Hi Controlling Expert,
i have one issues regarding, Cost Center assign to Profit Center
wht happened , we have made MIS Report Thru Report Painter KE80, we have map based on   Primary Cost Element, at the time of Business Transaction, we have capture the Finance Cost center i.e FI000, Marketing Cost center i.e MK000 , HR Cost Center i,e HR000 and assign the same cost  center FI000 to Profit Center i.e FI000 also same name, respectively. in MIS report there is two Head  i.e Sustaining Cost and Development Cost ,where we have to capture only Cost center  for Sustaining Cost related  to display i.e FI000, MK000 and HR000. KE80 report belongs to Profit Center wise you can see the Report. But same FI000, MK000 and HR000 also updated related with business transaction and capture above cost center like in depreciation  GL Amount 1000 cost center FI000 and sustaining cost also updated the same amount 1000 because we have assign FI000, i.e wrong . last 3 months post the amount now wht should I do for not updated sustaining cost, as I understand , should be delete sustaining Cost as well Development, and later on we can take report from KSB1 for FI000, MK000 and HR000, for management purpose, so if I cannot assign profit center FI000 to Cost Center .kindly correct me whether ryt or wrong. Coz Fianance, HR cost and marketing is only cost center. not suppose to assigh profit center, in this case how Profit Center removed from Cost center. kindly let me knw, or give me other option.
wen we see the report same Profit Center showing two times along with amount i.e wrong coz of Sustaining Cost we have assign Profit Center
in this report particulars are Below
Revenue  : Relevant GL ( At time of Business Transaction we have captured the Relevant Profit Center i.e Finished Product i.e R100: RA Tube
and RA Tube R100 assign with same Cost Center R100.
B.Material Cost : Relevant Primary Cost Element
Manpower      : same like Above
2.Energy            : same like Above
3.Consumption   : same Like Above
Conversion Cost (1+2+3)
Sustaining Cost   : Here we have given Profit Center i.e FI000, MK000 and HR000 these profit center assign 
Development Cost : Here we have given profit Cente EN000
Profit      (A-B-C-D-E-F)
G.Depreciation : Relevant Primary  Primary Cost Element
Financing Cost : Relevant Primary Cost Element
I. Other Income/Loss : Relevant Primary Cost Element
PBT : (F-G-H-I)
Kind regards
Pranav Kr. Gupta
SAP FICO Consultant.

Hi Pranav
You are logging same issue twice. I didnt see any difference in the two threads though.
If its the same issue, request you not to repeat this in future.
KE80 report two times value effected
Regards
Mustafa

Similar Messages

  • Cost Center Issue

    Hi All,
    I need to change the reports to relationship of an org unit A from Org unit1 to Org unit 2.
    Now When I go in Po10 and change the reporting relationship for org unit A I get the message
    "Entry is not allowes due to differenet cost center and person".
    Now i checked in the table for cost centers and company codes and figured out that Org unit A belongs to a diffenet cost center which is tied to Singapore Comapny code and Org unit 2 belongs to US company code.
    So I cant do the reports to relationship in OM because of diff cost center assignment to diff company codes.
    But, We have a case in the system where org unit P in Japan with diffent cost center reports to Org unitQ in US with diffenent cost center.
    I was just wondering how this relationship had been maintainned because here also we have diffenrt cost centers attached to different company codes. Then why is not possible in my case when i am trying to change rel for singapore orgunit to US org unit.
    I checked from PA side also, No special transfer action has been run on the employees belonging to Japan cost center.
    Can you please help me in solvingthis.
    How can i change the reports to rel w/o running any action on PA side?
    Regards
    Aryan

    Hi Experts,
    I have checked in Quality system, it allows me to move org unit japan under  (reports to) org unit US, having diff compnay codes and diff cost centers.
    But same is restricted in Prod and it gives me error that company codes and cost center are different,so I cant move org unit japan to report to org unit US.
    How is config done. Where do we configure this.
    Pls help me
    Reagrds
    Aryan

