Changing the ABAP Back-End System for the UME

Hi,
I went through many forums; sap notes (943498, 764417, 943602, 940893, 810434) and at help.sap.com
(http://help.sap.com/saphelp_nw70/helpdata/en/9e/fdcf3d4f902d10e10000000a114084/frameset.htm)
I am not able to resolve the issue.
Problem: We already have SSO configured between Portal (EP7) and backend R/3 system (ECC 6) which is working fine. Scenario is that we have dual maintenance system going on. Now we want to move our SSO configuration for Portal to point to new R/3 system, which is exactly same except different server name (same SID, system #, using same ports on different servers). Here is the catch service file for both R/3 system have same service name and port number defined.
R/3 current: sapmsXXX    3601/tcp
R/3 new sys: sapmsXXX     3601/tcp
Will this be causing hte problem or could be something else.
Thank in advance for your inputs!!
Error from the dev_server0 file:
[Thr 172] Fri Mar 28 14:10:19 2008
[Thr 172] JHVM_RegisterNatives: registering methods in com.sap.mw.rfc.driver.CpicDriver
[Thr 172] Fri Mar 28 14:10:20 2008
[Thr 172] ***LOG Q0I=> NiPConnect2: connect (146: Connection refused) [nixxi.cpp 2770]
[Thr 172] *** ERROR => NiPConnect2: SiPeekPendConn failed for hdl 0 / sock 46
(SI_ECONN_REFUSE/146; I4; ST; 156.44.162.55:3601) [nixxi.cpp    2770]
[Thr 172] *** ERROR => MsIAttachEx: NiBufConnect to server.name/sapmsXXX failed (rc=NIECONN_REFUSED) [msxxi_mt.c   652]
[Thr 172] *** ERROR => LgIAttach: MsAttach (rc=NIECONN_REFUSED) [lgxx_mt.c    3980]
[Thr 172] *** ERROR => LgIGroupX: LgIAttach(rc=-101) [lgxx_mt.c    4284]
[Thr 172] *** ERROR => JRFC> Error jrfc_lg LgGroup failed(-101) [jrfclg_mt.c  344]
[Thr 172] *** ERROR =>       mshost: server.name, msserv: sapmsXXX, r_group: BASIS [jrfclg_mt.c  345]
[Thr 14] JLaunchIExitJava: exit hook is called (rc = -11113)
[Thr 14]
ERROR => The Java VM terminated with a non-zero exit code.
Please see SAP Note 943602 , section 'J2EE Engine exit codes
for additional information and trouble shooting.
[Thr 14] SigISetIgnoreAction : SIG_IGN for signal 18
[Thr 14] JLaunchCloseProgram: good bye (exitcode = -11113)

Hi Patel,
It seems that the portal cannot attach backend system via load balancing.
1- Can you access to port# 3601 on 156.44.162.55 via telnet, from your portal system?
2- Did you checked your firewall settings on both systems?
Best regards,

Similar Messages

  • Value for customized fields didn't get copied to back end system

    Hi,
    We are in SRM 4.0 and using extended classic scenario.
    We have defined two customized fields in account assignment tab in shopping cart and SRM Po and also in back end PO.
    SRM POs are having values for the field but while transferring the Po details to back end system, for some of the line items of the Po the entries are missing in back end system.
    Problem is only with few line items of the PO.
    Have tried with FM like BBP_PD_PO_TRANSFER_EXEC  and BBP_PD_SC_RESUBMIT, but it is not transfering the values to back end.
    Is there any other way to push the missing values to back end system.
    Please advise.
    Thanks.

    Sk,
    Table adjustment has to be done accordingly. Get in touch with your Basis team.
    Thanks.

