Change Checkbox status at runtime
Hi,
I've got a question about checkboxes.
How do I change the status of a checkbox from unchecked to checked (or vice versa) at runtime?
How can I access it's values to say something like this:
if (cond1 = true) then
checkbox1 = 'CHECKED'
else
checkbox1 = 'UNCHECKED'
pls help me.
Thanks!
Hello,
Take a look at this thread -
Re: reference checkbox.checked value in javascript
If you're using a fairly recent version of Apex you can use the $x and $v syntax rather than html_GetElement, like this -
if ($x('item').checked == false) {
alert("The checkbox is not checked!");
}Hope this helps,
John.
http://jes.blogs.shellprompt.net
http://www.apex-evangelists.com
Similar Messages
-
How to change subscriptionDurability status at runtime.
I have written a MDB which is Durable at startup but I want to change it to 'NonDurable' at runtime on receiving a particular message. Please advise how at runtime I can change the settings of the MDB.
My MDB class file is as follows:
package test;
import javax.ejb.*;
import javax.jms.*;
@MessageDriven(
mappedName="topic01",
activationConfig={
@ActivationConfigProperty(propertyName="destinationType", propertyValue="javax.jms.Topic"),
@ActivationConfigProperty(propertyName="subscriptionDurability", propertyValue="Durable")})
public class FirstDurableMDB implements MessageListener {
public void onMessage(Message message) {
TextMessage tm = (TextMessage)message;
try {
String str = tm.getText();
if(str.equals("NonDurable")){
PLEASE TELL ME WHAT I SHOULD WRITE HERE
} catch (JMSException e) {
e.printStackTrace();
}The TopicSession has an unsubscribe(String subscriptionName) method - http://download.oracle.com/javaee/1.4/api/javax/jms/TopicSession.html#unsubscribe(java.lang.String), but then you will have to rely on plain MessageListeners rather than MDBs.
-
" Changed " Design Status after deployment involving two runtime reposiory
Hello everybody,
I'm experiencing severe metadata management problems in OWB 10.1.0.2.0.
When I deploy a mapping into the production runtime repository , it appears with a "changed" design status when I switch back to the development runtime repository.
If I can't rely on the design status it will be a nightmare to manage mapping delivery !
Anyone can share his experience about managing multiple runtime repository ?
Best regards,
Franck.Hi Franck
Looking at your single design repository that deploys to two runtime repositories; I would say when you switch the runtime, it updates internally the default connected runtime for the mapping. As you will remember you can deploy straight from within the design browser if you have previously set the deploy mode. It will be updating this.
Not much you can do, except create a different design repository. It is somewhat poor I know. I raised a number of TARS on this myself. Perhaps they improved it in Paris (but I somehow doubt it.) Multiple database deployment configuration should be in there but so should real user based functional security and versioning(via the frontend without script repository hacks).
Too sum up, nearly all sites use the multiple design repository approach.
Regards,
Richard Harrison -
Workflow changing the status based some columns value
OOB workflow SP designer 2013
The workflow purpose is change the status columns from
COMPLETE to IN PROGRESS or from
IN PROGRESS to COMPLETE according some columns value.. And if the change is from
IN PROGRESS to COMPLETE
there will be change in some columns like
If alertSOP Date <= today then change the status (Columns value) from Complete to In Progress and send email to the manager (the manager email address is a column (Manager Email)
Else pause until the alert date=Today()
If the status (columns) = in progress send Remainder email every 10 days
If the status change from in progress to
Complete (BY MANAGER MANUALLY) then
last renewed Date =TODAY()
Valid to Review=TODAY() + 4 MONTH
Alert Date=today() + 5 month
and Due Date=today() + 6 months
AND START THE WORKFLOW AFTER UPDATING THIS COLUMNS FOR NEXT cycle
SharePoint List(http://server/site/..) LIST ITEMS
Department
Contractor
Division
Manager Email
Contractor last renewed Date
Contractor Valid to Review
Alert SOPReview
DueDate Review
Status
Workflow Status
ABC
JONAH
10
[email protected]
01/01/2014
05/06/2014
5/07/2014
5/08/2014
COMPLETE
paused
DEF
SMITH
20
[email protected]
01/01/2014
02/03/2014
2/28/2014
3/20/2014
INPROGRESS
INPROGRESS
Note:
The status is changed manually by manager from IN PROGRESS TO COMPLETE
