Confirmation CO11N generate Re-work Order CO01

Hi,
Does anyone knows how to generate a Re-Work Production Order when performing Confirmation using CO11N?
What is the necessary configuration and process to achieve this. 
Thanks in advance.

HI,
    Follow the steps
First check in T code OPJF for the selection id a
Priority is defined for the Task list type S
with usage 1 and status 4 and then Proceed as
follows.
1. Create a Reference op set in t code Ca11.
Enter the plant, Description , usage and status
for the ref op set
Enter lot size and unit of measure.
Enter the op as 0010 / work center/op control
key/Description for the op
Enter the standard values and save.
2. Create a Standard trigger point in CO31.(Ex
Production)
Enter the Trigger Point usage /Group as FERT.
3.Tick the Trigger Point Functions.
4. Enable the indicator create order with Reference .
5.Enter the system status as PCNF.
6. Enter change as +.
7. Enable the indicator once.
8 . Now place the cursor on the create order with reference.
9. Go to Parameters.
10. In the Parameter enter in the group the created Reference op set group no.
11. Order type as PP01 and group counter as 1 and save the Trigger Point.
12. Now goto the Routing for your Material.
13. Choose the last op to assign the Trigger point.
14 .Select the OP -
Goto ---> Trigger Point overview.
15. Enter the Trigger Point usage as FERT.
16.Now choose that line ,select the Details---> Trigger Point
17. The system will says standard trigger point exists from which you can
select the created Trigger Point (EXx Production)and save.
18. MD02/MD04.
19. Convert the Planned Order into Production Order and Release the order.
20 .Now confirm th ops.
21. For the last op enter the yield and rework qty
and set the status as PCNF.
22. If the status of last op is PCNF then in the
system a POP UP will appear as Activited by
Trigger Point /Create order with reference/order
number/sequence and op number which trigger point
works and enter.
Trigger Points
Use
A trigger point is an object that can be assigned to an operation in order to trigger a function.
Trigger points can trigger functions,
u2022 If the status of an operation changes (example)
u2022 When an operation is confirmed. In this case the user decides whether the function is triggered (example)
You can also trigger a function by linking a user status to a u2018reason for varianceu2019 (example).
Features
At present, the following functions can be triggered:
u2022 Releasing directly succeeding operations
You can release all operations which come directly after the operation
u2022 Releasing operations up to stop indicator
You can release all operations up to and including the next operation with a release stop indicator.
u2022 Releasing preceding operations
You can release all operations which come before the operation in the order
u2022 Creating a new order by copying
You can create a new order. The order is created without reference to material using a reference operation set.
u2022 Including a reference operation set
You can include a reference operation set in the existing order. In this case you need to specify the operation after which the operation set is to be inserted. A production order is always rescheduled after a reference operation set has been included via a trigger point.
u2022 Triggering a workflow task
You can trigger a task defined as a workflow (Trigger Points).
To minimize the effort involved in creating trigger points, you can create standard trigger points and trigger point groups.
Standard Trigger Points
You can create standard trigger points in the routing or in the production order. A standard trigger point is used as a reference for creating trigger points. If you refer to a standard trigger point when creating a trigger point, the system transfers all necessary data from the standard trigger point into the new trigger point. As a result, the effort required for entering data is reduced.
To create standard trigger points, choose Logistics ® Production ® Master data ® Std. trigger point ® Create

Similar Messages

  • Updating PO confirmation and ASN through Work Order Confirmation

    Hi,
    We implemented PO collaboration and Supplier is doing PO Delivery confirmation and ASN.Now we are implementing Work Order Collaboration and system  created Work Order with reference to Purchase order.
    I want to know whether PO confirmation  and ASN date gets copied from Work order dates(after doing confrimation for phase Transport).
    I want to know what setting we need to do as presently it is not getting copied to Work order. And I want to know how it updates ECC confirmation tab for Purchase Order.
    Please do the needful
    Regards
    Raghavendra Pai

