I am very new to Oracle BPM and I'm currently using Oracle BPM 10g. I have done the expense report tutorial once.
And now I'm designing a process in a manufacturing company. I have a group,'items' with attributes name, pricePerItem, Quantity and Total. here Total is the product of pricePerItem and Quantity. the PBL program i wrote for it is :
amt as Decimal(3)
for each item in items do
amt = item.pricePerItem * item.quantity
     end     
     return amt
I have another attribute grossamt which is the sum of the every item's total value. the PBL program for this is:
amount as Decimal(3)
amount = 0
for each item in items do
amount = amount + item.total
end
return amount
However after I run the project, the 'total' field doesnt get calculated or populated which in turn leaves the grossamt field empty. Without this my process cannot proceed.
Please let me know if there is any error in the code i wrote above.
Or if there is any other work around for the same.
Thanks a lot in advance.

There's a trick you can employ that should make this easy. When you open an attribute, notice that you have a "Virtual" checkbox. After checking this, you'll notice that under the attribute in the Project Navigator tab that there will be "read" and "write" method.
For your line item total attribute inside the group add this logic to the read() method associated with the virtual attribute:
// this sets the line item “itemTotal” attribute of a Group.
//   (defined as Virtual). This code is in the Read Access
//    method for the itemTotal attribute and
//    “pricePerItem” and “quantity” are attributes in the group
return pricePerItem * quantityFor the overall total of the order that is based on the sum of the indiviidual order item lines in the group, add this logic in the virtual "grossAmount" attribute's read() method. The logic shown below assumes that your group's name is "items" and your order line item attribute inside the group is called "total".
// this is in a Virtual attribute’s Read Access code (the sum
// of all the order line items in a group is the order’s total)
return items[ ].total.sum( )Dan

Similar Messages

  • PRODUCTION FLOW FOR MANUFACTURING COMPANY

    Hi All experts,could you please share with me the production flow from raw material to profitability?I am 1st level support in my company and would like to know more about the business process for a production company.Please help and thanks in advance.

    Dear,
    Manufacturing is the transformation of raw materials into finished goods for sale, or intermediate processes involving the production or finishing of semi-manufactures. It is a large branch of industry and of secondary production. Some industries, like semiconductor and steel manufactureres use the term fabrication.
    Production
    Formal activity that adds value to goods and services, including creation, transport, and warehousing until used. Production is an organized process with specific goals.
    Please refer this link also,
    [PRODUCTION FLOW |http://sap-img.com/production/discrete-manufacturing-the-step-by-step-tcodes.htm]
    /message/3068159#3068159 [original link is broken]
    Regards,
    R.Brahmankar

  • Transportation process for Logistic company

    Hi Experts,
    We are going to open a new Transportation Company, provide Cargo & Transport service to inside/outside customer. Plz tell me what is the process from the begin & how am implement this in SAP system?
    Regards,
    Sanjay

