Configuration of Cost threshold for Parallelism

Hi all, 
I want to adjust the 'Cost Threshold for Parallelism' on the SQL server running  OLTP databases.
MSDN says that this is an estimate query duration - in seconds.
Is this estimate available in a DMV? I want to look at my server's query workload & assess which queries I want to be considered for parallel processing and which ones I don't.
Some potential candidates include:
dm_exec_query_stats.max_elapsed_time / dm_exec_query_stats.execution_count
I don't want to use this as this actual - where the setting is an estimate (on some arbitrary server).
I thought it might be the Estimated Subtree Cost in the query plan? Though I've read this has nothing to do with an estimated number of seconds.
Any assistance greatly appreciated.
Cheers, Clay

Thanks for the replies SQL24 and Ashwin - 
I am looking at a server which is struggling to keep up with a substantial increase in volumes.
My top 3 waits are:
- CXPACKET @ 55%
- LCK_M_IX @ 25%
- SOS_SCHEDULER_YIELD @9% (25% signal waits)
The production server has only 2 CPUs - the current MAXDOP and Cost Threshold for Parallelism are the default, 0 and 5. 
Though 2 CPUs is a tiny amount of CPU - I'm hesitant to request more until I can prove CPU is struggling (my 
In regards to "issues relating to parallelism" - my guess (I'm not a DBA) is
that too many queries are being parallelised - I'm basing this guess on the high level of waits on CXPACKET, the fact that it is primarily managing small transactions (+ plus some manifesting/grouping of those transactions each afternoon)  & the
fact that I currently only have 2 CPUs! 
To my original question - MSDN states "The
cost refers to an estimated elapsed time in seconds required to run the serial plan on a specific hardware configuration"
http://technet.microsoft.com/en-us/library/ms188603(v=sql.105).aspx
It is the 'specific hardware configuration' part of this description that renders all of the actual times (be it a max or average) that I can obtain from
dm_exec_query_stats worthless.... for this purpose.
My guess (again) was that it could be compared to the query plans estimated subtree cost - but before I attempted extraction of this info from query plans - I wanted to confirm.
Thanks again.

Similar Messages

  • Cost threshold for parallelism

    I ran
    Jonathan Kehayias's query to inspect my plan cache for costs and counts (see below for query).  Some of the costs returned were less than 5.  My server is currently configured with the default settings for MAXDOP and the cost threshold for
    parallelism.  I thought the query was only reporting on queries where parallelization had occurred per the clause "WHERE  n.query('.').exist('//RelOp[@PhysicalOp="Parallelism"]') = 1".  Obviously I do not understand what
    the query is doing, should I expect to see results with a StatementSubTreeCost of less than 5?
    SET TRANSACTION ISOLATION LEVEL READ UNCOMMITTED;
    WITH XMLNAMESPACES
    (DEFAULT 'http://schemas.microsoft.com/sqlserver/2004/07/showplan')
    SELECT
    query_plan AS CompleteQueryPlan,
    n.value('(@StatementText)[1]', 'VARCHAR(4000)') AS StatementText,
    n.value('(@StatementOptmLevel)[1]', 'VARCHAR(25)') AS StatementOptimizationLevel,
    n.value('(@StatementSubTreeCost)[1]', 'VARCHAR(128)') AS StatementSubTreeCost,
    n.query('.') AS ParallelSubTreeXML,
    ecp.usecounts,
    ecp.size_in_bytes
    FROM sys.dm_exec_cached_plans AS ecp
    CROSS APPLY sys.dm_exec_query_plan(plan_handle) AS eqp
    CROSS APPLY query_plan.nodes('/ShowPlanXML/BatchSequence/Batch/Statements/StmtSimple') AS qn(n)
    WHERE n.query('.').exist('//RelOp[@PhysicalOp="Parallelism"]') = 1

