hello all,
We are trying to copy our template project which holds the complete business process structure including all content and documentation in our production system, to safeguard our template project. The target project type is also a template project.  If we copy the template project with transaction solar_project_admin, we cannot get into the copied template project. We receive the next error message the "process structure doesn't not exist" and SAP refers to the SOLAR_GEN_* batch job, which didn;t run correctly. If we copy the template project in our test environment we don't have any problems. Only thing is that in the source template project in the template tab of project administration, the number of templates is growing each time we do a copy template project.
It seems that it is not possible to copy templates in production and probably that is why no process structure is created in the target template project.
Does anybody come across this issue?
thanks in advance,
Ralph

Hi Srini,
If you want to copy your template project e.g. for saveguarding your template project, you can copy the template project by using the transaction solar_project_admin. It is only possible to copy template to template.
The moment you copy the template project the assigned templates will be copied because they need to be unique. The background batch job does copy these assigned templates and will name the template an unique name e.g. template1.
For copying these templates you need to open your customizing otherwise the background job cannot copy the templates.
hope this will help.
Ralph

Similar Messages

  • Configuration steps not copied from Template project

    Hi All,
    We are creating a project using an existing template project (our own defined). The business processes are copied but the configuration steps and documentation in configuration does not come in the new project (SOLAR02).
    Could any one help.

    Goto solar01 transaction here first choose the business scenario of ur template project which you have added in the structure tab on the right side you have something known as attribute column
    Here choose the appropriate one for you
    Global
    A process is global when it is integrated throughout the enterprise, that is, it is cross-functional or cross-organizational. An element that is flagged as global cannot be changed in a Local Rollout, i.e. the structure element and all associated business content is pre-determined.
    Standard Complete
    A process is standardized if it must be executed in the same way in the entire enterprise (in all relevant organizational units). A standardized complete element (and its business content) can be seen as a proposition from the Global Template that should be used as delivered. However the local team may extend the structure element with additional substructures and with additional business content.
    Standard Partial
    A process is standardized if it must be executed in the same way in the entire enterprise (in all relevant organizational units). A standardized partial element (and its business content) can be seen as a proposition from the Global Template that should be used as delivered, but the process consist of sub-processes that are locally regulated by legal requirement and these need to be defined on a local level. The local team can design own process if agreed by the parent company. Therefore the local team may extend the structure element with additional substructures and with additional business content. Template business content may even be changed or deleted by the local team. Whenever a template object is deleted there is a warning message.
    Harmonized
    These Business Process, Master Data, Organizational Units will be standardized in the future. It is recommended that the Local Rollout uses the harmonized structure elements. A process is harmonized if it is recommended to execute the process in a specific way. Harmonization is a first step towards standardization, but without mandatory elements. One reason can be for organizational readiness or many legal requirements preventing standardization. For the local teaam the same activities are allowed/forbidden as for Standard Partial.
    Local
    A process is local if it is not possible or it makes no sense to define it as global, standardized, or harmonized. Local units must design this process for their needs. These processes are necessary for obtaining an executable system for testing. For the local teaam the same activities are allowed/forbidden as for Standard Partial.
    Note You can use the pass tab available next to +/- button which is used to pass this attribute which you have assign to the lower levels.
    Hope you got what you are looking for
    Regards
    Prakhar
    Edited by: Prakhar Saxena on Mar 20, 2009 2:12 PM

  • How to block copying incomplete template projects

    In our business we work with template projects from where we copy (CJ20N) the operational projects.
    It does happen that these template projects are ´in maintenance´ or are being defined... there is even a status field for that.
    The problem is that a user is able to create a copy of an incomplete template (they are geographically spread - so they do not easily communicate between template builders + operational project mgrs) - the system does not prevent a user from doing so... and according to our friends at SAP, the system works as designed..
    Has anyone of you experts seen this problem before, and how did you handle it to make sure that a user cannot copy from a template which is in maintenance?
    Edited by: Rony Cools on Aug 13, 2009 6:34 AM