  • MOPZ - Error during call of SAP back end system

    Hi Experts,
    I have this error during MOPZ - "select OS/DB dependent files" and following option as well.
    I have checked SAP NOTE 982045, but still cannot solve the issue.
    SM59 - SAP-OSS and SAPOSS connection test is successful.
    I have no idea what else is going wrong. kindly advise id you have any idea.
    Below are some error logs.
    From MOPZ
    Error calling SAP back-end system: Local gateway not running / CPIC-CALL: 'ThSAPCMRCV'SAP-OSS via RFC destination.
    From SM21
    Call of function GwRead failed, RC: -095
    Communication error, CPIC return code 017, SAP return code 24
    > Conversation ID: 13681187
    > CPI-C function: CMRCV
    From dev_rfc8
    **** Trace file opened at 20140904 134347 Malay Peninsula Standard Time, by disp+work
    **** Versions SAP-REL 721,0,300 RFC-VER U 3 1498740 MT-SL
    ======> CPIC-CALL: 'ThSAPCMRCV' : cmRc=17 thRc=247
    Local gateway not running                                               
    ABAP Programm: CL_SM_DATA_SENDER_RFC=========CP (Transaction: )
    Called function module: /SPN/SBI_INTERFACE
    User: BT_BASIS (Client: 100)
    Destination: SAP-OSS (Handle: 4, DtConId: 22F633E42CC0F1D280C9A0D3C1069543, DtConCnt: 1, ConvId: 12214252,{22F633E4-2CC0-F1D2-80C9-A0D3C1069543})
    EPP RootContextId: A0D3C10695431ED48CFEB45C956820C9, ConnectionId: D3F533E43BF2F12C80C9A0D3C1069543, ConnectionCnt: 1
    EPP TransactionId: D3F533E43BF2F12A80C9A0D3C1069543
    SERVER> RFC Server Session (handle: 1, 18243574, {D3F533E4-3BF2-F12C-80C9-A0D3C1069543})
    SERVER> Caller host:
    SERVER> Caller transaction code:  (Caller Program: CL_MO_SMP_ADAPTER=============CP)
    SERVER> Called function module: AGS_MOPZ_SMP_RFC
    Error RFCIO_ERROR_SYSERROR in abrfcpic.c : 3712
    CPIC-CALL: 'ThSAPCMRCV' : cmRc=17 thRc=247
    Local gateway not running                                               
    Error RFCIO_ERROR_MESSAGE in abrfcio.c : 1973
    Thank you.
    Por.

    Hi
    there are following things you can do
    1. log on to your SAP Router
    2. check entries in SAPRoutab.
    3. Telnet SAPSERV2 (Sap responding server) (Tcode oss1 will give you details of which SAP serve you are connecting ) on port 3299
    4. if you are able to telnet SAPserve from your Router server  then raise the call to SAP and ask whether they can reach your saprouter or not
    5. check /etc/services files and check for service 3299 defined or not
    6. telnet local Router server with port 3299
    7 try to download Sap Note from SNOTE in you solman system.
    all the best
    Regards
    Dishant.

  • BI - Java front end ...multiple BW abap back-ends?

    Experts,
    we have a BI java/portal running NW7.01sp6 (portal/BIjava application types).  We have used the config wizard to successfully  connect to our BW NW7.02 abap back-end in order to run bex, etc.
    My question is this: 
    Is it possible to connect the BI-java portal to multiple BW abap back-ends?  Or should we have one BI-java portal for each BW abap back-end?
    This may be the wrong forum for this question.  If so, please forgive me and point me to the correct one.
    Thanks
    NICK

    Hey Judith and experts,
    I found this note:
    Note 919197 - Troubleshooting: More than one master system found
    In there it states:
    Each SAP Web Application Server Java always has precisely one SAP Web Application Server ABAP, which serves as a BI master system. The metadata for Web items and Data Providers is read from this system, for example, and this is the only system from which you can start Web templates and Enterprise reports.
    If you want to display Web templates that originate from more than one SAP Web Application Server ABAP in an SAP Enterprise Portal, for example, you can use the Global Portal technology.
    Does anyone have any idea what they mean by "Global Portal technology"?  Or should I just bite the bullet and install another BI java portal to go with the ABAP instance.
    __NICK

  • Client Copy back-end system

    Hi Guys,
    We have made a client copy of the back-end system of SRM (SRM 5.0). Only the back-end and not SRM has been copied.
    After replication all the master- and customizing data again to SRM from the 'new' back-end I have found an issue with updating the suppliers.
    It seems that I can not remove old business partners from SRM with BUPA_TEST_DELETE if these are used already in SC's. However the new copy of the back-end system has completely different suppliers we need to use in SRM. This causes for an inconsistency with the supplier numbers, as we want to keep the R/3 numbers in SRM.
    Does anyone has a good idea how to proceed? That is, how can I remove the business partners (suppliers) in SRM which were used before the client copy of R/3, so that I will be able to completely get all the relevant 'new' vendors from the R/3 system after the client copy.
    When I execute BUPA_TEST_DELETE it will end up in error saying the suppliers can not be removed. Do I need to archive all the old documents (SC & PO) before I can remove all vendors in SRM, or is there a way to force the removal of all the business partners from before the back-end client copy?
    Thx.
    Skander