    Looks like it returns the plans where Parallelism has been using... I suggest you reading that Jonathan's blog especially comments . As you know
    SQL Server creates and runs a parallel plan for a query only when the estimated cost to run a serial plan for the same query is higher than the value set in cost
    threshold for parallelism
    That means if the cost of the plan is more than  5 sec  , then a parallel query will be created. So of cause you should see the costs more than 5 sec  in the output.
    Best Regards,Uri Dimant SQL Server MVP,
    http://sqlblog.com/blogs/uri_dimant/
    MS SQL optimization: MS SQL Development and Optimization
    MS SQL Consulting:
    Large scale of database and data cleansing
    Remote DBA Services:
    Improves MS SQL Database Performance
    SQL Server Integration Services:
    Business Intelligence

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Costing Run for Configurable Material

    Hi,
    When I try to run costing run CK40N for KMAT material, I am geting information "No materials selected" for the 'selection' flow-step.
    Below is the Error description.
    No materials selected
    Message no. CK277
    Diagnosis
    Due to the costing variant used, no materials could be selected for the cost estimate.
    System Response
    No materials were selected.
    Procedure
    1. First, check that the materials you want to cost exist.
    2. Then go into Customizing and check the costing variant, the reference variant, and the transfer control. If the plant changes, a suitable transfer strategy must be entered in the transfer control belonging to the reference variant.
    Thanks in Advance,
    Shiva

    hi Shiva,
      It is not possible to do the cost calculation for configurable materials in CK40N or CK11N.
      To do the product costing it is mainly required the BOM and Routing, but in case of configurable materials the BOM and Routing are not fixed(here Super BOM/Super Routing are used with valid object dependencies which may result in "n" number of material variants)
    To do the costing for configurable material you can use t code - CU50 (configuration simulation)
    Here in CU50 you can select the characteristics values which ultimately selects the valid BOM and Routing required for variant production and do the costing and check.
    Please check
    http://help.sap.com/saphelp_erp60_sp/helpdata/EN/7e/cb857b43a311d189ee0000e81ddfac/content.htm
    Pavan
    Edited by: Pavanakumar on Jun 29, 2009 4:34 PM

  • Steps for configuring shipping cost document

    Hi experts
                   Can anybody Please explain me the steps. Say that shipping cost is based on Route, weight group and carrier. We will be having an condition record for it. So here how do we configure shipping cost document.
    awaiting reply
    Bhanu

    hi,
    you have to add a condition for freight in the calcualtion - sheet.
    Bring i your condition - records.
    While copying form delivery to invoice, you have to set the pricing - roule 'H' calulate new fright costs and in the invoice, there will be a new pricing for the fright-costs ( and the tax ). ( The Condition should have the type fright ).
    Hans

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • Configurable material cost estimate

    Hi All,
    We have lot of configurable materials and some are finished materials and some are semi-finished.
    If semi-finished configurable material used in Finished materials, Semi-finished configurable material costs is not roll up correctly for Finished material.
    Only labor costs are rolling up and material costs not rolling up
    Valuation variants material price is:valuation according to price control.
    any help is appreciated...
    Thanks,
    Anusha

    Hi,
    In OKTZ have you tick on Roll up cost component  against the Cost component of  material .
    This indicator determines whether the costing results of a cost component are rolled up into the next-highest
    Regards,
    Shayam
    Edited by: Shayam_210 on Sep 29, 2011 6:40 AM

  • How to run multiple CodedUI Ordered Tests over multiple Test Agents for parallel execution using Test Controller

