Capacity on a graphical table

Hi PP Guru,
I would like to know how are we going to view capacity on a graphical table ,
Please provide me some idea on :-
A) Process Flow related with planning.
B) Tcode involve.
TQ.

9999,
For general CRP process flow, read SAP online help docs.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/8a/a5856e4adc11d189740000e8322d00/frameset.htm
in Spanish, an earlier version, but very similar:
http://help.sap.com/saphelp_470/helpdata/es/8a/a5856e4adc11d189740000e8322d00/frameset.htm
A common transaction used to vew Capacity in a graphical format is CM21.  There are others, as you will discover once you read the docs.
Best Regards
DB49

Similar Messages

  • Activating capacity display in Planning table of MF50.

    Hi Experts,
    I intend to use the MF50 for Planning my FG. My scenario is a normal PP PI and not REM. I am using production version to distinguish the work centre (defined as production place). I want to display the Capacity of the Workcentre on the MF50 screen along with the Planning table. I am able to see the Prod Versions, planned ordes / requirements on the screen. My only concern is I want to display the capacity on the same screen, I found that the Activate graphic and set graphic settings in the Capacity reqt planning have got greyed out.
    I request the experts to guide me in this case.
    Regards,
    A S K

    Hi
    Check the following settings :
    1. In  production Version whether work center is maintained as production line or not ? .Also make sure that  same work center ins maintained in  Routing or not .
    2. In MF50 Initial selection screen Scheduling TAB check whether  'capacity requirement ' along with detailed planning  is activated or not.It must be activated.
    Regards,
    Velmurugan S

  • SAP Logos/Graphic Table

    Hi,
    Does anyone know the name of an SAP table that contains Logo/Graphic information (such as name of logo/graphic, if it is black/white or color, etc.)  I've found a few structures, but I need a table. 
    Thank you,
    Danielle

    Hi
    Try to see the table STXBITMAPS
    Max

  • CM01 / capacity planning / generate graphic automatically ?

    Hello experts,
    we have implemented the capacity planning for our production.
    The processes are working fine.
    But I've got the following requirement to solve:
    Is it possible to generate the graphical views from CM01 every day automatically in background jobs and send them to printers or email-accounts (nice to have)?
    Thanks a lot for your answers.
    Regards
    Markus

    Dear,
    Yes it is possible to generate the graphical views from CM01go toGraphic--standard overview.
    But automatic in background it is not possible.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Use of Planning Table (MF50) in Capacity Levelling with Production Order

    Hello Experts
    I wish to know that is it possible to perform Capacity Levelling in planning table (tcode MF50) with respect to a Production Order ? It is known that MF50 is used in Repetitive manufacuring to do the capacity levelling with respect to Planned orders. But in our discrete manufacturing scenario we want to use planning table to the capacity levelling with respect toa Production order.
    Any clue or help pertaining to this will be highly appreciated.
    Thanks in advance
    Regards
    Jayanta

    Dear ,
    MF50 is does the cacapcity leveling based on mateail -run schedule order (planned order ) where as in discrete manufacturing , when you run the MRP ,  MRP system assume Infinite Capacity  and schedule the order as per your selection in MD02(2,1,3,3,2)  and then you convert those planned order to Production order .Here you checkied the Capacity in Production Order level .
    In stanadrd SAP  , it is not possible to use MF50 for discrete production order.
    In discrete order or process order ,  do the caapcity leveling , there are seperate planning table available based on Over all Capacity Profile and Schedule type .This can be done  in following way :
    1.CM31-Production Order Wise -Tabular
    2.CM23-PO wise -Graphical
    3.MC88: Ruf Cut Planning
    Work Centre Wise : CM21 -Graphical , CM22-Tabular Planning Table .
    Make sure the below set up before  you carry on the Capacity leveling :
    .Define time profile in OPD2.
    Define the strategy profile in OPDB
    Define the Overall profiles in OPD0.
    In OPJK  maintained check capacity with SAPSFCG013 profile for your production order type
    In OPU3 , scheduleing parametre s: Generate Capacity , Scheduling Type , Automatic Log ,Start date in Past as per your req.
    In OPJU , chekc the contol tab of the scheduleing as per OPU3
    In OPKP- Production scheduling paranmeters assing the overall capacity profile -SAPSFCG013  with finte scheduling tick.
    Master Data :
    1.Materials Master define the Production scheduler and production scheduling profile
    2.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    3.Routing - enter the values for the standard values. Use control key with scheduling.
    Hope this will help you .
    Regards
    JH

  • Table For Capacity requirements

    Hello Every one,
    Does any body know the table which contains details for capacity requirements raised for a planned order and production order raised for a specific tme period for multiple capacity categories.
    The table should contain or a logic should exist to link the following fields:
    1. Planned order, production order
    2. Capacity requirements
    3. Capacity category.
    4. Period
    This is because my current uses capacities of 2 capacity categories (machine and labor) to plan production.
    Sincerely,
    Aji

