Charm configuration in solman 4.0 SP14

Hello Gurus,
I have to do Charm (Change Request Management) configuration in my landscape of
SED-- SEQ,STQ-- STP.
Solman - STM
Can anyone of you please provide me step by step detail for this.
Thanks in advance
Jain Pankaj

I am doing Charm configuration
i am using Dolores Correa's Blog
/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
Landscape i am using for  Charm config.
SED:030 -
> SEQ/275 -
STP/275  ,Domain Controller is STP ( DOMAIN_SED)
Solman --- STM:100 ,  Solman is in the same domain,Domain Controller is STP ( DOMAIN_SED)
My doubts :
Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System-> Generate RFC connection to 000
Question 1- This RFC has to be genrated from solman STM:100 to Domain Controler (STP/000) ?
or STM:100 to all systems ( SED:000 , SEQ:000 ) in my landscape ?
Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System-> Add Import Authorization to Operator/Administrator
i. Make sure that the operator and administrator users in client 000 of the target systems have the same name as their user in the Solution Manager  system.
ii. Assign import authorization to the operator and administrator users in client 000 of the target systems (SAP_CHANGEMAN_OPERATOR and SAP_CHANGEMAN_ADMIN roles).
Question 2. what is operator or administrator user
is that my user ex. PJAIN ( the one who is configuring Charm ) or any other user ?
Spro- Solution manager- Configuration u2013 Senario Specific Settings Change Management-Transport Management System->Set Project Assignment of Requests as Mandatory
TMWFLOW/CMSCONF --->Check the entries in the Proj. Assignment column
System of Proj          Project Assigmnet
SED :030                   optional
if  i change this to "mandatory"
Question 3 will this avoid users creating transport orders directly in dev system ( SED:030) ??
as users are workin in dev system , and if i change this to madatory user wont b able to create change request in dev system ( SED:030 ) till the time configuration of  Charm gets over by me ,
and if i stuck in some error during charm configuration , no user wil be able to create change request in SED:030 ??
Please advice

Similar Messages

  • Issue in ChaRM Configuration

    Hello Guru's,
    I'm configuring the ChaRM in our solution manager system, we have 3 system landscape DEV>QAS>PRD, we made all the settings related to Charm. While checking the ChaRM configuration its throwing an error message.
    No consolidation system found for HMD-040 (project HMMAINT)
    No track for project HMMAINT with log. system HMD/040
    Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for HMP-040
    Also we checked the RFC connection, everything working fine. Could anyone suggest me why its throwing an error.
    regards,
    Guna

    Hi Guna,
    Base on the error shown in ur reply it is Basis landscape setup problem
    They need to create a client dependent stms in satellite and update the solman as a master domain controller
    unless that is done properly you get error like consolidation or export system etc.
    ask your basis team to check the same.
    Regards
    Prakhar

  • Change Management Configuration for SolMan 4.0 SP13

    Hi SolMan Experts,
    Recently, we have build SolMan4.0. As of now, we have configured this for System monitoring and EWA reports.
    Now, we are planning to configure for Change Management.
    Could you please provide me the useful documents for CHANGE MANAGEMENT configuration on SolMan4.0.
    Thanks in advance!
    Regards,
    Hari.

    Hello
    Follow the same steps which mentioned for SP12, as per my understanding there is not much difference in basic configuration of solution manager 4.0.
    Create systems in SMSY, RFC connections, create logical system, create project, activate charm, these are the basic steps.
    You will get information on this on saphelp and also go through the solman rkt (service.sap.com/rkt),
    sap market place  sap support infrastructure  solution manager  media library (u will find all documents)
    Even they gave given the charm configuration guide for SP12, u will find that in technical papers.
    Hope this will help
    Regards,
    Sharmishtha

  • Syntax error in program CL_AC_METRIC_REPOSITORY=======CP When going to managed system configuration in solman 7.1