The status from COMPLETE to IN PROGRESS is changed by event or Triggers (based the alert date)The First Part are coded as follow
(The workflow purpose is change the status columns from COMPLETE to IN
PROGRESS or fromIN PROGRESS to COMPLETE according
some columns value.. And if the change is from IN
PROGRESSto COMPLETE there
will be change in some columns like
If alertSOP Date <= today then change the status (Columns value) from Complete to In Progress and send email to the manager (the manager email address is a column (Manager Email)
Else pause until the alert date=Today()
If the status (columns) = in progress send
Reminder email every 10 days)
Note:
The first if Block work as expected
the second if block generate error.. Internal States Canceled
RequestorId: 3b262286-66e8-5f9f-09f8-3b09c5be0ebc. Details: System.ApplicationException: HTTP 400 {"Transfer-Encoding":["chunked"],"X-SharePointHealthScore":["1"],"SPClientServiceRequestDuration":["1997"],"SPRequestGuid":["3b262286-66e8-5f9f-09f8-3b09c5be0ebc"],"request-id":["3b262286-66e8-5f9f-09f8-3b09c5be0ebc"],"X-FRAME-OPTIONS":["SAMEORIGIN"],"X-Content-Type-Options":["nosniff"],"X-MS-InvokeApp":["1;
RequireReadOnly"],"MicrosoftSharePointTeamServices":["15.0.0.4420"],"Cache-Control":["max-age=0, private"],"Date":["Tue, 25 Mar 2014 21:25:35 GMT"],"X-AspNet-Version":["4.0.30319"],"X-Powered-By":["ASP.NET"]} at Microsoft.Activities.Hosting.Runtime.Subroutine.SubroutineChild.Execute(CodeActivityContext
context) at System.Activities.CodeActivity.InternalExecute(ActivityInstance instance, ActivityExecutor executor, BookmarkManager bookmarkManager) at System.Activities.Runtime.ActivityExecutor.ExecuteActivityWorkItem.ExecuteBody(ActivityExecutor executor, BookmarkManager
bookmarkManager, Location resultLocation) -
Cancelling a absence request haas not changed the status by the user
Hi experts,
An absence request has been cancelled,. Looking in Status Monitor, i will see that the reuest has been cancelled, but the user see the status stay on "Pendig For Approval". Normally the user will see the Absence Category set to Cancelled, but not "Pending For Approval". The reason is unknown to me. Thus i need your support.
Thanks in advance
MehdiJust to confirm my understanding, are you saying that:
1) Employee requested an Absence through SSHR Leave of Absence
2) An administrator queried the absence in the Workflow Status Monitor and Cancelled it
3) Now that absence is showing to the Employee as 'Pending Approval'
Is that right? You mention 'Normally the user will see...'. When you say 'normally' what is the behaviour you expect?
If I've understood you correct this is the behaviour I would expect: cancelling a workflow does not change the status from 'Pending For Approval' and it definitely does not change the Absence Category on the absence. Cancelling an absence via this route isn't really recommended because - as you are seeing - it gets stuck. It's best to get the approver to reject the absence instead.
To remove this cancelled absence, take a look at these Oracle Support articles:
Unable To Remove Cancelled Workflow Item Related To LOA Transaction [ID 1123714.1]
How to Purge Obsolete Workflow Runtime Data (FNDWFPR) for HR Workflow Completed Processes [ID 237564.1]
How to Run the HR Workflow Cleanup Process (HRWFDFCT) [ID 237524.1] -
In which transaction can I change the status of a field?
Hi,
In which transaction can I change the status of a field?
In transaction FB75 (enter customer credit memo) on the Details TAB, the G/L account is defaulted.
How can I change this field, so that I can enter a new G/L account?
Thank you for your feeback.
Kind regards,
Lindahi Linda,
this is the reconciliation account of the customer. As another commenter already pointed out, you can change this in the master data of the customer (tcode FD02, Company code data).
From Release 4.7 (and up) there is another option: in the master data of this G/L account you can set up, if you can change this G/L by posting. This is a checkbox in the G/L master data (tcode FS00). If you tick it, you'll be able to change this reconciliation account it in FB75 (and elswhere by customer postings).
"I see that in transaction Fd02, the reconc. account is also grey (cannot be changed)."
You have to check the field status settings in SPRO!
hope this helps
ec -
Picking status in Out. delivery changed to status A after GR post with MB0A
Hi,
I am facing an issue in our production system, these is the scenario:
- Replenishment delivery
- ZPicking confirmation idoc sucessfully picked the outbound delivery and post the GI. The material was cut and it was batch splitted.
