Can we create a single bdc for raw materials , and for some other transacti

hi
can we create a single bdc for raw materials , and for some other transaction? how?

Hi Jyothsna
For one transaction you will have to build your bdc table according to the recording for that transaction and then call that transaction using the bdc table. For another transaction , you will again have to build the bdc table with the details of that transaction.
You cannot call all at one shot.
Cheers
shivika

Similar Messages

  • Profit center assignment for Raw Materials and Store and spares

    Hi All,
    We have an issue with org structure while defining  Profit Centre.
    Presently we have  25 depots and 5 Manufacturing Plants and 10 type of Divisions.
    Plant and Depots are mapped with Business area
    10  type of Finished Goods and we have defined Divisions for the same in SD module.
    For the same we have defined 10 Profit Centre in order to get division wise profitability.
    10 Profit center will be used in FG materials  and we will be able to get the postings and profitability with product wise.
    But  for Raw materials and Stores material which profit center need to be assigned.
    Kindly help me in this regard.
    Regards,
    Sahil K

    Hi,
    profit centre basically used for the collection of cost and revenue  which are incurred and generated in an organization , so if your organization has created any profit centre which are assigned to the cost centre of manufaturing or production , those cost cost centre u can assigned to the raw materials.
    To assign  profit centre to raw materials - at the time of creation of Material master(mm01)  for raw materials you can choose  costing view at organizational level and can assign the cost PCTR which your assigning to cost centre.
    To assign division- you can choose the division according to the finished good wise if your divisions are segregated according to finished goods wise.(assignment of division  to the material master -according to the raw materials or spare and parts used to produce particular finished goods).
    Hopefully the above explanation clarify your doubt.
    Regards
    Binapani.

  • Can I create a single PO for two company codes

    Hi
    Can I create a single PO for two company codes. Though I know that Company code is assigned at header level but still I know there is a setting in controlling which when activated two company codes under same controlling area can procure the goods under the same PO.But i forget from where to activate that message or control in config.
    Thanks

    Hi Lekhram,
    I'm just beginner so maybe I got the wrong end of the stick.
    If you order something that something must belong to a definite company > plant. How could possess two company the same thing at the same time (totally)?
    (companies are at the same organisational level - none of them is subject to the other).
    Maybe I'm mistaken.
    So I <b>guess</b> you can use only one company code for one PO.
    Controlling area & company code
    http://help.sap.com/saphelp_46c/helpdata/en/e5/077a704acd11d182b90000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_46c/helpdata/en/08/513f4b43b511d182b30000e829fbfe/frameset.htm
    Purchasing & organisation
    http://help.sap.com/saphelp_46c/helpdata/en/75/ee0a9555c811d189900000e8322d00/frameset.htm
    All the best
    Csaba

  • How can I create a single order from multiple quotations?

    How can I create a single order from multiple quotations that I have created by the transaction VA21 ?
    Thanks in advance for the answers.

    hi
    Go to transaction: /nva01
    Enter order type : ZOR
    Sale org :xxxx
    Dist.channel:xx
    Division :xx
    Press enter
    Click on “Sale document” and select Create with reference
    Then enter 1st quotation number & click on “COPY” or “Selection list”. Then click on “Copy “.Then all line items which belong to quoation1 copy to order.
    Then,
    Click on “Sale document” and select Create with reference
    Then enter 2nd quotation number & click on “COPY” or “Selection list”. Then click on “Copy “.Then all line items which belong to quoation2 copy to order.
    Then,
    Click on “Sale document” and select Create with reference
    Then enter 3rd quotation number & click on “COPY” or “Selection list”. Then click on “Copy “.Then all line items which belong to quoation3 copy to order.
    Now save the sale document.
    Kindly give reward points
    Edited by: WISH on Mar 19, 2008 2:25 PM

  • Can i create a single image from multiple images in lightroom?

    Can i create a single image from multiple images in lightroom?

    Like a panorama, a composite or focus stack? Have you tried the Lightroom forum?
    Photoshop Lightroom

  • I can not create an Installer, After install the Vision Builder Demo and then uninstall it. I can not create a Labview installer anymore, it asks me for a Vision Builder Installer, even if My Labview program does not have nothing to do with it...

    I can not create an Installer on LabView, After install the Vision Builder Demo and then uninstall it. I can not create a Labview installer anymore, it asks me for a Vision Builder Installer, even if My Labview program does not have nothing to do with it...
    Solved!
    Go to Solution.