  • Cost  Center Issues

    Dear Friends,
    we have one Cost Center like 147520100 - HO F&A Dept   period 1.1.1900 to 31-12-999.   but this month we have changed the Description of this cost center to Account Dept  via Tcode OKEON.
    But  when we seeing Tcode KS03 
    147520100  - HO F&A    Valid From  01-01-1900 to 31-12-2011
    147520100 -  HO Accounts Dept   Valid From 01-01-2012 to 31-12-9999.
    we want to show only one.. because its creating confuse at user level...   we want to restrict this  or i want to back which was in earlier...
    please advice...
    Regards,
    Rajesh G

    Hello
    Delete the cost center with new validity. This will be possible if there is no posting done.
    As I said earlier in your case the description is maintained as time based field. For any change in time based field the system will create new validity periods. If you do not want this field to be time based then remove the tick for field "KTEX"' in T.Code OKEG.
    After this any change in text will not create a new validity.
    Sangram

  • F.50 / Cost Center Issue

    Hi Guys,
    When we are running F.50 transaction for P&Loss Adjustment,
    The error appears when processing the batch input job SAPF181( for F.50 ).
    The batch input job stop under processing and show errors (CostCenters required) u2013
    all CostCenters are entered manually when processing batch input in foreground u2013
    and processing continues when all CostCenters are entered.
    The CostCenters should be generated automatically by the batch input job.
    How can we do this..
    Thanks
    srik.

    Hi,
    You need to enter cost center at the time of posting in FB50 then try to execute in batch.
    you can also define default cost center in OKB9.
    Regards,
    JA

  • Invoic01 cost center / posting key

    Hello gurus.
    We are implementing a new process which requires us to use inbound IDoc INVOIC01.  These invoices don't go against any purchase order or other pre-existing documents -- they're expense reports from our various employees.  I think I have everything setup correction but I'm having two issues:
    1) Posting keys:  In transaction F-43, we use posting key '31' for the first item and '40' for all others.  Where should this be in the IDoc?
    2) Cost center: Similar to posting keys.  We have a cost center on our inbound application for each line.  Where should this be in the IDoc to map properly?
    Thanks in advance for any help!!

    Ok, I figured out the cost center issue (thanks to OSS note [150120|https://websmp230.sap-ag.de/sap%28bD1lbiZjPTAwMQ==%29/bc/bsp/spn/sapnotes/index2.htm?numm=150120]).  Now I just need to figure out how to handle the posting key.  I have setup transaction 'OBCE' but I'm still missing the first value (from first screen of transaction 'F-43' for example).
    Thanks in advance for any help!

  • Change profit center assignment in cost center

    Hi All,
    We have around 20 cost centers and assigned to 10 different profit centers.From 01/01/2011,we would like to change Profit center assignment in cost centers.
    all cost centers postings should post to old profit centers till 12/31/2010 and from 01/01/2011,postings should go to new profit centers.
    What is the best way to achieve this?any help is appreciated.
    Thanks,
    Anusha

    Hi Ajay,
    Thanks for your reply.profit center changes are working with analysis period changes.
    i have one more issue here,i can't change hierarchy in cost center and getting errors..
    Message no. KS042
    Diagnosis
    Field Hierarchy Area to be changed must be unique for the entire interval. You selected a change interval which does not include the entire period. Any change in the field would result in an inconsistency.
    I have try to change time depended field in configuration.system is not allowing for field "KHINR" in OKEG TC.
    any help is appreciated...
    Thanks,
    Anusha

  • Cost Center Assignment in OKB9 issue

    Hi All.
    I have one issue related to Cost Center Assignment.
    1.Our profit center structure is based on Product
    2. 70% of FG we get from Sub Contracting and thus we have to pay sub contracting charges to them for that.
    3  sub contracting charges  GL account is a Primary cost element thus have to assign cost center.
    4. In OKB9 we can assign one cost center per valuation area.
    our requirement is that in one plant we have many profit center according to product thus having diff cost center so we want to capture cost in that respective cost center according to product.
    Regards
    Shayam

    Hi Thanks for your reply.
    @AP  I tried but not found any exit for that.
    @yogesh  .. we dont assign cost center at material so no logic of picking cost center. Entry is posted at the higher level i.e at the level of PC and not at tbe level  of CC. system pick PC  from CC and not CC from PC.
    Hope this is clear to you.
    Regard
    Shayam

  • Profit center cost center assignment

    Dear All ,
    1) i need the total list of cost centers assigned to which profit center ?
    2) tcode to view the balance sheet
    pl guide

    Hi,
    1) Check Assignment to Profit center
    2) The T code to get into Balance sheet SA38 -> RFBILA00 or S_ALR_87012284.
    Regards,
    Akhila.