    Hello,
    you can enter a lower limit in the condition record:
    Lower limit of the condition rate/amount
    Indicates whether, during document processing, the system checks if manual changes fall short of the lower limit allowed for the corresponding condition record.
    Use
    When you maintain the scales in a condition record, the system checks whether the scale value falls below the lower limit.
    Or you can use the flag 'conditon update'.
    Condition update
    Controls whether limit values are relevant for pricing.
    E.g.: you can make the use of a particular condition record in the document dependent on a specified total value.
    This total value can be specified in the condition record.
    I hope that the information are helpful.
    With best regards
    Claudia Neudeck

  • How to copy a project from MBP to Mac Pro without media

    Explanation:
    Our Director takes all the video interviews, imports this media into a Mac Book Pro (FCP X 10.1.1), creates a Project, makes his audio selects, and edits the video onto the timeline.  Then he copies the Project to a portable hard drive.
    In the meantime, we have imported all the media into our main edit station, a Mac Pro.  Now we plug in the portable drive, open that Library, and copy the Project with the video interview selects to our main Event with all the media on the Mac Pro.
    The problem is ... the media of the interview selects is also copied.  Then we have duplicate media in our Event.  With the previous version of FCP X, we could copy over the timeline without media, then reconnect it.
    Any solutions?  A better way?
    Thank you.

    Hi Cliff,
    Welcome to the Support Communities!
    For your particular workflow to be successful, the media needs to be stored outside the Library (External Media). It is important that the media that is being shared is identical on all drives or computers.  The resource below will provide additional information and best practices for working with media in the new Final Cut Pro 10.1.1 environment.  See Page 4 regarding Managed vs. External Media.
    Managing Media with Final Cut Pro X Libraries
    www.apple.com/final-cut-pro/docs/Media_Management.pdf
    Managed and External Media
    Media that you import into a specific library is stored inside the library and is referred to as managed media. Media can also be imported or copied to any location on a connected volume and linked to the library as external media. Multiple users can access this external media instantly on shared storage, including a storage area network (SAN) such as Xsan, Apple’s SAN file system.
    Page 16-18 includes suggested workflows for collaborating with other editors.  The Transfer Library option on page 18 may work well for your particular situation:
    To hand off new events to a working library using a transfer library
    Another way to hand off new events to a working library on shared storage is to create an intermediate library, or “transfer” library. For example, an assistant editor can create a transfer library containing new events to be handed off to the primary editor, and then copy the new events from the transfer library to the primary editor’s working library.
    1. On the system you want to transfer from, select the events you want to hand off.
    2. Choose File > Copy Events to Library > New Library.
    3. In the window that appears, type a name for the new library, navigate to a location for the new library, and click Save.
    4. If you want to include optimized or proxy media in the new transfer library, select the appropriate checkboxes in the window that appears, and click OK.
    5. In the Libraries list, select the newly created library and choose File > Close Library.
    6. On the destination system, open the new transfer library by choosing File > Open Library > [library name], and drag the updated events to the working library.
    Note: Motion templates are not managed as assets within the library but are instead stored in ~/Movies/Motion Templates/. If a project is dependent on custom titles or other Motion templates, these must be handed off separately. Placing updated Motion templates in a central location on shared storage as a last step in any handoff process guarantees that all editors working on a project can access the templates at any time.
    I hope this information helps ….
    - Judy

  • Is there a way to create a Cairngorm "template" Project?

    Would it be possible to create a template for Cairngorm-based Flex projects, since they all have the same general architecture?:
    /src
    /control/events
    /control/commands
    /control/Controller.as
    /control/Services.mxml
    /model/ModelLocator.as
    /valueObjects
    /view
    I basically want to create this folder/file structure, and then start a new project in Flex Builder using this template. I know I can simply copy and paste the structure from a random folder, but I was wondering if there is any way to do this in Flex Builder.
    Thanks.

