Copying annual revenue planning into a CO version

Dear All,
I have condtion where we do planning of revenue on annual basis with GL. And we have overall cost planning. Tcode used was CJ42 and CJ40 respectively. We do not want to plan cost on annual basis.
Because of above condtion when we copy planning into other co versions revenue planning was not got copied. Tcode used was CJ9FS.
We have lock year up dation in CO versions because we got wrong values of cost planning into versions. So that yearwise revenue values not got copied into versions.
Is there any standard way to copy annual revenue plan into co versions with maintaining above conditions or any work arround?
We are using RA, because of that we have to use annual revenue planning to use GL.
Regards,
Nilesh Bagav.

Dear Hemant,
Thanks for your reply. IN CJ9BS/selection option/Primary Revenue option works for copying revenue in to initial year of CO version.
Thanks,
Nilesh Bagav.

Similar Messages

  • Can you convert your desktop site plan into the phone & tablet version w/o re-creating the pages?

    Can you convert your desktop site plan into the phone & tablet version without re-creating the landing pages? This seems too extensive to have to re-design each page?

    Cwsnell,
    On your nav bar there is a shorcut to other pages.
    The most effecient way I have found to do this from the phone layout,
    click on the page icon shown above
    type in the name of the page (and select the desktop version as indicated by the icon of the monitor)
    select all on that page (CTRL A / Command A) and copy (CTRL C / Command C)
    revert back to the phone layout page and paste (CTRL V / Command V)
    then resize, delete what you dont need, make any other edits and your done!
    There is not a way to copy a page entirely over.  The mobile version should have less information and less imagery to enable fast load times.
    -SiteSpot

  • I have a copy of my iTunes data and I'm looking to restore it all back into a new version of iTunes reloaded after a hard drive crash.  How do I do this?

    After having a hard drive crash, I've reloaded Windows 7 and all of my applications on a new hard drive.  I have also downloaded and installed a new version of iTunes on my computer.  I now want to restore all of my iTunes tracks, videos, movies, books, podcasts and all my playlists into the new version of iTunes from a back up of all of my previous hard drive before it crashed.  I have tried importing the data but iTunes drops all kinds of data (artist names, album names, track number, etc.) and have to now manually go through all of my iTunes data (18,000 tracks) to restore the data.  The data consists of a combination of purchased tracks (approx. 6,000) and my own personal CDs copied into iTunes.  I need help badly here as I'm lost on how to proceed.  Thanks.

    Hi Toboggan,
    If you are looking to restore your iTunes data from a backup, you may find the following article useful (while it is focused on moving between computers, many of the steps should also apply to your situation):
    iTunes: How to move your music to a new computer
    http://support.apple.com/kb/HT4527
    Regards,
    - Brenden

  • Is there a way to scroll between footnotes in the new pages version and to actually copy an old text with footnotes into the new version without losing them or having them in the text?

    Since my update I am no longer able to scroll between the footnotes. I have to klick on each one to change something. That is unbearable since I have to write a lot of academic texts which usally have a ton of different footnotes. I also can not copy some of my old texts into the new version without losing the footnotes or having them in the middle of my text. Does anyone know a trick or if apple will change that for good? Thx for any support - it really drives me crazy

    Isn't that you asking how to get it (undefined) back?
    If you never had Pages '09, you can buy it from Amazon very cheaply:
    http://www.freeforum101.com/iworktipsntrick/viewtopic.php?t=432&sid=f68e84cd2ec6 123bd2ed93806c7e7fb6&mforum=iworktipsntrick
    Peter

  • How do enter my product code into a trial version when I have a student copy of Adobe Photoshop CS6

    How do enter my product code into a trial version when I have a student copy of Adobe Photoshop CS6

    Redemption Code Help
    Installing and Activating a Try & Buy product
    Mylenium

  • Data copy in Hyperion Planning taking long time

    Hi All,
    good morning.
    I am using data copy in hyperion planning (11 1 2 2) to copy from one scenario to other selecting account annotations and supporting details.
    The essbase part of copying data completed (checked sessions), but when I checked the job console in planning it still says processing for past 2 hrs.
    My java heap size for planning is 1.5GB and the backed database is SQL server
    my suspicion is that the issue was with backend sql. but I don't where to start.
    can anyone please guide me.