    we are using VS 2013, I need to run multiple Coded UI Ordered Tests in parallel on different agents.
    My requirement :
    Example:   I have 40 Coded UI Test scripts in single solution/project. i want to run in different OS environments(example 5 OS ).  I have created 5 Ordered tests with the same 40 test cases. 
    I have one Controller machine and 5 test agent machines. Now I want my tests to be distributed in a way that every agent gets 1 Ordered test to execute. 
    Machine_C = Controller (Controls Machine_1,2,3,4,5)
    Machine_1 = Test Agent 1 (Should execute Ordered Test 1 (ex: OS - WIN 7) )
    Machine_2 = Test Agent 2 (Should execute Ordered Test 2 (ex:
    OS - WIN 8) )
    Machine_3 = Test Agent 3 (Should execute Ordered Test 3
    (ex: OS - WIN 2008 server)  )
    Machine_4 = Test Agent 4 (Should execute Ordered Test 4 (ex:
    OS - WIN 2012 server) )
    Machine_5 = Test Agent 5 (Should execute Ordered Test 5 (ex:
    OS - WIN 2003 server) )
    I have changed the  “MinimumTestsPerAgent” app setting value
    as '1' in controller’s configuration file (QTController.exe.config).
    When I run the Ordered tests from the test explorer all Test agent running with each Ordered test and showing the status as running. but with in the 5 Test Agents only 2 Agents executing the test cases remaining all 3 agents not executing the test cases but
    status showing as 'running' still for long time (exp: More then 3 hr) after that all so  its not responding. 
    I need to know how I can configure my controller or how I can tell it to execute these tests in parallel on different test agents. This will help me reducing the script execution time. 
     I am not sure what steps I am missing. 
    It will be of great help if someone can guide me how this can be achieved.
    -- > One more thing Can I Run one Coded UI Ordered Test on One Specific Test Agent?
    ex: Need to run ordered Test 1 in Win 7 OS (Test Agent 1) only.
    Thanks in Advance.

    Hi Divakar,
    Thank you for posting in MSDN forum.
    As far as I know, we cannot specify coded UI ordered test run on specific test agent. And it is mainly that test controller determine which coded UI ordered test assign to which test agent.
    Generally, I know that if we want to run multiple CodedUI Ordered Tests over multiple Test Agents for parallel execution using Test Controller.
    We will need to change the MinimumTestsPerAgent property to 1 in the test controller configuration file (QTControllerConfig.exe.config) as you said.
    And then we will need to change the bucketSize number of tests/number of machines in the test settings.
    For more information about how to set this bucketSize value, please refer the following blog.
    http://blogs.msdn.com/b/aseemb/archive/2010/08/11/how-to-run-automated-tests-on-different-machines-in-parallel.aspx
    You can refer this Jack's suggestion to run your coded UI ordered test in lab Environment or load test.
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/661e73da-5a08-4c9b-8e5a-fc08c5962783/run-different-codedui-tests-simultaneously-on-different-test-agents-from-a-single-test-controller?forum=vstest
    Best Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Cost update for third party and individual purchase orders

    Hi,
    We went live in around 5 months back. Last month we changed the configuration so that costs for back 2 back purhcase order will be determined from goods receipt & third party purchase orders could be determined from logistics invoice verification. This is working correctly with the new documents which are being created.
    We have an issue with the document which are already created and posted. We want to update these existing billing documents so that they can pick the rigth cost. For these old transactions currently the cost is being picked from valuation segment of the material.
    I have tried resolving this through reorganization of infostructures & through sdvprsupdate but it does not work.
    Best Regards
    n

    Hi,
    We went live in around 5 months back. Last month we changed the configuration so that costs for back 2 back purhcase order will be determined from goods receipt & third party purchase orders could be determined from logistics invoice verification. This is working correctly with the new documents which are being created.
    We have an issue with the document which are already created and posted. We want to update these existing billing documents so that they can pick the rigth cost. For these old transactions currently the cost is being picked from valuation segment of the material.
    I have tried resolving this through reorganization of infostructures & through sdvprsupdate but it does not work.
    Best Regards
    n

  • CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE

    How to clear this ? It should auto see to DISK not to tape, i posted 2 show all below, 1st one is giving me error, & the 2nd one is working fine for another db.....
    How to clear
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE 'SBT_TAPE' TO 1;
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE SBT_TAPE TO 1; # default
    RMAN> restore database preview;
    Starting restore at 27-JUN-12
    allocated channel: ORA_DISK_1
    channel ORA_DISK_1: sid=125 devtype=DISK
    released channel: ORA_DISK_1
    RMAN-00571: ===========================================================
    RMAN-00569: =============== ERROR MESSAGE STACK FOLLOWS ===============
    RMAN-00571: ===========================================================
    RMAN-03002: failure of restore command at 06/27/2012 11:45:25
    ORA-19554: error allocating device, device type: SBT_TAPE, device name:
    ORA-27211: Failed to load Media Management Library
    RMAN> show all;
    RMAN configuration parameters are:
    CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS;
    CONFIGURE BACKUP OPTIMIZATION OFF; # default
    CONFIGURE DEFAULT DEVICE TYPE TO DISK; # default
    CONFIGURE CONTROLFILE AUTOBACKUP ON;
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE DISK TO 'J:\Cognoscm\%F';
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE SBT_TAPE TO '%F'; # default
    CONFIGURE DEVICE TYPE DISK BACKUP TYPE TO COMPRESSED BACKUPSET PARALLELISM 1;
    CONFIGURE DEVICE TYPE 'SBT_TAPE' BACKUP TYPE TO COMPRESSED BACKUPSET PARALLELISM 1;
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE 'SBT_TAPE' TO 1;
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE DISK TO 1;
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE DISK TO 1;
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE SBT_TAPE TO 1; # default
    CONFIGURE CHANNEL DEVICE TYPE DISK FORMAT 'J:\COGNOSCM\%U';
    CONFIGURE MAXSETSIZE TO UNLIMITED; # default
    CONFIGURE ENCRYPTION FOR DATABASE OFF; # default
    CONFIGURE ENCRYPTION ALGORITHM 'AES128'; # default
    CONFIGURE ARCHIVELOG DELETION POLICY TO NONE; # default
    CONFIGURE SNAPSHOT CONTROLFILE NAME TO 'C:\ORACLE\10\DATABASE\SNCFCOGNOSCM.ORA'; # default
    RMAN> show all;
    RMAN configuration parameters are:
    CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS;
    CONFIGURE BACKUP OPTIMIZATION OFF; # default
    CONFIGURE DEFAULT DEVICE TYPE TO DISK; # default
    CONFIGURE CONTROLFILE AUTOBACKUP ON;
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE DISK TO 'J:\DELTEKCP\%F';
    CONFIGURE DEVICE TYPE DISK BACKUP TYPE TO COMPRESSED BACKUPSET PARALLELISM 1;
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE DISK TO 1; # default
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE DISK TO 1; # default
    CONFIGURE CHANNEL DEVICE TYPE DISK FORMAT 'J:\DELTEKCP\%U';
    CONFIGURE MAXSETSIZE TO UNLIMITED; # default
    CONFIGURE ENCRYPTION FOR DATABASE OFF; # default
    CONFIGURE ENCRYPTION ALGORITHM 'AES128'; # default
    CONFIGURE ARCHIVELOG DELETION POLICY TO NONE; # default
    CONFIGURE SNAPSHOT CONTROLFILE NAME TO 'C:\ORACLE\10\DATABASE\SNCFDELTEKCP.ORA'; # default