    FYI, when I try "Import... > General/File System", it only imports folders with files in them (it ignores /control/events, /control/commands, /view, and /valueObjects).
    On Wed, Dec 24, 2008 at 10:05 AM, Eric Belair
    <
    [email protected]> wrote:
    A new discussion was started by Eric Belair in
    Cairngorm Development --
      Is there a way to create a Cairngorm "template" Project?
    Would it be possible to create a template for Cairngorm-based Flex projects, since they all have the same general architecture?:
    /src
        /control/events
        /control/commands
        /control/Controller.as
        /control/Services.mxml
        /model/ModelLocator.as
        /valueObjects
        /view
    I basically want to create this folder/file structure, and then start a new project in Flex Builder using this template. I know I can simply copy and paste the structure from a random folder, but I was wondering if there is any way to do this in Flex Builder.
    Thanks.

  • Template project in SAP PS

    hi all,
    what is template project and how to create it?
    waiting for reply from forum friends,
    regards
    dipankar

    To create template projects go to CJ91 transaction & CN01 to create std networks and activities.
         A template project is one which has all the possible WBS element and activity scenarios listed. The advantage is that when one creates a brand new project, he/she can copy it from the template instead of working one up from scratch. The template will be created incorporating the standard practices of the organisation.

  • How to compare between two versions of template project???

    Dear All,
    We are doing some cleanup activity in our solution manager system. For this actually we have created the replica of this project from production system to a sandbox system. We can do the cleanup of this project and can transport this new project to our production system and can move on.
    But the pbm we are facing now is, how do we bring in the data captured or added to the production system after we have copied it to the sandbox system?
    Can anybody throw in some light into this issue?
    We tried the option of creating different version for the template and using the sa_project_upgrade transaction to compare between two versions of the template using "Current Version in Project" option. Not sure whether this will work out.
    {{We thought that if we try in this way, we can find the difference between the two versions of the template project, and from there, might be we can bring in the new changes into our new project manually. We do agree that this is not the right approach.}}
    But the end result we got was like we got the information regarding where all there is the difference between the current version in the template project to that of the original(in our case it checked against BPR as we selected the scenarios from BPR for this template). But what we expected was a difference between two versions of the template.
    Pls help. Pls make a try to help. Any thoughts in this direction will help us to move forward.
    Any info will be suitably rewarded.
    best regards,
    Krishna.

    Hi Andreas,
    Thanks a lot for your immediate reply.
    I too had that doubt that my appraoch will not work. But wanted to get confirmation that it will not work. Also wanted to know about any other approach. Thank you for providing me with some alternative approach.
    I tried the option suggested by you. But while running the comparison report for the newly copied project with the option "New Version of Original", I am getting the below error. I do agree that this approach should work. But for some reason I am getting the below error. Can you pls look into the same and help me out.
    Internal error
    Message no. AI_COMPARE006
    Diagnosis
    An unexpected error has occurred in:
               program CL_SA_PROJECT_UPGRADE_ONLINE==CP
               include CL_SA_PROJECT_UPGRADE_ONLINE==CM002
               line                                                  102
    Procedure
    Restart the transaction. If the problem persists, check if a SAP note is existing for this problem. If not please send a message to the SAP hotline.
    Thanks a lot in advance.
    best regards,
    Krishna.

  • Template Project Usage in Implementation Project

    hi,
    I have defined the Template project in Solar_project_admin. Now how I can use this template project in Implementation project.
    What are the steps of copying the template project into implemenation project.
    Regards
    PK

    Hi Aditya,
    Many Thanks. I am new to this feature ( Template project & roll out).  My requirement is like, I need to define one template project & same has to be rolled out in other contries implementation projects. This is in a broder sense.
    Now what are the steps to go about. How to proceed.
    Will there be only one Solution Manager or different countries will have sepearte Solman. Will one Solman will do all rollouts.
    Can you give me some useful stuff as a biginner, how the project management is used  ( especially Template project & roll out )
    Regards
    PK