    I am working with version 11.1.2.1 and running into the same issue. The Supporting detail option works fine if the application has just a few details, let’s say 50 cells, but if we have around 500 cell with details then the copy process never ends, the details are not copied, and I have to restart the Planning service. As a workaround we are using a two steps process. In the first step we copy the just Essbase using the copy data functionality of Planning (with no data copy options enabled) or by using an Essbase calculation script. For the Supporting Details piece we use the Export for Edit functionality of LCM and export them to an XML file, and then we edit the XML file and change the source member name with the target member name, and finally we use the Import after Edit functionality of LCM. Of course if works only if the Planning application was deployed using EPMA.

  • Project Revenue Plan Not Update from Sales Order Item

    I am generating a network and project from the sales order item using Assembly processing. I am using milestone billing on the sales order item and the milestones attached to the project network activities are appearing as billing blocks on the sales order item billing plan. However, the project revenue is not getting updated from the sales order billing plan. Can someone please help?
    I have deleted the billing plan on the billing WBS element and activated revenue planning update from sales order in cusomization for PS. I am looking at CNS41 under the project revenue sched in version 0. Is there a different report I should be looking at?
    Regards,
    Venkat.

    HI Venkat,
    You are looking at the correct report & I believe you have also done the necessary customization. If you create a sales order and reference it to a quotation, the related plan values in the WBS element are refreshed automatically.
    When the payment data is recorded, the terms of payment and the customer payment history are taken into consideration. One of the probable causes could be the credit limit of the customer might have been exceeded. Take help of your SD consultant & increase the credit limit for that customer (from the sales document), t-code FD32 if it is permitted in the business.
    After the new credit limit is set execute the following steps:
    u2022     Go to the t-code Change billing request (VA02)
    u2022     Open the required billing request
    u2022     Remove the account assignment of WBS element from each line item
    u2022     Save the billing request
    u2022     Reopen the billing request in change mode
    u2022     Reassign the WBS elements to all line items
    u2022     Now the changed credit limit will take affect
    u2022     Check the Planned Revenue for the said project in CNS41, it should get updated.
    Rgds
    Deepak

  • Copy project cost planning to budget only per year (IMCCP3)

    Dear All!
    Iu2019m trying to find a possibility in SAP Projectsystem to copy cost planning (done for more years) for various projects in planversion 0 to the budget for only one year. It seems that the transaction IMCCP3 only supports the copy of all years and it can not be restricted to e.g. copy costs only for year 2011 into the budget.
    Any clues would be helpful to me.
    Regards,

    Dear Praveen,
    thank you for your reply. Budgetprofile is set to values per year. Your idea is good but I fear that this is not suitable for a normal end user. I'm searching for a solution / transaction with the possibility to copy the costplanning to the budget for a specific year for more projects at a time.
    Interesing: It is possible to copy planned costs from one version per year to another version per year for more projects at the time with the transaction CJ9B but it is not possible for the budget...
    Take care,
    Peter

  • I have a rather old iMac 20" (mid 2007) and I want to upgrade the Hard drive. How do I change it? How do I transfer all my applications? May I just copy the old hd into the new one? Thanks.

    I have a rather old iMac 20" (mid 2007) and I want to upgrade the Hard drive. How do I change it? How do I transfer all my applications? May I just copy the old hd into the new one? Thanks.

    There are many online tutorials on how to change out the HD on a mid 2007 iMac. One of the originals is from 2007 and is Upgrade your iMac 20" or iMac 24" aluminum (mid 2007) to 1TB Hard Drive and 4 GB RAM - DIY Guide. As far as migrating your system Apple helps out with that in Setup Assistant which automatically starts when you turn on a new Mac for the first time. After you have installed the new HD you will have to format the new HD to Mac OS Extended (Journaled) and then you will have to install OS X. The first time you turn it on Setup Assistant will start. Follow the directions and you will be fine. In order to restore your information you will need to backup what is on the current internal HD first. I'd recommend using Time Machine (Assuming you are using Leopard or later) AND also creating a bootable clone using either SuperDuper or Carbon Copy Cloner.
    Please complete your profile so at the very least we know what version of OS X your machine has installed.

  • My HDD crashed in my old PC and I built a new system.  iTunes won't let me sync the music from my ipod back into the new version of iTunes I had to download.  How do I fix?

    My HDD crashed in my old PC and I built a new system.  iTunes won't let me sync the music from my iPod back into the new version of iTunes I had to download.  How do I fix?

    Syncing music via iTunes is only one way: from iTunes to your iPod.  If you need to copy the music from your iPod back to your PC, see this older post from another forum member Zevoneer covering the different ways to do this.
    https://discussions.apple.com/thread/2452022?start=0&tstart=0
    B-rock

  • How do I copy, paste Word document into Adobe Reader PDF?

