BOM explosion date after order finish date
Hi
We have issue with BOM explosion date. In process order, BOM explosion date is geting calculated after order finish date.
Any idea why this is happening.
Hi,
Just to understand the issue better, can you list the scheduled and basic dates on the order.
Anup.
Similar Messages
-
BOM Explosion with order finish date
Hi,
In transaction OPPQ it is possible to configure the BOM explosion date used by MRP and creation of a process order (see SAP NOTE 506345).
I suppose this setting is also considered when re-reading master data during release of an order.
The field BESAL can have the following values:
BOM explosion number/order start date
1 Order start date
2 Order finish date
3 BOM explosion number/order start date
4 BOM explosion number/order finish date
What I do not understand is that value 4 also end up in using the order start date when re-reading master data. Here the function module CO_ZF_VALIDATIONDATE_DET is called which contains the following coding:
+ Festwerte Feld BESAL:+*
* ' ' Seriennummer/Eckstarttermin
* 1 Eckstarttermin
* 2 Eckendtermin
* 3 Seriennummer
IF T399D-BESAL <> CHAR2.
* Auflösung mit Starttermin
u2026
ELSE.
* Auflösung mit Endtermin
u2026
ENDIF.
which says only use the Order finish date if BESAL has the value 2. The comment showing the possible values gives me the impression that SAP simply forgot to adapt this coding when splitting the value 3 (prev. only BOM explosion number) into 3 BOM explosion number/order start date and 4 BOM exlosion number/order finish date.
On the other hand the SAP Note mentioned above documents this behaviour.
Does anyone know the reason why value 4 (BOM exlosion number/order finish date) results in using the order start date ?hi,
The defination in OPPQ is only working for the MRP, when the planned order is created.
Then the explosion date will be copied from planned order to production/process order when you convert the planned order.
However, when the production or process order is created manually, or when you do a re-read master data process, then a different BOM explosion date process will be carried out as described in the SAP note 506345, it has explained the behavior clearly base on the different value of paramter:
V_T399D_S-BESAL = initial, 1, 3 or 4
V_T399D_S-BESAL = 2 (Explosion with order finish date)
So there is no problem to have different behavior of planned order and production/process order.
Regards,
Rachel -
Planned order creation with PDS valid on only order start date and not finish date
Hi All,
We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date. This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
Is there any way in ECC to control this? Any config or customization?
Regards,
SantoshNilesh,
I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
Hope this helps....
Regards,
Prasobh -
Req. delivery date and plan order finish date relationship
Dear Experts,
I have a question on setting the req. delivery date and plan order finish date relationship. Now, I want the plan order finish date is one day before the req. delivery date, is it possible to set it in configuration? Please advised! Many thanks!
Regards,
Matt YimMatt,
Please use a schedule margin key(SMK) in the material master MPR2 view which has float after production defined as 1day.
If there are no SMK with that defination then you can define you own in customisation and assign the same in the material master. (SPRO--->Production ->MRP->Planning ->Scheduling and Capacity Parameters->Define Floats).
Regards,
Prasobh -
Production finish date is later than order finish date?
In my company, most of the plan orders in MD04 have an exception message "64 Production finish date is later than order finish date". The plan strategy of the materials are 40. The plan orders are created from Scheduling Agreements or Independent Requirements. We set 'Scheduling' as 2(lead time) in the MD01/MD02. The self-production time in material master data is 0. The schedule margin code is 000 which all the parameters are 0.
For a example, we create a requirement on 2007.04.24. After MRP run, plan order generate. It's basic date will be 2007.04.24, but the production date IS 2007.04.25. All the plan order like that, the production date are always later than the basic date for one day.
Could someone tell me why? and how to settle this problem?
Thank you in advance!Hi,
check scheduling parameters for planned orders and scheduling parameters
for production orders.In that set the various indicators like
adjust basic dates to order start date
do not adjust basic dates to order start dates and try.
Tcode opu3 / opu5
Thanks,
s.nandhakumar -
MRP Planned order finish Date calculation (Planned delivery + GR Proc.time)
Dear Gurus,
Currently in our system, when MRP runs, Planned orders are created and the order finish date is calculate based on Purchasing processing time OMEW + Planned Delivery time from Material Master + GR processing time from material Master.
My business requirement is that, system has to take only Planned Delivery time + GR Processing time and exculde Purchasing PRocessing time.
I cant make it Purchasing Processing time as ZERO - because this is used for other Purchase orders and KPI will be affected for procurement department
Now we are going to Automate the Purchase orders for Materials - if outline agreement exist.
