Cant assign company code to controlling area
Dear All
I have created a compnay code but when ever i want to assign it with controlling area its show no data maintained .can any one give me a solution with TC .
Yeasin
Hi
Controling area chart of accounts and fiscal year and Chart of accounts and company code Chart of account and fiscal year should be the same
Have you checked it?
Thanks & Regards
Phaneendra
Similar Messages
-
Assign Company Code to Controlling Area
Sap FICO Experts,
I have error in <b>OX19</b> T_code. Here I had to assign the company code to Required controlling Area. But it exists Error, "Data in Company Code <b>SMSL</b> not Maintained"
Kindly tell me What I have to do the futher Process.Hello,
review the settings of the company code SMSL in transaction OBY6. Pay special attention to the assignment of CCode to CoAr... or other similar settings related to controlling...
If this doesnt help, pls post here the number of the message.
I hope this helps.
Richie. -
Issue in Assignment of company codes to controlling area TKAO2 and OKKP
Hello Gurus,
I configured company code and controlling area in development client and transport to Testing client.But in QA client I can see in the Table TKA02 and respective assignment of company code to controlling area .But if I am checking in TCode OKKP and selecting Controlling area and checking the company codes assisgment there is no asssisgmnet. is this issue relating to transport as I am FICO consultant not geting solution.
This issue pertain to only one controlling area other controlling area with there company code assignment is correct.
Thanks a lot
Edited by: Manu Rathore on Apr 7, 2011 8:56 AM
Edited by: Manu Rathore on Apr 7, 2011 8:58 AMHello Balaji,
But I transport everything through one transport request and I haven't maintain any sequence.can this issue be due to mine non maintaining of sequence in transport request or something else?
if so How to solve it.
Many Many Thanks
Manu -
Assignment of Company Code to Controlling Area
Hi All
Please see if you can help me out.
I am working on a Singapore project.
I have 4 company codes say 2000,3000,4000,5000 which have been assigned to a company SGSS.
Then I created a controlling area S001.
I successfully assigned Company Codes to Company & Company Codes to Credit Control Area 5100.
But when I try to assign my Company Codes to Controlling Area S001, the system throws a problem saying,u2019 Data in Company Code 2000 is not maintainedu2019.
I have maintained all the data in Company Code 2000. But as per my knowledge we donu2019t maintain u2018currency, fiscal year variant, and chart of accountsu2019 in Company Code. All these fields are maintained in u2018Controlling Area S001u2019.
__Data in company code 2000 is not maintained.__
__Message no. KT294__
__Diagnosis__
__Assignment control requires that the currency, fiscal year variant, and chart of accounts are all maintained in the company code. At least one of these settings is not maintained in company code 2000.__
__Procedure__
__Complete data maintenance in company code 2000. Only then can you assign company code 2000 to controlling area SG01 possible.__
Please see if anyone can bring some light on thisu2026..
Thanks & RegardsHello,
You need to fulfill two basic rules to assign two or more
Company Codes under the same controlling Area:
Operating Chart of Accounts shall be the same for all
Company Codes.
Fiscal Year Variant shall be same for all Company
Codes.
However, the fiscal year variant in the controlling area and the company codes
can have different number of special periods. The number of posting periods
must be the same.
Please recheck that you have fulfilled these.
Regards,
Ravi -
ASSINING COMPANY CODE TO CONTROLLING AREA
hi,
iam trying to assign the company code to the controlling area but there is field <b>C Ctr Hierarchy</b> which i need to fill up, how can i do that one before i assign company code to controlling areawhen you are creating a Controlling Area Cost Centre Standard Hierarchy is mandatory to can as well give the Std. Hier. while creating Controlling area itself and save it. The System will remind you that the said hierarchy is not maintained and should it be maintained now?
Click Yes, and save again.
the controlling area and std hierarchy get created simultaniously.
Assign points if found useful
Regards
Praveen -
How to get new company code and controlling area in SRM
Hi SDN,
we are on SRM 5.0.
Our finacial experts want to implement a new company code and controlling area.
In SRM I can set up a new company code easily in ppoma_bbp and import a new plant from backend for the new company code.
When testing in EBP I get the error: "company code xyz not available in controlling area zzz"
So I need to import the new backend controlling area, too. How can I get the second controlling area in SRM?
Thanx for help,
matthiasHi Muthuraman Govi and Sanjeev,
in fact I can see in backend in transaction KS03 (show cost center) there in the F4s, which comp.code + controll area combinations are valid and have indeed cost centers assigned.
So I have a new valid comp.code and a new valid cont.area.
The new comp.code belongs to the new contr. area.
In SRM I set the BUK attribute as described by Sanjeev (I had that already done). Still, if it is like you say, why do I get an error in EBP when trying to buy products from the new plant in the new company code...
Is there any more config.work necessary in backend or SRM?
kind regards, matthias -
Assign Company Code to FM area greyed out
Hi,
We are in 4.7 and currently have assigned one company code to FM area and now we have created a new company code and want to assign the new company code to the existing FM area but noticed that in IMG 'Assign company code to financial management area' the field 'FM area' for the new company code row is greyed out and unable to assign it.