    Hi Raghavendra
    The above validation check will prevent supplier confirming purchase order request lines in PO details screen, so only supplier can confirm through WO confirmations, i.e by accepting the work order request lines in delivery overview, adapt the work order
    This will make the work status as CIAG from CINE, in negotiation to in agreement
    Then you can publish the work order, this will copy the confirmed data from the work order as identical request data and confirmation data to the purchase order. this data will be picked by ROC_Out and updates the po data in backend
    Please check whether ROC_out is available in customizing
    SPRO-SNC-BASIC SETTINGS-PROCESSING INBOUND & OUTBOUND-PROCESS TYPES OUTBOUND MESSAGES
    ASSIGN OUTBOUND MESSAGES TO DEFAULT PROCESS TYPES
    REPLORDC_O ASSIGNED TO ICH SUPPLIER COLLABORATION
    Still if does not trigger, kindlly check the log slg1
    it could be problem with ODM's ,POS etc
    Best Regards
    vinod

  • ESTF Requisitions generated from Work Orders (IW31)

    I am generating purchase requisitions from work orders via IW31. I can edit field selection key ESTF to open certain fields for editing in transaction ME52N.
    However if I generate a service requisition the service line item fields are not available in field selection key ESTF. Where can I allow the service fields to be edited for requisitions generated from work orders. What field selection key should I update?
    Any guidence or ideas would be greatly appreciated.

    ML90 - IW31 controls what fields are available for change in the work order transaction IW31. It does not control what fields are available from ME52N. The issue face is that our maintenance staff are creating purchase requisitions from work orders. Purchasing then needs to be able to adjust the pricing on the service lines in the requisition, however since these originated from a work order the fields are unavailable for input.
    We were able to get around this issue by editing field selection key ESTF in the requisition screen layout config. This works for material purchase requisitions but not services. I am looking for an extension of ESTF in transaction ML90 if that makes sense. Any guidence you could provide would be appreciated.

  • View labor and material costs in plant maintenance work order

    Hi
    I am aware we can bring in the costs in the work order through Activity types and assigning the costs to the acitvity type.
    Is there anyway we can bring in the actual cost for the work performed by the associate? should we link the work center to HRMS?
    Please advise. I need your valuable input for all the points below.
    Main points that need to be addressed:
    1. Each associate that is capable of confirming hours to a work order needs to be assigned an hourly rate that is reflective of the actual cost for the work performed by this associate. These hours are then tracked through the work order to give a cost for labor assigned to that particular job.
    2.Any materials used in the performance of the required task(s) dictated by the work order will be assigned to that order. These materials can be assigned through SAP purchase requisitions, tool crib spot buys, or procurement with a purchase card.
    3.Standard reports need to be created so we can track the total maintenance costs for any level of the equipment hierarchy as currently set up in SAP. When this report is created it should show the total maintenace costs for all the levels of the equipment hierarchy broken down into labor cost and material cost.  I am using Tcode IW37N and IW40 . Is there any suggestion?

    Greetings Chandra,
    1) You will need to create Work Centres for your associates and create the Activity Types. You can default the Activity Type for each Work Centre and maintain the rate for the activity via t-code KP26 planning.
    2) Planned and unplanned Purchase Requisitions for Components with category N will debit the order with material costs. But what do you mean by "tool crib spot buys" and "procurement with a purchase card"? You may need to develop a solution to do such postings to the Order (or for purposes of Cost controlling, manual activity allocation similar to confirming work may be desired such as Manual Activity Allocations via CO transactions (KB21N), unless you can cover that with Purchase Requisitions and POs with "F Order" account assignment.
    3) MCI8 Cost Report should be suitable for you, once you set up the Value Categories & Cost Key Figures.
    See
    PMIS Cost Analysis Reporting Overview
    Maintenance Cost Key Figures in MCI3 and MCI8 Reports
    PM Order Value categories and costs display

  • Error while generating Work Order

    I have a problem while generating Work orders in SNC.
    I set the configuration as belows.
    <General setting for Work Order generation>
    1.Granularity -> Work Order per Purchase Order Item
    2.Create WOs with Report -> Check
    3.Publish Work Order Upon Creation and PO change -> check
    4.Send Work Order Information -> Upon Agreement and when a Phase Is Completed
    5.Send Production Progress Notification -> When a Phase Is Completed
    <Phase Structure>
    1.Comp. from SC Order -> Use SC Comp. as Input, Product and Co-Products as Output
    <Master Data Assignment>
    1.MD Used for WO -> Phase Structure
    2.Active -> Check
    When I use the program /SCA/WO_CREATE for generate Work Orders, Run time error occurs with below messages.
    Runtime Errors         OBJECTS_OBJREF_NOT_ASSIGNED
    Except.                CX_SY_REF_IS_INITIAL
    <Error analysis>
    The exception, which is assigned to class 'CX_SY_REF_IS_INITIAL', was not caught in
    procedure "GET_PIO_LCTYPE" "(METHOD)", nor was it propagated by a RAISING clause.
    Since the caller of the procedure could not have anticipated that the exception would occur, the current program is terminated.
    The reason for the exception is:
    You attempted to use a 'NULL' object reference (points to 'nothing')
    access a component (variable: "LS_NODEREF-R_NODE").
    An object reference must point to an object (an instance of a class)
    before it can be used to access components.
    Either the reference was never set or it was set to 'NULL' using the
    CLEAR statement.
    <Missing RAISING Clause in Interface>
    Program                                 /SCA/CL_WO_PHASE==============CP
    Include                                 /SCA/CL_WO_PHASE==============CM00V
    Row                                     1
    Module type                             (METHOD)
    Module Name                             GET_PIO_LCTYPE
    <Trigger Location of Exception>
    Program                                 /SCA/CL_WO_PHASE==============CP
    Include                                 /SCA/CL_WO_PHASE==============CM00V
    Row                                     45
    Module type                             (METHOD)
    Module Name                             GET_PIO_LCTYPE
    Please let me know what I have to do for this error.
    Thanks and Regards
    JT

    Hi JT
    Clearly the problem is with the method GET_PIO_LCTYPE of interface /SCA/CL_WO_PHASE
    Check whether note 1363834 should be implemented
    It could be because of some corrupted WO entries in database
    or some customizing entry it is expecting
    suggest you to debug the method and try to check what it is expecting
    Best Regards
    Vinod

  • Update Time confirmation and Long text of Work Order in single FM or BAPI

    Hi,
    I would like to know, which standard FM or BAPI will update the longtext along with the confirmation text while doing the time confirmation of a work order.
    I have tried with standard BAPI BAPI_ALM_CONF_CREATE for updating the time confirmation. This is updating the time and confirmation text properly but not the long text. I would like to know how can I update the long text while doing the time confirmation. Is there any other standard FM/BAPI will update both?
    Thanks in Advance,
    Mohan.

    There is no standard SAP enhancement we can use for this purpose.
    We have developed another program to maintian the long text in production order.
    This call can be closed.
    Cheers,
    Qiang

  • Generating the RM requirement based on the work order?

    Does Oracle Disceret MFG has the provision of generating the RM requirement based on the work order?

    Hi,
    If you mean RM requisition as Material indent from Stores , then Yes, Component Pick Slip is the form
    Regards
    S

  • Mass reversal of work order confirmations

    Hi all,
    Can we do a mass reversal of work order confirmations which we do through IW41 transaction,instead of reversing the confirmations one by one, if so please explain how.
    Thanks & Regards,
    Jegashree

    Dear,
    There is no mass confirmation cancellation Txn available in standard SAP.
    Use
    BAPI_ALM_CONF_CANCEL     Cancel confirmation for maintenance/service order
    Hope it will help you.
    Regards,
    R.Brahmankar

  • Check box to Work Order to identify that they were generated from PM,Ins,Pr

    Hello,
    Would it be possible to add a check box to Work Order to identify that they were generated from PM, inspection or Predictive Maintenance?
    How can we configure this and how can we set up to report on this.
    Thanks.

    There are many option to identify that order was from PM (which is planned) & corrective work orders.
    Set up order types & train user to use specific order types when they build maintenance plan / Item to create work order.
    Configure order type 'Define Default Value for Planning Indicator for Each Order Type' so that system knows what is planned & unplanned.
    SAP note for the config:
    (Define Default Value for Planning Indicator for Each Order T
    In this section, you can define a default value for each order type for the order planning indicator.
    The order planning indicator is used for selection and statistical analyses in the Plant Maintenance and Customer Service Information System.
    Three order planning indicators are predefined by SAP:
    Planned order. You should use this indicator for order types, for which tasks can be anticipated.
    Unplanned order. You should use this indicator for order types, for which the task cannot be anticipated, but also need not be performed immediately.
    Immediate order. You should use this indicator for order types, for which the necessity of the task cannot be anticipated, but where the task must be performed immediately.)
    Hope this is helpful.
    Ravi

  • Work order confirmation after TECO

    Hi Friends,
    I have been facing a trickey situation where even Work order got TECO and i am triying to confirm the Operation (IW41) its allowing me to enter actual hours.however in work order those hours getting updated as actual Hrs aganist operation.
    How its possible,in fact i should get error message.
    can you please suggest.
    Regards,
    Srinika

    It is standard behaviour. There are ways to restrict. See these 2 posts
    User-Exit way
    Stop Confirming TECOed PM Order: User-Exit Way
    Status Profile way
    PM Order - System Status and User Status Update
    KJogeswaraRao

  • Maintenance work order-- Time confirmation report for work orders

    Could you please let me know how to pull actual time confirmation report for the maintenance work orders?
    regds
    Arun

    Use transaction IW43 or  IW47 for maintenance order confirmation ( inprocess & completed ) and refer [link|http://help.sap.com/saphelp_erp2005/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm]
    -S.N

  • CO11N: how to perform confirmation entry authorization per work center

    During production order confirmation entry authorization per work center is required however the standard authorization object for the confirmation Is only per plant and order type

    Hi,
    Yes, you are correct..
    There is no check for  the workcenter, unlike for Network Orders..
    But, you can use the User Exits:
    CONFPP02  PP order conf.: Customer specific input checks 1
    CONFPP03  PP order conf.: Cust. specific check after op. selection
    CONFPP04  PP order conf.: Customer specific input checks 2
    for your own chcks at the time of confirmation..
    Take the help of your ABAPer..
    Regards,
    Siva

  • Need to confirm actual time for 2 persons on one operation  in work order( PM)

    Need to confirm actual time for 2 persons on one operation  in work order( PM)

    Hi Abdullatif Siam,
    If you can move your discussion to the relevant space, possibility of people responding to you would be more..
    May be you move your post here -- Enterprise Asset Management --> http://scn.sap.com/community/eam
    BR
    Prabhith

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • Get Lastest date of the Work Order confirmation

    Hi experts,
    I want to write a report to get the lastest date of Work Order confirmation.Pls give me some logic solution. How to do?
    I know the work order can be cofirmed partly,So there are maybe several date for work order confirmation,I only want get the latest one.
    Edited by: Bean Dou on Jan 5, 2009 8:24 AM

    SORT BY DATE FIELD
    DATA:CNT TYPE SY-TABIX VALUE 0.
    SORT ITAB BY ERDAT. --->SUPPOSE THIS IS THE DATE FIELD
    LOOP AT ITAB.
    CNT = CNT + 1.
    ENDLOOP.
    READ ITAB  INDEX CNT.
    ****NOW YOU CAN GET THE LATEST DATE ROW******
    ITAB-ERDAT.

Maybe you are looking for