BOM quantity update in a confiurable material

Hi All
Material is a configurable material ,which is having a selection options in a sales order and based on the selection options there is characteristics BOM quantity gets updated based on the formulae.
If you go to routing and double click on the operation to see the details , you will see the unit of measure conversion with the header and Operation fields. I want BOM quantity should get updated in the operation field (UMREN).
I was using the Reference characteristics with PLPOD table and UMREN field to update the value in the UMREN field. And i created a procedure with a logic and is assigned to configuration profile and the Routing operation.
Process is MTO process, Production order is generated when the sales order is created. i checked in production order after creating a sales order, UMREN field is not updated and dont know what where i am  doing mistake and i also checked in the Routing Master Data there also its not updating.
Above mentioned is not an requirement but to calculate the costs accurately, we have to approach this way.
Please suggest.
Thanks,
Quantum..
Edited by: quantum on Sep 15, 2009 8:07 AM

Hi,
NO inventory figures are updated. The invoice only affects the financial postings and does not affect any stock quantites.
By posting an invoice for a larger qty than was received you would increase the GR/IR clearing account qty so that the extra qty can be cleared if and when a further GR takes place.
But NO stock quantities are ever affected during MIRO.
Steve B

Similar Messages

  • Query on material and quantity updation

    I updated material and quantity updation for a particular material type and plant combination in development server. Before transpoting in transport request, when I View Cluster Maintenance: Data, I am able to see that in table T143M is also updated for some other plant and material types which I had not done in customising. Also note that for the entries in transport for all plant and material type combination other than intended one, there are no qunatity and value updating which had been activated. Can someone throw light as to whether is it a functional or techinal issue which is causing this?

    Hi,
    whenever your copping new material type from existing one it  will copy all the setting ie screen reference , attributes and even quantity / value update also . so it will display like that .

  • Validation of material BOM quantity at the time of production order confirm

    Hi,
    I want validation on material BOM ,when i confirm production order.
    Actually when i am going to confirm my production order by tcode CO11, In this screen,i click on "Goods Movement" button. According to confirmed quantity , consumed materials will display. Here i can change material quantities. And here i want some validation. I there any user exit for this screen.

    Hi,
             Exit Name Description
    PCSD0001 Applications development R/3 BOMS
    PCSD0002 BOMs: Customer fields in item
    PCSD0003 BOMs: Customer fields in header
    PCSD0004 BOM comparison
    PCSD0005 BOMs: component check for material items
    PCSD0006 Mass changes user exit
    PCSD0007 Check changes in STKO
    PCSD0008 WBS BOM: Customer-specific explosion for creating
    PCSD0009 Order/WBS BOM, determine URL page
    PCSD0010 Order/WBS BOM, determine explosion date
    PCSD0011 Knowledge-based order BOM, parallel update
    PCSD0012 Customer - Mat. number/mat. number during material exchange
    PCSD0013 Customer-specific processing of an explosion for BOM browser
    PCSD0014 Knowledge-Based Order BOM: Status
    BADI's are
    WORKORDER_CONFIRM
    WORKORDER_UPDATE
    WORKORDER_GOODSMVT
    <b>Reward points</b>
    Regards

  • Quantity update of material type

    Hi all,
    I have a question with regards to material type.
    Letu2019s say if I can a new material type with both purchasing and sales view, and unchecked the u201CQuantity Updatingu201D checkbox, and checked the u201CValue Updatingu201D checkbox in the material type configuration.
    1 - May I know what does it means?
    Does it meant:
    2 u2013 When I did a goods receipt into the system, there will no stock quantity update in display in the MMBE, MB52 (i.e. not inventorized)?
    3 u2013 Does it means the tmaterial create will be inventorized?
    4 u2013 the stock quantity will not be capture in the system but only the value will show in the book?
    This a bit confuse topic.
    Thanks.

    hi
    quantity and value update is ticked for the materials which being inventerised generally in the plant
    now if u dont tick for the quantity update then the material will required the account assignment as it will not stocked in SL
    if u untick for value update and tick for quantity then the material can be stored in the SL ,means we can do the GR but the there will be    no accounting documents
    better we explain you why dont you try it yourself
    regards
    kunal

  • GR for non valuated material/ no quantity update

    Good Morning, I wonder if someone can clarify if SAP is performing as expected in the following scenario:
    I have one company code.
    Valuation level is set to plant.
    There are two plants attached to the company code.
    I have a non valuated material that is set to quantity update in one plant but not in the other.
    I have created a PO with account assignment for the non valuated material in the plant where quanity updating is switched off.
    When I try carry out a GR in MIGO or MB01 it is forcing a storage location even though the material in that plant is set to no quantity update.
    This is not what I expected but does anyone know if this is working correclty and why?
    Thanks in advance.
    Andy Rushforth

