Creation of Process Order without assigning master recipe

Hi,
I want to create a process order without having default master recipe for the given material or default operation for the given order type. I want the user to select the master recipe manually in process order. We do not want to use production version also.
We can define the default operation for the order type (OPJG) so that we can create a process order. I do not want a default operation in the process order but the user should select a valid master recipe. If we have default operation in the process order, it serves no purpose as it is never used anywhere.
Is there any way we can achieve this?
Regards,

Hi,
Please find the required details and conditions for creating process orders without master recipe.
http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
Regards
Kannan

Similar Messages

  • Re: Creation of sales order without material master

    Hi All,
                Is it possible to create sales Order, without material master. In case if so please provide the details.

    Hi,
    It is possible to save order without any material.
    But if you want to restrict it, go to VOV8 and select your Sales Document Type and see if any incompletion procedure is assigned.
    Now go to SPRO - SD - BASIC FUNCTIONS - LOG OF INCOMPLETION ITEMS - SALES ORDER ITEM -
    and for your incompletion procedure maintain VBAP under table and MATNR under field name. Also you can tick on warning message, if user now tries to save the order without any material.
    So now you can restrict saving order without having any material.
    I am sure this will help you, if it does, please dont forget to reward points for contribution.
    Regards
    Ravi

  • Creation of Purchase Order Without material master

    Dear Experts,
    Can we create PO with out material master.
    1. If yes,  what is the functional objective behind creating PO with out material master
    2.  Where do you do the setting for the same
    I am trouble shooting on issue where once the user creates PO without Material master and with the account assignment caragory K and one GL account the FI document gets posted in MIGO and MIRO. But when I  use more than 1 GL account with the same above setting the FI document does not get posted.
    Any Input.
    Regards
    Paul

    Hi Tao,
    Thanks for your prompt response.
    The issue here is little different which i missed to mention above.
    with the account assignment catagory K when I put two different Cost center system does not go FI posting.
    paul

  • Process Order without BOM

    I want to create a Process Order without a BOM & Recipe . Is that Possible ?
    I tried the following :
    Material Master setting  MRP 4 view -Explosion/Dependent Requirements section define " "(Blank) for Selection Method field
    Order Type Dependent parameters (COR4)
    Production Version Blank :
    Recipe: Do not use Master Recipe
    But the problem is that I cannot keep BOM application Blank
    BOM application has the link for selection ID which is linked to BOM usage .
    I am not able to bypass this check in any way & as a result it gives an error (No valid BOM) on Process order creation
    Shall appreciate a response

    Hi,
    Yes, it is possible to create process order without BOM & master recipe.
    By having some config settings in place for BOM & recipe selection, you can create process order without BOM & recipe in SAP.
    Normally, this scenario comes into picture where you're not sure about the operations to be carried out and materials to be consumed for an order.
    For creating and testing such scenario, refer below SCN thread, which was discussed before,
    Create Process order without Production Version | SCN
    Regards,
    Narresh

  • CO and Process order without material using T. Code CORO

    Hi
    We need to use Process Order without material functionality for recording "changeover" time and cost (i.e. setting up process for production of other material in a production line).
    For this purpose we have configured a separate process order type. We have created a separate activity for Changeover and planned rates using KP26.
    Now we create Process Order without material using T. Code CORO and confirm it using COR6N. On confirmation system successfully credits Cost Center.
    We need to know:
    1) whether we should settle the process order as well or no need to assign settlement profile to Order Type
    2) Or should we run Cost Estimate first.
    Plz help, if any have idea

    Thank you all for your valuable input.
    Srinivasa, your suggestion is very good, especially when calculation of variances/WIP is required. But again as there is no cost relevant material where the WIP/Variances will be settled during settlement process?
    1) PP need to create process order without material because changeover cost should not be charged to either material and capacity hours are consumed during changeover. 2) CO need to identify the cost of changeover which should be charged to cost center. So far we have achieved both of these two objectives by the following activities:
    Creation of Process Order without material using CORO T.Code     say 3 hours of changeover occurred we create order with quantity of 3 Hours. And confirmation of activities quantity 3 using COR6N so cost center is credited by 3 x rate per hour. As there is a separate Process Order type for Changeover we can identify changeover quantity and cost in a given period.
    After contributors feedback in this thread I have come to conclusion that I don't need to assign Settlement Profile and PA Structure to Changeover Process Order type. So no need to run Process Order settlement. As there is no specific required for Changeover WIP/Variances as well.