    Dear SAP Gurus,
    Good Morning.
    I'm getting error in managed system configuration in solman 7.1. Error is like
    The system preparation and Basic configuration in working fine, but when we are going to click the managed system configuration Error getting like this.
    Solution Manager  Version : 7.1
    SP Level  : SP5
    Thanks in Advance.
    Regrads,
    Kumar BN

    Hello Kumar,
    I would suggest moving this discussion to this space in SCN: http://scn.sap.com/community/it-management/alm/solution-manager
    That will help get you a quicker response.
    Thank you,
    Kristen

  • EWA Configuration In SolMan 7.1

    Dear Gurus,
    Greetings...
    We implemented Solution Manager 7.1 in our landscape and we need to configure EWA for our production Systems.
    Can any one guide me how to configure Early Watch Alerts.
    Thanks in advance.
    Regards,
    D M Reddy

    dmreddy wrote:
    > Can any one guide me how to configure Early Watch Alerts.
    ...In the same way you 'installed' the Solution Manager 7.1 i.e. by Referring the SAP guides available at OSS.
    You must had downloaded the 'Installation Guide' from OSS to 'install' the solman, similarly you will have to download the 'Configuration Guide' from OSS to 'Configure' the Solman.
    service.sap.com/instguides --> SAP Components --> SAP Solution manager -> Solman Release 7.1 --> 'Configuration' and 'Operations' sections !
    https://websmp104.sap-ag.de/~sapidb/011000358700000492832011E.PDF
    Thanks

  • Configuration in SOLMAN 7.1

    Hi,
    I created one "z" Customized Transaction Type Copy of SMHF , it wont Pick the Customized Transaction type in "Urgent Creation "
    how to make it as default ( Customized Transaction Type ).

    dmreddy wrote:
    > Can any one guide me how to configure Early Watch Alerts.
    ...In the same way you 'installed' the Solution Manager 7.1 i.e. by Referring the SAP guides available at OSS.
    You must had downloaded the 'Installation Guide' from OSS to 'install' the solman, similarly you will have to download the 'Configuration Guide' from OSS to 'Configure' the Solman.
    service.sap.com/instguides --> SAP Components --> SAP Solution manager -> Solman Release 7.1 --> 'Configuration' and 'Operations' sections !
    https://websmp104.sap-ag.de/~sapidb/011000358700000492832011E.PDF
    Thanks

  • CCMS monitoring configuration in SOLMAN

    Hi All,
    I am doing CCMS configuration in SOLMAN can anyone please resolve my below doubt
    1: Is there any extra memory sapce requirement ?
    i dont think it would be require ?
    2: We want to execute a script or unix command when alert is triggered thru CCMS. How to do that?
    BR
    Vyash

    Hi,
    Are you trying to setup monitoring for your Solution Manager system on it's own, or setting up monitoring on Solution Manager which will act as the CCMS CEN?
    This link from SAP Help has the step by step instructions on how to assign the OS command to an autoreaction method and then assigning that on to an MTE class and MTE.
    [http://help.sap.com/saphelp_nw70/helpdata/EN/27/cbdf3b8dc95136e10000000a114084/frameset.htm]
    If you're setting up the CEN, it's slightly different. Create a new auto-reaction method.
    1.     Transaction: rz21
    2.     Goto: technical infrastructure - configure central system - assign central autoreactions
    3.     In 'defined central autoreactions' window: Select u2018newu2019
    4.     In the copy box, search for "CCMS_AUTO_REACT_OP_COMMAND"
    5.     Create a copy of this method. Complete the information:
    6.     Name: Z_UNIX_SCRIPT
    7.     In the parameter tab, enter the logical name for the command u2018Z_UNIX_SCRIPT_TO_DO_XYZ'.
    8.     Setup the Executable tab as below. This will be the detault.
    9.     Setup the control tab as below. This will ensure the alert is processed automatically.
    Execute method : Periodically in dialog process
    Startup Method: Execute method immediately - on all application servers
    Save
    You then need to assign the autoreaction
    From the Manage Central Autoreactions screen. Select the system to monitor, the MTE class to monitor and the central autoreaction method, then press u2018Assign Central Autoreactionu2019 button. This will make the necessary CCMS updates to start monitoring.
    Gareth
    Gareth