- Then it was performed a GR (mov 101) against a stock transfer order via MB0A.
- After this GR posted, the status of picking of the parent material of the batch split was changed from status " " (Not relevant) to status "A" (Not yet processed).
- Also the status at header level was changed.
Current status of the delivery
Header Status
Picking Confirmation --> B
Total Gds mvt status --> B
Item Status
Item 10:
Pick confirmation --> A
Goods movt --> B
We have tried to reverse the GI to generate it again and reset the statuses but it is not possible to do it via VL09 neither MBST, etc.
Any idea on how to correct this problem?
Thanks,Hi,
What is the moment type being taken for PGI through idoc?check the moment type definition for its allowable transactions and foe reverse.
Regards, -
Usage decision follow up action change of status in equipment
Hello every one, I am having calibration scenerio in my project. All process is running properly but the issue which i am having is that when i am giving usage decision i should get a pop up to change the status of the equipment which is not coming in my case. i have checked followup action whch PM_QM there i have activated 2 Funtion modules one is for automatic TECO of order which is working properly and second is change to status in equipment master which is not working for me. Kindly give some guidance to me on same.
Regards
AbhishekHelloo,
Please let me know the equipment type you are using.
If you are using equipment type other than Q then u may get such type of issues.
Please try out with equipmetn type Q or P
Thanks -
Changing the status of Equipment in a follow up action
Hi All,
I have a requirement in which a function module will be triggered for a particular Follow up action.
In this FM we have to determine the equipment and the Maintenance Order , if both are available , status of the equipment
should change to 'A' , status of maintenance - order = 'Technically completed' and Maintenance Notification = 'Notification Completed' .
How can this be done.? I am able to change the status of Maintenance order and notification but can anyone help me in
determining the equipment and changing its status to 'A'. ?
Thanks in advance.
VasukiHi Gajesh,
The process is as follows :
1) During Calibration of a product,depending on the technician's User decision , 3 follow up actions are created.
2) Each follow up action has one FM associated with it, which is customised in SPRO > Display IMG > Quality Management > Quality Inspection > Inspection Lot Completion > Define follow-Up Action .
3) In the first case ( first Follow up action when the inspection is successful) the first FM is triggered. In this FM we have to perform the following steps :
a) Determine the Maintenance Order and the equipment.
b) Incase both are available, status of equipmnt should be changed to 'A',
Maintenance Order should be changed to 'Technically completed' and
Maintenance Notification to 'Notification Completed' .
If you need further info pls let me know.
Thanks,
Vasuki -
Change of Status is not working in WebUI
Hello All,
Iam facing a problem in changing the status of the item in web UI requirement as follows.
We need to set the item status from the To be Closed to Close.The status To be closed is set by an contract processor and schedules the Action .i.e Close item Once the contract approver execuets the action.It need to be change to Closed and the item end date need to be set to the date when the Action is execueted
I have done my coding in the Execute method for the action Close item by using the FM CRM_ORDER_MAINTAIN
to change the item enddate and CRM_STATUS_CHANGE_EXTERN to change the Status to Closed and the Commit Work .My code is working fine in GUI but this is not working in WebUI . I can only see it when i execute the action go to the edit mode.
Can any one help me out in this regards.
Thanks in Advance.
Regards,
Kiran Posanapalli.
Edited by: posanapalli kiran on Feb 15, 2010 7:16 PMHi Kiran,
we're having the same issue that an opportunity is updated in the normal Gui but not in the WebUI when using FM CRM_ORDER_MAINTAIN.
What coding did you use for fixing this?
Kind regards,
Roy Willems -
Regading function module to change User Status IN CJ02
Hi All,
I need to chage System status from Budget Assigned(BDAS) to Release. Can any body help me is there any FM to change this status.Tell me ASAP
Thanks,
Sagar.Hi,
BAPI_BUS2001_SET_STATUS: For Project Defn, WBS
BAPI_BUS2002_SET_STATUS: For Networks
Regards -
How to change report displayname at runtime when run from the report server?
hi all,
with the reportviewer widget in a winforms app, i'm able to change report displayname at runtime by handling thesubmittingparametervalues event like so:
private void reportViewer1_SubmittingParameterValues(object sender, ReportParametersEventArgs e)
string po = e.Parameters["Order"].Values[0];
this.reportViewer1.ServerReport.DisplayName = "Load Out - " + po + " - " + DateTime.Now.ToShortDateString();
question: how do i achieve the same thing when the report is run via the ssrs reportserver website?
thanks for any tips,
sffHi sherifffruitfly2,
According to your description, you want to change the display name of report in Report Manager. Right?