    Hello Aji,
    Please find the tables:
    KBKO    Header record for capacity requirements
    KAKO    Capacity Header Segment
    KAKT    Capacity Description
    KAZY    Intervals of Capacity
    KBKO     Header record for capacity requirements
    KBED     Capacity requirements records
    KBKO     Header record for capacity requirements
    KBED      Capacity requirements records
    KBEZ      Add. data for table KBED (for indiv. capacities/splits)
    TC26      Capacity category
    Regards,
    Alok Tiwari

  • Table for capacity alt.uom

    Hi ,
    For a work center the capacity is maintained in "time" and the alt unit of measure maintained is "MW" . I tried to see in number of tables, but this "MW" is not seen in any table. Can you pls suggest the table in which i need to look in.
    Regards
    ShankarR

    Hi ,
    KAPE table has UOM but i do not get the link of field "capacity id " in this table with the work center in CRHD.
    Table CRHD has field 'object id '
    How can i get that?
    Regards
    ShankarR

  • SQVI - Join Table Graphical display

    Hello,
    In SQVI, when I enter to change the join table, the screen enter into "Classical Table Join Definition".
    How I can switch to "Graphical Table Join Definition"??
    In SQ02 it is on the setting menu, but I didn't found how to do it in SQVI.
    Could you help?
    Thanks
    BR
    Nazim

    Hai Nazmin,
    In SQVI click the Basis Mode icon in the left top
    Now it will show
    Layout Mode
    and in the right side
    Export as : select the Graphics
    and execute
    Regards,
    Mani

  • Work center capacity graphical view

    Greetings!
    How do I see work center available capacity in graphical form?
    Also how can I see work center capacity utilization in graphical form?
    -Hemant

    Hi
    I don't exactly remember, the T-CODE is CM02 or CM03.
    Regards
    MUHAMMAD HUNAIN AHMED

  • Graphical Representation

    Hi Experts,
    I have a discrete manufacturing scenario. What are the transactions in which I will be able to see the graphical representations of the production orders? Also, is the MF50 transaction limited only to the repetitive manufacturing scenario?
    Regards,
    Sachin

    Hi,
    Not sure if my interpretation of your query is correct, but if you want to do capacity leveling, then
    Work Center View
    CM21 (planning table - graphical)
    CM22 (planning table - tabular)
    Individual Capacity View
    CM27 (planning table - graphical)
    CM28 (planning table - tabular)
    Order View
    CM31 (planning table - graphical)
    CM23 (planning table - tabular)
    Also you may use CM25 - online & CM40 for background.
    Check if the above meets your need.
    Regards,
    Vivek

  • How Do I Change the Padding in Table Cells

    Hi, I am trying to set up a table that will allow text to fill the entire cell. I know that if I double click an individual cell, the left and right boundaries of the cell will be displayed on the ruler. However, I can't select multiple cells (even in a column) to adjust the boundaries. By default, all cells are created with no padding on the left, but half an inch on the right. I want no padding on the right as well. I know I can change the the tab for the table with the text inspector, after the fact.
    So, #1. How can I change the default right cell wrap for all cells in a table?
    Additionally, I know how to get rid of the padding above the text (via text property "instant margins"), but I also need to eliminate the padding at the bottom of the text. When I adjust the instant margin, it just moves the text the upper-left corner of the cell, but does not change the vertical size of the cell. I can change the individual row height by grabbing the border and dragging it up, but, again, this is a pain for large table. I know I can also change the overall cell height by dragging the lower table boundary.
    #2. How do I change the default cell height so the cell is tight against the text, regardless of the font size, for all cells in a table?
    Any help or suggestion will be greatly appreciated.
    Thanks
    Gary

    Thanks for the reply.
    Unfortunately, those options will not do what I need.
    If I turn off "Wrap text", the text overflows the cell and the text in the adjacent cell to the right will hidden. I still want the text to wrap, just not half an inch from the right border.
    And the "Resize to fit" changes the cell width, which I want to keep the cell at a static width.
    One workaround I found, was to modify the table as needed, using text properties, and then save the table as the table default. Unfortunately, that overwrites the factory default, and new table's tabs in other templates (all other properties seem to be retained)
    The second option that seems to work, is to save my entire document as a template. That seems to hold all the properties for graphics, tables, etc.
    A bit kludgy, but those methods seem to do the trick.
    Now, how do I get the default table properties back?
    Gary

