CO substitution for sender activity type

Is it possible to substitute the sender activity type during a KB21N activity allocation?  I attempted to do this at the line item level (callup point 1) by changing field COBL-LSTAR but the substitution was not reflected in the controlling document.  I later found note 392273 which states that this isn't possible at the line item level...  "In activity allocation (KB21, KB21N) or in the reposting of an activity allocation (KB65), the system prevents a substitution of the sender."
Is there another way to substitute the sender activity type?
Thanks
Jeff

Hi,
For booking of time sheet through CATS, it requires mandatory fields.
Cost center
Activity type
CO object(internal order, n/w or activity, WBS, SO, Cost center)
For booking the time sheet through CATS:-
- rates should be maintained in cost center w.r.t activity type.
- personnel number with the responsible cost center.
- data entry profile.
Also whenever we are booking the time sheet, we are booking the hours against some of the activity performed in business such as project management, erection, commisioning etc. So that we can check the cost on the project related to various business activity.
Thanks & regards,
KK

Similar Messages

  • Error saying "Enter the sender activity type also"

    While trying to upload the HR details from NON SAP to SAP through SE38, an error reflects asking to enter the sender activity type.
    Can any body help me.

    Hi,
    Please refer to the online documentation help whose link is listed below :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c3/c6c2a40f4f11d2956400a0c930669b/content.htm
    This link mentions four different data entry scenarios that can be configured for data entry profile in CATS.
    if you want to have the activity transfered to HR, you have to activate this Controlling object for pers. cost assignment in your
    customizing:
    - Personnel Time Management
      - Time Data Recording and Administration
        - Integrating Time Management with Other R/3 Applications
          - Recording Personnel Costs
            - Enter Controlling objs permitted for pers. cost assignment
    here you can find in the documentation:
    'In this step, you specify which Cost Allocation or Funds Management  objects the personnel costs can be assigned to.
      and, in addition, for account assignment to activity type:
      COBL-LSTAR Activity type
       In cac1 'cost accounting variant' is set to 'Assignment of personnel costs to master cost center'. In this case, the cost center is not transferred to HR. Activity allocation is done directly from cats through the other (non-hr) components. Check for 'activity allocation' in the online documentation.
    the cost assignment variant 'B' (Assignment of personal costs to sender) needs a receiving accounting object.
    If there is no receiving object the cost assignment variant changes to '0'.
    regards
    Waman

  • Want to change the cost element for a activity type (KP26)

    Hi,
    I want to change the Allocation cost element for an activity type in KP26. I have already changed the cost element in the activity master data in KL02. Now i want to change it in KP26. I am trying to delete the existing line item in KP26  to create the new line item with the new cost element, but system not allowing to delete the existing one. It throws the error message ""Allocations with XXXXXXX/XXXX (Cost center/Activity type)  exist ; deletion not possible". Can someone please help me to change the cost element?
    Regards
    Dev

    Hi Rao and Lalit,
    Thanx for you people for helping me. i havin gone doubt here. If i am deleting the existing line in KP26 and create new line with appropriage cost element will it be cause the existing datas? I don't want to go for another activity type, because our process is a complex process exist all over the world in more than 300 company codes. So i want to use the existing activity type but want to change the allocation cost element alone. Is there any possibility to change the cost element alone?
    Regards,
    Dev

  • Actual price calculation for multiple activity types

    Gurus,
    I am working on a scenario where we have 2 main cost centers  (A & B) from which services are used in different cost centers one of which is C. C is assigned to a work center. Now for the cost center C,two activity types are defined ATA and ATB which are actually the services from cost center A and B respectively.
       Now for standard cost estimate I can define planned rates for those two activities based on the cost center C. Now at the month end I want to draw the costs from A and B based on the % of the services drawn by C and then calculate the actual price for those activities, i.e. run revaluation cycle. My question is, when I would run the revaluation cycle, how am I going to differentiate the cost of each activity types based on the cost input from respective cost centers (A and B) ?
       I short, with more than one activity type and more than one input cost center, is it possible to valuate the activities on actual prices?
    Thanks in advance!
    Snigdho

    Hi Snigdho
    Yes, you can!!
    If I have understood your question well - What you want is that the Cost allocated to From A to C should be divided by Act type ATA and cost allocated from B to C, should be divided by ATB, at the period end... Is that what you want?
    You can achieve this in SAP... 
    1. Create 2 separate secondary cost elements for each Act Type ATA and ATB
    2. Create a Spliting structure in OKES... You would assign Secondary cost ele 1 to ATA and Sec Cost ele 2 to ATB
    Assign cost center C to this splitting structure in OKEW
    3. now, when you calculate Act price, you will get what you want
    Regards
    Ajay M

  • Issues about substitution for network activity

    Hi guys,
    Today we have tried to creat a substitution for the network activity (Tcode: OPSN).  we also create some by reference the existing ones. When we choose form menu Edit->Validation/Substitution->Substitution, it really triger the our defined exit. But when we save the network, after we change the activity. It trigger nothing! So I am very confused.
    Welcome any suggestion!
    thanks very much!
    --James

    Hi James,
    check settings in network profile. For automatic substitution you need to make settings there.
    Cheers
    Thorsten

  • Automatic substitution for network activity

    Hi.
    I have managed a substitution for network activities. But I want this substitution automatic when saving network or all project (CJ20N). On IMG on network profile, I have not the "automatic substitution indicator" I have usually on "project profile".
    Have you an idea, please ?

    Your requirement is that you want the substitution automatic when saving network or all projects. 
    On IMG on network profile, you are not getting  the "automatic substitution indicator" that is standard.
    infact you network activity susstitution rule will flow to project via assignment of that network profile to project pfofile.
    Please follow below steps.
    1. you have to  tick mark  the filed 'automatic substitution indicator' in all the project profile for which you want substitution automatic when saving.
    2. in that above step no. project profiles you have to use the network profile in which you have defined your substition for the activities.
    Regards
    Nitin

  • Which bapi for create activity type

    i use ecc 4.6
    i just find
    BAPI_ACTIVITYTYPEGRP_CREATE
    for create activity group
    but i do not find the bapi for create the activiy type
    which bapi is for create activiy type
    if the sap does not supply this bapi
    wich method to create the activity type (i know shdb can do it)

    BAPI_ACTTYPE_CREATEMULTIPLE

  • Activity Type set up for cost center

    Hi All ,
               While creating a task list i m getting a message
    Activity type is not set up for cost center in the year 2008
    Message no. CR062
    How could i set the activity type for cost center? Plz tell the procedure.
    regards
    sunil
    Edited by: sunil gupta on Sep 19, 2008 10:12 AM

    Dear Sunil,
    Check out this,
    1.Create a Cost center using T code - KS01.
    2.Create an activity type using T code - KL01.
    3.Assign the Rates for an activity type & cost center combination using T code KP26.
    4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate
    under Fixed price and set value as 2 for distribution key and plan price indicator as 3.
    5.After performing this ,while creating the work center ,this combination of activity type & cost center
    should be assigned.Then while creating routing/task list this work center can assigned for performing
    operations.
    Check with this & revert back if you need any further help.
    Regards
    Mangalraj.S

  • Activity Types for a Work Center

    Dear Experts,
    I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
    Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
    The Msg No. is CR 091.
    Please guide me to find out where I am missing something?
    Thanks & Regards,
    Rohit.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • Costing for activity types in CS

    Dear All
    Hope you all are doing well.I want to perform costing on service order based on activity type for Customer Services. These activities should be assigned to service material. How can activities assign to service materail? Currently I have configured  valuation catagories , assign cost elements to value catagories, define activity types,Price planning for activity type and assign these activity types to work center.
    Your immedite response is higly appreciable
    Thank you,
    Nomi

    Dear All
    Really sorry for late reply! DIP Profile helps a lot in Configuring Quotation and Billing document. What I did was
    1. I create activities with the help of CO consultant and give price to the activities type.
    2. Setting performed for DISPLAY OF COST in Maintenance and Service       ProcessingBasic settings for these activities.
    3. Assign Cost element for these activities. 
    4. Assign these activities type to the work center.
    5. Define Services Materials for each activity type so that they can be displayed in my quotation and billing document.
    6. Assign services materials to DIP Profile as such:
    u2022     Define planned cost u2013 Total Record as source.
    u2022     In Material Determination for profile I assign each of my service material to Transfer cost and Quantity and assign respective cost and revenue element of that activity type to the Service material.
    When I create a service order with revenue u201CSM02u201D.I do not specify service material. I assign my activities types in operations and when I calculate costing it sums up all the revenue in costing for planned costs but when I create quotation and billing document for the service order it shows individual material for each activity type and its amount on item data and total is displayed in header data against EK01 condition type moreover planned and actual cost are displayed in service order.
    The problem is, I have not create any condition record nor assign these condition type to my pricing procedure as value is arising from activity type.
    Which condition types can be assigned to pricing procedure so that they can pick up the value of the activity type?
    Thank you
    Nomi