    RMAN> show all;
    using target database control file instead of recovery catalog
    RMAN configuration parameters are:
    CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 7 DAYS;
    CONFIGURE BACKUP OPTIMIZATION OFF; # default
    CONFIGURE DEFAULT DEVICE TYPE TO DISK; # default
    CONFIGURE CONTROLFILE AUTOBACKUP ON;
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE DISK TO 'J:\Cognoscm\%F';
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE SBT_TAPE TO '%F'; # default
    CONFIGURE DEVICE TYPE DISK BACKUP TYPE TO COMPRESSED BACKUPSET PARALLELISM 1;
    CONFIGURE DEVICE TYPE 'SBT_TAPE' BACKUP TYPE TO COMPRESSED BACKUPSET PARALLELISM 1;
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE 'SBT_TAPE' TO 1;
    CONFIGURE DATAFILE BACKUP COPIES FOR DEVICE TYPE DISK TO 1;
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE DISK TO 1;
    CONFIGURE ARCHIVELOG BACKUP COPIES FOR DEVICE TYPE SBT_TAPE TO 1; # default
    CONFIGURE CHANNEL DEVICE TYPE DISK FORMAT 'J:\COGNOSCM\%U';
    CONFIGURE MAXSETSIZE TO UNLIMITED; # default
    CONFIGURE ENCRYPTION FOR DATABASE OFF; # default
    CONFIGURE ENCRYPTION ALGORITHM 'AES128'; # default
    CONFIGURE ARCHIVELOG DELETION POLICY TO NONE; # default
    CONFIGURE SNAPSHOT CONTROLFILE NAME TO 'C:\ORACLE\10\DATABASE\SNCFCOGNOSCM.ORA'; # default
    RMAN> restore database preview;
    Starting restore at 27-JUN-12
    allocated channel: ORA_DISK_1
    channel ORA_DISK_1: sid=124 devtype=DISK
    RMAN-06908: WARNING: operation will not run in parallel on the allocated channels
    RMAN-06909: WARNING: parallelism require Enterprise Edition
    released channel: ORA_DISK_1
    RMAN-00571: ===========================================================
    RMAN-00569: =============== ERROR MESSAGE STACK FOLLOWS ===============
    RMAN-00571: ===========================================================
    RMAN-03002: failure of restore command at 06/27/2012 13:22:40
    ORA-19554: error allocating device, device type: SBT_TAPE, device name:
    ORA-27211: Failed to load Media Management Library

  • Acc.assignment object replaced by current master cost center for employee

    Hi,
    I am facing a peculiar warning message while running the payroll posting run for only 2 employees.  The warning message s as follows:
    "Acc.assignment object replaced by current master cost center for employee
    Message no. 3G399"
    Prior to this, there were an error saying the
    "Account assignment objects are incorrect. No substitution is possible.
    Message no. 3G209"
    Later we found that the Position was not assigned to that employee properly.  I later assigned the correct position.. but still during the posting run the warning message appears.
    Please let me know if this is okay or is this an error which restricts the postings.
    Regards,
    Balaji TR

    Your postings will go through with the first warning message. However, please be warned that any account assignment related entries (IT 0027, 2001, 2002) will be wholly ignored.
    Check if any entries have been made to different cost centers for the erroring employees. If so, check for the reason why those entries have been made (since it is evident that the configuration does not support such entries). You may need to tie in with a CO consultant to ensure that there are no loose ends.

  • Define a settlement cost element for receiver type CTR

    Hi, i work for real estate company and we just implemented SAP. were on our process of closing our books and we are tied by error during PS settlement. House repair, which is an income statement account and cost element as well, are monitored in Project Systems with settlement rule set to GL. Postings will initially be posted as Project Cost WBS and will be settled to house repair GL. however, someone advised us that only balance sheet accounts should be settled to GL. Cost and expenses should be settled to Cost Center and so we changed the configuration and business process to posting costs directly to GL house repair and settlemet rule is to be settled to CTR. After the change in configurations and settlement rule, we still cannot process settlement due to this error "Define a settlement cost element for receiver type CTR". Please help, i may have missed a step in system configurations. Thanks thanks

    Define a settlement cost element for receiver type CTR
    Check in OKO6 whether you have defined the required Settlement Cost Element to the allocation structure.
    thanks
    G. Lakshmipathi

  • Cost Recognization for Third Party  vendor direct delivery to customer

    Hi ,
      We have a customer project . A material is assigned in a project. But this material will be directly delivered to the customer from the vendor.
    To configure this
    - we can create a Material with Procurement Type " Third party requisition for WBS element " .
    - Create Purchase Req in the Project
    - Create Purchase order against the PR.
    Now , the question is we cannot do the  MIGO here since the material will be send to the customer directly.
    Can any one explain me the remaining process in completing this scenario from :
    - How we can record ( MIGO or what Transaction )  goods delivered from the vendor to the customer directly recognized in SAP.
    - How the cost incured for this material posted to the project.
    Please explain.
    regards
    sankar

