CN01 assign Material Component to internal activity

Hello gurus;
In transaction CN01 / CN02 can I assign only one Material Component to internal activity without Bill of Material (BOM)?
It is possible? How can i do?
Best regards,
Mariano

Virendra;
Thanks for your response.
I saw the SAP Help portal in [http://help.sap.com/saphelp_46c/helpdata/es/4c/227a7746e611d189470000e829fbbd/frameset.htm]
and I must use a Bill of Material to assign material component. There is no other choice
This is the point where I disagree with SAP, cause the client says that they use Operational Networks, cause it's more simple to assign components to activities.
Best regards.
Mariano

Similar Messages

  • How to create a Purchase Requisition for a material component in WBS or NW?

    Hello All,
    I have created a project with the following structure:
    Project Defination (Construction of Sub station)
          Main WBS
                   Level 1 WBS
                             Level 2 WBS
                                       Network for level 2 WBS
                                                      Activity  (Procuring Material)
                                                                 Material Component - MATXXX (Stock Item)
    Now in the above structure i have a activity where in i am procuring all the materails required to construct a Substation.
    So under this activity i have assigned all the materials which are needed to build Substaion.
    After i change the status of the project to release, there  a reservation created for the quantity of the material which i have mentioned in the material component under the activity.
    Now my querey is, how should i create a Purchase requisition for the reserved materail quantity in order to bring in the stock against the WBS / network / Project ?
    Awaiting your reply.
    Thanks and Regards,
    Sudarshan.

    Hi Sudarshan,
    In your case you can run Me5J to check the list of PR created against your project.
    Then Create PO and similarly you can check list of PO in Me2J.
    Then followed by GR and check if any GR release exist in MIGO. Then once after doing GR you can check the Material in Stock which will move material from Unrestricted stock to Project Stock which you can check it in MMBE.
    Then you can do the Good Issue in MIGO itself and run MIRO to complete the cycle.
    Regards'
    syed

  • Material planning currency in assignment tab of Internal activity

    Hello Friends,
    In the network configuration profile using OPUU, I have included material cost element in the activity parameter tab of internally y processed activity having control key PS01.
    The inclusion of cost element as above will allow user to plan material value in the assignment tab of the internally processed tab.  However, the currency displayed for planning is USD and that too is grayed i.e. non editable. Necessary screen shot is appended.
    Can we change this default currency to object currency? Our is a global system in which is controlling area currency is USD but object currency is country specific i.e. for India INR, for SG the same is SGD, for Thailand it is THB etc.
    Thanks and best regards

    Hello
    Thanks for your feedback.
    Can you provide authentic SAP documents to estabilish your argument ?
    That will be very helpful to me.
    Thanks once again and best regards
    Bharat Parikh

  • Assignment of Material Component

    Hi,
    To which activity should we attached material component ( Stock and Nonstock)?
    Please explain both for Internal Activty as well as external activity.
    Muzamil

    Hi,
    To answer your question To which activity should we attached material component ":
    Lets take an example:
    Component "A" is being procured and dispatched to the customer. But before dispatching assume that there is a Factory acceptance test (FAT) for this material, so in your project there would be three activities with FS relation ship:
    Procurement> FAT> Dispatch or the Shipment
    Now you know very well that this material is needed for sure at the end of the procurement activity or at the start of the FAT activity.
    1. Either assign this material to Procurement activity with Allign finish date on the general data tab of the Material "A"
    or assign it to FAT activity with Allign start date on the general data tab of the Material "A"
    2. So when you schedule the proecet the requirement date on the general data tab of the Material "A" is picked up from that particular activity.
    Now to explain your question :When to chose the Stock and non stock:
    1. If you wish to dispatch the material directly from the vendor to customer, assigne this material component--delete the procurement indicator and enter "N" as item categoty (Based on the configuration in OPS8) you wll have two options so choose third party order.
    2. If you wish to dispatch the material after it is received in your own plant then chose "L" as item category and save it..
    Hope it is clear now.
    Reward point if found useful..Revert back if any more doubts.
    Thanks.

  • Internal activity material cost not displayed in report s_alr_87013558

    Hi all,
    I have an material attached to the internal activity.
    this internal activity is inturn attached to a network
    which inturn attached to a WBS.
    After the PR and PO creation of the material attached
    the cost report s_alr_87013558 shows values in the
    WBS element not in the network activity to the material
    was attached
    How to catch the cost value to network activity instead of WBS elment
    Can anybody have a clue why it is happening
    Thanks and Regards
    pv

    hi sreenivas,
    thank you for the suggestion
    in budget report the actual and commitment value is pulled
    to respective network activity or wbs element depending upon the account assignment category during the automatic PR
    creation from CJ20n
    In my scenario during automatic PR creation it is Q(project make to order) instead of N(network).
    Can you throw some light to this where in
    i can generate auto PR with account assgnment category N
    for a material attached to network through internal activity
    Note:
    to catch the cost we also need to activate the cost rel indicator in purchasing doc tab for material in cj20n
    regards
    pv