  • Changes to Profit center assigned to cost center

    Hi
    We have a scnario in which the profit center assigned to the cost center master has to be changed. We have been advised also to  change the validity period of the same from the date of change of the profit center .However, the cost center has been used to for some data postings with the old profit center maintained in the cost center master. Now my query is:
    1. What is the impact of changing the profit center in cost center master? In our case, some data has been posted to the cost center when the old profit center was maintained.
    2. Why should we change the validity period of the cost center after changing the profit center assigned to the cost center?
    3. Also, what is the way to transfer the entries which have been posted to the old profit center to the new profit center?
    Regards
    Sanil Bhandari

    hi,
    1) The impact of profit center is more in the cost center. when ever we assign profit center to cost center. the cost will be updated automatically. so there is no direct posting in profit center only statstical posting are generated.
    2) second one when we want to create profit center first chek it out profit center valid and upto. if same is not maintained in creation of cost center . so u must have to change the validity periods
    3) i am not sure this one i thing 7KEH OR 1KEF TC is there any way tommorow i will give the answer this questions.
          if my answers are wrong plz correct and replay to my id [email protected]
    thank you

  • Assignment of Profit center in cost center

    Hello Friends,
    What is the significance of assignment of profit center in cost center ?  System does not allow me to post activity prices in KP26 without assignment of profit center to cost center. It gives error that
    "Profit center 1000/DUMMY_PCA does not exist for 01.04.2009"
    How to solve this error with out assignment of profit center in cost center?
    Waiting for reply!

    Profit Center is an Organizational unit in Accounting that reflects a management-oriented structure of the organization for the purpose of internal control.
    Hence its Assignemnt with Cost center should be there for proper assessment of Organisation.
    If  you do not assign a profit center, the SAP System transfers the data from the dummy profit center defined in configuration for the respective controlling area to Profit Center Accounting.
    Therefor proper cost center with Proft center assgined has to be used for Cost center / actvity type planning in KP26.

  • G/L Account, Cost Center, Profit Center closing downstream issue

    Hello,
    We have issue and I hope most of you must be having this, kind of organization we are every year we need to close down some G/L or Profit Center or Cost Center, however there can be 1000's of reason where you need to reverse document  but problem is Object like G/L, Profit center or cost center are already closed and hence reversal gets error out.
    Do anyone have any thoughts how to handle this more better.
    Thanks
    parth

    Hi Parth
    1. Either you need to unblock the master data temporarily
    2. As a Best Practice, if you intend to discontinue a master from 01.01.2014 onwards, have it open till say, 30.06.2014 or any date as agreed by all.. So that, reversals wont be affected
    Br, Ajay M

  • Profit Center issue when executing GR55

    Hi Experts,
       I was reported by the business users that they see transactions with the Dummy Profit Centers when they run report for Balance Sheet and P&L Statements. They dont want to see any Dummy Profit Center Report Transactions in their financial statementsin both BSand P&LStatements. 
    For example a number of Documents posted against same G/L account and few of them have dummy profit centers, users doesn't want to see them.
    I already checked in tables BSAD,BSID, BSIS,BSAD, BKPF,BSEG
    TCodes: FAGL3KEH (No default profit centers allocated to anyone of the company codes), FBL3N, FBL5N, VF03
    So we know that there is issue but I need to know the process to find it.
    Can anyone help me out the procedure to find out the issue. This is very high priority issue.
    Thanks,
    Andy Roger

