We are currently testing our ChaRM processes.  The biggest issue we have with the ChARM system is that transports associated with a Change Request are being imported into subsequent systems regardless of the status of the change request.
For instance...
If I have 5 transports (each having their own change request) in which all 5 have been released from development and have been imported into the quality system. It seems that from this point on, if 3 of the 5 change requests have their status changed to "testing completed", the production import should only import 3 of the 5 tranports.  We assumed that if the other two did not have a status of testing completed, they would not be allowed to be imported into production.  This causes an issue because all 5 tranports will move to quality and subsequently move to production regardless of the status of the change request.  All 5 of these tranports are also on the same maintenance cycle.
Is this the way the system is supposed to work?  If so, how do we utilize ChARM in a continuous maintenance production environment?
Your response is appreciated, Thank You for your help.

Thanks for the update.
So, I guess my next question would be if Change requests and their associated tranports can be moved from one maintenance cycle to another after they have been submitted and released from Dev.  My concern is that in our normal production release environment has tranports that pass testing requirements at different times.
For example, Lets say that we release transports into our production system, or "set to go live" for a scheduled import on Tuesday and Thursdays at 5PM. 
On Monday, I have 5 transports from 5 different Change Requests that I develop and release the DEV environment. On Tuesday, 3 of the 5 transports have been successfully tested and are cleared to go to Production, however 2 of the Change Requests did not have testing completed.
Is it possible to move the 2 transports to a subsequent maintenance cycle so that the first 3 that successfully passed testing can proceed to go live and import on Tuesday at 5PM?
My concern is that we do not always know upon development release when the Change Request and associated transport will be permitted to go to production.
Thanks much for your help.

Similar Messages

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Change Request & Task Issue

    Hi Experts,
       Please help me out for following concern.
       Changes done(In Z program) for some testing purpose, are saved in test CR.
       Now i want to save changes doin again in New CR,  for further transport.But whenever i am goin to change it ,its taking either the same test CR or creating new Task in same CR. But not askin for new CR.
      Some1 concerned that i have to release that CR ,then only i can do that,but i cant do it ,as it is test CR.
      Please suggest solution.
    Thanks in advance.
    Thanks and Regards
    Deepak

    A Change request that is not released consists of an abject list that has details of the objects (programs, etc) that are to be transported in the request.  While it is not released, it does not contain any of the details of the objects, just their object keys.  These details are in individual tasks by user id.
    When you release the change request, the system takes a copy of the current version of all the objects and writes it to two files in the transport directory of the SAP server - one control file and one data file.  These files are named based on the request number.
    <b>If you make further changes to a program before releasing the request, those changes will be included in that request when it is released.</b>
    If you have made changes to a program that have been put into a change request that is not to be transported you need to manually move the relevant object list entries to the new transport request.  You cannot simply delete them from the first request and then save changes to the program again as the object list entries may not be the same.  Releasing the change request is not a solution as this may have the same result - the entries added to the new request may be incomplete.
    For example, if you create a program it is added to a request as R3TR PROG containing program, texts, gui etc, but if you later change it and save it is added to request as LIMU REPS for program or LIMU REPT for texts or LIMU CUAD for gui.
    To move manually, copy/paste values from SU10 object list of the task to a new request/task.  Once 100% sure it is OK in new request, delete line from old task then lock object in new request (select line and use padlock icon).  For customising there may be object keys associated with the line that you also need to copy.  Take care to ensure all relevant objects are in the new transport.
    Andrew