    Transportation Configuration:
    Process 1
    Step: 1
    Maintain Purchase Organization
    Path: Sprou2014Enterprise Structureu2014Definitionu2014Materials Managementu2014Maintain Purchasing Organization.
    Step: 2
    Create Purchasing Group
    Path: Sprou2014Materials Managementu2014Purchasingu2014Create Purchasing Group.
    Step: 3
    Maintain Transportation Planning Point to Company Code.
    Path: Sprou2014Enterprise Structureu2014Definitionu2014Logistics Executionu2014Maintain Transportation Planning Point
    Step: 3A
    Assign Transportation planning point to company code.
    Step: 4
    Assign Purchasing Organizations to Company Code.
    Path: Sprou2014Enterprise Structureu2014Assignmentu2014Materials managementu2014Assign Purchasing Organization to Company Code.
    Step: 5
    Assign Purchasing Organizations to Plant.
    Path: Sprou2014Enterprise Structureu2014Assignmentu2014Materials management-- Assign Purchasing Organization to Plant
    Step: 6
    Create Vendor Account Group
    Path: Img u2014Financial Accountingu2014Accounts Receivables and Accounts Payablesu2014Customer Accountsu2014Vendor Accountsu2014Master Datau2014Preparations for Creating Vendor Master Data--Define Account Group
    Step: 8
    Create Vendor
    T-Code: XK01
    Step: 9
    Define Modes of Transport
    Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Function---Routesu2014Define Routesu2014Define Modes of Transport.
    Step: 9A
    Define Shipping Types
    Path: Under the Same Menu path---Define Shipping Types
    Select New Entries and Assign the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr) and Assign Shipping type Procedure group.
    Step: 9B
    Define Transportation Connection Point
    Path: Under the Same Menu path--- Define Transportation Connection Point.
    Step: 9C
    Define Routes and Stages.
    Path: Under the Same Menu path--- Define Routes and Stages.
    Select the New Entries and Enter the Details
    Then Select the Routes stages and define
    Step: 9D
    Maintain Stages for all Routes.
    Path: Under the Same Menu path---Maintain Stages for all Routes.
    Step: 10
    ROUTE DETERMINATION
    Define Transportation Zone
    Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Function---Routesu2014Route Determinationu2014Define Transportation Zone.
    Step: 10A
    Maintain County and Transportation Zone for Shipping Point.
    Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.
    Select the Shipping point and enter the Country and Transportation Zone
    Step: 10B
    Define Transportation Groups.
    Path: Under the Same Menu path---Define Transportation Groups
    step: 10D
    Maintain Route Determination
    Path: Under the Same Menu path--Maintain Route Determination.
    Select New Entries and Define the Route Determination.
    SHIPMENTS
    Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Functionu2014Shipments
    Step: 11
    Define Shipment Types
    Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Functionu2014Shipmentsu2014Define Shipment Types.
    Select the New Entries and define Shipment Type
    Step: 12
    go to Customer master data.
    In Address of General data. Enter the Transportation Zone id. And save
    U will get the route.
    Process 2
    1) Maintain transportation planning point through Menu as follows:
    Enterpriseà Definition à Logistic Execution àIMG Maintain  transportation planning point.àStructure
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    Logisticà Transportation àBasic Transportation Functions àIMG Routesà àDefine routesàExecution Define modes of transport
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    IMG DefineàLogistic Executionà Transportation àBasic Transportation Functionsà Route àshipping types
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    BasicàRoutes àIMG DefineàLogistic Execution Define transportationà Transportation àTransportation Functions  routesàconnection points
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
    Logià BasicàRoutes à Define routes àIMG Defineàstic Execution  Transportation routes and stagesàTransportation Functions
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    àIMG Define transportationàLogistic Execution à Transportation àBasic Transportation Functions zonesà Route àRouter determination
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
    à Route determination àIMG à Logistic Execution à Transportation Maintain country andà Basic Transportation Functions àRoute  transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Basicà Route àIMG Route determinationàLogistic Execution  Maintain routeà Transportation àTransportation Functions  àdetermination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the datau2019s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Defineà Logistic Execution typesà Transportation à Shipments àshipment
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    BasicàIMG Defineà Logistic Execution and assignà Transportation à Shipments cost àfunctions  tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    IMG define andà Logistic Execution à Transportation àShipments cost proceduresà Pricing à Price control àassign pricing
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
    àIMG Assign purchasing dataà Logistic Execution à Transportationà Shipments cost àSettlement 
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
    à àIMG Automatic G/L Account Determinationà Logistics Execution àTransportation  Shipment CostsàSettlement 
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    Transportationà Shipment Costs à Settlement àIMG Automaticà Logistics Execution Determination of CO Assignmentsà Or T-code: OKB9
    16) Maintain shipping point address.
    à Logistics Execution à Enterprise Structure Define, copy, delete, check shippingàDefinition  point
    17) Creating G/L account centrally.
    Financial à General Ledger à Master Records àAccounting àAccounting Individualà Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
    Master dataà Transportation à Shipment cost à PricesàLogistic Execution createà Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    u2022 Weight
    u2022 Volume
    u2022 Variable capacity
    u2022 Number of stops
    u2022 Maximum duration
    u2022 Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Single documentà Create àTransportation Planningà Transportationà Logistic Execution ®Logistics
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single documentà Createà Shipment cost à Transportationà Logistic Execution ®Logistics
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details u2013 Freight cost items screen, then check the check box u201CTransferu201D, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the u201CTransferu201D check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Single documentà Create à Transportation Planning à Transportationà Logistic Execution ®Logistics
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single documentà Createà Shipment cost à Transportationà Logistic Execution ®Logistics
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details u2013 Freight cost items screen, then check the check box u201CTransferu201D, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the u201CTransferu201D check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N u2013 Service Entry Sheet
    6) MIRO u2013 Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    Regards
    Amit