Please let me know if I have missed any configuration.
Thks
VSHi,
We can assign one FM area to more than one company code & not required any additional configuration
I Guess, when you are trying to assign, same time some user using the same table related to FM area or Company Code.
so Just try again with same path
Thank you
Anil -
Company code Vs controlling area.
Hi Friends,
Please let me know if i can assign one company code to multiple controlling areas.
If no how do i know which company code aviliable to assign.
Regards,
krishna.Hi,
It is not possible.
CONTROLLING AREA:Controlling Area is a Organizational unit that represents a closed system for Cost Accounting purpose.
To this purpose you need to maintain Controlling Area. To this Controlling Area you need to activate the components of
Controlling for a fiscal year.
To this Controlling are you have to assign your Company Code. A Controlling Area may be used 2 or more Company Codes.
That is called CROSS COMPANY CODE COST A/C. If you are using common Controlling Area for 2 or more Company Codes then you
need to maintain consistency of the following.I.
CHART OF A/C : must be same for all Company Codes.II.
FISCAL YEAR : must be same for all Company Codes.III.
PERIOD & CLOSING : must be done at the same time.
currency : it may be different.
for one controlling area you can maintain multiple Company Codes but for one Company code you can maintain only one
controlling area.
let me know if u need more information. -
Error Mssg: FI673 while assigning company code to FM area
Hi,
I have multiple company codes and only one company code (A) is assigned to FM area and another company code (B) is not assigned to FM area but some transactions have already been posted in dev client, I got the following error message while trying to assign the company code B to the same FM area.
"You must not change assignment to company code B
Diagnosis:
There is already actual data for FM area, which is assigned to company code B"
Please note that I have already deleted the FI transactions for company B thru t-code OBR1 but unable to delete the CO transactions as multiple company codes assigned to one CO area.
Please let me know how to overcome this issue of assigning the company code B to FM area.
Thanks
VSHi,
check SAPNET note 1502436 maybe its helpful.
Best regards, Christian -
ALE configuration, Assign Company Code to Cross-System Company
Hello all,
I set up and configured ALE so that we can keep our production, QA, development master data in sync. I activated the change pointers for the particular message type for which we want to create IDOCs when new master data is created, or existing master data is changed. IDOCs are then sent to the QA and development systems.
Are these three ALE configurations associated with anything outside of ALE? Is there any area that can or will be affected by these three configuration settings?
Transaction <b>SALE</b>
<b>Cross-System Company Codes</b>
- all Company codes in our system
<b>Assign Cross-System Company Code to Chart of Accounts</b>
- all Company codes are associated with the one chart of accounts
<b>Assign Company Code to Cross-System Company</b>
- global company code is the same as the company code
Thanks
BruceIn T.Code: OX19 - Assign company code to controlling area
Please check that if for ur Controlling Area, the
Currency Type:
Currency:
Currency Type
10 Company code currency
20 Controlling area currency
30 Group currency
40 Hard currency
50 Index-based currency
60 Global company currency
Currency
required code of Currency
Should/Are properly maintained in OX19.
This type of error will be for this stage itself.
Provide points if satisfied
Regards
Dinakar
SAP will be throwing this type of messages when
Differing currencies: USD - CAD
Message no. KT276
Diagnosis
The system makes consistency checks during assignment of a company code to a controlling area as part of assignment control.
The same checks take place if assignments already exist and you change the basic data in the controlling area, or if you define the controlling area and company code as a 1:1 structure.
If the check finds an error, the system cannot execute the function ("Assign" or"Change basic data"). If you do not maintain the required data for the consistency check (such as currency, chart of accounts, or fiscal year variant in the company code), this also results in an error message.
You want to use currency type USD. The SAP System determined the company codes assigned to controlling area CAD and the relevant currencies. One discrepancy occurred in one of the currencies.
Note
A precondition for currency type "10" is that all company codes assigned to the controlling area must use the same currency.
A precondition for currency types "40" and "50" is that all company codes assigned to the controlling area must belong to the same country or use the same hard currency or index-based currency.
A precondition for currency type "60" is that all company codes must belong to the same company or all the companies must use the same currency.
Procedure
Change the currency type or the currency settings. -
Internal Order: Change Co Code and Controlling Area
Hi,
We have setup internal order -> <i><b>customised</b></i> order type, to store data regarding our projects. The setup involves choosing a Controlling Area which will inherit the Company Code (1:1 mapping between controlling area & co code) once we Create the Order (transaction KO01).
The field Company Code is greyed out and not maintainable.
There is no posting involved. Just for storing data related to the projects (cost centre is defined though).
A problem occurs when our client asked to change the company code field from A to B. I used transaction KO02 and tried to change it from "Environment" -> "Set CO area" but the change is not reflected later once I go into the Master Data screen.
Since the Company Code field is already greyed out in the Master Data screen, I also can't make changes there.
