Cost clearing account (COS) f.13 clearing small differences.

Hi,
We have a COS clearing account 1234.
We have small differences which we would like to clear with F.13.
I tried with OBA0, but I do not know how to activate the tolerance group on the G/L account
because the tolereance group is missing and I cannot add it with field status.
It could also be the case that it is not the correct way to do it.
Please let me know.
Best regards,
Eric.

Hi
Can anybody help with this question, because the former solution I cannot fibure out that it helps, because I created everything, except the tolerance group on the G/L master. I cannot find the field.
Best regards,
eRic.

Similar Messages

  • Why we use different clearing account for GR/IR and planned cost clearing a

    My client ask for using same account for GR/IR account and all planned cost clearing account.
    i try to convince it should be different accounts but he needs a logical answer.
    Why we use different clearing account for GR/IR and planned cost clearing accounts?

    Dear friend.
    u just tell him while doing GR it will debited n  while doing IR it should get credited.hence we  need to take diff G/L account or same account.
    regds
    nasir

  • To clear minor difference in GRC account

    Hi,
    GR and IR giving a very small differences which somehow not due to quantity or not due to exchange rate.
    GR clearing 50.01
    IR clearing 50.20
    Difference of 0.19
    So in this case, how can I clear the GRC clearing account?
    As it is not due to quantity, i cannot use MR11.
    Any transaction that I can use to set them off completely?
    Thanks

    Hi,
    You can charge the difference in to Rounding difference account by using the Tolerance limits.  When you are executing E.13 select the check box of Include tolerances, then system automatically charge the difference in to Rounding difference account.
    Thanks

  • Automatic Clearing with Small Difference

    Hi all,
    I want to one GL Account to Automatic Clearing (f.13) with Small Difference consider with another GL account.
    Manual Clearing Working is fine.
    Regards,
    Spradip
    Edited by: spradip on Dec 20, 2011 1:24 PM

    you will have to setup the open item clearing config
    GL based tolerances
    tolerance grp
    assigning tolerance grp to users
    have a clearing GL to clear the difference amount.
    If these are setup correctly, the clearing is possible.
    once this config is setup, try manual clearing once and then use the same GL as part of F.13.
    if you have problems and If you are an ABAP savvy, try debugging and catch hold of what is it looking for....usually the above setting should help you clear.

  • How to get clear small text on black background?

    hi,
    I'm trying to get some clear small text on black, in the letterboxed area below some video. I've been trying 14pt, with a bit of tracking, using Arial, Helvetica, Skia, and Lucida Grande. They all look clear enough when rendered out to QT, but on my production monitor they dont look good. When I compress it for DVD (using very high bit rate settings) they really fall apart.
    I even tried making the text in After Effects, which is what I do with my subtitles, but those are larger (about 24points) and for some reason the small text generated in After Effects looked worse than the native FCP text.
    Does anyone have suggestions for the best combination of font and point size to give me clear small text for a black background? I dont mind going up a few point sizes.
    Any suggestions would be highly appreciated. Thank you....

    Hi all,
    Many thanks for all the suggestions.
    I wound up using Helvetica 18pt, white set at 85%, and applied stib's de-interlacer (http://www.pureandapplied.com.au/plugins.html).
    I tried Guassian Blur set to 0.1 but that made it less clear and didn't really help with the flicker. I also made sure to set the position to an even numbered line (I'm using uncompressed)
    When I tried Helevetic 17pt, the "a" and the "e" both fell apart towards the top of the letter making them hard to read. I would guess that "g", "i", and "j" would also have problems had I used them.
    I didnt have enough time to test, but I wonder if there isnt some font that is better suited for this kind of work than Helvetica. Futura is nice and clean, but a bit thin. Helvetica Neue is also good, but not much differnet than Helvetica. Verdana and Lucida Grande might also be good choice. What do you all use?
    thanks again...

  • Transfer of shipment cost in accounting

    Dear Gurus,
    I am working on transportation module,EC-TRA
    I know how to transfer the shipment cost to accounting. I am aware that when the FI documents are posted the GR/IR accounts are posted and provision is made in FI for the shipment cost.
    I am currently transferring the shipment cost after the vehicle has dispatched the plant because i want to create liability once the vehicle is dispatched(This is especially useful for month end deliveries). Please note here the time for the vehicle to reach is more than 2 days.
    When i transfer the shipment cost the service entry sheet is generated. I am using ERS procedure and GR based invoice verification.
    I will be doing MIRO against the service entry sheet for bill passing.
    I want to trasfer the shipment cost to accounting( i.e create the provision entry) at the time of vehicle dispatch but want to create the service entry sheet only when the vehicle reaches the deatination point. This will ensure that i am not making payment to transporter before the vehicle has reached its destination.
    Please advise how can i map this situation.
    Your urgent help in this matter is highly appreciated.
    Thanks
    KS