  • How to Search BPM Processes for a Given Date Range through a VC Report

    Hi All,
    We have a VC component build to view the BPM process information. Here we are supposed to provide a Date range option for searching the processes. But the Range search is not working.
    I tried in below ways.
    1. On Action Submit, I set the Occurance_D value as "=DSTR(@DATE_FROM,"M/D/YY")&" - "&DSTR(DADD(@DATE_TO,1,"D"),"M/D/YY")" it is working only if there are processes existing either on DATE_FROM or on DATE_TO, otherwise its not working.
    Like, I have 5 processes triggered on Sep-5-2011, then if i give the Date Range as 9/5/11 - 9/11/11  or 9/1/11 - 9/5/11  it is working. But if I give 9/1/11 - 9/11/11 it is not working.
    I tried this way as well.
    =DSTR(@DATE_FROM,"M/D/YY")&" : "&DSTR(DADD(@DATE_TO,1,"D"),"M/D/YY") . Even this is not working.
    Can some one please help.
    Regards,
    SrinivaS

    Dear SrinivaS,
    The main things you need to consider are:
    - store your date value from the UI in a store
    - the store gets used to submit a filter string in format (MM/DD/YY) to
    BI_START_TIME_D.
    If you follow http://help.sap.com/saphelp_nw72/helpdata/en/81/541300d147
    41b39057c8ab3be61f7a/frameset.htm
    you find that the process data source can be filtered in format  "9/9/11
    - 9/12/11" for field BI_START_TIME_D and BI_END_TIME_D.
    The trick is now at submission time to concatenate the strings
    accordingly and submit to BI_START_TIME_D. Use the following dynamic
    expression
    =DSTR(store@START_DATE_FROM,"MM/DD/YY")&" - "
    &DSTR(store@START_DATE_TO,"MM/DD/YY")
    to format the string during submission. I was able to verify this on my
    machine. I hope that also your locale settings work with this
    implementation.
    Find attached a link to a small sample application [(test_date.zip) |please find attached a small sample application (test_date.zip) which]which shows you the proper usage of a date picker in conjunction with the
    process data source. Please import the zip file into VC and deploy it.
    Best regards,
    Ralf.

  • Please tell me procedure of CIN configuration for manufacturing company

    please tell me procedure of CIN configuration for manufacturing company

    Its a big deal dud. There are steps for configuration.can not be discussed in posts. stll look at below threads
    http://scn.sap.com/docs/DOC-5739
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/207dd2ad-bf92-2b10-a88b-e3a4a01ca7fc?overridelayout=true

  • Business process for foundry company

    Hi,
    What are all busines process can be seen in a Foundry company in view of SAP implementation??
    Pl give some valuble inpits
    Good posints will be given full marks
    Thanks
    GR

    Hi
    May be helpful.
    http://www.foundrynet.com/pdf/wp-sap-app-delivery-sol.pdf
    Vijay

  • Need help for BPM Process Task - Looping

    Hi Folks,
        I need some info regarding Task Looping in a BPM Process.
    Is there any code sample which mentions how to perform task looping and setting the context appropriately.
    Thanks,
    Brian.

    Hi Brian,
    Please find the below link for Multiple Looping
    http://help.sap.com/saphelp_nwce72/helpdata/en/3d/786ec2dd1243c28aeffa4c1c70df25/content.htm
    Regards
    Srikanth

  • Creation of same personnel number for different company codes

    Hi All,
    I am having the requirement to cerate same personnel number under different compant codes.
    Eg. There are 2 company codes MO10 and MO20 for the same country
    Personnel number- 0100000023 should exist for both company code MO10 and MO20.
    Please help.
    regards,
    Gaurav

    Dear Roger,
    Thanks for replying, I have been waiting for this. We are a group  of copmanies with the name of orient and have  four different  companies and currently  using one payroll area Z1 for payroll processing for  OEL; company code 1000. we have these company codes 2000, 3000 and 4000 for rest three companies and want to use same payroll area Z1 for processing payroll of these three companies. is that possible to do in SAP HCM if yes then how?
    Can you please guide on this? Look forward for your response.
    Stay Blessed,
    Waqar

  • In what situation i can go for the BPM process?

    hai pals,
         i wld like know in what kind of situation we will go for an BPM process for message transfer.
    with regards,
    rajesh.