  • Get looped SMARTFORMs Graphic via WD

    Hi Experts,
    i want to get a looped graphic (table containing a text has been constructed in Smartforms) in the PDF.
    the table  will be filled with a text( 10 till 1000 words) in a textedit UI-elemt( dynamic textedit with type TLINE). so each time the user click on 'write text' Button, a new textedit appears and the user can write his text there. in the end if the user have wrote 10 times texts in textedit UI-element( means 10 textedit UI-element will appear in Portal) this should also in  the PDF appears.
    the coding is following, but i dont know where i have to make changes or where shall make loop?
    i hope that everything is clear for you ,
    DATA: fm_name TYPE rs38l_fnam,                
            ls_contp TYPE ssfctrlop,       
            ls_output  TYPE ssfcompop,         
            ls_output_data TYPE ssfcrescl,         
            tab_otf_final TYPE TABLE OF itcoo.
      DATA :  bin_filesize  TYPE i,
              bin_file      TYPE xstring,
              pdf_tab       TYPE TABLE OF tline.
    Set the output parameters
      ls_output_options-tdprinter = 'PDF1'.
    set control parameters to get the output format (OTF) from Smart Forms
      ls_contp-no_dialog = 'X'.
      ls_contp-getotf = 'X'.
      ls_contp-preview = 'X'.
      CALL FUNCTION 'SSF_FUNCTION_MODULE_NAME'
      EXPORTING
      formname = 'Z_TAD_PAP'
    VARIANT = ' '
    DIRECT_CALL = ' '
      IMPORTING
      fm_name = fm_name
    EXCEPTIONS
    no_form = 1
    no_function_module = 2
    OTHERS = 3
      CALL FUNCTION fm_name
        EXPORTING
          control_parameters = ls_control_parameters
          output_options     = ls_output
          user_settings      = space
        IMPORTING
          job_output_info    = ls_output_data
        TABLES
          z_tad_pap_data     = lt_table  (this table is containing my data )
        EXCEPTIONS
          formatting_error   = 1
          internal_error     = 2
          send_error         = 3
          user_canceled      = 4
          OTHERS             = 5.
    tab_otf_final[] = ls_output_data-otfdata[].
    " Convert OTF data into PDF data
      CALL FUNCTION 'CONVERT_OTF'
        EXPORTING
          format                = 'PDF'
          max_linewidth         = 132
        IMPORTING
          bin_filesize          = bin_filesize
          bin_file              = bin_file
        TABLES
          otf                   = tab_otf_final
          lines                 = pdf_tab
        EXCEPTIONS
          err_max_linewidth     = 1
          err_format            = 2
          err_conv_not_possible = 3
          err_bad_otf           = 4
          OTHERS                = 5.
    cl_wd_runtime_services=>attach_file_to_response(
    i_filename      = 'mail.pdf'
    i_content       =  bin_file
    i_mime_type   =   '/Desktop').
    thank you for help

    hi Kowluri,
    sorry that i didnt answer you so quik, i was busy with other stuff.
    well, what i am looking for, is how to fill my table in SMATRFORMS from WD, i already have an internal Table that contains the data, (this table contains only the data for one textedit UI-elements).
    the problem is , this component (table) in smartforms , should be called more than one time ( the same component) . if the user have wrote 2 or 3  or 4 texts ( each textedit UI-elemet contains a text in the Portal),  all of those texts should be displayed on the PDF , and this component(table) in SMARTFORMS should be called each time for each text.
    i hope that everything is clear, if not , i will explain more
    Best Regards
    Natel

  • Issue with Internal Table

    Hi All,
    I have defined an internal table 'with occurs 0'.
    While debuggining, i am observing that only 50,000 lines are getting populated in that internal table.
    How to increase the capacity of the internal table, so that it can hold more number of lines?
    Regards
    Pavan

    I would like to explaing you all about this issue.
    I have defined an internal table as follows...
    data:  IT_CATSDB       TYPE BAPICATS2 OCCURS 0 WITH HEADER LINE.
    I have used a BAPI called "BAPI_CATIMESHEETRECORD_GETLIST" which will retirieve the Timesheet details of all employees within a given date range.
    Now, the number of entries that we got from this BAPI are stored in the internal table it_catsdb.
    I have observed that this internal table is holding max of 50k lines.
    If i check the database table (CATSDB) for the same conditions in SE11, i am able to get around 1L lines.
    Hence my report is showing incorrect output.
    Kindly help me out with some logic, so that this internal table can hold as much as data possible without any restriction.....
    Regards
    Pavan

  • MM42 change material, split valuation at batch level, M301, locking table

    Dear All,
    I'm working on ECC 6.0 retail and I have activated split valuation at batch level.  Now in MBEW for this specific material I have almost 14.400 entries.
    If I try to change some material data (MM42) I receive an error message M3021 A system error has occurred while locking and then Lock table overflow.
    I used SM12 to see the table (while MM42 is still running) and it seems that MBEW is the problem.
    What should I do?  For any material modification the system has to modify every entry in MBEW? Is there any possibility to skip this?
    Thank you.