In Reporting Services, we can't make the report file name dynamically. But we have Build-in Fields to show report name and execution time in a report. We can add a textbox and put in the expression below:
="Load on- "+Globals!ReportName+" "+Globals!ExecutionTime
It will show the report name with execution time when we run the report:
Reference:
Built-in Collections in Expressions (Report Builder and SSRS)
If you have any question, please feel free to ask.
Best Regards,
Simon Hou -
Hi
Using SPD i am creating list workflow.
Scenario: Employee submits a request . Task assign to manager. Manager can either approve/ reject. If approve then change the state column to "done". If rejected the state column to "Rejected".
Problem is "Assign a to do item" is assigning the task to manager. But after manager approves the status in the task list not changed to "Completed". Still it is showing "Not started". I dont want to manually complete the task.
Please help me for automatic process.
What i should do to change the status to "Complete" automatically after manager approval
Regards
Jhanani
Janani.RHi Janani,
From your description, you would like to create an approval workflow for a list. When an employee submit a request to the list, an approval task should be assigned to manager, then manager could approve or reject the request. From the request list,
we should be able to see the Approval task’s status.
Not understand the reason of designing the workflow to two steps, an approval action should be enough from my understanding. For producing, I create a list named Request list, then customize it in InfoPath form to add a Request field for stating request
content. Then add a workflow to list named Approval task, add the action of Start an approval process with administrator and make the workflow automatically start when item is added.
The image below shows the status of Adding items, Approving and Rejecting. Please check if it could meet your requirement.
Regards,
Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
[email protected] .
Rebecca Tu
TechNet Community Support -
Is it possible to change the status from Bid Rejected to Bid submitted?
Hi there.
We are working in SRM 4.0.
One user rejected a bid, but it was a mistake. Is it possible to change the status from Bid Rejected to Bid submitted?
We would like to modify the status from Bid Rejected to Bid submitted or Awaiting Approval to Bid submitted in order to solve errors.
Thanks and regards.
Raúl Moncada.Hi ,
Use Function Module : BBP_PD_BID_STATUS_CHANGE
Supply Activity = 'QOSU' .
Regards,
Sachin S M -
Error in CV02N while changing the status.
Hi Experts,
We are getting a error while changing the status of technical change document that " Inconsistent characteristic value assignment" .The document is in status "in use" and we are trying to change it to " old version" using T code CV02N.
when I tried to see the error desription it is telling that delete the inconsistencies. But I didn't find the list of incosistencies. What may be the problem? Please help me out to get ride of this problem.
Thanks and best regards,
PraveenHi Pete,
The full text message: Inconsistent characteristic value assignment
Message no. C1821
In diagnosis it is telling that "You want to change the value assigned to a characteristic. However, the change causes inconsistency, so the new value is not allowed."
Actually I am just changing the status of the document. I am not changing any characteristic value.
Actually it is appearing as information message. but while saving it pop up and not allowing to save.
Please do the needful.
Best Regards,
Praveen
Maybe you are looking for
-
How do i sync ical with google calendar, in that direction
i have google cal and ical syncset up but it was set up by google telling what to enter into ical. this made my other calendars, all the google calendars i have other than the main one, into "delegates" on ical. whats the reason or process for this?
-
Envy4-1130us crashed during BIOS update
Hello! I just killed my favorite laptop Envy4-1130us. I decided to update BIOS from v.13 to v.25 During update process, OS (Win8.1) hangt up. No errors was shown. After few hours laptop restarted, and now it's not works. Power led is on, system fan w
-
How to make a program that shuts off either ports or protocols on a network
I'd like to set up a program, one that I can run on three computers on the same network. I have very basic networking experience (Ive made a server that can have one client connection at a time, with simple commands). My roomates are addicted to bitt
-
Hi, I installed Brtools & was trying to connect remote data base. Created a instance using ssh <hostname> -l ora<SID> . (it never asked me for password). Not able to connect to that DB. I'm on oracle & unix. Is there anything i'm missing.
-
Custom Macro into standard Web ADI Integrator
Hi All, I have done the below customization for "Journal Upload" integrator. I have added a new option "Attachments" to the Oracle Tab using the below custom macro code. And it is opening a custom OA Framework page(It will ask for a login) and I can