    Refer to the IMG Activity Documentation for the following IMG Node.
    Financial Accounting (New) -> General Ledger Accounting (New) -> Master Data -> Profit Center -> Create Dummy Profit Center
    Here is the documentation:
    Create Dummy Profit Center
    This function lets you create the dummy profit center for the current controlling area.
    The dummy profit center is updated in data transfers whenever the object to which the data was originally posted (cost center, order, and so on) is not assigned to a profit center. This ensures that the data in Profit Center Accounting is complete. You can later send the data on the dummy profit center to the other profit centers using assessment or distribution.
    You create the master record for the dummy profit center using this special transaction. To change or display it, use the normal profit center maintenance functions.
    The name of the dummy profit center is displayed in the controlling area settings for Profit Center Accounting.
    Prerequisites
    The standard hierarchy must exist for the current controlling area.
    Actions
    Enter the name of the dummy profit center. The rest of the steps are the same as when you create a normal profit center.
    Choose the function Extras -> Set controlling area first to make sure that the correct controlling area is set.
    I am guessing this is where your dummy profit center postings are coming from (a cost center / order or some other account assignment object that is not assigned to a profit center).  It should be mandatory (in your month-end close) to run reports on dummy profit center(s) and move balances, if any, to the real profit center, before you pull financial statements.

  • Cost center & Profit Center set up

    Hi,
    I am a Chartered Accountant by Profession. I just started my classes to eventually go for certification as FICO Consultant. I have the following question for you. I would appreciate if someone could answer this for me.
    THIS IS WHAT I WANT TO ACHIEVE AS AN END RESULT FROM CONTROLLING SET UP.
    Basic Premises:
    One Company is doing business in computers and has business area's already defined geographically.
    Products/ Profit Centers: Desktops & Laptops, Computer hardware like mother boards, RAM, Hard drives etc, Software.
    Cost Centers: Production, Ware housing, Selling & Distribution, Gen Admin.
    We can set up cost elements to match up with the expenses accts in GL. Say Cost of Production, Salaries, Stationery, Postage, Travel Etc. While setting up the cost elements we will not select a default cost center.
    We can set up cost centers for Production, Warehousing, Selling & Distr. and Gen Admin.
    We then set up Profit centers for Desktops & Laptops, Computer Hardware, Software.
    Now let us go with an example for a flow of an expenditure:
    We have incurred a Production cost for desktops 1,000 and Production cost for Computer Hardware 750.00
    If we leave the linking of cost centers with the profit centers, at the entry level we can select a cost center Production for both the expense of 1,000 and 750 and then select the profit center Desktop & laptops for 1,000 and Profit Center Computer Hardware for 750. This will solve and settle the issue.
    But  I have been advised that the cost centers need to be linked to profit centers. The flow will be
    1. Cost Element to Cost Center has to be done by the user ( Since we did not define a default cost center at the Cost Element level).
    2. From the cost center the expenditure should flow automatically (Since we can link the Cost Center to A Profit Center). This is where I am having a problem in understanding the concept.
    For a single cost center we cannot define multiple Profit Centers. In the above example say we link the Cost Center "Production" to Profit Center "Desktop & laptops". What will happen to 750 which actually relates to Profit Center "Computer Hardware". We can have as many Cost Centers as Profit centers to solve the problem, but that defeats the management purpose of wanting to know what is the production cost for all lines. Can we create Production in the second level under Standard Hierarchy and create cost centers for Production (Desktops & Laptops), Production(Computer Hardware) and Production Software, Drag and group them under the Second level Production that we created under standard Hierarchy. I do not know how this will affect the reports that are generated for cost centers. The reports for Profit centers will be fine.
    Hemreddy

    Hi,
    Cost center is defined as per requirement, In your scenerio cost center will be department wise like different product dept for example Desktop, hardware accessories, laptops etc.. So, every cost cenet should be assigned to profit center. As per reporting related to cost center and profit center both report has it own advantages like cost center is purely related to cost of the particular department wheras profit center is related to both cost and revenue, it is broad prospective related to profit or loss made for that particular profit center.
    Regards,
    Sreekanth