I tried changing the Screen layout (i.e. Order layout) of the field selection in IMG, but also not working.
Does anyone has any other ideas? Many thanks in advance.
Kind regards,
NikSince, you have one to one relationship between company code and controlling area, you will not be able to change the company code in order master.
If there are multiple company codes attached to same controlling area, then you need not enter company code in the order master. For this you will need to make company code as optional field in the field status for order type.This will facilitate posting from multiple company codes (attached to same controlling area) to the same order.
If company code is entered and some postings takes place then system will not allow you to change the data.
Regards
Rakesh Pawaskar -
Assign Company Codes to new Credit Controlling areas after going live.
Dear FI Experts;
Our Status Now:
We Have 3 Company Codes, CC 1000, 2000, 3000 and one Credit Controlling Area Code 0001, and the Customers are assigned to this Credit Controlling area with no problems and we are live since about 9 months ago.
Requirement:
We have a requirement to split the Customer Credit limit between companies, which means we have to create more credit control areas for example CCA 0002, and 0003, and though assign our 3 company codes to the new credit control areas, as follows:
CC 1000 to CCA 0001
CC2000 to CCA 0002
CC3000 to CCA 0003
And my Question is, what is the procedures to follow to do that (Not a Customization Procedures, I mean the How the Customers would be affected and the open items for them and how to resolve that), since as mentioned above we are already live since 9 months ago, and credit management is active and all our customers are assigned to our old Credit control area 0001, and also what is the consequence of doing that new assignment since we are live, thanks for your replyYou will need to manage to create new credit master data under new credit control area. System should reorganize existing credit data after reassignment, that is when you change master data (create credit master under new credit control area), new credit exposure is calculated based on AR in company code and existing open orders will get rechecked for credit under new credit control area & new risk categories assigned to them.
-
Profit center assign in Copany code and controling Area
where Profit center assign in Copany code and controling Area ?
Hi,
Company code, Controlling Area, Profit centre, Cost centres are created by FI/CO functionals.
Pl. discuss with your FI/CO counterpart.
My suggestion is that, don't create yourself, because it integrates to lot of other areas.
Just for learning purpose, you can go to SPRO-Controlling-Profit centre accounting.
Madhava -
Assign company code to consolidation staging ledger
Dear Guru,
When I execute tcode GC41, there is an error message , it said :
No ledger for consolidation has been specified
Message no. GC191
Diagnosis
No consolidation staging ledger was allocated to the company code.
System Response
If an extract is to be created for consolidation, then every company code must also be allocated to the consolidation staging ledger. This means that every company code is posted directly to two ledgers.
Procedure
Every company code which is to be transferred to consolidation must be allocated to the consolidation additional ledger. The consolidation additional ledger must point to the GLT3 data base.
How to assign company code to consolidation staging ledger?
I check Tcode OCZ2, there is Ledger 9 (Additnal Consolidation Ledger), should I create new ledger for consolidation staging ledger? How to make it?
Thanks before.There are some steps that one must do in order to populate the Cons tables.
Some of them you may find in SPRO t-code. SAP.help.com is not very bad in this also. -
Error while assigning Operating concer to Controlling Area
Hi...
while I am trying to assign operating concern to controlling area, the system is showing the following error message.
Diagnosis
Controlling area 7500 and operating concern 7500 have different fiscal year variants (01 and K4). However, for cost center assessment, settlement, and many other types of postings to Profitability Analysis, the controlling area and the operating concern must have identical fiscal year variants, otherwise error messages or serious data inconsistencies can occur.
But i already changed fiscal year variant from K4 to 01 in Operating concern and i run the generate operating concern environment also. still the system is showing the same error message.
Is there anything more i need to do after changing fiscal year variant in Operting concern.
Please help me.
Thank you,
Regards,
SantoshI have got the solution.
Thank you,
Regards,
Santosh
Maybe you are looking for
-
I think I had an old itunes id. When I go to Itunes on my program list all of my music comes up, there are probably a hundred or two songs. But it never let me burn them to anything other than my Ipod. I changed my password so now when I pull up m
-
Increase UDP sending size over 64k bytes and get error -113,sending buffer not enough
Dear all, I have a case that I must send a data over 64k bytes in a socket with UDP . I got a error-113 shows "A message sent on a datagram socket was larger than the internal message buffer or some other network limit, or the buffer used to receive
-
hi i have a power book G4 running panther OSX 10.3.9 about 4 years old but the hardrive is only 2 years old. it's memory filled up recently so i removed 3 gigs worth of memory. i then downloaded a pdf form only for all the free memory to disappear. s
-
Music and photos from Droid to Iphone4?
I recently switched from Droid Incredible to Iphone 4, and I don't know how to get music and pictures transfered over. Can someone please help?? Verizon store told me to sync to iTunes, but didn't get an explanation of how...
-
Drill down reports from Before Report Trigger
Hallo, I am using reports 6.08 and I want to run several subreports from the parameter form of a master report. However when I call srw.run_report() from the Before Report Trigger with batch=no I get the error message ... When I use batch=yes I canno