    Hi,
    Is the issue is about posting the shipment cost to provisional account, on saving the shipment cost document? So that you can avoid payment to the vendor before the goods reach the customer.
    Service Entry sheet which is created automatically also triggers a Material Document. You can customise the postings with valuation calss so that it will post to FR2= freight clearing.
    On cretion of MIRO you can have the postings to actual  Freight account FR1= freight Clearing.
    Discuss with your MM consultant for this customisation.
    Hope this helps.
    Regards,
    Sharan

  • 1_CO_PA_AFS_CCA(cost center accounting) DS enhancement

    hi friends,
    i'm trying to extract COPA : Profitability Analysis data using 1_CO_PA_AFS_CCA(cost center accounting) to custom cube directly(i.e Data source to custom cube without any staging in between datasource & cube).
    In ECC6.0 (tcode: CK40N and then  costs ), per material wise i want to extract labour costs, deprecision, power & fuel, sub contract charges,other manufacturing costs along with this i want to extract i field information "costing lot size".
    I want to extract "costing lot size", but data source doesn't have this field. Is it possible to enhace DS.
    If yes, how to do that?
    Thanks,
    naresh

    Hello Shruti,
    Can you give more explaination about the problem
    Thanks & Regards,
    NK.A

  • How can i change my bank account cos last time i used my credit card now i want to use my debit card sgain

    How can i change my bank account cos i used my credit card last time now i want to use my debit card again

    iTunes Store: Accepted forms of payment
    http://support.apple.com/kb/HT5552
    Changing Account Information  >  http://support.apple.com/kb/HT1918
    If necessary...
    Contact iTunes Customer Service and request assistance
    Use this Link  >  Apple  Support  iTunes Store  Contact

  • In WM how to clear partially difference in an open storage type with one mi

    Hi
    I would like to know how in WM to clear partially differences in an open storage type with one mixed bin not totally counted?
    thanks in advance
    cadanj

    Please do the inventory check for the whole bin.Count the each quant of the material. Difference can be cleared.Use following transactions.
    1.LI01N-Create Inventory document.
    2.LI11N-Enter inventory count.
    3.LI20-Clear WM differences
    4.LI21-Clera IM differences.
    Let me know if u have any other question.
    Regards,
    PRashant

  • BPS Retraction for cost center accounting

    hi guys,
       When i create sender structure for retraction,need to specify the retraction target(eg UPB_RET_COPS) using drop down to find.But i can't find any value after using drop down button.So i want to know how  and where to define the retraction target,in BPS or R/3?
       The dictionary structure has the same problem.
       And what do mean the fields of 'offset'  and 'sender field lgth'?
       Need your help!
       thanks a lot!
    frank feng

    Hi,
    Go through following links where u can get a fair idea for u r problem:
    /people/praveen.mayalur/blog/2006/07/01/bps-retraction-for-cost-center-accounting--i
    /people/praveen.mayalur/blog/2006/07/11/bps-retraction-for-cost-center-accounting--ii-primary-cost-qty
    Thanks,
    Debasish

  • BPS Retraction for Cost Center Accounting - Cost Element - Compounding with

    Hello everybody,
    I'm using the "BPS Retraction for Cost Center Accounting" described in the blog from Praveen Mayalur. I have customized the BPS system  (3.5) as described.
    But if i started the retraction i receive a dump. I have debug a little bit and i found out that there is a problem with the InfoObject "Cost Element". It is compounding with two InfoObjects "Source system ID" and "Controlling area".
    PERFORM FILL_RSRDEP USING I_AREA
                              I_CHANM
                              ITO_CHADEP
                        CHANGING LT_RSRDEP
                                 L_SUBRC.
    IF L_SUBRC NE 0.
    *Abhängige Merkmale müssen in der ITO_CHADEP stehen
      MESSAGE X099(UPC).
    ENDIF.
    Does anybody have this problem before. ?
    Regards Detlev

    Hi,
    it looks that your 0COSTELEMNT has been changed and the additional compounding object 0SOURSYSTEM has bben added. In BI Content it is only compounded to 0CO_AREA. So may be this is the problem.
    To be sure that it works you must make the change in your source system to and "compound" 0COSTCENTER to 0SOURSYSTEM. Or you have to chabge the retraction that way that it ignores the source system and only reads 0CO_AREA and costcenter.
    Regards,
    Juergen

  • BPS retraction part for Cost center accounting

    hi All
            Can any body help me regarding the retraction part for cost center accounting bw-bps, how the retraction is exactly done . when part is where the data
    comes sits in bw and R/3 .
    how exactly plan data sits in r/3 what is the relation
    while extrating the data into the bw, what is procedure for extracting in to the transactional cubes
    prs

