Dear All
Hope you all are doing well.I want to perform costing on service order based on activity type for Customer Services. These activities should be assigned to service material. How can activities assign to service materail? Currently I have configured  valuation catagories , assign cost elements to value catagories, define activity types,Price planning for activity type and assign these activity types to work center.
Your immedite response is higly appreciable
Thank you,
Nomi

Dear All
Really sorry for late reply! DIP Profile helps a lot in Configuring Quotation and Billing document. What I did was
1. I create activities with the help of CO consultant and give price to the activities type.
2. Setting performed for DISPLAY OF COST in Maintenance and Service       ProcessingBasic settings for these activities.
3. Assign Cost element for these activities. 
4. Assign these activities type to the work center.
5. Define Services Materials for each activity type so that they can be displayed in my quotation and billing document.
6. Assign services materials to DIP Profile as such:
u2022     Define planned cost u2013 Total Record as source.
u2022     In Material Determination for profile I assign each of my service material to Transfer cost and Quantity and assign respective cost and revenue element of that activity type to the Service material.
When I create a service order with revenue u201CSM02u201D.I do not specify service material. I assign my activities types in operations and when I calculate costing it sums up all the revenue in costing for planned costs but when I create quotation and billing document for the service order it shows individual material for each activity type and its amount on item data and total is displayed in header data against EK01 condition type moreover planned and actual cost are displayed in service order.
The problem is, I have not create any condition record nor assign these condition type to my pricing procedure as value is arising from activity type.
Which condition types can be assigned to pricing procedure so that they can pick up the value of the activity type?
Thank you
Nomi

Similar Messages

  • Master record for cost center/activity type

    Hi all;
    How create a master record between an cost center and activity type?
    Thank you

    Hi
    You can create master data between cost center / activity type.
    You can link the two by planning for activity qty the combination of a cost center / activity type in KP26. Then you do a detailed planning for costs for the cost center / activity type / cost element in KP06.
    I hope it is clear..
    Regards,
    Suraj

  • Table for cost center / activity type prices

    Can someone give me the table name where cost center/activity type prices are stored?
    Regards,
    Manohar

    hi,
    for cost centers
    table name  =  CSKSZ
    field name =  KOSTL
    Activity prices
    table name = RKPLN
    field name =  TKF
    HOPE IT HELPS
    regards
    sayeed

  • CONTROL DATA FOR ACTIVITY TYPE NOT MAINTAINED

    dear all
    i get this error when calculating production order cost
    control data for activity type 1000\4230\1420 not maintained for fiscal year 2007
    i hv maintained data in kp26
    can any one pl help. i am learnign sap pp and hv 4.7 version
    thanks and regards

    Dear Anshuman
    my prob. started during cost cal. in prod. order first error was version 0 not maintained for fiscal year 2007, THEN i maintained it in the path as told by you T code OKEQ.
    but after that error changed to CONTROL DATA FOR ACTIVITY TYPE NOT MAINTAINED ( 1000/4230/1420)
    i maintained data in kp26, but the error is still coming
    pl. suggest some solution as i am not able to proceed further.
    Thanks and regards
    Raj

  • CATS INTEGRATION WITH PP AND PM MODULE ( TO FIND ACTUAL MANPOWER COSTING THROUGH ACTIVITY TYPE)

    Hi Experts,
    We have a scenario like, Client wants to track the actual manpower costing through activity type ( Ex: How much hours an employee worked on a particular work center to produce an “X” product, So that his actual cost should be loaded on that product.
    We have employee ( 1. Staff 2. Worker 3. Contract labor employee and apprentice from third party roll and staff and worker we plan to go with negative time management and for contract labor and apprentice will go with through cats.
    Since we are not going to run the payroll for contract labor employee and apprentice, we just maintaining the employee data as a group ( Ex: Group A,B,C etc.. Each group consists 20 or 30 employees, According to system each group as one employee and according to us each group consists as 20 or 30 employee.
    The Activity type as well cost center will be created by Co module, the same will be assigned in info type 0315, but still i want more input from experts on the same, since i am new to cross application time sheet configuration, could any one help me out to find the actual manpower costing in a better way.
    Regards,
    Prem

    Hi Experts,
    Can any one please reply on the same.
    How to arrive the exact manpower costing through activity type ?..
    Regards,
    Prem

  • KSPP error: Plan/SOP order &: Reference to cost center/activity typ

    Dears,
    I need to know how to correct the error: "Plan/SOP order &: Reference to cost center/activity typ" that I received when I run the KSPP.
    Error code kp603.
    Thanks in advance
    KR
    Vincent

