Cost Analysis: Planned Vs Actual Cost Variance for cost

Hai
Which is the standard cube for "Cost Analysis: Planned Vs Actual Cost Variance for cost"?
Because i need these fields
Cost Element
Actual Cost
Plan cost
Debit Posting
Credit Posting
Controlling Area
Cost Centre

Hi nvr,
Cost Element : Cost Element nothing but a which product your spending
Actual Cost : How much amount your spend on particular product
Plan cost : How much amount you need to spend on particular product
Debit Posting : In Accounting they are doing one positng that is depend on Debit and Credit.
Credit Posting:
For Exp: your parchase one product RS.500/-
In FI they are posted like this.
Product Name DR.(Debit) 500
to Cash                                      500 (Credit)
here product name is debit posting
cash is credit posting.
Controlling Area : Which area your spending the money
For Exp: You have Man.Company your doing some processes which process that cost is spend nothing but a Controlling Area.
Cost Centre : cost Centre nothing but which process.
Hope its' helps .
Thanks and Regards,
Venkat.

Similar Messages

  • Process Order Cost Analysis Target and Actual Quantity Missing

    This is related to Process order costing .
    Issue : Before activating  Material Update field in Costing view 1 of Material master , we have created few process orders and Delivered .
    Hence cost analysis shows Actual and target cost fields  Empty in COST ANALYSIS  report of  order  . After Updating field in Material master , New Process orders are calculated with Actual and Target cost .
    Solution needed : How to do Actual and Target cost estimation back in cost analysis report  for old process orders which are created before Material Update field ?

    You have deleted the Component in the BoM.
    Then you have created a production order, check if the start date of this order is after the date change in the BoM..... Can be that the component stills exists in the order ? Have you tried deleting the compoent in the order BoM ?

  • Cost analysis - Plan cost

    Hi all
    In the cost analysis screen of the productin order display (CO03), how does the system calculates the plan costs column?
    Thanks in advance
    Regards
    Yiming

    Hi
    The plan costs come from the preliminary costing of the production order.
    See attached link for further information:
    http://help.sap.com/saphelp_erp2005/helpdata/en/90/ba6505446711d189420000e829fbbd/frameset.htm
    Regards, Elaine

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • Production Order Cost Analysis - Goods Receipt

    I have been assigned to create analysis of production orders.  I need to show the volume variance as well as the cost variance using both the initial planned costs as well as the actual costs when the production order is completed.  All this information is available in COR3 on cost analysis, but I need to allow for display of multiple orders based on plant and date information.
    I have found that the ingredients are in the table RESB with most of the information that I need, I have not had luck in finding what table has the goods receipt information (produced product).  SAP help says that the fields are in KKBCS_OUT, which is a structure that I can't find where populated from.
    I would appreciate any assistance in this endeavor.
    Thanks
    Steven M Engel

    Thanks for the suggestions, but they have not provided me with what I think I need to give a solution to my superiors.
    I will attempt to clarify what I need to do.  We are a manufacturing facility.  We have a BOM that says to make 10 E, I need 3 A, 2 B, 3 C, and 4 D.  Each of the components (A to D) have a set cost at the time the production order is created, this looks to be saved as part of the planned cost in RESB.  Produced product E also has a planned cost at time production order created (as seen by COR3) but that is not stored in RESB.
    At production time we actually use 2.5 A, 2.5 B, 3 C, and 5 D to make the 10 E.  COR3 cost analysis is showing me the cost variance.  This cost variance has two parts, part 1 is because the quantities of the inputs are different.  Part 2 is because between the time the production order was created, and the production order was finished, the costs of A to E may have changed.
    I need to breakout the different components to show management how much of the total cost variance is attributed to each part.  I need a report that management can run (or have run) that will allow them choose by plant, date, end product, etc.  so they can direct what changes need to be made to costing, pricing, and BOMs.
    I hope that I have laid out what I am trying to do in a coherent manner.  Also I am new to the SAP system with less than 1 year using the system.
    Thanks for your time.
    Steven M Engel

  • Cost Centre Plan data not updating FAGLFLEXT

    Dear Experts,
    In our production environment, our cost centre plan is not updating FAGLFLEXT table. Profit centre plan using GP12N is fine.
    We are using the New GL and have FIN-CCA and FIN-PCA scenario activated.
    Integrated planning is ticked in the planning versions for both Controlling and New GL Plan versions.
    Controlling plan version and New GL plan version have the same name.
    In table Controlling table COSP, I can see the plan data on business transaction type RKP1.
    I expect to see it in FAGLFLEXT with RKP1 but I see no plan values at all.
    In fact, in the previous 3 environments, we have not had this problem and cost centre plan and actual has updated FAGLFLEXT. Only in Production...
    Any suggestions? Help if you can! Thanks alot,
    Deb

    Dear Ravi,
    I don't think this is the problem.
    It seems that:
    - the CC plan was created -> it updated CO tables e.g. COSP -> no update to FAGLFLEXT
    - the CC plan was deleted -> it updated CO tables with negative value -> updated FALFLEXT with negative value
    -the CC plan was update again -> it updated CO table -> updated FAGLFLEXT and balance with negative value is zero
    - the CC plan was deleted again -> it updated CO tabe with negative value -> FAGLFLEXT  is in minus value!
    It seems like somewhere between first and second steps, the scenario FIN-CCA was not behaving like it was active!
    Have you come across this before?
    Thanks!
    Debora