  • Creating Process Orders Without a Material and Without a Master Recipe

    Hi PP experts, anyone knows if it is possible and how to do create Process Orders Without a Material and Without a Master Recipe?
    Thanks!!

    Dear,
    If you want to use a cleanout recipe
    T code CORO
    create a order w/o material for rework qty
    Make the same entries as described under Creating a Process Order With a Material. Use OPJG config to have a default operation defined for the plant and order type combination.
    Please find the required details and conditions for creating process orders without master recipe.
    http://help.sap.com/saphelp_47x200/helpdata/en/89/a42cb3461e11d182b50000e829fbfe/frameset.htm
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Oct 13, 2008 5:12 PM

  • Control receipe creation in process order

    Hi,
    Can you please tell me how to create control receipe.
    After releasing the process order when I select the button for creating  control receipe. System shows error as " No control receipe generated"
    Please tell me the basic steps required to create control receipe and PI sheet.
    Regards
    Karthikeyan

    Hi,
    Check In master Recipe ,in the PI Tab,There must be some PI category is assigned and in that PI Category,this PI Charactiristic has been assigned.
    First goto that Phase of the Master Recipe and then goto PI tab and then find the PI category.
    In Process order
    Goto->List->Control Recipe List--->
    As per above link first find out Control Recipe is generated or not and also find out its status.
    If Status is Created then you can find it in CO53,
    if status is Sent then you can find it in CO55 or CO60
    Please rfer this thread also,
    https://forums.sdn.sap.com/click.jspa?searchID=16154042&messageID=5839678
    Regards,
    R.Brahmankar

  • Inspection Lot for Process Order without Header Material

    Guys,
    We have an scenario that we create a Process Order without Header material using T code CORO. Is it possible to assign or create  a Inspection lot for Process order?
    Regards,
    Senthilraja

    Hi
    Please refer
    QPL10004 User subscreen for displaying additional data in insp. lot
    Regards
    Sujit

  • Change Production version during creation of Process Order COR1

    Hi,
    Scenario:
    Based on the entered Material, Plant and Order type system need to trigger a popup asking the user to select the Production Version. This should happen before clicking on SAVE button, so that all the values will be populated correctly based on the changed VERID.
    I did not find a user exit that enables to change the Production Version (VERID) value. So I thought of displaying the popup in the user exit EXIT_SAPLCOZF_003 which will be triggered before initial screen appears, export the selected value and pass it to a User Exit or BADI where VERID can be changed. But cannot find a user exit to do it.
    Please help me find a User Exit or BADI to change the Production Version during creation of Process Order using COR1 transaction before clicking on SAVE button.
    Thanks,
    Manoj.

    Hi Manoj,
    So - almost four years later - I saw your post and I saw myself in the very same situation as you did...
    I found a solution for those who wants to change the production version of the production order from the sales order creation: create an enhancement in the function module 'MD_VERSION_SELECTION' and you are good to go.

  • BADI/EXIT - COR1 (block release process order without number batch)

    Hi Gurus,
    There are a BADI ou User EXIT in the transaction COR1 to block the release Process Order without number of batch created??
    In COR2 OK, but COR1 I don´t find. I tried all the possibilities that knew!!!
    Thank´s
    Cleber

    Hi,
    The below user exits are avilable for COR1.
    EXIT_SAPLCOKO_001
    EXIT_SAPLCOKO_002
    EXIT_SAPLCOKO_003
    EXIT_SAPLCOKO_004
    EXIT_SAPLCOKO_005
    EXIT_SAPLCOKO_006
    Check if you can use any of the above.
    Regards,
    Soumya.