    A client is not using Microsoft Word, but typing text for my edits into Adobe PDF. Too many edits, too cumbersome for me. After converting PDF to Word, I edit using various ink colors. How can I copy, cut, paste edited WORD document into her PDF? Other than by using "paper clip" or "attachment" features?

    Thanks, graffiti...So, can't copy, paste Word document into PDF?
    What is the "full version" of Adobe vs my Adobe Reader? Adobe Acrobat?
    I do have a cloud, but doesn't help with my editing problem.

  • Copying from microsoft word into my application

    I am copying from microsoft word into my application..
    and them on submit, i am calling a procedure i get the following error
    Caused by: java.sql.SQLException: ORA-01460: unimplemented or unreasonable conversion requested
    i think its down to special characters used.. like apostrophe is different in word then normal.. anyone got solution for this error not to occur?

    74 questions, 72 unresolved.
    And this one: sadly we are not looking over your shoulder, so we don't know what 'copying' means, which version of Word, which 4-digit version of the database, and which SQL statement fails.
    Sybrand Bakker
    Senior Oracle DBA

  • Revenue Planning to cost elements

    Hi,
    I am Working on Project system object.
    When i am trying  planned revenue is added on the project, I need to find if there is a way to assign the revenue amount on the lowest WBS to a cost element. This is required for revenue amounts to appear in costing reports. CJ42 is used to add planned revenue manually.

    hi anuradha,
    Revenue Planning
    Use
    Revenue planning can be necessary when you perform results analysis on a sales order item and use a results analysis method that uses the planned revenues to calculate the results analysis data.
    Features
    The net value (revenue) for sales-order-related production is determined in pricing in Sales and Distribution (SD). Pricing depends on specific conditions which you maintain in Sales and Distribution.
    A particular customer orders a particular quantity of a product on a particular day. The variable factors – customer, product, quantity ordered, date – determine the final price for the customer.
    The system uses the conditions you specified to calculate the gross price at which the customer is invoiced; any discounts applying to the customer, for example; and other values such as freight charges and tax.
    Pricing is controlled by a pricing procedure which is selected through the sales document type. Price elements such as prices, surcharges and discounts, freight costs and taxes are saved in Sales and Distribution as condition types. The pricing procedure determines which condition types are used and the sequence in which they are calculated in the sales order.
    Condition Types
    The standard system contains the following condition types that can be used in connection with unit costing, product costing, and preliminary order costing in assembly processing:
    Condition Types for Pricing
    Condition Type
    Meaning
    EK01
    Cost of goods manufactured (CGM)
    EK02
    CGM (statistical)
    EK03
    Fixed CGM (statistical)
    Condition type EK01 is mainly used for cost-plus contracts in which the sales price depends on the expected costs.
    Condition type EK02 is mainly used when the sales price is a market price and the expected costs are only used for informational purposes.
    Condition type EK03 offers the capability of transferring the fixed costs of a cost estimate into the conditions.
    The costs are transferred from the cost component view Cost of goods sold into the condition type.
    The above-mentioned condition types must be of category Q. Whether a condition type of category Q is only used in pricing as a statistical value or for price calculation is controlled in the pricing procedure.
    The condition type is created in Customizing for Sales.
    The condition type can be selected as follows:
    Through the sales document type
    Condition types EK01 and EK02 are specified in the CndTypLineItems field in the sales document type.
    Through the requirements class
    This enables you to define different condition types for different sales document items of a sales document.
    Condition types EK01 or EK02 are specified in the CndTypLineItems field in the requirements class.
    Condition type EK03 is specified in the CondTypLinItFix field. You can only use condition type EK03 in conjunction with the requirements class.
    Planned Revenues
    Revenue elements from the SD pricing procedure that are not statistical are updated as planned revenue on the sales order item that carries costs and revenues, and can be viewed in the Product Cost Controlling Information System. Sales deductions can also be assigned to revenue elements through account determination, and updated on the CO object for the sales order item.
    The condition type is selected through the sales document type.
    Condition type EK01 is selected for sales document type TA (standard order). This means that the value from the cost estimate goes directly into pricing. A surcharge is calculated from this value and the net value for the sales order item is calculated.
    Condition type EK02 is selected for sales document type TA (standard order). Pricing is carried out on the basis of condition type PR00. To maintain this price, choose Logistics ® Sales/distribution ® Sales ® Master data ® Prices ® Material prices and enter a material price. The material price is updated under condition type PR00, while the values from the cost estimate are updated under condition type EK02 and can be used for informational purposes.
    Actual Revenue in Product Cost by Sales Order
    Use
    In Product Cost by Sales Order, actual revenues are updated to the sales order item that carries costs and revenues at the time of invoicing.
    Integration
    You can view the actual revenues in comparison with the planned revenues and costs in the Product Cost Controlling Information System at any time.
    You can settle the costs and revenues that are updated to the sales order item to a profitability segment in Profitability Analysis (CO-PA) during period-end closing for Product Cost by Sales Order. When you perform results analysis, the results analysis data are settled to CO-PA.
    The processing in Product Cost by Sales Order therefore differs from the processing in Product Cost by Order or Product Cost by Period (make-to-stock production and with a valuated sales order stock without a sales order item that carries costs and revenues).
    If you perform this type of product cost controlling (such as in addition to Product Cost by Sales Order), then in Product Cost by Order or Product Cost by Period the revenues from invoicing are transferred to CO-PA.
    If you are using the cost-of-sales accounting in Financial Accounting (FI) and are using a valuated sales order stock, you do not need to perform results analysis in order to transfer the cost of sales to FI. The cost of sales is transferred to Financial Accounting at the point of the goods issue posting.
    Prerequisites
    To ensure that the revenues are displayed on the sales order item, you must create revenue accounts and possibly sales deduction accounts as primary cost elements of cost element type 11 (revenues) or 12 (sales deductions). Make the necessary settings in Customizing under Controlling ® Overhead Cost Controlling ® Cost and Revenue Element Accounting ® Master data ® Cost Elements.
    To be able to settle the costs to Profitability Analysis, you must make the necessary settings in Customizing for Profitability Analysis. Make the necessary settings in Customizing under Controlling ® Profitability Analysis.
    Features
    Billing
    Billing invoices the customer for the goods and services delivered for a sales order.
    In Sales and Distribution, you create an invoice (billing document) on the basis of a reference document. In order-related billing, the reference document is the standard order or the delivery document with delivery-related billing.
    The data such as prices and quantities are transferred from the previous documents into the billing documents. The price can be calculated in the following ways:
    Using pricing on the basis of conditions (such as material or customer)
    On the basis of the incurred costs if you want to use resource-related billing
    When you enter a billing document, the system proposes a billing type depending on the reference document.
    The billing type determines the following:
    Which pricing procedure is used for account determination for Financial Accounting
    Whether the invoices are passed immediately to Financial Accounting
    Account assignment is controlled by the following parameters:
    The chart of accounts
    The sales organization
    The account assignment group of the customer (in the Account group field in the Invoicing screen of the customer master record)
    The account assignment group of the material (in the Account assignment group field in the Sales 2 view of the material master record)
    The account key in the pricing procedure
    thanks
    karthik
    <REMOVED BY MODERATOR>
    Edited by: Alvaro Tejada Galindo on Apr 15, 2008 3:10 PM