    Hi,
    If Company B raises the PO to Vendor but the material is delivered to Company A.
    Here in this case you need to do the GR in MIGO for the non valuated material to Company B using the PO. But stock will not available in the stores as it will directly post to the consumption to cost centres. Then you have to do 202 mvt type in MB1A for the same cost centre to update the stock in Company B.
    Then you need to create the STO inter company then you need to transfer the stock from Company B to Company A. This is actually a long process and involves correct monitoring to stream line process.
    Why don't you raise the PO in Company A to Supplier instead of Company B.
    rgds
    Chidanand

  • Prevent quantity updating during Goods Receipt

    Hi,
    We have a particular requirement for a type of subcontracting process (not the standard SAP subcontracting) as mentioned below.
    We create a Purchase Order for a material (without a standard cost) and giving an account assignment category in the PO. The Net price mentioned in the PO is the processing charges for the vendor (service charges). It does not indicate price for the material.
    When we receive the finished material from the vendor, we perform a Goods receipt. The stock gets updated and accounting documents are created.
    Our requirement is to stop this quantity updating during Goods Receipt. But, at the same time, we would like the accounting documents to be created as we need to pay the vendor.
    Is there any way of achieving this?
    Pl let me know. Any inputs would be appreciated.

    Hi,
    Thanks for the response!
    I understand that in the standard process, the parent item inforecord takes care of the processing charges. But this is process that has been customized differently as the client has SAP as well as legacy systems talking to each other.
    Turning off the qty updating at the material type level will turn it off for all purchase orders created for the material at that particular plant which is something we would like to avoid.
    We would basically like to turn it off for particular purchase order type. The reason for turning it off is that after the GR is done, there is a separate process that comes from the legacy system and updates the same quantity of finished product and also posts the consumption of components.
    So, our basic requirement is , is it possible to turn off qty updating for the GR of a particular purchase order document type and yet create accounting document. Material is not a valuated material and has a standard cost zero.
    Any inputs in this regard will be helpful.
    Regards

  • Multy level BOM & RG1 updation

    Hi all,
    we r doing multy level bom in sales order
    EX: project item is TAP
          equipment item is TAN(finished material)
        component itam is BTAN
    we r maintaing pricing at TAN leval and BTAN pricing is statistical.But we r delivering BTAN itams under tae TAN, procuring the materials for TAN bom wise and not delivering the TAN but how the RG1 register will b update.
    Sales process.
    Inquiry-quotation-s.order-deliver(BTAN means semifinished+ bought only)-proforma invoice with JEX - excise invoice.
    and commarcial invoice with billing plan TAN item wise only.
    ONE MORE ISSUE is the delivery status of the equipment(TAN) in sales order is open because we r not maintin stock not delivery.how the equipment(TAN) will b updated in RG1 register
    regarsd,
    srinivas

    RG1 will be updated according to the Goods Issue documents (MB03).
    which will be against to specific movement type.
    in your issue, if you are delivering the main item or sub item goods- specific material doc against to this movement type will be generated ( doc type:WL), which will be seen in delivery doc flow:Goods issue document.
    RG1 will update only for this material document, not for those items, whcih is nto actually delivered.

  • BOM quantity change (STPO-MENGE) resulting quantity less than 1

    Hi,
      Anyone have done a BOM quantity change (STPO-MENGE) where the resulting quantity is less than 1.  Please help.
      Thanks,
         Hazel

    Do you mean base quantity by saying header quantity?  I'm running variant configuration.  The base quantity is restricted to 1.  Moreover, changing the unit of measure is not an option.  Each is the official base unit of measure.
    Sample Scenario/Requirement:
    An order for a qty of 1000 requires a total 84 plates.  Each plate can yield a qty of 12.
    SAP uses the equation -->
    Current Component Qty =
                (required qty/base qty) * saved component qty
    Calculations:
    Step 1) Derive Current Component Qty
    Let required qty = order qty (VBAP-KWMENG),
              base qty = max yield per plate (given)
    Current Component Qty =
                 ceiling (VBAP-KWMENG/max yield per plate)
              = ceiling (1000/12)
              = ceiling (83.333333)
              = 84
    The Current Component Qty (84) is the qty used production orders and is equal to the Requirements Qty of the component (RESBD-MENGE)
    Step 2) Derive save component qty.  In Variant Configuration, save component qty is equal to STPO-MENGE.  Base quantity of 1 is assigned to the KMAT (configurable material).
    Since Current Component Qty =
          (required qty/base qty) * saved component qty
    by substitution -->
        84 = (1000/1) * saved component qty
    saved component qty = (84/1000)
    saved component qty = .084
    Issue/Problem:
    I have the above calculations correct in Variant Configuration.  To run a check, I do a production order simulation (CO01S) for a Total order qty of 1000 with today's Finish date.  When I click for components overview, it gives me a Requirements qty of the component of 83 and NOT 84.
    I'm not sure how SAP does the calculation in the background, but I was thinking; maybe, by increasing the number of decimals from 3 (.083) to 6 (.083333) would give me the 84 that I needed.
    Roberto