  • Maintaining of Currency for Activity Type

    Hi,
    Plz let me know the solution for this issue and inpact of this on on other applications.My Controlling Area Currency is EUR but my Co Code Currency is INR and in Cost Center Master Record I maintained the  Currrency for this as INR.
    When entering the price for Activity type which is attached for this Cost Center.
    Tell me know in whcih currency can I maintain the price for this activity type and what is the impact on this ?
    Plz it is very urgent.
    Br,
    Edu

    Since the controlling area currency if EUR, the activity rates will be in EUR. In itemization you can display the cost in INR as well as EUR.
    Regards
    Rakesh Pawaskar

  • Activity type in time sheet

    Hi all,
    In PS we donu2019t capture any cost. In such case, While entering timesheet, the system through an error message, to enter sender Activity type and it is not allowing to enter timesheet.
    Now, what should be done to skip entering activity type and enter timesheet without entering activity type?
    I guess it is controlled through work center, by not maintaining costing tab, but the system does not allow to save the work center without entering the cost center under costing tab.
    Please suggest, in entering time sheet without activity type
    Thanks,
    Chandru

    Hi,
    Go to --> SPRO --> Cross Application Components --> Time Sheet --> Settings for all User Interfaces --> Time Recording --> Choose Fields -->Data Entry section --> Activity types
    Double click and in reference to data entry profiles we can restrict the entry for the activity type whether it is required / Display / Hide / Input.
    Check and confirm whether the problem is solved
    Regards,
    Selva

  • Cost center & Activity types

    Res all,
    how to define cost center for work center ?
    and how to define activity types for SETUP , MACHINE , LABOUR etc activity?
    plz send details with TCODES
    regards

    Hi Ajay
    For defining Activity types T code KL01
    Then you have to plan the activity by using T code KP26
    Here you assign the activity type to particular cost center
    To define cost center T code KS01
    Then in CR01 (work center) u will assign the cost center and activity type
    to that cost center
    Thanks
    Ansuman

  • "Activity type 420 1002 2393074 in the fiscal year 2010 not valid" PM03

    We have an issue with the PM03 for the year 2010. "When the scheduler tries to schedule the pm..He gets an error "Activity type 420 1002 2393074 in the fiscal year 2010 not valid" The planner will close the work order then re-open it. The error will go away, but when the work order is scheduled there is 0 hours scheduled.. This will be a big issue if there are not any hours assigned to work orders.
    Can you help me?
    Thanks!

    Davison,
      Please maintain the prices for the activity type, Cost center combination for the fiscal year 2010 using transaction KP26. The log generally disappears after you save and leave the transaction. You will see the log again only when you reschedule the order and are in the same transaction.
    Also check whether "scheduling" has been activated for the PM03 control key for scheduling to be taken into consideration for the operation.You can view the same by using the drop down for the control key on the transaction.
    Regards
    Narasimhan

  • How to change validity period of cost centre or activity type

    Hi
    How to change validity period for an Activity type or Cost centre?
    Can we change the validity period once created?
    regards
    Prakash

    Please note this can be done.
    Go to Edit Cost Center
    Goto Edit, Analysis Period.
    Create a new validity period say today until 3112999
    Change the data you want and save.
    When you go into the CC again it will show two validity periods.

Maybe you are looking for

  • Stuck on iMessage with non-iPhone

    I have an iPhone 4 running iOS 5.0.1. My friend had an iPhone 4S for about a week, until she traded it in for an Android phone. For that week that we both had iPhones, we were obviously using iMessage. Now that she no longer has iOS, we (obviously) c

  • Need to close icloud account and the ipod was stolen

    ipod stolen, need to close mail, how do you do it from a regular library account.

  • Can one monitor be used with 2 computers?

    I have a PC and will be buying a Mac Pro soon. I really want to avoid using 2 monitors. I heard that it's possible for the Mac display to be used with 2 different computers. Is this possible? How would I switch between viewing my PC & viewing my Mac

  • Cannot open MXF XAVC files in quicktime or FCP7

    I am working with a new Sony FS7 video camera  that records in XAVC codec as mxf  files - Same as the F5 or F55. I have installed the new ProApps update that is supposed to  make it easy to use XAVC in Final Cut 7 which I still use and have also upda

  • Connecting to 6i designer

    I have just installed Oracle 6i Designer, and unfortunately, have not found any documentation on how to create a user, therefore I cannot connect to the service. I have used 8i (without desinger) previously, and know that the default login is SYSTEM