    Hi,
    Symptom
    Key word: Enqueue
    FM: A system error has occurred in the block handler
    Message in the syslog: lock table overflowed
    Other terms
    M3021 MM02 F5 288 F5288 FBRA
    Reason and Prerequisites
    The lock table has overflowed.
    Cause 1: Dimensions of the lock table are too small
    Cause 2: The update lags far behind or has shut down completely, so that the lock entries of the update requests that are not yet updated cause the lock table to overflow.
    Cause 3: Poor design of the application programs. A lock is issued for each object in an application program, for example a collective run with many objects.
    Solution
    Determine the cause:
    SM12 -> Goto -> Diagnosis (old)
    SM12 -> Extras -> Diagnosis (new)
    checks the effectiveness of the lock management
    SM12 -> Goto -> Diagnosis in update (old)
    SM12 -> Extras -> Diagnosis in update (new)
    checks the effectiveness of the lock management in conjunction with updates
    SM12 -> OkCode TEST -> Error handling -> Statistics (old, only in the enqueue server)
    SM12 -> Extras -> Statistics (new)
    shows the statistics of the lock management, including the previous maximum fill levels (peak usage) of the partial tables in the lock table
    If the owner table overflows, cause 2 generally applies.
    In the alert monitor (RZ20), an overrunning of the (customizable) high-water marks is detected and displayed as an alert reason.
    The size of the lock table can be set with the profile parameter u201Cenque/table_size =u201C. specifies the size of the lock table in kilobytes. The setting must be made in the profile of the enqueue server ( u2026_DVEBM.. ). The change only takes effect after the restart of the enqueue server.
    The default size is 500 KB in the Rel 3.1x implementation of the enqueue table. The resulting sizes for the individual tables are:
    Owner table: approx 560.
    Name table: approx 560.
    Entry table: approx 2240.
    As of Rel 4.xx the new implementation of the lock table takes effect.
    It can also be activated as described in note 75144 for the 3.1I kernel. The default size is 2000 KB. The resulting sizes for the individual tables are:
    Owner table: approx 5400
    Name table: approx 5400
    Entry table: approx 5400
    Example: with the
    u201Cenque/table_size =32000u2033 profile parameter, the size of the enqueue table is set to 32000 KB. The tables can then have approx 40,000 entries.
    Note that the above sizes and numbers depend on various factors such as the kernel release, patch number, platform, address length (32/64-bit), and character width (Ascii/Unicode). Use the statistics display in SM12 to check the actual capacity of the lock table.
    If cause 2 applies, an enlargement of the lock table only delays the overflow of the lock table, but it cannot generally be avoided.
    In this case you need to eliminate the update shutdown or accelerate the throughput of the update program using more update processes. Using CCMS (operation modes, see training BC120) the category of work processes can be switched at runtime, for example an interactive work process can be converted temporarily into an update process, to temporarily increase the throughput of the update.
    For cause 3, you should consider a tuning of the task function. Instead of issuing a large number of individual locks, it may be better to use generic locks (wildcard) to block a complete subarea. This will also allow you to considerably improve the performance.

  • T-code to find the capacity of the machine.

    HI Experts,
    I have a scenario for Process industry,
    In Resources i define formula for Capacity & scheduling , In Master Recipe i give the value to my formula and as per get the Capacity availibility & Scheduling time.
    i want to know Is there any T-code by which the Production engineer can know the
    capacity of the Machine on a given day or Group of days.

    Dear Sandy,
    Check these reports,
    CM01                 Cap. planning, work center load
    CM02                 Capac. planning, work center orders
    CM03                 Capac. planning, work center pool
    CM04                 Capac. planning, work center backlog
    CM05                 Capacity plan.:Work center overload
    CM07                 Cap. planning: Variable access
    CM0X                 Capacity planning
    CM10                 Capacity leveling
    CM11                 Maintain flow control
    CM21                 Capacity leveling SFC planning table
    CM22                 Capacity leveling:SFC planning table
    CM23                 Capacity leveling: SFC orders tab.
    CM24                 Capacity leveling: PM indiv. tab.
    CM25                 Capacity leveling: Variable
    CM26                 Capacity Leveling: Proj.View Tabular
    CM27                 Capacity level.: SFC indiv.cap.graph
    CM28                 Capac.level.: SFC indiv.cap. tab.
    CM50                 Capacity level.: SFC work cntr list
    In the most of the reports after giving the work center and plant,in the top menu click on Settings--->general,select the radio button
    either for day bucket or weekly buket and then check.goto enviroment
    Regards
    S Mangalraj.

Maybe you are looking for