    This post could give you some info:
    CCA Retraction with BW BPS
    Hope it helps.
    Regards

  • Tax calc. during invoice post - taking unplanned del cost into account

    Hi all
    Iam posting an invoice in Miro for a p.o
    i have material cost,unplanned cost
    Iam using a input Tax of 5% which should only take Material cost into
    account while posting.
    but in my case it is taking the unplanned del cost also for calculation
    can you pl. let me know where the changes are to be made so that only material
    cost is to be taken for tax calculation.
    for eg
    material cost -- 100
    tax               -- 5.0%
    unplanned del cost -- 10
    so my inv. value should be -- 115.00
    where as it is taking as -- 115.50.
    regards
    Prasanna

    Hi srinivas
    Thanks for your inputs
    This is the present scenario.
    We are distributing Unplanned del cost among the line items.
    1. without having the Config made ( in OMR2)
    We can still post the Invoices with Unplanned delivery cost
    (without clicking the Calculate tax button )
    by adding the
    1. unplnd del cost in invoice details
    2.clicking the Net proposal button on tax tab view
    3. enter the total amt on basic data
    4 when we are simulating we are getting
    Warning message *********Twice ******
    as Tax entered incorrect (code V4, amount 5.50), correct 6.05 eur
    Message no. FF 707. and then we get the
    5 We have to click the continue button twice
    6 then we get the Invoice data view
    7 when we click post , then again the
    above warning message appears,
    8  then we click continue button then it allows us to post.
    correct me if the above process is wrong
    My question :-
            1.  is this the standard functionality when using unplanned delivery cost  (without tax calculation )
           2. Can we apply some OSS so that this message appears only once.
    Thanks
    prasanna

  • Deactivate Cost center accounting in controlling area

    Hi all,
    Could you describe the consequences of the deactivation of CO-CCA in the controlling area?: should I expect incoherencies ?
    The activation (deactivation) code setting is free in OKKP transaction. My first deactivation test show me it's possible to make new postings in FI (FB60) and the cost center is not necessary anymore.
    In fact in my case I don't need to check FI-CO reconciliation.
    Regards
    Pascal Cuenin

    Hello
    Why this type of requirement is coming into our mind. SAP controlling has very good funtionalities for internal reporting. If you deactivate cost center accounting then how your management would see...cost center reporting, budgeting, controlling
    for example you have cost element salary,,,,,with one gl for a company,,,how you will distinguish salary with reference to a division , dept, location....
    how you will get your assessment, settlement, costing all these for which CO functionalities are developed
    regards
    dinabandhu

  • Substitution written under cost center accounting is not working for tcode MB1B but working for MIGO_GI

    Hi All
    Do you know why this behaviour different for subtitution written under cost center accounting.
    We have written substitution using coding block table. Logic of substitution is in case of any GL maintained in a set is being used for posting , then we will replace the cost center with profit center vlaue. Reason being we have same naming convention for Cost center and Profit center.
    Thanks
    Sonia

    Hi,
    MB1B is t-code for stock transfer posting.
    Stock transfer posting generate FI document using balance sheet account, not P&L account.
    Because you don’t create cost elements using balance sheet accounts related to stock, I think that Substitution written under cost center accounting is not working for tcode MB1B is right.

Maybe you are looking for

  • Capturing failure event of Process Type ABAP program in Process Chain

    Hi all I am calling an ABAP program in a Process Chain, there are subsequent steps after the ABAP program. The subsequent steps should execute if the ABAP program fails. While running the process cahin, if the ABAP program fails, then a pop-up comes

  • HELP - which driver should I use?

    Hi,           We are developing an application using WebLogic 6.0 in conjunction with           TOPLink 2.5.1 for object/relational mapping (manages the persistence           layer). We would like to configure our application to use WebLogic's       

  • IMac 27" (mid 2010): Will replacing the HD cause fan problems?

    Hi, I have an iMac 27" (mid 2010). My HD is broken, and I'd like to replace it. I've already installed an SSD, so replacing the HD shouldn't be much of a problem. However I've read that replacing the HD causes the fan to spin up all the time. Some si

  • I cant import or place tiff and psd files

    I cant import or place tiff and psd files, but jpg - its ok. This trouble is on User Account. In Admin Acc -  there is no problem. Illustrator CS5 (UA).

  • Returnable Transport Packaging Material In ASN ( EDI -856)

    Hi, We are working on inbound delivery creation with returnable transport packaging (RTP) materials. We want to create inbound delivery with RTP and we are passing RTP material in E1EDL24 without reference document (i.e. purchase order or PSA) as we