  • Copy cost center planning to profit center

    Hi dear,i did cost center planning with KP06,then i try 1KE0 to copy cost center planning data to profit center,but seems it does not work,because there is no relevant planning data when i use KE5Z to check planning data
    can someboyd kindly tell me what i need to do to transfer cost center planning to PCA,THANKS

    Hi,
    To integrate cost center accounting (CCA) planning with PCA, for each fiscal year in Maintenance of Versions, the Integrated Planning checkbox should be checked . Also in PCA, maintenance of plan versions -> settings for Profit Center Accounting, the Online Transfer checkbox should be checked so that the postings are transferred to Profit Center Accounting for each activity automatically
    Tcode KE5Z is for Profit Center Actual Line Items. So even if you select record type 1 here, it will not give planning data. Similarly, tcode KE5Y is for  Profit Center Plan Line Items. If you select record type 0 here, it will not give actual data. If Integrated Planning is activated (as mentioned above), then KE5Y will give you all planning data, irrespective of whether it is planned using PCA or CCA.
    Regards,
    Sangeeta

  • HT5569 Is there a way to store a wi-fi password on an iPad and then copy and paste it into the proper space when you want to connect to your password protected network?  (the password is 31 random characters)

    Is there a way to store a wi-fi password on an ipad and then copy and paste it into the proper space when you want to connect to your password proctected newwor?  (the password is 31 random characters)

    Yes, if both the Mac and iPad are setup using the same iCloud account, then any notes you enter on the Mac will be synced across to the iPad almost instantly.
    Same occurs with the 1Password app I mentioned. If you have both the Mac and iPad versions of it, and setup either iCloud or Dropbox syncing, any passwords entered on the Mac will be synced to the app running on the iPad ready for copying and pasting. This would be the most secure method, but not the cheapest.

Maybe you are looking for