  • Copy cost center planning to profit center

    Hi dear,i did cost center planning with KP06,then i try 1KE0 to copy cost center planning data to profit center,but seems it does not work,because there is no relevant planning data when i use KE5Z to check planning data
    can someboyd kindly tell me what i need to do to transfer cost center planning to PCA,THANKS

    Hi,
    To integrate cost center accounting (CCA) planning with PCA, for each fiscal year in Maintenance of Versions, the Integrated Planning checkbox should be checked . Also in PCA, maintenance of plan versions -> settings for Profit Center Accounting, the Online Transfer checkbox should be checked so that the postings are transferred to Profit Center Accounting for each activity automatically
    Tcode KE5Z is for Profit Center Actual Line Items. So even if you select record type 1 here, it will not give planning data. Similarly, tcode KE5Y is for  Profit Center Plan Line Items. If you select record type 0 here, it will not give actual data. If Integrated Planning is activated (as mentioned above), then KE5Y will give you all planning data, irrespective of whether it is planned using PCA or CCA.
    Regards,
    Sangeeta

  • BAPI For Cost Center Smart Tag

    Hi Experts
    I need to Create a BAPI that retrieves the planned and actual budget details for a given cost center. This will need to be restricted per Cost Center based on Employees ID associated to that cost center. This BAPI wil be used to create the Cost Center Smart Tag.
    Regards
    Balaji

    Create a customise BAPI then just like a simple function module select those fields which u want to import
    make it RFC enable

  • Planned and Actual Labour hour

    Hi,
    Pl. let me know the table and field name for the following.
    1) Planned and delivered date for the production order.
    2) Planned and Actual labour hours for the production order.
    3) Work centre for the production order operation reference.
    Madhava

    Hi,
    Find the below related  tables
                         AUFK                    Production order headers
         AFIH                    Maintenance order header
         AUFM                    Goods movement for prod. order
         AFKO                    Order header data PP orders
         AFPO                    Order item
         RESB                    Order componenten     
           AFVC                    Order operations
         AFVV                    Quantities/dates/values in the operation
         AFVU                    User fields of the operation
         AFFL                    Work order sequence
         AFFH                    PRT assignment data for the work order(routing)
         JSTO                    Status profile
                          JEST                    Object status
         AFRU                    Order completion confirmations
    Regards
    SANIL

  • Planned vs Actual Cost Report (with variance) for PM Orders

    Hi Experts,
    We are using the project system to collate order costs for annual shut work.  We have a requirement for a report to show 25% variance between planned and actual order costs (maintneance order).
    At this stage, we dont mind whether this is implemented in the the PM system, or the PS system.
    This is a fairly basic / common requirment.  Are there any standard transactions we could use to:
    1.  Select a list of orders using standard selection criteria.
    2.  Select a % for variance, e.g. 25%
    3.  Display a list of orders where the planned vs actual costs were greater than 25% and what the actual variance is for each order?
    Thanks,
    Maikel

    Hi Maikel,
                   I have never seen any such scenario, but the best thing that can come to me is for the shut down activities you muct have created a Revision, then based on that Revision you can take a dump of all the orders with Planned and Actual Cost, in the excel, and there by putting the formulae you can definitely have the Varience report.
    Hope it helps you.
    Regards,
    Yawar Khan

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Issue with report (S_ALR_87013611) that is actual/plan line items for Cost

    Hi Gurus,
    I am having issue with the report (S_ALR_87013611) that is actual/plan line items for Cost Center.
    When i execute the report for a cost element  510200 the amount is 23,380.13, but when i drill down on it by double click on that amount the value in obj curr is 15468.91. Hence there is the differnce. When i futher drill down by double click on the amont of 15468.91 and i go to display group currency and take the total it is 23380.13 and display in local / doc currency the amount is 15468.91. I guess due to this there is difference. The cost center & the cost elements are the same i have checket it.
    My concerns is that the group curr is USD and obj curr / local curr is USD. So is group curr and doc curr is USD then when i click on dislay curr and select group curr why the amounts are changing.
    Kindly adivce

    Try to look if there is any filtering criteria applied in the report to which you drill-down.
    The difference can be also caused by the "value type" - some reports show actual and statistical costs together in one column while the others strictly show (are defined to show) only e.g. actual costs (type 04) and not the statistical costs (type 11)

  • Table for cost center plan/actual data

    Hello gurus,
            What are the tables to get for cost center wise plan/ actual data? The data which was entered through KP06 was sitting in whcih table?
    regds
    ramachandra

    Hello Ramachandra,
    Actual and Plan Data can be found in COVP view.
    1) For Actuals, you should use the values 04 and 11 to the field WRTTP;
    2) For Plans, you should use the values 01 and 10 to the field WRTTP.
    If you need to get the totals, you should use tables COSP and COSS.
    Hope this help you.
    Cheers,
    Daniel.

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar