CO and Process order without material using T. Code CORO

Hi
We need to use Process Order without material functionality for recording "changeover" time and cost (i.e. setting up process for production of other material in a production line).
For this purpose we have configured a separate process order type. We have created a separate activity for Changeover and planned rates using KP26.
Now we create Process Order without material using T. Code CORO and confirm it using COR6N. On confirmation system successfully credits Cost Center.
We need to know:
1) whether we should settle the process order as well or no need to assign settlement profile to Order Type
2) Or should we run Cost Estimate first.
Plz help, if any have idea

Thank you all for your valuable input.
Srinivasa, your suggestion is very good, especially when calculation of variances/WIP is required. But again as there is no cost relevant material where the WIP/Variances will be settled during settlement process?
1) PP need to create process order without material because changeover cost should not be charged to either material and capacity hours are consumed during changeover. 2) CO need to identify the cost of changeover which should be charged to cost center. So far we have achieved both of these two objectives by the following activities:
Creation of Process Order without material using CORO T.Code     say 3 hours of changeover occurred we create order with quantity of 3 Hours. And confirmation of activities quantity 3 using COR6N so cost center is credited by 3 x rate per hour. As there is a separate Process Order type for Changeover we can identify changeover quantity and cost in a given period.
After contributors feedback in this thread I have come to conclusion that I don't need to assign Settlement Profile and PA Structure to Changeover Process Order type. So no need to run Process Order settlement. As there is no specific required for Changeover WIP/Variances as well.

Similar Messages

  • Userexit for populate profit center entry without material in T.code CORO.

    Hi guru's
    we are running T.code. CORO.. we want to populate profit center entry without material. can any one tell me the exact user-exit used for this and . can you tell me the procedure how to find the specific userexit trigger at that point while we are running any T.code.
    Thanks in Advance..
    GSANA
    user exist in PP for transaction code CORO-process order without matl code to populate profit center entry, can u plz find out that & send it to me..

    Thank you all for your valuable input.
    Srinivasa, your suggestion is very good, especially when calculation of variances/WIP is required. But again as there is no cost relevant material where the WIP/Variances will be settled during settlement process?
    1) PP need to create process order without material because changeover cost should not be charged to either material and capacity hours are consumed during changeover. 2) CO need to identify the cost of changeover which should be charged to cost center. So far we have achieved both of these two objectives by the following activities:
    Creation of Process Order without material using CORO T.Code     say 3 hours of changeover occurred we create order with quantity of 3 Hours. And confirmation of activities quantity 3 using COR6N so cost center is credited by 3 x rate per hour. As there is a separate Process Order type for Changeover we can identify changeover quantity and cost in a given period.
    After contributors feedback in this thread I have come to conclusion that I don't need to assign Settlement Profile and PA Structure to Changeover Process Order type. So no need to run Process Order settlement. As there is no specific required for Changeover WIP/Variances as well.

  • Inspection Lot for Process Order without Header Material

    Guys,
    We have an scenario that we create a Process Order without Header material using T code CORO. Is it possible to assign or create  a Inspection lot for Process order?
    Regards,
    Senthilraja

    Hi
    Please refer
    QPL10004 User subscreen for displaying additional data in insp. lot
    Regards
    Sujit

  • Profit center to be populated in Production order without material.

    Hi,
         I am creating Process order without material for my requirement and the settlement receiver of these order will be a cost center. Now my requirement is the Profit center assigned to the cost center is to be populated in the Profit center field (CAUFVD-PRCTR) in Assignment tab of the Process order when saving the order. Kindly tell me how to achieve the same.
    Thanks & Regards,
    Ravi Kumar C.

    Dear R.Brahmankar,
       The exit referred in the note will trigger while opening CORO itself. But my requirement is to trigger after entering the cost center in the settlement rule (Settlement receiver is manually entered before saving the order). After entering the cost center in the settlement rule system should populate the profit center. Is there anyway to achive the requirement.
    Regards,
    Ravi Kumar C.

  • Creating Process Orders Without a Material and Without a Master Recipe

    Hi PP experts, anyone knows if it is possible and how to do create Process Orders Without a Material and Without a Master Recipe?
    Thanks!!

