful validation the data will be sent to interface tables & then to base table.
    The integrator uses a procedure & sends data to the procedure. Procedure then loads data in temporary table & does the rest of work.
    To do this i need to know the following thinngs:
    1. How i can track the line no of Excel?
    2. How do I know that all data are loaded in temporaray table because the validation & rest of work will be done once all the rows of excel are transfered to temporaray table. i.e. How do i determine the End of File in Excel?
    3. How do i write error messages from the table to the excel in web adi?
    Any help will be appreciated. Please send me the sample scripts & web adi developer guide at [email protected],[email protected]

    If you check the XML that Web ADI generates to upload a document you will note that each row gets a row number. It would be a matter of being able to keep track of that number in your table so that when you are reporting the error back you can include that number in the message so the code in the Excel spreadsheet can assign it to the correct row.
    I would suggest trying to use even some of the basic validation mechanisms provided within Web ADI, as these will automatically return the error messages for bad data to the correct row in the spreadsheet.
    Web ADI will take the uploaded data, perform any validation check defined within meta-data then push the data to your Interface table. There are plenty of examples in th shipped code of product teams then using the Import phase of the upload to perform additional checks and then push the data further. But if you can utilize the existing Web ADI functionality. The data never ends up in the table in the first place to require any clean up on your part.

  • Error while deleting Bill of Material

    Dear Expert,
            when i am deleting complete Bill of Material for a plant, i am getting error as Engineering change mgmt called with data that could not be interpreted
    Message no. CC092 or some times Message CC 061with diffent message
    Diagnosis
    You have chosen an engineering change management function.
    As the function module was called with an incorrectly configured interface, the data could not be interpreted.
    if i ignore this error message & save it then it will delete whole BOM. But i unable to understand why this error getting. recently we have implemented EHP-3 also for FI Module & also implement SAP Note:1278790 to resolve for BOM creation error.
    Regards,
    Ishwar

    Hi,
    i think, u introduced "Engin. Change managemnt  "
    Plz check that one and revert me back
    Thanks
    jeetendra

  • Sub items of bill of material is not copying in sales returns

    Dear All,
    Regarding sales returns with referance to invoice consist bill of material sub items are not
    copying in to sales returns order because invoice is not consist sub items of bill of material those which are relevent
    for delivery but relevent for billing and pricing
    For this issue make subitems of bill of material to be copied in to billing without pricing to solve the issue.
    If not can create the sales returns order with referance to sales order consist bill of materials to copy sub items along
    with the main item.
    but client wants to  create the sales returns with referance to invoice irrespective of the bill of materials
    we need to customize the zprogramme to get sales order No. if invoice consist bill of material to copy sub items from sales order to sales retuns order.
    With out z  programme can we copy the sub items of bill of materials from  invoice to  sales retuns order.
    But invoice consist only main item of bill of bill of material relevent for pring not relevent for delivery.
    sub items are relevent for delivery but no relevent for billing and pricing.
    Please provide the solution.

    Hi,
    Main item relevant for billing not for delivery
    sub items relevant for delivery not for billing
    Here you can flow sub items in to invoice but do not add item value to invoice net value
    You can control this through statistical indicator in item category detail VOV7
    Under business data tab Statistical value maintain X or Y
    Then even if sub item have price then at invoice time it will statistical (just at item level) system will not add it in net value of invoice.
    Kapil

  • Material Confirmation date in future though the material is in stock

    Dear Gurus,
    Please tell me why the system is giving the material confirmation date in future though the matl is  available in stock.
    System creating two schedule lines one for 15/10 (15 oct) and the second one with the confirmation of quantity on 22/11 (22 Nov) as I have enough stock than the required for this order. In MRP1 view of same  matl Master of same material delivery planning time is 28 days. and in MRP3 view the Replenishment lead time is 20 days.  please tell me what date system considering to shift  the confirmation date in future. the factory calender has Sat-sunday off.
    please tell me the possible reasons for confirmation date change.
    regards,
    Sandesh

    Hi ,
    Please check the  value at MM03-> Sales: General plant Tab ->Availability Check is '02'.
    u201802u2019 will consider all the u2018Individual Requirementsu2019 done before and during the creation of Sales order for the combination of respective Material & Plant.
    Even though Material stock will be visible for you at MMBe for respective plant double click on the Quantity, it will show you multiple Row with one of it will be " On Order Stock" these are the other orders for which Quantity is already confirmed but respective PGI is not yet done.
    The next schedule line date always generated based on the Factory calendar (based on Holidays/Weekly Offs if any).
    AT MD04 Tcode, based on the selection made at Material master for Availability Check you could see all the requirements related to Goods Issue Sales Orders , STO & Production Orders for Goods receipts.
    Hope this will solve your query.
    With Best Regards,
    RB.

Maybe you are looking for

  • A/R Down Payment Invoice and A/R Invoice

    Dear Experts, I have thousands of A/R Down Payment Invoices (Not Yet Fully Applied) that were suppose to be applied to the correct A/R Invoice through an integration that didn't work.  Is there an easy way or any way to apply the down payments to the

  • How can I throw a hard 404 error to apache when a JSP is not found.

    How can I throw a hard 404 error to apache when a JSP is not found. I want to let apache handle the error.

  • Remote Desktop Connection - internal error

    My laptop is running Windows 8.1 and since yesterday has starting giving problems when connecting to remote PCs using Remote Desktop Connection. It asks for the password and then shows 'Configuring remote session' for about 30 seconds and then displa

  • Bom and Routing

    Dear Gurus,                For a oil refinery wht will be the  BOM and Routing.Input is crude and out put is 32 FGs at differnt level.The routing seems to be complex and how to structure the BOM ?How the product costing is done in refinery? Any body

  • BEX Variable - Current FY/Period

    Hi , Currently i have a input variable for Period/FY in my bex query. i would like to change it customer exit field whereby system detects the current fiscal year period by itself without the need of user keying it in. I believe variable 0FPER can be