  • Profit center issue

    Hi
    one of our billing documnet has got cash pricing procedure assigned to it. Accordingly, when a billing document is created, certain G/L is getting debited instead of customer account. We are also crediting same G/L account thru VKOA settings. e.g.
    Debit G/L 300000                   $100
    Credit G/L 300000                  $100
    G/L 300000 is created as a revenue cost element in CO.
    Now the issue is,
    Does revenue cost element requires assignment to CO object ? DO we need to give cost center in default settings ? If not then, I am getting error - G/L 300000 requires assignment in CO
    If I give cost center in OKB9, only the first line item is getting cost center thereby not matching in Cost center accounting. How to get cost center in second line item. IN this case, profit center for these tw line items will also be different. First line item will get from default of the cost center in OKB9 and the second one gets from sales order.
    If no cost center is required, then also, first line item does not get profit center assigned to it. On the other hand , second line item gets the same from sales order.
    Can anyone help me in this regard ? Either both line items should get same cost center ? PC or if no cost center at all, then, same profit center in both line items
    Regards
    Raj

    Hi
    It dosen't help.
    My question is if the same G/L is getting profit center in the second line item, then why cant in the first line item also ?
    First line item is determined by cash pricing procedure. Second line item is determined by condition type in regular pricing procedure. SAme G/L is deterimined in both of these line items.
    If I maintain defauld cost center for this G/L in OKB9, first line item takes that wih default profit center of that cost center. However second line item does notget any cost center but gets profit center from sales order
    What I want is either it should take cost center as first line item or both line items shiould take profict center from sales order
    Help
    Raj

  • Cost center line items by profit center

    Hi,
    We have an issue, where user has processed a document in FI with profit center "X" however the cost center of the document has profit center "Y" in the master data.
    In FI, accounting document showed against the profit center "X" with which user has processed.
    In CO document profit center was coming with "Y whcih is in cost center master data.
    There is a variance between FI and CO for profit centers.
    However profit center account is not completly configured, it is configured minimally. So GLPCA, GLPCT do not fetch data for the given profit centers, I do not have profit center appearing in CO line item reports. We are using ECC 6.0 version.
    Please help me to reconcile the difference.
    Regards,
    Ramesh.

    Hi,
    I think your case for SAP is not normal process. Normally, if user assign separate profit center which is different to profit center in the Cost Object, lets say the cost center, during the posting the system will issue message that the profit center is changed the profit center assigned in the Cost object. System would not accept two different profit center on one posting process.
    For example:
    Posting material using assigment cost center X  that contain profit center 1000, then also assign own profit center 1402.
    During posting, the system will issue message " the profit center is changed to 1000". This is what happen when there is discrepancy in profit center during posting.
    So, by having one profit center in a document,  the data that flow from FI will follow the assignment in the Cost Object.
    For this problem, I think you need to raise this issue to OSS.
    Regards,
    Irhasni

Maybe you are looking for

  • Lied to at Willowbrook TX store and lost out on points... Train your staff

    Decided to take advantage of the 5x bonus point offered at the beginning of January and make a big purchase to cash in on the bonus points so I went to the Willowbrook store in Northwest Houston and bought a new game console and games when checking o

  • Is it possible to install two GUI version on same server??

    Hi all, I am facing a typical problem. I am using ECC 6.0 on Solaris server and accessing through CITRIX where SAP GUI 6.4 is installed. I have got Internet Explorer 7. Some dumps are cumming like message_server_x Then I went for SAP GUI 7.1 in which

  • ITunes Not Working [at all..;need help!; very detailed.]

    Hello. My iTunes doesnt work at all. When I click on iTunes, it doesnt open or anything. I have uninstalled it and then re-installed it many times, it didnt work. Because of my iTunes not working, i had no choice but to put my songs on manually using

  • Address book: can't select iPhoto faces

    Supposedly, I can double click the picture in a contact in address book, then click the Faces icon at the bottom left to browse from my iPhoto library. However, in my address book, that icon is always greyed out. Any ideas why that might be? Regards,

  • Price unit is incorrectly changed from 1000 to 1 - Impact and correction steps

    Dear Experts, We have noticed  there was a Price change ( MR21)  for the materials. However during the process,  price unit was wrongly changed to 1. ( Original price unit of the materials consists of 1000, 100, 10 etc) Due to this there is a huge im