    Hi,
    I already figured out how to solve the issue.
    For anyone who wants to know how to:
    -First clear the vendor groups in the vendor hierarchy; do not renove the root node
    -Then run BBPGETVD which will get you the new vendors from the back-end; for me only role LF for suppliers.
    -Then run BBPUPDVD which will update all the fields for the old business partner numbers in SRM which were used in documents, and replicated from the old back-end system.
    In my case I had to play a litlebit with the setting 'only creditors', to update BP numbers which were not suppliers in the new back-end.
    After performing these steps everything should be fine.
    So it's perfectly possible to make a client copy of only the back-end system without copying SRM (in the classic scenario that is).
    Rgds,
    Skander

  • Error : No valid R/3 Back-end system

    Hi CRM gurus,
    I'm trying to connect SAP CRM 5.0 to SAP ECC 5.0.
    When I launch trx R3AS for downloading the first object of the list coming from Best Practise (DNL_CUST_ACGRPB), I am getting the above error: "No valid R/3 Back-end system."
    Now the point is that RFCs work smoothly, administration console as well and R/3 view CRMRFCPAR was filled correctly.
    Where is the problem? I'm looking into, but without results.
    Any suggestions in this issue will be rewarded.
    Regards,
    AndreA

    Many thanks Praveen,
    I have carried out all the checks in the tables and it seems that everything is fine!.
    Creating a RFC Destication for CRM in R/3
    Maintain Table CRMRFCPAR and CRMCONSUM?
    In Table CRMPAROLTP, Parameter "crm release" should set to your CRM version ( ex 500 for crm 5.0)
    Maintain table TBE11, APPI should be NDI(new dimension integration),A yes
    I don't really know where the error could lay.
    Andrea

  • Can two different SRM clients systems connect to one R/3 Back-end system?

    Hello,
    Trying to developing SRM Co-Exist/Global strategy, based on the following scenario:
    1.  Two different SRM client systems, each at DIFFERENT SRM Version/Release Level.  SRM system "A" runs in Stand-Alone and Extend Classic Scenario mode.  SRM system "B" runs in Classic Scenario mode
    2.  Two different R/3 back-end systems, each with SAME R/3 4.7 Version/Release Level.
    Question 1:  Can the two (2) different SRM client systems be connected to one (1) of the R/3 back-end systems?
    Question 2:  Are there any Basis Plug-In (PI_BASIS) issues/difficulties to consider from either the SRM client or R/3 back-end side?
    Question 3:  Does each SRM client need it own unique transaction document type(s) and number range(s) definitions?
    Question 4:  Are there any other difficulties, for example, with RFC and Partner Profile related definitions and what are the steps to address/resolve difficulties?
    Please advise and thanks in advance for your feedback!
    Regards,
    Ed
    Edited by: Ed Shigo on Mar 16, 2009 6:40 AM

    Question 1: Can the two (2) different SRM client systems be connected to one (1) of the R/3 back-end systems?
    They can be connected
    Question 2: Are there any Basis Plug-In (PI_BASIS) issues/difficulties to consider from either the SRM client or R/3 back-end side?
    Make sure that you have unique consumer entries for Middleware for Material replication, RFCs etc
    Question 3: Does each SRM client need it own unique transaction document type(s) and number range(s) definitions?
    Yes you need to have them.
    Question 4: Are there any other difficulties, for example, with RFC and Partner Profile related definitions and what are the steps to address/resolve difficulties?
    Don't see any difficulties as long as the a structured approach is followed.