  • ChaRM - Change Request where to raise? Is it in Satellite  system or Solman

    Hi Friends,
    For creating the change request( TCode: charm_create) is it necessary to login to solman & then raise CR ?
    Is is possible to raise Change Request in satellite systems ?
    If I have done development configuraion in BI & Now I want to move it to QA. What is the process steps for the same?
    Many Thanks
    Praveen K

    hi
    Change Request  have to raised in Solman. You might be aware all change requests will be connected to a maintenace project / Implementation project in Solman.
    In that project, your satellite system landscape have to be maintained.
    refer the below help doc for the process flow
    [http://help.sap.com/saphelp_smehp1/helpdata/en/2b/614e1cb8204f35b477eac703073589/content.htm]
    Suppose for doing a configuration change  in your BI system, you have a raise a CR in Solman and choose the appropriate maintenance cycle of BI landscape and continue process. Refer the solman rkt   documents also.
    regards
    Naveen

  • ChaRM change request/transport sequencing

    hi everyone,
    how is everyone keeping track of the sequence needed to bring change requests production?
    Also, what happens if there is interdependencies between the changes made in two change requests? For example a change in A relies on B, and a change in B relies on A. If this was the situation, you wouldn't be able to bring A or B in first. How would this be corrected?
    regards,
    Jason

    hi
    Change Request  have to raised in Solman. You might be aware all change requests will be connected to a maintenace project / Implementation project in Solman.
    In that project, your satellite system landscape have to be maintained.
    refer the below help doc for the process flow
    [http://help.sap.com/saphelp_smehp1/helpdata/en/2b/614e1cb8204f35b477eac703073589/content.htm]
    Suppose for doing a configuration change  in your BI system, you have a raise a CR in Solman and choose the appropriate maintenance cycle of BI landscape and continue process. Refer the solman rkt   documents also.
    regards
    Naveen

  • Delete request  in ODS  or  Change request status

    Hi Experts!.
    I have been trying to delete a request from ODS,  and this have been Impossible.
    Originally Data was in ODS and in Cube. I deleted the data from the cube without problems.
    To delete the request from the ODS I turned the check status to red.
    If I try to delete the request from the ODS, at first, the request is flagged with a 'Trashbin' indicator, and when click 'Refresh' again, the 'Trashbin' indicator changes back to the 'Report is available' icon.
    I have already checked:
    - Data from this requests are not in any datatarget.
    - There are not any process locking the ODS.
    - I checked T.code SM37 josb BI_DEL* after deletion and the message was there was no records for that request.
    I decided to delete the data selectively and leave the request as already is,  but I can't get the request to green again. I have no message errors but it doesnt change.
    I entered to the monitor for the request and turned the status to green again, but outside is still in red.
    Can anybody helpme?
    Even deleting the request o turning it to green again will be a solution.
    Thanks a lot!.
    Ana M.

    Hi Ana,
    I think that you're able to change the total status, but not the status in the administration requests of ODS, because the system feels that the active table and the change log table are not aligned. This is a way to prevent to update records from ODS to other data target.
    So you have to realigned active table and change log.
    Try to delete the request in the change log related to the activation of the records you've uploaded. You can delete that request in PSA administration, the name of the request is ODSR*.
    For example: your request is REQU_1000. In the tab  "reconstruction" of the requests management of ODS you also find the name of the activation request for example ODSR_2000.  You'll find that request even if you don't use PSA during the upload!
    Once you set the correct selections for PSA tree (settings --> display selections for PSA tree), search in the PSA administration the request ODSR_2000 and delete it. 
    Hope this helps
    matteo

  • ChaRM Change Request and Change Documents if withdraw

    Hi groupies,
    my problem is this:
    we did copy the standard transaction sdcr etc. to zdcr etc.
    If I release a zdcr a new transaction zdmi (normal correction) will be created. I switch into the new transaction type zdmi and  withdraw the transaction zdmi. Now I go back into the transaction zdcr. In the Standard SDCR you must release the SDCR again. But in my case the status is still "released". What is the problem? Know anyone the problem?
    nico