    Hi Rajesh,
       BPM process is a very useful tool as the name suggest ccBPM when ever you want to model your soultion hitting different systems, Also helps in controling and  monitoring complex integration solution process.
        As it uses SAP workflow engine behind it is very effective in building complex soultion.
        some simple scenarios could be
         Wait for more than one input and start your integration process..
         Raising alerts, exceptions and so on...
    cheers,
    Vedavyas
    Message was edited by: Vedavyas Cuntheepuram

  • Call Enterprise service in BPM Process

    Hi,
    I define a BPM process for PO creation
    In the first Lane : Purchase requestor
    In the second Lane: Approve Process
    In the third Lane: Create PO(Enterprise Service)
    Here in the first lane iam giving the below attributes
    Requestor Name
    Requestor Country
    Product ID
    Product Descrption
    This will be send to second lane i.e Approver Process
    Once he approved it should create a PO in Hu2 if he reject it should goto first stage
    I consumed Enterprise Service from HU2 and i published in service registry
    Now i created automated activity and imported PO create service in BPM flow seccussfully.
    Now my problem is to write code in webdynpro.
    How to write code for below process?
    In the second lane i.e Approver Process i should write a code that if it approve goto third process i.e call webservice which which creates a PO .If it rejects goto first process??How to write this code?Plz can u help Iam new to coding moreover to webdynpro...
    Regards
    Shwetha.
    Edited by: Shwetha-Capita on May 1, 2009 1:28 PM

    Hi Shwetha,
    The following part of the documentation explains how to prepare your Web Dynpro DC so that it can be used in SAP NetWeaver BPM:
    https://help.sap.com/saphelp_nwce711/helpdata/en/48/cae1791e774da5e10000000a421937/frameset.htm
    The important thing to know is that SAP NetWeaver BPM is waiting for a complete event to be triggered in your application. Once this is received the process flow continues.
    So in your case you would simply create two Web Dynpro user interfaces. The first one for entering the data and the second one for reviewing / approving / rejecting the data.
    In the first case you would have some sort of "submit" button, which triggers the before mentioned 'complete' event. SAP NetWeaver BPM will then take the data that is visible in the Web Dynpro context of the interface controller and continue the processing.
    The second case basically works the same with one little difference: Here you would have two buttons -  one for the approval and one for rejection. Both will trigger the 'complete' event, but should set a field in the Web Dynpro context (e.g. "isApproved") differently. While the "approve" button should set it to "true" the "reject" button would set it to "false".
    So once this step is also completed you could make use of gateways and conditions (https://help.sap.com/saphelp_nwce711/helpdata/en/47/635cb242bf6831e10000000a421937/frameset.htm) in your proces model to determine if the data should be passed to the service for PO creaton or if it should handle a different situation in case of a rejection.
    If you're new to SAP NetWeaver BPM it might help having a look at the documentation first and also browse through some sample models as they are provided here:
    https://www.sdn.sap.com/irj/sdn/nw-bpm?rid=/webcontent/uuid/006a16ad-a3ad-2b10-4e9a-af2ee5820848 [original link is broken]
    Hope that helps,
    Martin

  • BPM processes,receiving signals (events) & correlation to existing instance

    Hi,
    BPM 11g/SOA Suite 11g (R1 PS2)
    I am wondering whether it is possible to receive signals (EDN events) into a running process instance. The documentation describes how a process can be started by an event. I would like to be able to feed an event (signal) into a running process (just like we do with correlation in BPEL processes). Is that possible - and if so, how?
    Along the same lines, can BPM processes receive messages through externally exposed WebService operations - into correlated process instances? For example: I have started the process to create a new employee in the organization and I want to inform the process instances taking care of this employee that she will start on a later date than originally assumed (or not at all because she has accepted another job). I know the unique employee id for this new hire. How can I configure the BPM process such that this incoming call after the instance has started is fed into a Receive activity in the process instance working on this employee?
    Maybe a similar is question would be: can a message catch event be used without a corresponding message throw event - to catch incoming messages asynchronously and not related to a message sent by the process instance.
    thanks very much for your insights,
    Lucas

    I also tried DB Adapters and it is not working for my scenario. Needed help/pointers from a BPM Guru \.
    As per my business scenario, If there any update in the database (offline approval. not using worklist) then i should complete the running BPM process for approval.
    1. To achieve this, I created a adapter to poll and it is working in polling. What is not working is picking the update in process and mark is closed/complete.
    2. I tried using Catch Event with continuation mode (but it needs throw event to begin with).
    3. I also tried ‘Receive event’, which also needs start event for continuation.
    4. If i use Initiate mode for catch event then it initiate a new process and mark it close and does not do anything with original process (having this catch event). This catch event is still waiting.
    5. If i use “receive” event with Initiate mode then jdeveloper is giving compilation time error saying that some service is not referenced in composite.
    6. I have also tried other options of using “Sub-process” or another process and invoking it but nothing seems to work.
    Any help/pointers? Thanks a lot.