  • Two SRM systems connected to One back end system

    Hi..
    Note: I have posted this message earlier ......but couldn't find that. I am just reposting the message:
    In our quality environment, we have two SRM and two backend systems. One for testing purpose and other for training purpose. We are planning to remove one back end system and connect both the SRM systems to one backend system.
    1. Is it possible to have this landscape?
    2. In SRM & R/3 we can define two RFC connnections but from R/3 side, I am not sure how the system will determine the respective RFC connection during GR or any other process.
    3. Are there any other difficulties?
    We are in SRM 4.0 using Extended classic scenario. We are using SRM for processing shopping cart, Po and confirmations.
    Please advise.
    Thanks.

    Hi Prashanth,
    is  very much possible.
    for this you need to configure the partner profiles.
    need to define port
    need to configure inbound paramters and outbound parameters.
    we20 - create partner profiles.
    define outbound parameters and inbound parameters of the message type.
    we21 - define port.
    under Transactional RFC.
    and create a distribution model and add message type.
    revert back to me if any problem still you find.
    regards
    sai

  • Vendor Replication and Different Back-end Systems

    Hello,
    Currently, we have vendor replication were the vendor number from the back-end is used in SRM-EBP.  Now, we want add another back-end but there are vendor number conflicts.  Is there a way to configure it so that the new back-end replicaition generates new numbers in SRM-EBP? 
    Honestly, there should be a cleansing and alignment of vendor numbers between the two back-end systems. However, that is big task that the organization doea not want to take on at this time.
    Has anyone encounter this issue and how did you resolve it?
    Regards, Dean.
    Edited by: Dean Hinson on Feb 3, 2010 3:26 PM

    Hi,
    You can find option "If R/3 number assignment is not possible: Internal number assignment" in the bottom of BBPGETDV transaction screen.
    Regards,
    Masa

  • Role mapping between Portal and Back end systems

    I am new to SAP EP.
    I just want to know how the mapping between portal and back end system happens.
    Scenario : There is a role in ECC system...say FI India. Now there is a request by the FI team that they want to access this role from Portal. In this case, please tell me how the security team will do it. Because I guess, it has to be done by the security team.

    Hi,
    Usually the role from backend is uploaded to portal then it will be seen as Group and we need to assign our portal roles to this group. Please refer [this|http://help.sap.com/saphelp_nw73/helpdata/en/d6/7859ec80df46738e23ccb4f4c8c502/content.htm].
    Regards,
    Samir

  • Define Logical Port and Back-End Destinations for ESOA use of this config

    Hi,
       Please let me know what is the use of this config I am not able to get a documentation.
    Define Logical Port and Back-End Destinations for ESOA

    Hi Autobots,
    Even I am looking for the same information. Did u get some headstart into the matter?
    Pl provide me with the inputs too.
    Cheers
    Nikhil

  • How to get PO CHANGE HISTORY from back end tables?

    Hi All,
    I need to get the PO Change history from the back end reason being users want to see not only the change made but who made the changes on those PO's. The PO change history.html doesnot give the information of the user who made changes to the PO. Can any one provide me the query involved in this html page. I can add the updated_by column to that. I built a query already but it is not giving me the field altered on the PO Line.
    I learnt that we can get the information from the archive tables but my question is how to know which field has been changed from the original PO to the revised PO. I am unable to figure out if that revision is for Unit Price change or amount change or Bill to change etc. i.e., as it shows in PO change History html page I need to see which field is altered on a particular PO. Is that possible?
    Thanks for your help!
    Prathima
    Message was edited by:
    Prathima

    Hi Anil,
    Turning Audit on PO_LINES_ALL helped to track the changes. I have a problem though.
    In the sense - Below is the query I created to track changes on Unit Price of a Po Line.
    SELECT
    poh.segment1 po_num
    ,pol.line_num po_line_num
    ,pola.unit_price price_changed_from
    ,pol.unit_price price_changed_to
    ,fnd1.description created_by
    ,fnd.description last_updated_by
    ,fnd2.description previously_updated_by
    --,decode(pola.audit_transaction_type,'U','UPDATE','I','INSERT') audit_transaction_type
    ,pol.last_update_date
    FROM po.po_lines_all_a pola,po.po_lines_all pol,apps.fnd_user fnd,apps.fnd_user fnd1,po.po_headers_all poh,apps.fnd_user fnd2
    WHERE pola.po_line_id = pol.po_line_id
    AND pola.audit_transaction_type = 'U'
    and poh.po_header_id = pol.po_header_id
    AND fnd.user_name = pola.audit_user_name
    and pola.unit_price is not null
    and fnd1.user_id = pol.created_by
    and fnd2.user_id(+) = pola.LAST_UPDATED_BY
    Now the problem is
    When I update a line twice. intially I changed the unitprice value of line 4 from .72 to 0.8 and later I changed it back to 0.8 to 0.72. Intial Changed to 0.72 shuld be 0.8 but it changed to 0.72 as it is pulling from po_lines_all table. How can you capture that changed to???
    po_num Line Changed from Changed to
    26603     4     0.72000      0.72000
    26603     4     0.80000     0.72000
    Please help.
    Thanks,
    Prathima