    Hi everbody,
    I found that when we have a formula in Resource -> Costing view but no quantity ( zero ) in Standard Value for operations (Master recipe) then we face the error.
    Other tips could be found in sapnote 1770587 and sapnote 380282.
    I hope this help to solve the issue.
    Regards

  • Cost element/activity type planning upload

    Hi,
    When doing the cost element/activity type planning upload via KP06, can I assign only one characteristic in the element definition level?   Because I want to put in the excel upload layout  the cost elements, cost centers and activity types.  But ECC 6.0 is allowing only one characteristic in the element definition level.  Has anyone encountered this problem?
    Thanks and best regards,
    Thess

    Hello,
    This is controlled by planning are in your planning profile. You need to use "Cost ctrs: Cost element/activity inputs" planning area for this purpose.
    Hope you are conversant with Integrated excel upload.
    To do integrated excel upload of cost center plan data.
    IMG ==> Controlling ==> Cost Center Accounting ==> Planning ==> Manual Planning User Defined Layouts - Create your own layout or copy from standard layout and change it.
    IMG ==> Controlling ==> Cost Center Accounting ==> Planning ==> Define User Defined Planner Profiles
    Copy the SAPALL to ZSAPALL. You cannot change SAPALL as it is standard.
    In ZSAPALL planner profile, select proper planning area and enter your layout.
    Tick Integrate Excel.
    Once the popup for KP06 comes, you need enter the data and save it. It would generate the file name.
    With the same file name you need upload the plan data by using KP06.
    In KP06
    Extras ==> Excel Planning ==> Upload
    Select the file as prepared in accordance with format at the time of generating the file name.
    Hope this solves your problem.
    Please let me know if you need futher help.
    Regards,
    Ravi

  • Maintaining of Currency for Activity Type

    Hi,
    Plz let me know the solution for this issue and inpact of this on on other applications.My Controlling Area Currency is EUR but my Co Code Currency is INR and in Cost Center Master Record I maintained the  Currrency for this as INR.
    When entering the price for Activity type which is attached for this Cost Center.
    Tell me know in whcih currency can I maintain the price for this activity type and what is the impact on this ?
    Plz it is very urgent.
    Br,
    Edu

    Since the controlling area currency if EUR, the activity rates will be in EUR. In itemization you can display the cost in INR as well as EUR.
    Regards
    Rakesh Pawaskar

  • Costing varient/Activity types tab

    hello gurus,
                    in costing variant/activity types tab my strategy sequence is 1.plan price for the period and 2.actual price for the period.here my question is from where the system will pickup these prices.please explain this
    thanks
    rihana

    Hi Samaar,
    Based on this configuration, system will read the Planned Price or Actual Price of the Activity Types maintained in the recipe.
    You can see these Planned Prices & Actual Prices of the Activity Types  using T-Code # KSBT
    Regards,
    Pandu

  • Is there table/Report history including timestamp & date for activity type created?

    Hi Guys
    I have an audit request for activity type that should include Date of creation/change and timestamp for them, but I don´t know if there is a table or report
    that I should run.
    Actually in KP26 in section line item shown the dates but by activity type, I expect to run in mass
    I really appreciate if someone have suggestion or idea how is possible to get information with dates and timestamp

    Hi Marco,
    If not in standard, this can be achieved by customized field in the table. This is called Append Structure and you can add Z table.
    Talk to an ABAP person. He can do it.
    I know I have not answered you in a straight way
    Regards,
    Krishnendu.

  • Standard report for Activity types in REM scenario.

    Hi PP Gurus,
    Is there any standard report like MCRP, MCP6, MF12 in REM scenario to capture time booked for Activity types? Please revert.
    Thanks & Regards,
    Abu Arbab

    Hi R. Brahmankar,
    Thanks for your prompt reply. We need to track Activity types booked in terms of quantity. We checked all the transaction code that you suggested.
    The track of Activity type is also possible in standard SAP system provided we do Separated Backflush only.
    T-code- MF12:
    Field Name- Production Activities:*
    Production activity posting in worklist
    If you select this indicator, the system only displays the document logs for which production activities still have to be posted.
    The selected documents provide you with a worklist which you process using the separate backflush transaction.
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Sep 24, 2008 11:07 AM
    Edited by: abu arbaba on Sep 24, 2008 11:12 AM
    Edited by: abu arbaba on Oct 16, 2008 8:16 AM