  • BOM quantity changes tracking issue - please help

    hi,
    we use Engineering change management and change BOM with reference to a change number .
    we need to have a report to know by inputtig the date and know on that date what are all the BOM changes are done using change number.
    if we only add a new BOM component we are getting the details ,
    when we modify the BOM component quantity we need to track the new quantity added and old quantity deleted with reference to that change number.
    example : for a BOM component  A, using some change number N if we modify the quantity from 0.5 to 
                   1 .
                   then we should get in our report with reference to the change number  N added quantity is 1 and deleted quantity is 0.5 . when we go by the tables AENR,STAS and STPO , against the change number N we are getting only the added quantity of 1 and we are not able to get the deleted quantity 0.5
    we input the  date in to table AENR and get change number AENNR for the selected date .Input this change number  to STAS  here we are able to see one record with X in the field LKENZ and one with out. from here we take STLTY,STLNR,STLKN and pass to STPO to get IDNRK,Quantity referring to the same change number .
    here in this table STPO we are not getting any record with field LKENZ=X,
    only added quantity record is there
    deleted quantity reference record is not there
    please help
    MADHU KIRAN

    hi,
    AUT10 is not giving the quantity deleted or added and coponent
    our major requirement is we need to have an ABAP report whose input is date and during that date using change number what changes ae doen to BOM we need to get as output
    AENR table gives AENNR -change number using which on the selected date BOM changes are done
    taking this AENNR from STAS table we can get the added , deleted details with respect to BOM number , etc..
    using this from STPO table if i try to get
    there i am getting only added components its quantity details only
    about deleted  with reference to the details available in STAS , in STPO  table entries are not getting updated
    today if i change BOM quantity using one change number , again the same components quantity i change after some days that addition onlly getting stored , deleted quantity(means old quantity ) is not getting stored against the change number
    plz help
    regards,
    madhu kiran.

  • Dependency to change BOM quantity + 1

    Hi,
    I have a scenario, where we want to change the quantity of BOM item to original quantity + 1 if a certain characteristic is fulfilled. Now I have tried $self.stpo_menge = 1 + mdata $self.stpo_menge, but what happens, is that i get multiples of the original quantity. Eg. if in BOM quantity is 1 pc and in order 2 pc, my component requirement should be 1 + 2 = 3 pc, but currently it is (1+1)*2 = 4 pc. Can you please help, which formula do I require to make the adding of the 1 pc to the final quantity?
    Thanks in advance!
    Anu

    Hi Anu
    based on your furmula it is working fine
    it will not work with Order qnty , if we use AFKO_GAMNG then  we need to match the material number also with STPO which is difficult
    what you can do is you fix it in formula with help of IF and ELSE
    if it is useful reward
    Thanks
    Bala

  • OMS2 - quantity update vs. value update

    Hello MM experts,
    Could anyone please explain the difference between quantity update vs. value update - which is selected in what scenario.
    We have a new material with 3050 val. class and VERP as item category group. When we created PO, it gave us error as to  'Account Assignment Mandatory'. So I selected quantity update in OMS2 for VERP material type. However, it still gave the error. So, I selected the 'value update'. Now the PO was created successfully. I did not select value initially, since it wasn't selected for any other material type/plant.
    Please explain the reason.
    Thank you.

    Hi Munair,
    from accounting perspective any material can be purchased for either  STOCK or for CONSUMPTION
    - STOCK implies that material will be kept in inventory and will be managed on Qty and Value basis ( you can see stock qty and value in material master accounting view and in reports like MB52) and subsequent issue will generate an account posting
    -  CONSUMPTION means that material's purchase value will be consumed at the time of purchase.
    for items which we always want to be consumed at the time of purchase e.g. factory consumable or small items like stationary etc. where we don't want to track them on value basis in accounting  we need to put VALUE update as ' blank'
    this will ensure that material can't be brought in to inventory and hence will always ask for account assignment because system wants to know that if its for consumption than against what it will be consumed e.g. cost centre / internal order
    it will allow to progress of you use an account assignment and put a cost centre against it.
    In your case some companies wants to track packaging on a value basis ( so require value update as X in OMS2)
    for others if packaging is too small in terms of value than they prefer not to track this is accounting and somark value update as 'blank' in OMS2)
    Hope this clears
    Regards
    Dheeraj