  • G/L is not automatically assigned to material component

    Hi All,
    We use transaction CJ20N in creating a meterial component, non stock item category(N), G/L is not automatically populated. Could you please tell me how does the system in SAP automatically assign G/L account in the material component. I have checked the valuation class for the material group and a G/L is assigned there but it is not assigning in the material component.
    Thanks in advance

    hi,
    yes i have checked the network profile and the g/l account is mandatory, therefore prompting the system for the g/l account to be assigned first
    also, the g/l account is assigned to the valuation class
    Edited by: UserID on Aug 8, 2011 8:09 AM

  • PS Workforce planning, Person Assignment in internal activity.

    Hello PS colleagues!
    I’m trying to use the workforce planning functions but I can not get the screen for person assignment in the internal activity.
    I have done this, IMG I go to this path:
    Project System -> Structures -> Operative Structures -> Network -> User Interface Settings -> Layout of Activity Detail Screens -> Define layout activity detail screens
    Then I create all tab, I copy the standard to my network profile and there is tab 8, in standard is call ”Admin.” then when I try it out it do not appear in the project, I use project builder.
    Does any one what more I need to do for this to work??
    Please help me out with this.
    Best Regards
    Jose Marin

    Check the consulting note 543362
    This note explains the steps/configuration node that needs to be in place for workforce planning
    Regards
    Sreenivas

  • Plant grey out when assign material to activity

    Dear All
    How can system make it gray in plant when i will assign material to activity at created stage of WBS. Is there any config to make it gray in the plant &material under activity ??? I want plant to be editable even after assign material to activty.
    Regards

    Hi Hari Krishna
    Thanx for your reply but in my project when i assign material to activity w.r.t procurment indicator (PF) as a MRP- relevant reservation  my plant was editable but when i assign material w.r.t  procurment indicator (ZPF) in advance procurment via a network my plant was not editable @ that time my PR no. also not generated. If plant was not editable after generated PR it was okay but user require that before generated PR it was editable like in MRP- relevant reservation.
    Regards

  • Activity 0010 has been assigned material components - Deletion not allowed

    HI friends,
    Even after deleting the material from the activity, the system is giving the following error message
    Activity 0010 has been assigned material components - Deletion not allowed 
    The status of the activity is REL.
    One purchase order already created for this WBS element.
    The material found deleted from the activity but why it is giving the same  message.
    Activity 0010 has been assigned material components - Deletion not allowed
    Edited by: M.Alagesan on Sep 13, 2010 1:15 PM

    Is that material already consumed?
    Generally when you try to delete the operation, it also deletes the dependencies of the activity, i.e., it deletes the components associated to that activity, if it is not issued to the order.
    Check the details in your system.
    Praveen

  • Bapi assign PO to material component

    Hello
    I am migrating some material components to a new project structure.
    I have created the new material components and the new PO (based on the old ones) but i do not know now how to link the material component to the PO.Is there any BAPI that does this?
    Do i have to first create a purchase requisition for this material component or how can i link the mat component to the PO.
    I have used  bapi's for creating material components and PO,so i would need also some bapi that could do something like that.
    Is there any bapi for changing material component ?
    thank you

    Hi
    before creating material components,we have to set the purchase requisition flag to "immediately" so that a purchase requisition is created immediately after material component creation.
    Afterwards i have read the newly created PR's and gave them as parameter to the bapi for PO creation

  • Error CK 694 No structure could be determined for internal activity

    Hi everybody
    When I do confirmation, I have an error like this: CK 694 No structure could be determined for internal activity
    In KP26, I defined plan price for Exactly Cost center and activity, Price indication is 3.
    In costing variance
    In OPL1, Actual Cost for Activity I choose 1. Plan Price...
    In OKTZ, I define Cost Element in Cost Component Structure
    I don't use  Activity Group.
    I don't know how to fix this error. Does anybody help me ? Please
    Thanks.
    QuangDD

    Dear,
    CK11N check the cost component structure for this material
    Check whether secondary cost element is assined to that activity.If it is assigned then check cost component structure in IMG where that secondary cost element is assigned or not.
    Please refer this thread also,
    PRODUCT COSTING ERROR -CK11N
    Regards,
    R.Brahmankar

  • Material component in created status

    Hi,
    The n/w is released also activity is released but the material component assigned are still in created status. PR,PO and GR for the material done but GI not allowed because of this status movement allowed is untick.
    Please suggest.