     Hi Shada this can happen if you are including additional installers to your installer for example DAQmx. When you are doing this the installer has to include other files like MAX (Measuremente and Automation Explorer). Probably when you installed Vision Builder it updated MAX, so when your installer is trying to Include MAX, its asking for the source where it was installed in your computer in this case Vision Builder.
     Here you can cache the information so its not asked again, or you can download a newer version fo DAQmx, so it will update MAX and change de dependecy.
     You can find more details about this issue in this KB:
    KnowledgeBase 3S88PJMY: Why Do I Get A "Missing Distribution" Error When Trying to Build an Installe...
    And for keeping a copy here is more info:
     How Do I Stop the Missing Distribution Notification Each Time I Build An Installer?
    Best Regards
    Benjamin C
    Senior Systems Engineer // CLA // CLED // CTD

  • Collective requirement for Raw materials for the whole week during mrp ru

    hi gurus,
          I have a requirement like this. the raw materials required for on different requirement dates has to be clubbed together  per week and one single purchase requisition for that raw material for that week. I had created a availability checking group and assigned that to check rule. then attached that in material master mrp 3 view of the material master.
       If i run mrp for that product, it is not clubbing the weekly requirement instead it is clubbing only daily requirement and pr is getting generated.
      can anybody give some valuable inputs so that i can proceed further?
    regards,
    senthil

    Hi,
    Try using the Lot Size: WB.
    With this system wil club together all the requirements and propose a single receipt element.
    Regards,
    Siva

  • Planning at client level for raw materials

    HI all,
                 I've several plants under one company code, sometimes same raw materials are used to produce finished products in various plants. Here, we are using central purchasing department to procure the raw materials.
    For instance, in plant 1000, the user from purchase department raises a purchase requisition for ' X ' component to produce the finished product, and same ' X '  component exist in the BOM of finished Product in plant 2000, for which stock exists in plant 2000 and is  a high value component.
    The issue here is the purchase planner in the central purchasing department is not aware of the stock which exists in plant 2000, and raises a purchase order for the requisition generated from plant 1000.i.e If the purchase planner could check the stock in plant 2000, this enables him to generate STO for plant 1000 from plant 2000, which save the inventory costs.
    I would like to know, whether this issue can be mapped in APO.
    Any help, much appreciated.
    Thanks & Regards,

    Hi Rajesh,
                    You can actually just do the whole thing in SNP Heuristics. While Optimizer is capable of giving you better solution, I suggest trying Heuristics first as it is simple and inexpensive compared to Optimizer.
    Here is the suggested solution:
    You have plants 1000, 2000 and 3000 and you  have a DC "DCA" ( your procuring department)
    When there is a requirement at DCA, you want to check the stock in 1000 first than in 2000 and then fianlly in 3000.
    Set your material with procurement type E in plant and F at the DC
    Create transportation lanes between
    DCA-1000 with transportation time say 2 Hrs ( in means of transport)
    DCA-2000 with transportation time say 3 Hrs ( in means of transport)
    DCA-3000 with transportation time say 5 Hrs ( in means of transport)
    When you run SNP location heuristics, the system checks the plant with shortest transportation time and takes 1000, if not found it tries 2000 and finally 3000 to create a stock transfer.
    Please remember that transportation lanes are always one way and APO does not support the flow in opposite direction line 1000 to DC is supported but not DC to 1000. This stock transfer has to be manually created in ECC system.
    Please let me know if I got your scenario right.

  • Purchase requisitions for  raw materials

    Iam having multilevel BOM and when I do Sales order MRP then Iam getting planned order for Semi finished items but not getting Purchase requisitions for  raw materials.

    Hi,
    Planing File Entry :-
    The planning file is used to limit the scope of the planning run for the
    total planning run. For this purpose, all materials that have been
    assigned a valid MRP type are automatically entered in the planning
    file.
    System will check the Planing file entry only in the case of Total MRP (MD01) or Total MPS (MD40).
    While there is no need in the case of MD02,MD03,MD41,MD42,MD50.
    Now how this Planing File entry activates,
    - Once MRP is activated at Plant level (T.code OMDU)system automatically maintains entry in Planning file for all those materials which contains the Active MRP type.
    - So if materials which are created before this activation of MRP in that case you have to maintain this planing file entry manual.You can do this either by MD20 or by using Back Ground Jon OMD0.
    Regards,
    Dhaval