    Hi.
    Search for customizing section "Make settings for Change Transaction Types"
    Select ZDMI and assign the following:
    Assign Action: SET_PREDOC for user status "withdrawn" (check table TJ30 or the corresponding status profile via customizing). It's something like "E0xx"
    Specify Status Attributes: Fill in the appropriate information, especially user status ("E0xx" - same as above), transaction type (ZDCR), Statusprofile (status profile used for ZDCR, i.e. ZDCRHEAD) and user status which ZDCR should be reset to (i.e. "E0001 to be approved" or "E0003 rejected")
    If you just want to be able to create another ZDMI you could also add an action condition to your ZDCR.
    (Tx: SPPFCADM -> CRMD_ORDER -> Condition Configuration)
    Hope this helps.
    /cheers

  • Authorized Status problem in change Request

    Hi All,
    when a correction is completed/withdrawn, generally the change request status changes to Implemented/new and we used to confirm the realization.
    The Problem is due to some missing configuration(in status attribuites), this was not done before and tickets were created and authorized.
    now after the necassary configuration being done, For the open corrections it is changing to implemented. but for already completed corrections the status is still Authorized only.
    It is always getting displayed in the report as not completed ones.
    Kindly guide on how can we close this change requestswith status authorized and whose corrections are completed already.
    Regards,
    Subhashini.

    Hi Subhashini.
    I am running in to the same problem....
    The Problem is due to some missing configuration(in status attribuites), this was not done before and tickets were created and authorized.
    Could you please tell me what changes you did to resolve the issue ?
    Please see the active thread:
    [Re: Controlling ACTION in ChaRM|Re: Controlling ACTION in ChaRM]
    Regards.
    Rajesh Narkhede

  • Configuring BW to Report Change Requests and Change Documents

    We upgraded to Solution Manager 4.0 on DB2 and need to extract the Change Request and Change Document tables to BW for reporting. We know that there is an internal Transaction Monitor, but we need to also report using BEx Analyzer for users who will not log into Solution Manager.
    We found one table CRMD_ORDERADM_H for some Change Request fields, but cannot find the tables for the rest. Does someone know the tables where these fields reside?  Thank you.
    <u><b>CHANGE REQUEST</b></u>
    <b><u>Screen Name     Table</u></b>
    Priority     
    Category     
    Description     CRMD_ORDERADM_H
    Sold-to Party     
    Requester                      COMT_PARTNER_TO_DISPLAY
    Change Manager     
    Change Advisory Board     
    Ibase     
    Product     
    Subject     
    External Reference     CRMD_SALES
    Date     
    Change Request ID     CRMD_ORDERADM_H
    Decision Date     
    Implementation Date     
    Time of Entry     
    Change Request Log     
    Description of Change     
    Change Request Status     
    <u><b>CHANGE DOCUMENT</b></u>
    <u><b>Screen Name     Table</b></u>
    Change Document ID     
    Status     
    Description     
    IT Operator     
    Implementation Date     
    Time of Entry     
    Overview

    We upgraded to Solution Manager 4.0 on DB2 and need to extract the Change Request and Change Document tables to BW for reporting. We know that there is an internal Transaction Monitor, but we need to also report using BEx Analyzer for users who will not log into Solution Manager.
    We found one table CRMD_ORDERADM_H for some Change Request fields, but cannot find the tables for the rest. Does someone know the tables where these fields reside?  Thank you.
    <u><b>CHANGE REQUEST</b></u>
    <b><u>Screen Name     Table</u></b>
    Priority     
    Category     
    Description     CRMD_ORDERADM_H
    Sold-to Party     
    Requester                      COMT_PARTNER_TO_DISPLAY
    Change Manager     
    Change Advisory Board     
    Ibase     
    Product     
    Subject     
    External Reference     CRMD_SALES
    Date     
    Change Request ID     CRMD_ORDERADM_H
    Decision Date     
    Implementation Date     
    Time of Entry     
    Change Request Log     
    Description of Change     
    Change Request Status     
    <u><b>CHANGE DOCUMENT</b></u>
    <u><b>Screen Name     Table</b></u>
    Change Document ID     
    Status     
    Description     
    IT Operator     
    Implementation Date     
    Time of Entry     
    Overview