    Hi,
    when you create a PR from project using selection third party order, it creates a consumption as P and gives a prompt to enter customer/ vendor details to that order. Then is if you see there would only a PR number and no reservation even if you may have selected stockable. So, when you do GR for the same, it will update the inventory and make posting to WBS element using statistical cost element which you may have created for the balance sheet account for the inventory. The actual cost will be booked for the same WBS element/network activity when you will use CNS0 for making the delivery of the same material with reference to third party order or when you consume the stock directly using 221Q/ 281Q.
    I hope this will help you.
    Regards
    Avisek Bhardwaj

  • Error when Create Cost Estimate for Material using CK11

    Dear Experts,
    I have a material ABCD which is FOC parts:-
    1) Procurement type: F
    2) Special procurement type: Z (at first, it was wrongly entered as B. I changed special procurement to Z & the message 'The procurement type of the special procurement type is E' displayed but I still can save & system allowed it).
    3) Standard price is 0.00 as this is FOC.
    Firstly, I run CK11 for material EFGH which is the parent of material ABCD.
    This time, the material ABCD has special procurement type B. I received error messages:
    1) No price could be determined for material ABCD in plant xyz,
    2) Cost component split costed with value of zero,
    3) Cost estimate for material ABCD in plant xyz is incorrect.
    Then, I changed special procurement type for material ABCD from B to Z and run CK11 again. Still the same error occurred.
    Could someone advise me how to run CK11 without errors.
    Thanks in advance!

    I don't know if B and Z are really the name of your special procurement keys or you are just using them as examples.  Either way, the special procurement key is critical for determining how your material is valued.  It is used for such things as stock transfer from other plant, subcontracting, and consignment processes.  Can you tell me how these special proccurement keys are set or what you want to use these keys for.  You can find the configuration for these key under menu path Controlling - Porduct cost controlling - Product cost planning - Material cost estimate with quantity structure - Settings for quantity structure control - Master data - Check special procurement types.
    thanks,

  • Group currency settings for parallel valuation

    hi,
    we need to go for parallel currency valuation for our SA company code but i need to know what are the impacts for changing the existing configuration
    Company code is productive
    Controlling area assignement control is "controlling area same as company code"
    currency setting currency type 10 is assigned
    OB22 is not maintained
    Currency setting for client leval (scc4) is SAR
    Regards
    Sanjith

    Hi,
    Offcourse, incase if you are chaning the valuations after go live, there could be data inconsistancy for addtional currency values in reports.
    Hope you want to have SAR as addtional curerncy. (LC2)
    In OBY6, for your company code, enter SAR in field Hard Currency and SAVE.
    Add SAR as an addtional currency in OB22  for your company code,with below settings.
    Curr Type: 40, Valuation BLANK, ER Type: M, Sour Curr: 1, Trs Type Det: 2.....SAVE
    Regards,
    Srinu

Maybe you are looking for

  • Running a physical standby database in noarchivelog mode

    Primary Database: 2 node rac cluster, 11.2.0.2 GI and RDBMS Standby Database: single instance 11.2.0.2 OS: AIX 7.1 Hello, I'm in the process of implementing a data guard standby system. To make this system simpler to admin, I want to run the standby

  • Hide the page in the URL?

    Can one hide the page from showing in the URL? As in WWW.MyWebsite.ca/pages/images/summer2014.php to just.. WWW.MyWebsite.ca

  • Time and date keep changing

    It started happening a week or so ago. Every time I boot the time is changed. I set the date from the bios but arch shows the time wrong. Also because of this I sometimes get problems during bootup because the partition looks like it was last mounted

  • Advice On Debugging Android Version

    Hello, I have created an app using Flex and Flash builder which runs fine on the iPad. When I test the app on the desktop by targeting it toward an Android tablet, it works fine also. However, when I try and run the app on the Android tablet, it runs

  • Macbook pro late 2008 graphics

    Does the Macbook Pro late 2008 automatically switch to the Nividia 9600m( high performance) graphics chip when you plug in an external display? I thinking about buying a Macbook pro that the display freezes on startup and I think it might be the disp