  • Back end activities for Activation & Deactivation of Aggregates

    Hi ,
    Could any body help me to understand the back-end activites performed at the time of activation and deactivation of aggregates.
    Is filling of Agreegate is same as Roll up?
    What is the diffrence between de-activation and deletion of Aggregate?
    Thanks.
    Santanu

    Hi Bose,
    Activation:
    In order to use an aggregate in the first place, it must be defined activated and filled.When you activate it, the required tables are created in the database from theaggregate definition. Technically speaking, an aggregate is actually a separate BasicCube with its own fact table and dimension tables. Dimension tables that agree with the InfoCube are used together. Upon creation, every aggregate is given a six-digit number that starts with the figure1. The table names that make up the logical object that is the aggregate are then derived in a similar manner, as are the table names of an InfoCube. For example, if the aggregate has the technical name 100001, the fact tables are called: /BIC/E100001 and /BIC/F100001. Its dimensions, which are not the same as those in the InfoCube,have the table names /BIC/D100001P, /BIC/D100001T and so on.
    Rollup:
    New data packets / requests that are loaded into the InfoCube cannot be used at first for reporting if there are aggregates that are already filled. The new packets must first be written to the aggregates by a so-called “roll-up”. In other words, data that has been recently loaded into an InfoCube is not visible for reporting, from the InfoCube or aggregates, until an aggregate roll-up takes place. During this process you can continue to report using the data that existed prior to the recent data load. The new data is only displayed by queries that are executed after a successful roll-up.
    Go for the below link for more information.
    http://sapbibw2010.blogspot.in/2010/10/aggregates.html
    Naresh

  • How to change both start and end dates for an business event (or any object

    Hi all.
    We are in the case to change the validity dates for several business events in training management.
    The special point is that both, start and end date, have to be changed.
    In example, business event 00000001 is valid from 2010.01.01 to 2010.01.31 and shoud be "moved" from 2010.05.01 to 2010.05.31.
    So if i run RHBEGDA0 report to change start date first, it doesn't work propperly because new start date is bigger than old enddate.
    Next thing we thought is to change end date first, using RHGRENZ1, and then change the start date, with the report RHBEGDA0. Problem with this solution is that a business event duration shoud be calculated taking care of free days (weekends and day ofs).
    Is there any better solution for this?
    Thanks in advance for your help.
    Best regards.

    Hi,
    I gueass the best solution is to use PV1A t-code.
    You can write an LSMW for this t-code if the number of business events to be maintained is huge.
    Regards,
    Dilek

  • Importing Color Corrected Master Back Into System for Trailer, DVDs, etc.

    Hi there,
    Thanks to all of you who have been of great help to me as I've been working with Technicolor on the Mastering of a feature. I've never really had a feature leave my system before, or at least one that I stayed in control of, so this has all been very new and educational.
    Okay, question (or, rather, a confirmation) for final steps - they are sending me the following next week, for me to keep or for import back into Premiere for trailer cutting, still pulling, festival DVD making, etc. I just want to make sure this list is sufficient.
    Physical Deliveries
    HDCAM Master Tape
    DVD-R
    Files on a Hard Drive
    10-Bit Uncompressed Quicktime of Completed Film
    Compressed 422 ProRes Quicktime of Completed Film
    I guess my main question is - will the 422 suffice for a high quality trailer and DVDs? They also offered to make an even-more-compressed H264, but if I can inport the ProRes Quicktime, that doesn't seem necessary, does it?
    Thanks!
    Stephen Cone

    I guess my main question is - will the 422 suffice for a high quality trailer and DVDs?
    Yes.  All else being equal.

Maybe you are looking for