  • Email notification in Charm with several status changes

    Hello,
    according to OSS 1275036 I tried to implement email notification in my Charm-process using BADI  AGS_SDK_SCHED_ST_CHD in my schedule condition. If a new partner is responible in Charm-process, this partner should be notified by email. The email should be send if user status is changing.
    It still works for my change request (notification of change manager) and the first step of my change document (notification of developer). But for all following steps (e.g. notification of tester) no action for email-notification is found in my change document.
    In my actions I only use schedule conditions (according to OSS) and no start condition. To use the BADI for several user status, I maintained my user status in field value instead of inital value.
    Does anybody know, how to use this BADI for several status changes in my change document?
    Thanks,
    Laura

    Hello together,
    I solved my problem by using CRM Standardcustomizing. Forgot SAP note 1275036 and 865619. They are all bad and not sufficient for a complex Charm scenario.
    I only used note 1275036 for the first mail in my change document (email to developer). For all following mail notifcations I'm using actions based on workflow conditions instead of BADI.
    Just using normal CRM-Customizing and create one schedule and start condition for every used action.
    E.g. send mail to tester:
    schedule condition:
      &Servicevorgang CRM.Anwenderstatus&  [*] E0002+DHFHEAD 
      and    &Servicevorgang CRM.ErrorFreeFlag&  = X 
    start condition:
    &Servicevorgang CRM.Anwenderstatus&  [*] E0004+DHFHEAD 
      and    &Servicevorgang CRM.ErrorFreeFlag&  = X 
    This works perfect, because you won't get several mails for one status if you save your document more than one time, which is a problem with note 865619.
    Regards,
    Laura Mathes

  • Milestone Error when changing the status of service request.

    Hi Expert.
    I got an issue where service request is displayed with an error "Item 10: Start and end dates must be identical for a milestone date".
    I took around 200 service requests and observed that in the change history, the response profile of the contract was changed. We also observed that whenever service request contain these errors, automatic change of status is not happening.
    Unfortunately I'm not able to reproduce this error in Quality system.
    Kindly advice on how these errors can be resolved and how these can be reproduced.
    Thanks in advance.

    You can ave a runitme event or workflow triggered that can generate such behavior.
    First increase logging on your object manager (evtloglvl :) ) and look at any error message.
    Second assess with your development team what automation has been setup ranging from script, Business Services, workflow to assist you in troubleshooting.
    Best Regards
    Evtloglvl

  • You cannot cancel a change request with status New.

    We're just starting to dive into SCSM. We created a test Change Request and now want to delete / cancel it. When we try, we get a message
    "You cannot cancel a change request with status New."
    Is there an easy way to remove this?
    Orange County District Attorney

    Hi, a Little late but..
    This is a problema from your 3 scsm services, maybe in your principal or secundary server.  You must to restart services in an special order and delete application cache.
    Please review
    http://www.systemcentercentral.com/scsm-2012-tip-all-workflows-stuck-in-new-status-and-never-completing-issue-and-workaround/
    it Works!
    If you have principal and secondary do it in both servers.
    I think this problem is for bad performance in databases and application, so review your hardware design, and logical, so review workflow performance too.
    For items when state new, you must change it to inprogress with smlets

  • Change Management Request will not change from Status New

    When I create a new Change Request the Status is listed as New.  The Status never changes from "New" to "Pending" or "In Progress."  In addition, my Review Activity Status is blank and I cannot approve the Change Request.
    Any ideas?