  • Adjust changes in Implementation Project  back to Template Project

    Hello All,
    Please can you help with transaction SA_PROJECT_UPGRADE, the case is as follow:
    STEP 1
    - Template project is created including process structure and documents, template is activated
    - Implementation project: is created derived from template project.
    - In Template project: Change in pocess node made: added an new process node
    - Run SA_PROJECT_UPGRADE with checked box "New Version of Original" and chosen project: Implementation project
    - Implementation project:  the yellow boxes appears on the appropriate place and button "adjust to original" is used.
    So far, so good
    STEP 2
    - Implementation project: a new process node is added, project is saved
    - Run SA_PROJECT_UPGRADE with checked box "'Current Version in Project" and chosen project: Implementation project
    - Template project: no changes are visible in SOLAR01 or SOLAR02
    - In SOLAR01: settings -> User specific -> box checked "Dislay changes made in project"
    So far, NOT good.
    Resume:
    - using transaction SA_PROJECT_UPGRADE from Template -> Implementation Project works according documentation
    - using transaction SA_PROJECT_UPGRADE from Implementation Project -> Templates does not work according documentation
    Does anybody recognise this?
    Or do I oversee something?
    System: SSM 4.0 updated to SP13
    Thanks in advance
    Rutger Koppelaar

    Hi Rutger (& all others watching this thread),
    I would like to make certain corrections to one of the points posted by me:
    2) Within a Template Project, any actual changes to the document does not offer itself as a 'change' while doing comparison on Implementation Project. In other words, after a given Scenario and all its associated documentation are copied into an Implementation project, if a given document at a given node needs to be edited, it's better to create a new document and upload it in Template Project than to open & change the same document. If the same document is edited, the Compare and Adjust cannot see that as 'difference'.
    On the above point, I have now see better/different results with my recent work; not sure if this is version/ support package specific.
    Environment:
    SolMan 4.0
    SAP_BASIS - Release 700 Level 0013
    SAP_ABA - Release 700 Level 0013
    ST - Release 400 Level 0014
    Assumption: Both the Template and Implementation Projects are in the same SolMan instance and not a case where the Template is being transported into another instance!
    Findings (please bear with this verbose description; one day I intend creating a Blog instead, to list all these points):
    (1) In General Documentation Tab of Template Project, any changes made is instantly visible in General Documentation Tab of the Implementation project - not even dependent on running SA_PROJECT_UPGRADE transaction
    If you indeed run this transaction - in foreground or background, and later check the Implementation Project, it would not highlight that node as having undergone any change. However, if you double click the document itself, you'd be pleasantly surprosed that it opens the most updated version you maintained in the Template Project. No need for 'Compare and Adjust'.
    (2) In Test Cases Tab - any change you make to Test Document in Template Project is again instantly available for the Implementation Project that had inherited the document, provided no manual changes were done to that document in the Implementaiton Project directly. Again, no need to run SA_PROJECT_UPGRADE transaction or the subsequent 'Compare and Adjust' function
        2a) If, however, the Test Document was altered in Implementation Project subsequently, the chain gets broken (in my understanding so far), and any subsequent changes made in Template Project does not become 'instantly' visible in Implementation Project - the two behave as though they are different documents
              In such a case, if you desire to 'restore' the supremacy of Template Project's contents, run SA_PROJECT_UPGRADE transaction, and after the background job finishes, visit Implementation Project concerned. The node where the Documents differ is not highlighted (unfortunately).  However, if you are aware of that node, and hit  'Compare and Adjust' button the ensuing Window does tell you with a # sign on the right hand panel that the Document has indeed changed in the original. You can 'adjust' that and save.
    Once this is done, and also you vow to not change the document in Implementation Project directly, the link between the two is kind of re-established. Any subsequent alterations you make in the Test Case at Template Project would be instantly visible from Implementation Project, as before !
    I have tried to explain precisely what I experiemented and found. I hope this works consistently
    The ways in which Document linkages are established and pointers to KW object IDs work is rather inscrutable for me, without ABAP support.
    I'll update any further findings here.
    Please keep a watch.
    Thanks and regards,
    Srini

  • How to map business scenarios from implementation project to template project

    Hi
    We have a template project and in this we have maintained few business scenarios. And also some specific scenarions are configured in the implementation project. Now we need to make template project as Global Template and for this we need map all existing scenarios in implementation project to template project.
    Please suggest how we can map from implementation project to template project.
    Thank you