  • Actual activity price does not exist for cost center / activity type

    Hi,
    We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
    We have used a customized program and have loaded the data from se38.
    All this HR data will be saved in CAT2
    Later we transfer the time related data into SAP FI/CO using CAT7.
    +When  tested  with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
    For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
    Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
    We have run the price calculation forr the FY 2010.
    Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
    When uploaded employee time sheets before, all the cost were getting claculated and were entering into  the respective cost elements, but now no amounts are being calculated and it is taking Zero.
    When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
    PLease assit
    Regards,
    shilpa

    Hi
    I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
    Regards
    Ajay M

  • How rate is calculated for activity types

    Hi Gurus,
    There is activity type XYZ created and when in do KB21N and enter the cost center and activity type the rate is calculated.
    I do not know where is the rate maintained. It is coming 27.96 hence how the system is taking 27.96 rate for 1 Qty.
    Regards.

    Planned Activity rates are calcualted in KPSI and updated in KP26. Actual rates are calculated in KSII and can be viewed in KBK7.
    Please check the rate in KP26 for the period/cost center/activity combination

  • PS: planned costs by activity type

    Hi experts,
    I have a problem about an activity type.
    I have created an activity type and planned it on a cost center. This activity type is inserted in a work center with standard formala key "SAP003".
    I insert my activity type in an internal processing of WBE and I calculate costs for this internal processing.
    When I see the cost report of internal processing, the system returns this message: "No costs were calculated for the activity".
    Why? Is it correct?
    Thank you
    Nicola

    Hi Ashish Jain,
    I have planned activity type/price with the transaction KP26, but the system doesn't return any value in planned costs of WBE.
    Why?
    Thanks
    Nicola

  • Need to find cost for activity

    Hi,
    I am an ABAPper. I created an ALV report to show costs by period. I think this part of the report is correct. I joined tables COSS, COKA, CSKU, PRPS, PROJ. I found the cost by period in COSS. The report is sorted by the secondary cost element.
    Now my user wants to "drill-down" on a period and for that period (and SCE) wants to see the detail (in dollars). I know that the individual activity is stored in AFRU, and I found a view which joins AFRU to COBK, COEP. I tried this, hoping I could get the detail, but the amounts don't match against the totals I see in COSS.
    Can anyone help me? Thanks in advance.

    Sreekanth,
    I load activity from the external system through a different program I wrote.  I use the same activity type to set the rate for each record.  In addition, my client wanted me to "blend" the rates, so that in my example of $800 of straight time and $400 of overtime, (assuming an hourly employee) I would divide $1200 by 40 hrs, to get a "blended" rate of $30.  I would then set the activity rate to $3 and load the hours the employee worked.  Because my client wants this, I cannot change the design.  Besides, it was a 'fixed bid' installation of PS, and I don't have time to rewrite the programs.
    I have limited understanding of PS (this is my first project with it), but it is my understanding that activity type only retains the current value.  Is there a history of what was the type was set to (and when)?  If so, then I could (re)calculate using that times the AFRU hours.
    You have told me much more than the functional analyst I'm working with, so I awarded you partial points for pointing me in the right direction.  I appreciate your help.
    Regards,

Maybe you are looking for

  • Multiple physical inventory document active for same material-storage locat

    hi experts, I am using transaction code MI31 for creating physical inventory document for all materials at a particular warehouse(storage location). User is selecting direct generation of of PI documents in the transaction. If by mistake he presses e

  • Regarding Radio Button Tab Traversal

    Hi All, Iam Using the JGoodies , I have the RadioButtons in my application . Here my problem is when I traverse through the Tab , focus is moving to the Deselected RadioButton label , which should not happen . Is there any way to avoid this ? Can any

  • Drop-Down Menu in Firworks 8

    I know there has to be a way to make a drop-down menu in Fireworks 8 similar to the one on the homepage: http://www.adobe.com/. You know when you roll over PRODUCTS and a drop-down menu comes down listing some products that you can click on. I want t

  • Apple tv ipad and multiroom music

    I want to be able to play the same song on my tv and my iPad 2 in a multiple room configuration. I have just bought apple tv. The idea is to stream music from my iTunes pc to apple tv in the living room and to the iPad 2 in the bedroom simultaneously

  • PoE for IP Phones and non PoE switches

    Like everyone has already pointed out, a PoE device will need to be connected directly to a 802.3af compliant PoE switch. If you only have one jack for every workstation, then you will have to connect the phone to the wall/switch, and connect the com