  • Budget check in PR/PO for Raw Materials

    Hello
    We have requirement that there should be a Budget check even for Raw Materials before PR /PO is created.
    We have observed that Budget check is done if Account Assignment Category "F" is used.But for procuring Raw Materials is there any way we can check the Budget.
    Can this be requirement  done through Funds Management ?
    Regards
    Vaibhav Mahajan

    Hi,
    'Budget check even for Raw Materials before PR /PO is created' before PR?when you want check budget?
    'We have observed that Budget check is done if Account Assignment Category "F" is used'-not only for F.
    'Can this be requirement done through Funds Management ?'-you can check at PR/PO level as well as GR/IR

  • Can you create a template that has a header and footer to forms?

    Can you create a template that has a header and footer to forms?

    Yes but how are they going to create the Landscape versions?
    The problem with doing it in Pages '09 as rotated content is that the Headers and Footers are not rotated and there is inherent clumsiness in the rotated content usually being too large for the page when viewed at 90°.
    Best to make it in two or more separate documents.
    Peter

  • Profit Centers for Raw Materials

    Hi Experts,
    I would like to know in general which profit center will be used in raw materials. For example raw material, say sugar, it can be used in finished product A and finished product B, its like a shared service, in this case which profit center needs to be assigned. Will there a P&L taken in these profit centers.
    Also for cost centers, in a production line, there are can be different product lines can be manufactured, for eg finished product A different product line and finished product B different product line manufactured in one common cost center. In this case which profit center will be used in this common manufacturing cost center.
    Apart from assignment, should we perform some month end allocation and stuff like that.
    Thanks.
    Best Regards,
    GJ.

    Hi,
    If the raw material is shared by 2 product to manufactured then use the common profit center for raw material .
    Regards,
    Sreekanth

  • How to create customer exit for characteristic variables and for text vars.

    hi friends,
      can anybody tell me how to create customer exit for characteristic variables and for text variables in bw ides system.
    thanks,
    sree

    Hi,
    Please have a look at:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/f1a7e790-0201-0010-0a8d-f08a4662562d
    Krzys

  • In MRP for changing MTO to MTS for raw materials

    Hi guys,
    I am getting one problem that i have changed for raw materials fron individual indiactor to clollective indicator to get its Purchase requistion for MTS. But in MD02 or IN MD04 it is still showing PR for individaul sales order in some cases.Can you pl.tell me why it is so.
    regards

    Please check the following..as Mat.master settings may be overrided as per below..
    You can maintain this indicator in the following places:
    In the material master record
    For the explosion type of the BOM item (in Customizing for Basic Data in Define Explosion Types)
    The setting for the explosion type overrides that in the material master record.
    Dependencies
    If the material is assigned to a material type that does not allow quantity-based inventory management in this plant, you can set the indicator to individual requirements only.
    If the stock is to be managed in sales order stock or project stock, the indicator must be set to one of the following options:
    Individual and collective requirements
    Individual requirements only
    If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants.

  • Why so long for raw suppert  updates for new cameras

    why so long for raw support  updates for new cameras

    Only Apple management can answer that and they don't give out that type of information.
    If there is  a specific camera you would like supported send feedback to Apple. See Aperture->Provide Aperture Feedback

Maybe you are looking for

  • Word Templates in a Sharepoint Library

    Hi, Is there a way to get the same behaviour in a document library in SP2010 as when you "open" (= double click) on a Word template (.dot/.dotm extension) in the Windows Explorer => creates a new document based on the template. (I know about creating

  • Mapping issue with if else

    Src. Structure: A (0-unbounded)    within A-> p B (0-unbounded)   within B-> p NOTE: at a given instant either A/B can occur, # of K(Target)should b same as # of A/B Target structure K(0-unbounded)     within K---> z(1) now i have done A/B -> K mappi

  • Can you have a pdf as an icon for single click access on ipad or iphone?

    can you have a pdf as an icon for single click access on ipad or iphone?

  • Task list creation

    Experts I have an error message when I create a task list for an equipment. I have configured the number range for task list. Object ROUTING_E number range 01 does not exist Message no. CV711 venkat

  • Changing the Decimal Notation

    Hello Experts, We have a request to change the decimal notation of values. Please consider the below example. Value: 450000 (Four lakhs and fifty thousand) Actual Decimal Notation in the syetm is 450,000.00 (In thousands) Expected Decimal Notation: 4