  • Re : sales order without assigning document type in OVAZ

    Hi
        How to create sales order without assigning document type in OVAZ.
    Thanks
    Mani

    Hi Mani,
    If all your order types can be used in all the sales orders, you dont need to maintain in OVAZ. If you think ur order type has to be used only in one of the sales area then you need to maintain in OVAZ.
    Hope this helps.
    Kind Regards
    Chakradhar

  • Rework process order without price calculation

    Hi friends,
    Our client at present rework process order done through edit or change or add the a BOM manually from the T.code COR1, because of that my costing has been changed hugely it will hit my price diff account, After Costing run price will change 10 to 50 Rs like that.
    How to do without price calculation for the rework process order ,please provide the solution for this requirements.
    Thanks &Regards,
    Sabhapathy R

    hi
    the purpose of process order w/o material
    If you want to use a process order for a reworking procedure
    If you want to use a cleanout recipe
    t code  CORO
    create a order w/o material for rework qty
    Make the same entries as described under Creating a Process Order With a Material. Once you have created the process order, the system will copy all the data from your master recipe, but not the material list.
    maintain settlement cat,receiver and % in parent order
    carryout goods movement for rework qty
    deva

  • Batch creation during process order

    Dear all,
               Can any body tell me for some materials Automatic batch is not creating after releasing the process order.
    Regards
    Ravi

    Dear,
    Go to MM02 of these materials click on work scheduling view and check which scheduling profile is maintained there.
    Then go to CORY and check same scheduling profile for Auto Batch Creation. If scheduling profile is missing then assign same in work scheduling view of material master.

  • Error with Creation of process order

    HI,
        I am trying to create a Process order, system throw the error message "No valid task list for material XXXXX plant XXXX  for sel.criteria". MAster data has not been transferd. I have checked in Recipie and BOM Nothing is missing, evry thing is fine. But as for my best of knowledge, it has been mantained correctly.
    Kindly tell me what could be the problem & how to resolve it.
    Regards.
    NSR

    NSR,
    The problem could be the validity dates or Lotsizes or status.
    Most often faced problem could be that you would have created the recipe valid from todays date, but you may trying to create a Process order back dated. You can go to the master data tab in the process order display transcation(COR3) and check the Explosion dates, and check in C203 your master recipe header valid from date.
    Regards,
    Prasobh

  • Unsolved Problem-Order without Material Master

    Hi all
    My problem is still unsolved. I want to create Sales Order with out Material Master. In Materials Management, we create Purchase orders to vendors with out a Material Master by just typing  description of a material and then assigning Material Group and Cost Centre to that description.
    If it is possible to issue Purchase Orders with out material master, then it is not possible to create sales Order also without material master?
    I got an answer here yesterday to type description in Material description field in SO and use item category TATX. The problem with this is, it allows delivery, but does not allow pricing (pricing setting immediately goes to display mode in item category screen). If I do any other alterations with this item category, then it asks for material number while creating sales order.
    Please help

    Hi,
    I think the for text material pricing is not applicable.Thats why it's not taking.Text material is only for displaying text only.
    Regards,
    Hari.

Maybe you are looking for

  • Podcast downloads - wrong folders used?

    Using iTunes 7.6.2.9 I subscribe to a podcast and new episodes are picked up and downloaded automatically. Instead of being stored in the Podcasts folder though, the files are stored in the standard Artist name -> Album name structure. What this mean

  • Safari on my MacBook Air will not open?

    Safari crashed when I was watching Netflix.  I did the OS X Yosemite version 8.0.2 update (this update ruined my life) Every time I try to open Safari it says "Problem Report for Safari Safari quit unexpectedly. Click Reopen to open this application

  • Max-shm-memory - definition

    Hi Guys, I'm trying to get a clear definition on project.max-shm-memory. Lets say its set to 4GB for user.oracle. Does this mean that the maximum amount of shared memory available to the project is 4GB or that the maximum shared memory segment size c

  • Using exernal HD from PC

    I need to take a HD out of my PC and put into a external case for use with my macbook. I hear that you can read it but not write to it on a Mac? What do I need to do to use it?

  • Incompatible display driver. Premiere Elements 11

    Today when trying to open a project a message came up saying that an incompatible display driver had been detected: Intel(R) HD Graphic Family 3.0.0 Build 8.15.10.2559. I've checked and the driver is up to date however the project will not now open.