  • Breaking of charms configuration

    Dear Experts ,
    please help me on below
    i want to disconnect my charms configuration due to some internal reasons , but i dont know how to disconnect
    please let me how can i disconnect charms configuration
    Regards

    Hi,
    Please delete the existing TMS configuration. Later re-configure TMS between your required Landscape excluding domain link from Solution Manager. This should achieve your purpose.
    Hope this helps.
    Regards,
    Deepak Kori

  • CHARM configuration on solution manager 4.0

    Is client specific transport routes (extended transport) must for CHARM configuration?
    Can somebody provide step by step documentation for CHARM config on solution manger 4.0

    Hello Deepen,
    Please use the following links to know more about Change Request Management.
    http://help.sap.com/saphelp_sm40/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/frameset.htm
    also the following links,
    http://service.sap.com/solutionmanager -> Downloads -> Documentation -> "3.2 SP08 PDF Documentation Change Request Managmt. English"
    check the ppt,
    http://service.sap.com/solutionmanager
    Goto Media Library --> Use Case Presentations --> SAP Solution Manager - Change Request Management
    Service.sap links provide a useful guide and sim file to show various step useful for implementing the same.
    https://websmp201.sap-ag.de/~sapidb/011000358700004508362006E
    https://websmp201.sap-ag.de/~sapidb/011000358700006932702005E.sim
    https://websmp201.sap-ag.de/~sapidb/011000358700006932712005E.sim
    Hope the above links are helpful.
    Regards,
    Satish.

  • Error in CHARM configuration to move JAVA objects 'The project is not relea

    Hi,
    I have BI 7.0 (ABAP + JAVA) landscape (i.e. CBD, CBQ and CBP) on SPS12 and SolMan 7.0 (SMD) on SPS14.  My goal is to move both ABAP and JAVA transports through CHARM. I performed following tasks:
    1.  Configured TMS by selecting CBD as Transport Domain controller to move Java transports
    2.  Configured CHARM for BI landscape to move ABAP transports in SMD and it is working fine
    3.  Configured CTS+ to move JAVA transports on SMD instead of CBD because CTS_BROWSER service is not available on CBD due to SPS12. While configuring CTS+ in SMD, I used SIDs for BI Java landscape as reverse SID (i.e. DBC, QBC and PBC) and used mapping parameter to map to original SID.  I used reverse SID because already in SMD (CBD, CBQ and CBP) has been defined for CHARM purpose. Now, I am able to move successfully JAVA transports of BI landscape from SMD.
    4.  I am having issue in configuring CHARM on SMD for JAVA transports.  I am following http://service.sap.com/solutionmanager --> Media Library --> TechnicalPapers --> How to Set Up and Use eCTS/ChaRM Solution Manager 4.0 SP12 document.  Following are the steps, I performed to move JAVA transport through CHARM:
         a.  Defined JAVA systems (i.e. DBC, QBC and PBC) in SMSY as Enterprise portal systems
         b.  Defined ABAP system (i.e. Where Transport request is created, in my case it is SMD) in SMSY
         c.  Defined logical component for both ABAP and JAVA systems
         d.  Defined solution manager project by adding two logical components created at step C (i.e. ABAP and JAVA)
         e.  I am getting error when I am trying to activate CHARM and create task list.  The error is as follows:
    /TMWFLOW/TRACKN 101: 'Warning: Problems occurred during synchronization of the system landscape'.
    If you choose 'Check', the system displays the following message in the results list of the check:
    /TMWFLOW/TRACK_N 806: 'No consolidation system found for SMD-200 (project zjava3)'
    If you try to create a task list by choosing the relevant pushbutton, the system issues message
    /TMWFLOW/CONFIG_UI 017: 'The project is not released. Hence cycle can not be created'.
    I found a relevant sap note for this 1054264 but it is not useful me, as it suggest to upgrade SolMan to SPS12 but whereas I am on SPS 14.
    Any suggestion are welcome.  Thanks in advance.
    Regards
    Shiv