    Hello,
    Along with Sandeep recommendation, you can do it by several ways.It all depends on how are the current projects organized.
    Did you create the template project and then rolled out the templates to the impl. project?
    In case you want to update these scenarios in the Template project based on the changes you performed in te Impl. Project, you can use the Compare & Adjust functionality.
    You can Copy Scenarios from one project into another by using the right click/context menu directly in the node in solar01.
    If you just want to copy the structure, you could export the  Impl. project structure in solar_project_admin by using the "fill business blueprint" functionality, then adjust the structure similarly for the template project and upload.
    and so on..
    regards,
    Fabricius

  • What's the purpose of copying the projects?

    I use Enterprise PeopleTools 8.49 Installation for Oracle for a guide to install the peoplesoft. When I did the step of Updating Database to Latest PeopleTools Release of Chapter 7B, I found that it told me to copy the project to the database but no to tell me to build it. Without building the project, the objects of the project can not be built. Should I need to build the project? What’s the purpose of copying the projects?

    I'm afraid, you were starting to speak about Peopletools installation tasks, which come with its own particularities, now you're speaking about maintenance packs which come with other particularities.
    Honestly, I didn't read the MP6ML installation guide, and if you need to build the project or not, I do not know, and if you need, I don't know the options neither.
    But I'm sure, because I did it several times by the past for other MPs, everything was well explained in the doc and/or template, including the exact options you need to set before building the project.
    For MP application, PSCA should be used as most as possible, if not possible, then manuals steps are described in the templates. If not, then open a case to Peoplesoft support.
    ...the second one just told me to copy the projects named HC9_MP6_ML_1_CP and HC9_MP6_ML_2_CP from file to my target database. So should I build the projects? And which options should I choose when I build the projects?If the template describe only a manual copy project (without build), then copy and do not build the project.
    Nicolas.

  • Copying a project and network structure

    Dear experts,
    I have a problem in copying the project.
    I am using Investment management. After approval of the project I'm activating the measure at the time of activating the WBSE there is an option of copying the operative project or std. project, when I mention the operative project in copy filed and save, the project structure upto WBSE levels are copying. Upto this it is fine.
    The networks are not copying by this method. I'm trying to create a network with reference network. Its copying that particular network along with the relationships within the same network.
    But my problem is we are using PS for R&D projects and all the projects are having similar structure, so i want to copy the whole project structure mainly the relationships of other networks also.
    I tried using CJ2D, here I can only cerate a new project without investment management. Here when i create a project with reference to another project the system copies everything like all level WBSE and Network activities with all relationships I mentioned in the earlier networks. Actually this is the requirement I'm looking at. But I'm not able to get this done when I'm using investment management.
    Can anyone please help me in sorting out this issue.
    My major problem is R&D project contains so many activities and with lot of relationships within the network and also with other network activates. And we will be having nearly 100 projects per year and creating the same kind of networks every time is a very huge task.
    Please some one through lights on this issue.
    Thanks and Regards,
    Praveen.

    Hi Elza,
    Thanks for your inputs, really helpful.
    I follwed like this, activated the project deifinition in appropriate request saved it. Then in CJ20N I opened the project and in template area I have opened the operative project's level 1 WBSE element and dragged the same to the new project definition, system copied everything from the operative proejct structure all WBSE and the network activities with the relationships as such.
    But I have one more doubt. What happens to the link between the  Appropriation Request and the Project? Like when I used to activate the proejct definition and create a project from appropriation request there is link between the approriation request ans the project and copies the planned values to the project, and also controls the budget values w.r.t the project.
    But what happens in this case? how the link is established and the budget is controlled? Can you please clarify this also?
    Thanks again for your help.
    Regards,
    Praveen.
    Regards

  • Template project

    Hi! everyboby
    Can anyone tell me how to create a template project ?
    I am having problem when I try to save it.  I do not know what type of package I heve to type.
    Thank you very much
    Xiomara