    Hi,
    Thanks for your reply ..
    the material component status in cj20n is created not released where as the activty is released. Procurement for the material is allowed but since the material is in system status created movement allowed is untick and hence GI not allowed.
    Regards

  • No price could be determined for internal activity LABOUR 0000005006

    No price could be determined for internal activity LABOUR 0000005006
    Costs of cost element 7500001 cannot be assigned to any cost component
    Message no. CK578
    Diagnosis
    In preliminary order costing or a confirmation, costs for cost element 7500001 were calculated that could not be assigned to any cost component of cost component structure 01.
    These costs are from the usage of an internal activity (activity type SETUP) for cost center WORKCENTER.
    System Response
    The costs will be treated as fully relevant to stock valuation, and debit the order and credit the cost center with the full amount when a confirmation is entered.
    Procedure
    If necessary, assign cost element 7500001 to a cost component in cost component structure 01.

    Dear,
    You need to check this calling your cost component structure using OKTZ.Your Cost Element must be assigned to one of the components.
    Please closed your previous thread also by assigning relevant points.
    Regards,
    R.Brahmankar

  • Material component Overview

    Hi,
    1) In the material component overview, there is a column called "Quantity Received". But no value is getting updated in this column when I am receiving materials. What can be the reason for this?
    2) In the same report, "Shortfall Qty" column is also available. Is it the difference between the Requirement Qty and the Received Qty? If not, what is it?
    3) What is the meaning of "Pegged Requirement"?
    regards
    Pratap

    Hi Mr.Muraleedharan,
    The second and the third questions are solved. My Shortfall qty column is displaying the correct values.
    But the "Quantity Received" column is not at all displaying any values. I will explain to you my whole scenario.
    Scenario:
    In our project, we are using Internal activities for creating reservations of materials. So, no "GR qty" is being shown in the activity detail screen as in the case of External activity.
    A WBS BOM is created for the whole project which consists of all the materials required. MRP is run on the WBS BOM and the procurement is done. When I check the "CN52N" after doing GR, the "GR Qty" column is not getting updated. The materials are both L and N.
    Hope you have understood my scenario.
    regards
    Pratap

  • Material ledger is not active in valuation area C002

    Dear All,
    I have a Scheduling Agreement for a material 'A' with Vendor 'V' with diff prices with validity dates, I did the GR & when i am posting the invoice thro' miro, system is throwing error as above Material ledger is not active in valuation area C002 Why should I activate the material ledger here ? Pls suggest how can i solve this ?
    regds,
    Kallu

    Hi
    For a Particular material, Material Ledger is active or not? Can be checked in Accountig view of Material Master.
    Why we need Material Ledger?
    A fundamental task of the material ledger is carrying inventories in multiple currencies and/or
    valuations.
    Material inventory values are normally carried by the SAP system in one currency. The material
    ledger component enables the R/3 System to carry inventory values in two additional
    currencies/valuations. Therefore, all goods movements in the material ledger are performed in up
    to 3 currencies or valuations. Currency amounts are translated into foreign currencies at
    historical exchange rates directly at the time of posting. Businesses such as those in highinflation
    countries can therefore carry their inventories in a more stable currency (such as US
    dollars). This reveals inflationary effects on inventory values.
    If you use transfer prices to represent value flows in your company in different
    valuation views, you must use the material ledger. This allows you to carry your
    inventories in three different valuations (legal valuation, valuation for reporting
    purposes, and profit center valuation).
    Before activating the material ledger, make sure you know which currencies and valuations
    you want to use, because you cannot go back and change the setting.
    Activating the material ledger is a prerequisite for using multiple valuations.
    Thanks
    Raman

Maybe you are looking for

  • Address bar search is not working

    When I type keywords into the address bar, it used to return a list of google search results. Now, it returns "The address isn't valid". I know I can use the search bar to search google, but the ability to search keywords straight from the address ba

  • Image looks different in Acrobat after exporting to PDF

    I just created an image in InDesign. I exported it as a PDF and viewed it in Acrobat. There are two things going on here that I'm not sure about. First of all, there appears to be a broken edge on the right side of the image when viewed in Acrobat. I

  • Macbook pro Retina 15" reboot issues

    Hi all I am a newcomer to the community. Right I've had the my brand new macbook pro retina 15' since the begining of september 2014 which came with Mavericks.All seems fine back then I did the terrible thing and upgraded to the yosmite when it came

  • How to generate auto increment id for sharepoint list item using calculated column?.

    Dear all, List Id will be auto generated in the format "TP_W1_SCO_00001".(00001 Numbers will keep changing for the documents). FOR EX:- first listem ID :TP_W1_SCO_00001 sECOND listem ID :TP_W1_SCO_00002 Please tell me how to do it by using calculated

  • DBMS export extension

    Does anyone know what the DBMS export extension is in the quote from the following article: "... revoke public execute permissions for DBMS export extension ..." http://news.com.com/Patched+Oracle+database+still+at+risk%2C+bughunter+says/2100-1002_3-