    Hello
    You should first fix the errors you get such as the missing consolidation system
    Please see thread [Re: No consolidation system found for SID in solman; or check the forum on the error message "'No consolidation system found for" and you will find relevant information.
    I would advise to update your SAP Solution Manager though to one of the latest available levels, there are a lot of fixes and enhancements to Charm (and also availability of quality gate management which gives some of the functionality of Charm but is more compact).
    Kind regards
    Tom

  • Solution Manager 7.1 upgrade or configuration in Solman 7.0 EHP1

    Hi,
    We have a Solution Manager 7.0 EhP1 and there is a project now to configure several functionalities on it such as Charm and Services desk among others.  We have the option of configuring all the functionalities in SOlman 7.0 EHP1 or upgrading to 7.1 and then configure the functionalities in the new version.
    I would like to know if anybody has implemented an upgrade of Solman 7.0 EHP1 to Solman 7.1 with some functionalities implemented.
    I would like as well if in the fact the the Solman 7.0 EHP1 has several functionalities implemented complicates the upgrade to Solman 7.1. The fact that the upgrade is more complicated due to all the functionalities configured, would be important factor  to upgrade to 7.1 instead configure it in 7.0 EHP1.
    Any information about this would be appreciated.
    Many thanks in advance!
    Raquel

    Newer functionality and more holistically speaking, an ALM Tool, arguably one of the best in the market should be more than enough to take you to 7.1
    if all you have is EWA, there is no major risk associated, the new 7.1 has new transaction types for ChaRM and Service Desk, the functionalities of which are better rounded and can support more enterprise wide processes.
    Graphical Business Blueprint tool, my favorite feature in 7.1 and enhanced features in Project Implementation tools will only help you manage your implementations/support projects better.
    If all you have is EWA, I have half a mind to ask you to do a fresh install, and not bother with the upgrade. Saves you time and lot of effort as well.

  • ChaRM functionality in SOLMAN

    Hello ChaRM-experts!
    I have the following questions regarding ChaRM-Setup:
    1) Do I always need to define a Maintenance Project or can I use tcode u201CSCMAu201D to use transport management/ChaRM for satellite systems in SOLMAN
    2) Is it possible to use transport management between several logical components?
    3) Which transport routes from satellite systems will be supported within ChaRM of SOLMAN? We have a lot of own transport routes.
    4) Are there some escalation mechanisms, e.g. when the urgent correction will be not executed within 1 week?
    Thank you very much!
    Thom

    Haven't tested this scenario but you are able to assign more than one logical component to a SMI project.
    All the systems will be listed in your task list.
    But the point is: even if one system - lets say a QA or project system - is not included in the SMI project via a logical component and thus not available in the task list released transport request from a DEV system will be delivered to that system nevertheless (in case the package/transport layer contained in the request is configured in your CTS to deliver the QA/project system).
    So you may use several logical components, release your transport via action in task list. All via CTS connected systems will be delivered in background. You may import your transport requests in follow-up systems via action in the task list or via aut. import job. For the production you may want to have the system listed in the task list (and therefore part of a logical component assigned to your project) because you usually do not use aut. import jobs for that kind of system and need use the action to import transports.
    Hope this helps.
    /cheers

  • Charm Configuration for Multiple Landscape

    Dear Guru's,
    We're having 5 landscapes (ECC, BI, etc) and one solution manager system, is it possible to configure ChaRm for the multiple landscape and control those 5 landscape in single solution manager system.
    Expecting your positive reply.
    regards,
    Guna

    Hi,
    You may create 5 Locical components and Assign them in the Maintenance Projects.
    and mainetenance cycle project each of them.
    There should be domain links from solman to each domain controllers in your landscape.
    Follow configuration as in SPRO
    Hope this helps.
    Feel free to revert back.
    -=-Ragu