  • Synchronous transmission without BPM process

    Right now I have a S/A bridge BPM process for HTTP => XI => RFC interface.
    However this is taking 5 - 8 seconds to process. On further analysing this process, we found out that WF engine is taking 4 seconds in initialize.
    Can I accomplish a synchronous interface without a BPM?

    Hi Parimala,
    If it just a HTTP>XI>RFC Scenario, it can be achieved without a BPM.
    Steps in IR
    1) Create DT,MT and MI(both request and response)for HTTP interface
    2) Import metadata for RFC Interface into "Import Objects"
    3) Create two Message Mappings
        1) HTTP REq-->RFCREQ
        2) RFC Res-->HTTP Res
    4) Create IM for with both REq and RES maps
    Steps in ID
    1) Create HTTP Business Service. As HTTP Adapter is a built in adapter no CC needed.
    2) Add the BS for R/3 and create the Receiver CC for RFC Adapter
    3)Create Routing Rules using RD,ID,RA with Receiver CC
    Use HTTP Client App to test this.
    Hope this helps.
    Rgds,
    Sam Raju

  • BPM Process and UWL in Federation

    Hi,
    I need to chekc the feasibility for the same.
    I would like to create a BPM Process for a typical workflow in a CE 7.1 JEE 5 Application Server.
    Now , I would like to connect a UWL formatted in a SAP Portal NW 7.0 as a consumer portal to the BPM Process.
    Is there a feasibility to do the same..
    Best Regards
    Sid

    Open your project explorer and expand the BPM project you have created. Locate a folder named "Rules" in the Project Tree. Right-click on the Rules folder and select 'Create new rule'. You can model your rules such as rule-scripts here and use it in the BPM.
    Note: These rules cannot be used outside the BPM Project.

  • How to trigger the BPM process from WD Application

    Hello All,
    I have a simple business process with two ui activities. I am able to start the process from NWA -> Process Repository.
    But, I need to start the process from the application. Here is the requirement:
    User opens the application. ON completion, the BPM process for approval needs to be triggered. How do i access/obtain process?
    If I need to call a particular task in process, How do i do that?
    Kindly assist.
    Thank you.
    Regards,
    Sharath

    if you want to know the whole story, please refer to the doc
    http://help.sap.com/saphelp_nwce72/helpdata/en/44/4d2bb1c6b00597e10000000a155369/frameset.htm
    the profile, provider system,endpoint。。。。。
    search this doc in sdn, it is a good example regarding the configuration.
    How to Use SOA Configuration to Call RFCs and Web Services from within SAP NetWeaver BPM
    hope those may help.

  • Any implementations of CRM leasing in manufacturing company

    Hello All,
    I know that CRM leasing is only used with typical leasing company, but wanted to check with you guys if there was any implementation done for manufacturing company for CRM leasing who does leasing on its own with single legal entity, how is accounting and delivery is effected.
    or are there any restrictions in implementing CRM leasing with OEMS?
    any help here is highly appreciated.
    Thanks

    Additional question, In case of Operating Lease why do we split Repayment amount during Term period of the contract, in this case the lessee is not buying the Asset right, he will return the Asset to the Lessor anyways.

Maybe you are looking for

  • Ref cursor and dynamic sql

    Hi.. I'm using a ref cursor query to fetch data for a report and works just fine. However i need to use dynamic sql in the query because the columns used in the where condition and for some calculations may change dynamically according to user input

  • Enhancement in MIGO for Goods Movement

    Hi Gurus, I got a requirement to Create a 262 goods movement materials document with reference to a Sub-Contract GR for an account assigned Sub-Contract PO thru TCODE MIGO. The details are describe as follow: Once the 101/543 GR movement is carried o

  • I want to embed text AND image from same XML file

    Hey, I got following problem: I want to put 1 image AND my text in 1 external XML file. I can load either one of them in seperate XML files. I need this because I want my content to be scrollable on my website and with this my image has to scroll wit

  • What are ancillary files associated with trash?

    Most of the items I put in the trash now produce a window which mentions ancillary files. What is the point if this extra window?

  • ALV simple edit problem

    Hello all, I've have in an ALV list an editable column, the proble is that when the cell values are changed the data table remains the same. Is there a method for cl_gui_alv_grid class or another way to update the data table form ALV list. Lots of th