    Dear,
    If you want to use a cleanout recipe
    T code CORO
    create a order w/o material for rework qty
    Make the same entries as described under Creating a Process Order With a Material. Use OPJG config to have a default operation defined for the plant and order type combination.
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Oct 13, 2008 5:12 PM

  • What is the use of production order without material?

    Hi gurus,
    can anyone plz tell what is the use of production order without material?
    n steps involve to perform this task?

    Dear amnpp,
    It's widely used for capturing the rework activities(components and activity cost),both for final rework and inprocess rework
    activities.
    Check these links,
    Rework order manually (not Trigger)
    rework order
    Rework Order Steps
    Re: Coustomization order type for Rework
    Regards
    Mangalraj.S

  • Production Order without Material Number and linked to a PM Order...

    Hi All,
    Is it possible to create a Production Order without Material Number (because it is a "just one time" production), and link it to a PM Order (enterred by a sister Plant) in order to finally report the cost to that PM Order?
    And if YES, how to do it???
    Explanation of the problem (business scenario):
    We have 2 Plants. Let say Plant "A" and Plant "B".
    Plant B is producing spare parts for Plant A.
    There are usual spare parts, which have a Material Number.
    But there are also spare parts which will be produced only once, and which don't have a Material Number. (= because it is a very punctual production).
    Plant A needs a punctual spare part.
    It creates a PM Order for Plant B.
    Plant B needs to create a Production Order for that spare part (without Material Number).
    Then, when confirmed and delivered, the cost of that production needs to be reported (assigned) to the PM Order.
    Thanks in advance for your help on the subject.
    Regards,
    Rudy.

    Thank you for the information.
    After some modifications on the Prod.Order Type and the creation of a Reference Operation Set, it seems to work.
    Still have a cost problem, but on the way to be solved.
    Thanks a lot,
    Rudy.

  • Creation of Process Order without assigning master recipe

    Hi,
    I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
    We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
    Is there any way we can achieve this?
    Regards,

    Hi,
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards
    Kannan

  • Process Order without BOM

    I want to create a Process Order without a BOM & Recipe . Is that Possible ?
    I tried the following :
    Material Master setting  MRP 4 view -Explosion/Dependent Requirements section define " "(Blank) for Selection Method field
    Order Type Dependent parameters (COR4)
    Production Version Blank :
    Recipe: Do not use Master Recipe
    But the problem is that I cannot keep BOM application Blank
    BOM application has the link for selection ID which is linked to BOM usage .
    I am not able to bypass this check in any way & as a result it gives an error (No valid BOM) on Process order creation
    Shall appreciate a response

    Hi,
    Yes, it is possible to create process order without BOM & master recipe.
    By having some config settings in place for BOM & recipe selection, you can create process order without BOM & recipe in SAP.
    Normally, this scenario comes into picture where you're not sure about the operations to be carried out and materials to be consumed for an order.
    For creating and testing such scenario, refer below SCN thread, which was discussed before,
    Create Process order without Production Version | SCN
    Regards,
    Narresh

  • Is it possible to release Process Order  with Material Shortage

    Hi All,
    We are using PP-PI & still wants to have behavior of the PP prod order
    i.e. Release Process Order with Material shortage.
    Is it Possible.
    Regards,
    Jatin

    Hi Jatin,
    Go to Transaction OPJK. Select your Plant, order type and Business function as 2-Check availability during order release.
    Under Material Availability tab, maintain '1- User decides on release if parts are missing' if user wants to decide for release of Process order or '2-Release permitted despite missing parts' if you want directly the Process order should be released despite of shortage in Release material field.
    These settings are similar to PP.
    Please check and revert.
    Regards,
    Hiren Ramani

  • Production order without material

    I am using Production order without material and without sales order in CO07. I want to derive profit center for this production order. What  is procedure to derive it?

    Hi Mayuresh,
    We can settle the order against cost objects, cost center,  material,  order item, order,  sales document item, WBS element...
    But Profit center is not a cost object so you can link the cost center in production order, Cost center can be linked with profit center so u can get the result in profit center also.
    Regards,
    S.Suresh.

  • GR for create the production order without material(co07)

    Hi all,
               I am creating the  production order without  material (T-Code :co07), After creating this order i want to get the Material from W/H and after dismantling how to do GR for this Prod.order, What is the Movement type to be used?Please advice me

    Dear Kumar,
    CO07 specially meant for Rework order (Production order
    without material) or for dismantalling the Customer returns or
    Inhouse rejected,for the components which re good to reuse
    again,their quantity will be entered in -ve and so 531 movement
    takes place.
    On the other hand,if you want to use for rework purpose and
    want to consume some components,using MB1A T code ,the
    materials required are issued.
    Already our Forum member(Krishnamohan) has given clearly in his first reply.
    Regards
    Mangalraj.S

  • Production Orders without material - component reservations in APO

    Hi All,
    We are using transaction CO07 to create a production order without material. We have four materials in the BOM for this production order. One is an input product and three are output products. My intention is to have the components on this BOM show up in APO as reservations or something else that will be considered in our planning.
    At this point I am not able to see anything in APO system (e.g order reservations) like I would with a regular production order with material. Does anyone have any experience with this functionality or know if it is supported by SAP?
    Thank you,
    Paul

    Hi Paul,
    It is an interesting case, a don't know if you have solved it. Anyway, here is my suggestion -
    1) If you want to see a reservation in APO for a component, you need to make sure that the header product exists in APO as well, and the production order for this header has also been CIFed over to APO. This is the first check.
    2) If the first check is OK, then you should check that all the 3 header products exist in APO (In your case, you have 3 three header products). And then, the production order appears for all the 3 products in product view.
    With the above checks, I am certain, you should see the reservation for the component, else it is an ieal OSS candidate.
    Thanks,
    Prashant Ghule

  • Stop user creating process order with material for specific order type

    Hey Team,
    Is there a way where I can stop creating process order with material for specific order type says Z*. We are using ZNMA  order type to create trial batch and we do not want to create process order with material for this order type.
    Any ideas?
    Thanks
    Bhavesh Patel.

    You can restrict the order creation in CO01 based on authorization, Remove the authorization for Z order type for the particular user,  Check with your basis Guy

  • Re: Creation of sales order without material master

    Hi All,
                Is it possible to create sales Order, without material master. In case if so please provide the details.

    Hi,
    It is possible to save order without any material.
    But if you want to restrict it, go to VOV8 and select your Sales Document Type and see if any incompletion procedure is assigned.
    Now go to SPRO - SD - BASIC FUNCTIONS - LOG OF INCOMPLETION ITEMS - SALES ORDER ITEM -
    and for your incompletion procedure maintain VBAP under table and MATNR under field name. Also you can tick on warning message, if user now tries to save the order without any material.
    So now you can restrict saving order without having any material.
    I am sure this will help you, if it does, please dont forget to reward points for contribution.
    Regards
    Ravi

Maybe you are looking for

  • How to generate a query involving multiple tables(one left join others)

    Hi, all, I want to query a db like these: I need all the demographics information(from table demo) and their acr info(from table acr), and their clinical info(from table clinical), and their lab info(from table lab). The db is like this: demo->acr: o

  • SQL Loader Control File use of integer(n)

    Dear Gentlemen, I have an "ascii" file where some fields are binary of 2, 4 and 8 bytes. This file has to be loaded to oracle (8.1.7) Table using SQL Loader. According to SQL Loader documentation, for this case I must use as a field type: integer(n),

  • Plot two graphs in same XY graph

    Hi i want to save the graphs which are generated by a Vi into  a file programically   how this can be done thanks in advance augustin Certified LabVIEW Associate Developer Solved! Go to Solution.

  • Unable to serialize XMLElement using SOAP?

    I'm using oracle AS 10.1.3.0 release. I'm trying to set up a webservice that will accept an Element (which I've done in prior releases no problem). When I attempt to call the webservice I get the following error: Caused by: java.lang.IllegalStateExce

  • Saving a stream location in iTunes

    I listen to a radio station and would like to know how to save a stream in my playlist or somewhere so I can refer back to it when I need to. This is probably a very simple question but the answer eludes me. Thanks all, ~M