  • Lot size in BOM as well as for alternate material

    how can we define the Lot size and validity period for a BOM means we want to define that 1 to 100 qty are to be produced with alternate 1 and 101 to 1000 for alternate 2. How the same can be defined in the master BOM.
    There is one component in the BOM and there is a alternate material is also, Users want to define that while issuing the material , system allow to issue only say qty " 50" and then alternate material for next lot.
    Is there any possibility to define the BOM as per the above requirement.
    thanks
    harish

    Dear Harish,
    if u have alternative BOM's, then creat production versions
    1) creat BOM with two alternatives (say alt 1 1to 100 & alt 2 101 to 200)
    2) creat multiple Routings with two group counters
    3) creat production version in MM02 in MRP 4 view or work scheduling view
    4) in BOM slection in MRP 4 view maitain the prameter as 3 or 4
    Then MRP takes care of lot sizes difined in PV & BOM and creat procurment proposals
    Regards
    kumar
    Edited by: kumar kumar on Aug 3, 2009 8:02 AM

  • Quantity updates in return order from referenced Invoice

    Dear Gurus,
    I have set  the return sales order creation with the reference of a Invoice document. Therefore when i make the return order i enter the invoice number into the reference and then make the changes with quantity as per the requirement. suppose in invoice I have 5 quantity and in the return order I make it 2 so return of 2 will take place, then i will do PGR for quantity 2 with the reference of return order and then the credit for return upto  this its working fine. But now if I want make the second return order with reference of same Invoice system will give me pop up saying that the return anf credit of quantity 2 has already done for so and so item. Then if I enter in the return sales order in the order quantity I should see 3 quantity only as the return and credit of 2 quantity already took place but here the quantity in sales order is not getting change and it is appearing 5.
    I dont know where the mistake? I check the copy control also for ZTAN (invoice) to ZREN (Return) it is as follows.
    Copying Reqt - 303
    DataT - 153
    DataT - 104
    DataT - 004
    Pricing type - D
    Update Doc Flow - X
    and remaining all fields are blank
    Copy Control at header level ZIF2 to ZIRE
    Copying Reqt - 021
    DataT - 052
    DataT - 103
    DataT - 003
    Copy Item Number - Checked
    Complete reference  - Unchecked
    Please help me how this quantity update will happen automatically?
    Regards,
    Sanjay

    Hello Dear Sanjay;
    I completely understand your requirement, but this is how the SAP system works. I had already this needs and actually the system doesn't have control like this. Is this a bug ? Maybe....
    We were forced to development a Z program or new routine to treat this control.
    The system send a simple message including quantities, but internally the function module allow to do a return orders, for instance, how many times as you want.....
    I hope you can understand the limitation.
    Regards
    Ruy Castro

  • Inbound delivery putaway quantity update

    Dear experts
    It is regarding the putaway quantity update in inbound delivery with WM transfer order.
    I found the putaway quantity updated immediately once TO created.
    I have confusion that the putaway quantity should be updated once TO confirmed not created.
    Could you please let me know your  comment? thanks!
    Zhixian

    That is standard SAP behavior however at the time of PGR system check the whether delivery quantity is matching with putaway qty or not, if it match then only it allows to perform PGR
    also one more setting is helpful in this regard (this help to update the quantity in delivery)
    LE ----WM---Interface---Shipping ---Define Shipping Control at the Movement Type Level

  • Can not put decimal quantity in BOM quantity

    Hi all,
                 while go to put decimal quantity in BOM quantity, sytem is not allowing me. It is only allowing me to put only integer number.
    with regards,
    partha

    Partha,
    Is it an error or warning message. Like Suhas said it might be due to User settings. Change the format for numbers to decimal (middle one) in User settings.
    IF it is a warning message it may be that the UOm does not support decimals as per customizing. Check in CUNI.
    Regards
    Ram

Maybe you are looking for

  • What are the Update tables?

    In LO Delta scenario, Data posted parallel into document tables and update tables. What are the Document tables? What are the Update tables? Give example for Application 11, which is document tables, and update tables?

  • When batching Save for Web, Illustrator also saves copy of .ai file

    This question was asked and abonadoned here, so I'm posting because it's also happening to me. CS4 & CS5 (I tried both), Mac OS 10.6 1. I select the "Save for Web PNG" action, which is part of the default set, and select "Batch." 2. I choose a source

  • HT204053 why is my apple ID disabled?

    i would like to know why is my apple id disabled ?

  • My Ipod keeps freezing up

    My ipod was working just fine but my brother thought it would be fun top tap an electric fly swatter on it. I dont know if that would cause it to freeze up but that's my only thought. Could an electric shock causes that?

  • Customize XSLT List View Webpart Styling

    Hello, everyone. I think I know the answer to this, but I'm at wits end so I figured I'd turn to the forums (first time). I'm a SP Power User with some minimal coding experience. I know CSS, HTML, some JS, some JQuery. My question, however, involves