    Hi Xiomara,
    As regards approaches to Template Project, there are primarily two:
    (1) Create a Template Project with a view to share project structure and content to Rollouts or other Implementation Projects planned to be carried out from various other SolMan instances in those respective countries or business units
    (2) Create a Template Project to share the structure and contents with other projects that are to be based out of the same SolMan instance
    If yours is of type (2) - which most people tend to have - you dont have to worry about Packages/ Transports etc. and save the Project as Local Object.
    It's an 'irreversible' decision and therefore, it's better to check with all senior members of the project team.
    If you go ahead with (2) and at some very late stage, you realise that there is a subsidiary in Asia or South America who are keen to use your Project structure and knowledge, but based out of their 'own' Solution Manager instance, you'll have a few possibilities, including:
    - Client Copy to start with, as a one time 'gift'
    - Transport the whole Template Project as a one time gift !
    Basically, type (1) is to be used mainly where a clear requirement exists - a central team is convened somewhere (e.g. Europe) representing all geographies, and would like to be the only team that keeps preparing 80% of Global Scenarios, Processes and Content and dish them out to local subsidiaries who can then 'adopt' such incremental templates in their respective SolMan instances.
    Or, SAP Partner firms may opt for type (1) to create some pioneering work/content at their premises in their own SolMan and periodically 'release' such value added content to the client(s) concerned.
    If you can assess your own context and make up your mind to not opt for (1) you can conveniently ignore the 'package' business and save your Template Project and all its subsequent contents in SOLAR01/02 etc. to 'Local Object' - not transportable.
    Please also read SAP Note 603336 for more information on limitations of these two types of approach.
    Feel free to ask for any more info; this is a favourite topic of mine and time permitting, would like to answer as much as I can !
    Best regards,
    Srini

  • Exit for replacing WBS element characters while copying from Project

    Hi All,
    While copying a Project from other Project/template in CJ01, we are getting only first 10 letters of a WBS element are getting replaced.
    The requirement is to have replacement of letters even after 10th character in WBS element.
    The SAP Note 502322 suggests to have user specific (custom) replacement logic in the user exit CNEX0033.
    Anyone has worked around such requirements?? If so can you share it,,,?????
    Regards
    Pavan

    Hi,
    While creating a Project in CJ01 by giving a template, the new Project will get created with all WBS elements from the template Project.
    In standard system, the WBS Element which has more than 10 characters will get copied till 10th character only.
    Now we need to work on user exit CNEX0033, so that entire WBS element name should get copied in the new Project.
    Anyone has worked on such requirement???
    When i create new Project in CJ01, the exit CNEXX0033 will trigger..
    If so can you suggest me how to move further??
    Regards
    Pavan

  • Copying Implementation Projects

    I understand that the process for creating implementation projects is to copy from a template project. However, is it possible to make an identical copy of (not transport) an existing implementation project and all of its attached documentation without doing a client copy? If so, how?
    Thank you,
    Megan

    Hi Megan,
    you can copy a complete project via the project administration transaction (solar_project_admin). Select a project from the list and use the menu path "Project --> Copy". You will receive project copy screen in which you can select the copy options.
    Best regards,
    Michael

Maybe you are looking for

  • Archive old Google Calendar events from iCal 4?

    I have 8 Google calendars filled with events going back years. It's too big and I want to thin it out by archiving all events older than two years. I'll do it manually, but I can't find a way that works. I haven't found any way within Google to do it

  • Return material to vendor from blocked stock

    Hi! I am going to use blocked stock (s) to lock low quality material. How could I return it to vendor. Please give me document chain . We use WMS and document flow must include outbound delivery. Andrey Garsin.

  • Mail server is too slow to deliver the mail to internal domain

    Hi, My mail server faster enough to send the mails to other domains, but when i try to send mail to my own domain it too slow some time it take 30 t0 40 minutes to deliver the mail. Please help Thanks, Gulab Pasha

  • Please help i need a sourcecode i think it�s easy

    Please help i need the source code for a programm which should ask me for a number for instance: "7" and then should the programm write "seven" please help