How to make system settings for a MRP run, the Planned order finish date - should consider only Planned delivery time from Material master + GR Processing Time ( it should exculed Purchasing PRocessing time). Is it posssible? if not by any user exit, ABAP coding should be done?
gurus please advice!
BADI : MD_PLDORD_CHANGE - is this can be used?
Please advice
Regards
RS
Edited by: RS on May 18, 2010 10:22 AM
Edited by: RS on May 18, 2010 10:33 AM
Edited by: RS on May 18, 2010 1:34 PMLet me check, if I can find a way to paste /afs/md04 (AFS Envirnoment) screen shot . But in the mean time following are the
details
IHPT - 12 days
GRPT - 0 days
SMK - 000 (Op Period, Float After Prod., Float Before Prod.,Release Per. - 0 days)
Thanks, -
Process Order Basic Finish Date and Scheduled Finish Date
Folks,
I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
Or does anyone have any ideas how to measure proces order performance to the production schedule?
Thank you for your help,
GregRajesha, thank you for your reply but it doesn't solve my problem.
Let me restate my scenario:
I start a process order and both the basic and scheduled finish dates are the same, June 1.
At some point, shop floor tells me they will be late and cannot deliver until June 15.
I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
Thank you for your help,
Greg -
How Production Order finish date and time is being comptued by SAP?
Hello Expert,
How Production Order finish date and time is being comptued by SAP? for example, we create a Production Order via CO01, the basic start date is 29.09.2008 and time is 04:00 it gives us basic finish date is 29.09.2008 and time is 13:28.
how does SAP compute the time 13:28 as it finished time
Please explain me briefly.
Thanks
RyanHello Guys,
When we create Production Order in R/3 the time is calculated by routing but it is extended at SetUp machine time. It is not correct?. SetUp imachines time used only for first Production Order for the same product and it is plan manually, for others Production Order we need calculate time for production without SetUp machine time being pick up to compute finish time. how could we achieve this? only those Machine time will be check.
thanks -
Set Order finish date in planned order on Production order creation CO41
Hi experts,
I'm trying to set the order finish date, field SFC_POCO-PEDTR on transaction CO41, into Scheduled finish, field CAUFVD-GLTRS, of production order transaction.
The issue is get the value of PEDTR. For change the value GLTRS i'm using the exit PPCO0007 and it works, but i haven't the value of field PEDTR.
I hope to have been clear.
anybody can help me??
Thanks in advance
Marco
Edited by: Menegazzo Marco on Aug 3, 2010 5:20 PMHi DwarakanathS
Thanks for you reply....
But if in the exit i try with the code you suggest, when i do the assign:
FIELD-SYMBOLS <my_fs> TYPE SFC_POCO.
ASSIGN SAPLCOUP(SFC_POCO) TO <my_fs>.
the program give me an error "Field "SAPLCOUP" is unknown. It is neither in one of the specified"...
and if i try with this:
FIELD-SYMBOLS <my_fs> TYPE SFC_POCO.
ASSIGN 'SAPLCOUP(SFC_POCO)' TO <my_fs>.
the error is "SAPLCOUP(SFC_POCO)'" and "<MY_FS>" are type-incompatible."
what's wrong?
thanks
Marco
Edited by: Menegazzo Marco on Aug 4, 2010 10:16 AM
Edited by: Menegazzo Marco on Aug 4, 2010 10:53 AM -
Can GATP confimed date come from production order finishing date??
Hi Expert,
I have one question to ask.
in the GATP , I want to the APO system can consider the production ability , that is, when I create a sales order, the system will make a GATP check in APO, if there is no enough stock, the system will create a PPDS planned order and return the planner order finsihed date as the schedule line confirmed date.
I do not know this is possible or not??
I hope some expert can help me to solve this problem
thank you in advance!Hi Liu,
Why Planned order date.. It could be Production order date (planned order release date) + inhouse production time + Transporation lead time + GR processing time (at the original location where the order is placed) ..that should determine the material availability date. CTP exactly does this. Make sure that the "replenishment lead time is switched off" in the product-location master (in fact this is location independent)- as this take precedene over everything else.
Also ensure that that end of checking horizon is larger than the interval established above, else MAD could be much earlier. Also enure that transfer of requirements is set both at header and schudule line level for CTP to work.
Regards,
Loknath -
Hi Experts,
I have met a problem in BOM explosion in sales order.
I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
Can anyone help?
Regards,
EmilyHi,
Go to CS02 and select ur bom and go to components give 1 that means 1;1
hope u get it
regards,
sadanandam kasarla -
Material BOM explosion in Service Order components
Hi experts,
I created a Material BOM with transaction code CS01.