  • My SLD is configured in SOLMAN sys, How can I connect it with SAP PI system

    Dear Friends
           My Basis has configured SLD in Solman, Now I cant use SXMB_IFR tcode in my PI that suggest me some error. saying "error in connection cant read secure connection config" or something like that.  Plus SLDCHECK tcode is also not happy. it suggest that RFC connections are missing.
         It is clear that My SLD is not linked with PI system. something is missing in technical system part and its not even bridged. but since I am not a BASIS guy I dont know How can I configure it. Not even my BASIS guy understands that I need to bring SOLMAN SLD to PI.
    Can anyone suggests me How can I bring my SOLMAN SLD to PI system so I can run SXMB_IFR tcode ? I need to create some rfc connection like LCRSAPRFC and SAPSLDAPI but dont know the connection type like t, or something else. Please englight me by suggesting How can I bring my SOLMAN SLD to PI.
    One intresting observation is when I try to run my SLD over url using PI system as host it comes but says SLD is not configured properly and when I did the same practice with SOLMAN host it works fine and I didnt receive any error.
    Please reply me. your any help will be appreciated greatly.
    Regards
    Naeem

    Hi,
    Preferebly PI should have it's own SLD. And SOLMAN could use PI's SLD.
    Please check Installation guide and SLD Administration Guide from Service Market place before finalizing SLD architecture in your System landscape.
    I guess SOLMAN will have only one Instance in system landscape. (Not three system landscape like Dev, Qa, Prod).
    If you want to go ahead with your current SLD plan, then Change your SLD hostname in Exchange Profile of PI, to SOLMAN Host name.
    Regards
    Praveen K
    Edited by: Praveen Kurni on Jul 7, 2011 6:12 PM

  • Solution Manager Charm configuration

    Hi @all,
    I´am using SAP Solution Manager 7.0 SP 15. Configurated all Charm Steps successfully.
    The SAP Solutoin Manager - Scenario- Specific Settings - Change Management - Extended Configuration -Checks - Execute Check Report is green
    I can´t open any hance cycle in solar_project_admin - System Landscape - Change Requests , Create Task List, I get the result "project is not released. hance cycle can not be created".
    If i click "check", there are three errors:
    Message from function module /TMWFLOW/CALC_SINGLE_TRACK: No source system
    (Message no. /TMWFLOW/TRACK_N103)
    No track for project DF_WART_01 with log. system A36/200
    (Message no. /TMWFLOW/CM_CHECK038)
    CTS projects in production systems for project DF_WART_01
    (Message no. /TMWFLOW/TASKLIST190)
    System change options are empty.
    In my authorized Change Requests - related documents (next document). i get "there are no actions in the Worklist"
    i´ve no idea where my fault is. I hope you can help me.
    Please suggest.
    Best Regards
    Daniel

    Now I have created a new maintenance project, I´ve configured everything, when I check it, I get two errors:
    No consolidation system found for A36-200 (project DF_SOLMAN1)
    Message no. /TMWFLOW/TRACK_N806
    No track for project DF_SOLMAN1 with log. system A36/200
    Message no. /TMWFLOW/CM_CHECK038
    I noticed that this thread is pretty old already but I bumped into similar error messages and in the end it was caused by a TMS route configuration that didn't match the configuration of the logical component that was in use.
    You can pretty easily verify this through SMSY. Navigate to your logical component there, select the line of the system assignment and click on Shipment Routes button. If you get an empty screen back, then your TMS transport route configuration doesn't match your logical component configuration.
    For example, you've got DEV 100 - DEV 200 - PRD 100 for a CHARM demo landscape. If your TMS transport route configuration matches this but your logical component has DEV 100 assigned as Quality Assurance, then your configuration check for CHARM will fail because there is a mismatch.
    When your configuration is correct, so both your TMS transport route as your Logical Component (system role assignment), then you should get a transport route configuration back (visible) after clicking Shipment Routes.