    Hi,
    You can also try this :
    http://www.systemcentercentral.com/scsm-2012-tip-all-workflows-stuck-in-new-status-and-never-completing-issue-and-workaround/
    1. Stop the 3 System Center Management services on the Service Manager Management Server responsible for your workflows:
    System Center Management
    System Center Data Access Service
    System Center Management Configuration
    Note: Technically, I likely could have gotten away with just stopping the System Center Management service, but I wanted to give this server a fresh start.
    2. Delete the contents of the C:\Program Files\Microsoft System Center 2012\Service Manager\Health Service State folder.
    Make sure the Health Service Store folder and the .edb files in it are deleted.
    3. Restart the 3 services listed above.
    4. Verify the contents of the C:\Program Files\Microsoft System Center 2012\Service Manager\Health Service State  folder are recreated.
    5. The SRs in the “New” state should start processing and progress into the ”In Progress” state.
    Remy BOVI

  • Digital Signatures for Changing the statuses in Issue Mgmt

    Hi
    Has anyone put in place digital signatures for Issue
    Managemnt when we change the status values in an issue.
    We are looking at SAP Note 835584 - Digital signature for documents,
    but that is not applicable for us as we want to initiate the digital
    signature when the status profile "SLFI0001" kicks in and the status is
    changed from one to the other.(eg in process to completed etc)
    We have created the digital signature and the strategies, but are
    looking for a place to attach this with the status profile "SLFI0001".
    Is there a place we can attach the digital signature strategies to this
    status profile?
    Anyone has any ideas on how it can be done?
    Thanks in advance..
    sap ques..

    We have a document that needs to be signed by more than one individual -- and in our process we are using the Topacz signature pad to get the signature.  It's similar to the one you sign at the grocery store, drug store, etc.  In order to NOT have the first signature invalidated, we were told to edit the registry...and it works perfectly!
    [HKEY_CURRENT_USER\Software\Adobe\Adobe Acrobat\8.0\AVAlert\cCheckbox]
    "iDigSigSaveAsCertified"=dword:00000001
    [HKEY_CURRENT_USER\Software\Adobe\Adobe Acrobat\8.0\AVAlert\cCheckbox\cAnnots]
    "iReaderEnableSaveWarn"=dword:00000001
    Obviously if you are using a different version of Acrobat, you'll have to change the key accordingly.
    Hopefully this will work with your process.
    Good luck!!

  • Hiding Status column in MSS Status Overview for Personnel Change Requests

    Hi,
    We have MSS implemented in SAP Portal.
    We are using Status Overview for Personnel Change Requests iview for which we have multiple columns displayed with data.
    We need to hide Status column in Status Overview for Personnel Change Requests iview for all the users.
    Can any body please let me know how it can be done.
    Regards,
    Pradeep B
    Edited by: pradeep balam on May 17, 2011 4:01 PM

    Hi Pradeep,
    Preview the portal page which you want to edit, in this case status overview in PCR. In the preview press the CTRL-key and right-click on the column that you want to edit. Here, you will be able to perform your customizations like hiding columns, labels etc
    Hope it helps,
    Prathamesh

Maybe you are looking for

  • Power Mac G4 MDD won't wake from sleep mode

    I have a Power Mac G4 MDD 1.25GHz with a 15" Apple display and running 10.4. I can not wake the computer up from the sleep mode. It will not respond to the mouse moving, a mouse click, a keyboard key, the power button on the display or the power butt

  • SQL 2012 SqlAgent wont start

    Hi, I'm testing a new install of SQL server2012, and the SQLAgent will no longer start. Build = Microsoft SQL Server 2012 (SP1) - 11.0.3000.0 (X64)  Enterprise Edition: Core-based Licensing (64-bit) on Windows NT 6.2 <X64> (Build 9200: ) (Hypervisor)

  • Missing movement type data in 0IC_C03 cube

    Hi Gurus , i  have deltas running for 0ic_c03 cube in B1 7.0 i have used transformations for loading cube . In a report of this cube for plant material stock,  i can c the quantities matching with MB51  report of R/3 where as the values are not match

  • BI Content Transformation Rule for Data Source 2LIS_03_BX

    Hi All, I am using BI content info cube 0RT_C54 for queries. I am uanble to find BI content transformation rules for the Data Source 2LIS_03_BX. In "Network Display of the data flow" I am able to see the transformation rules for this data source. How

  • TROUBLE  with get server cookie method