Then I try to add this BOM in the component of a service order.
What I expected is the BOM to be exploded in the service order. But this behaviour doesn't occur.
Do you know what I can do to trigger a Material BOM explosion at service order level.
By the way, the BOM is not exploded after the service order (in the reservation or in MIGO).
Thank you for your help.Hi Özgen,
Thank you for help.
Special Procurement 50 didn't exist in my system.
I created it in SPRO for the plant with the Procurement Type F (External Procurement) and the flag Phantom Item checked..
Then I created
- Material A (MM01)
- Material BOM A (CS01) with:
-- item 1 Material B (which has Spec Proc Type 50 in MM02-MRP2)
-- item 2 Material C (which has Spec Proc Type 50 in MM02-MRP2)
After that I created a Service Order (IW31)
I put Material A in the Component tab with quantity 1.
The BOM remains unexploded.
Did I miss something? -
Early schedule start date, early schedule finish date
I want early schedule start date, early schedule finish date and project cost plan in my report. This is a PS requirement. In the standard cube (0PS_C02) I can find actual start date and actual finish date. Has anybody used early schedule start date and early schedule finish date in the reports? If yes then did you get it using standard cube/ODS or you went for enhancement?
HI,
He have to go for few tables in which u can find all the data.
Firstly u have to enhance the datasource .
First go to table AFKO here you insert AFUNR (Order Number) this table you will get AUFPL .
Then take AUFLP and go to AFVV table and insert AFUPL . you will get all the activites and all dates of each activity for example early start date ,early finish date, foirecost date etc.
Thanks and Regards
Dinesh -
Process the result so that the dates are ordered by date
I am retrieving a query result from a sql database of which
one column contains a string of this format:
09/08/2008
How can I process this result so that the dates are ordered
by date?
Thanks for anu help :)what's your db and version?
pretty much all dbs have built-in string and date functions,
a
combinations of which will let you update your field to be
date/datetime.
you will probably want to create a new field in the table to
store the
converted dates, then check that they all have been converted
correctly,
then delete the current date field and rename the new field
to the old
date field's name.
using your db's string functions you will need to extract
day, month and
year parts of your date text, and pass them to your db's date
creation
function.
if your db is MySQL, it has a very handy STR_TO_DATE(str,
format)
function... check details in mysql ref manual.
Azadi Saryev
Sabai-dee.com
http://www.sabai-dee.com/ -
Basic start date and basic finish date in the maintenance sub-order
Hi guys,
when I create a maintenance sub-order by the transaction IW36 are the Basic start date and the Basic finish date taken,inherited from the principal Maintenance order?And if it is in this way,is there the possibility to put these two dates as a current day only on the maintenance sub-order ?Thanks in advance...
MaximilianHere is my code
DATA : lv_date_diff TYPE i.
lv_date_diff = caufvd_imp-gltrp - caufvd_imp-gstrp.
caufvd_exp-gstrp = sy-datum.
caufvd_exp-gltrp = sy-datum + lv_date_diff.
This is a 4 year old answered message. Please open a thread for your specific query.
-Paul
Moderator
Edited by: Paul Meehan on Nov 24, 2011 8:42 AM
Maybe you are looking for
-
No longer boots since update [kinit & call trace troubles]
Hi all, Recently I did a full system upgrade on a completely working system (running I assume was a 2.6.28 kernel26) that upgraded it to 2.6.29. It then stopped booting correctly. I left this for a while since I didn't have the time for messing aroun
-
Which is better, antenna or bridge?
System is an Airport Extreme Base Station & Airport Express for Air Tunes. The Express is too far away. Is an antenna on the Extreme a better solution than adding an Extreme relay, keeping performance in mind?
-
Unable to see the native mode report 2012 in Chrome with SharePoint 2010
Hi Techies, We are facing strange issues to make reporting services 2012 native mode work with SharePoint 2010 in Chrome. We are able to see all the reports in I.E. with SPS but when I open the SharePoint page on which the report is placed then in th
-
Ever since FF3.6 came out there has been an issue with the Dreamweaver preview feature. As a result, I uninstalled 3.6 and am hanging out with 3.5.9 until this issue is resolved. Every time a new version of Firefox comes out I do a Google search to s
-
Mail 8.1 won't open links from messges
When reading a message, links within the message won't open. When I 2 finger click on the link, the drop-down window ask "open, open link behind mail, copy link, services" . None of them work. Before Yosemite. I could 2 finger click and choose what