Cost is showing wrongly in CK11N due to Unit of Measurment (UOM)

Dear Experts,
Cost is showing wrongly in CK11N Std cost estimates. I maintained 95 INR in Material Master per KG, but 9.5 INR Per KG in CK11N. How to maintain Unit of measurement settings correctly.
Regards,
KBR.

Hello Karru,
I recommend these notes:
526780     Cost estimate: units of measure for activity types
72442      Unit conversion in product costing
30658      Price in info record: rounding errors
207628     Unit of operation times changes
Cheers

Similar Messages

  • Unit of Measurement Field showing Gray while created asset master

    Dear All,
    When I am try to create the asset sstem is showing the Quantity Filed but the Unit of Measurement is showing in Gray.
    I also check the screen layout rule but still it not coming as an input field.
    Kindly help me out to resolve this ASAP.
    Regards,
    Sandeep

    Hi,
    Please check the screen layout assigned to the asset class under which you are creating the assets and then check the screen layout rules of that screen layout whether the field "Unit of measurement" is optional or not.
    Thanks Monoj

  • OH Cost by Alt unit of measure: EXIT_SAPLKASC_002

    Hi,
    I am maintaining the OH cost in INR. 10/KG
    My base unit of measure of materail is EA and I maintain conversion factor between EA and KG.
    As per standard my OH rate has to be maintained in UoM EA, which is not possible for business complexity. Still I want to calculate OH cost in standard cost estimate.
    I have activated an user Exit "EXIT_SAPLKASC_002" and trying to change the base quantity and UoM while doing standard cost estimate (CK40n). Objective is to match the Quantity & UoM under estimation, with OH rate UoM and get the correct value.
    Problem:
    In import parameter although there is a field MATNR (Material number), in Communication Structure Item I_KOMP, no value is getting passed in this filed.
    If you have used alternative UoM for OH cost estimate, suggest me the correct process.
    Regards,
    Abir.

    Hi Abir, I have that same problem. Did you fixed it?
    Thank you

  • Planned overhead is calculating wrongly in CK11N run, it is just more than double

    Hi Gurus
    1) While running CK11N overhead cost is calculating wrongly on base (material price). In my case I have maintained 1% Overhead on raw material for Duty in cost sheet. In my case no routing, and my FG is getting produced by process order. My Raw material cost is showing Rs. 2,364.45 but my Duty is showing Rs. 48.73, When I run CK11N for Finished goods.
    When I Check the costing structure it is showing all the material for costing, if i drill down there it is calculating correctly for Raw materials. Say heavy furnace oil material cost is Rs. 36,140.16 /M.T and overhead is Rs. 361.40 and for all raw material it is calculating correct 1%. But for my finished goods it is just more than 2%.
    As per my understanding over head is calculating for RM once @ 1% and later material cost + overhead cost getting calculated by 1% again.
    Please see the attachment. I have furnished a statement for this also.
    2) Also Please tell me the T-Code for costing run as actual cost. and how can I show a comparison report on planned and actual report for a product costing.
    3) My scenario is this is a power generation Co. Not possible to maintain activity cost. What they want to do is. on the last day of a month they will take the trial balance for the plant/ business area and will set the percentage in cost sheet (Actual for current month / planned for next month) for admin, manpower and other costs based on raw material GL values.
    So I have created a cost sheet where I have maintained base and assigned those RM GL/ Cost elements and other costs I have maintained in cost sheet based on row No. 10 (base) and assigned secondary cost elements and percentages assigned as per overhead type and plant, in cost component structure I have maintained same cost elements as set earlier in cost sheet.
    Please find the file attached
    Please suggest me if I M wrong.
    Thanks & Regards
    Subrata

    Hi.
    In itemization of CK11N over head is showing correct. But the material cost for RM is already after charging overhead. I have checked the itemization of Process order there for the first material was Rs. 144.56, but in the itemization view of CK11N it is showing Rs.148.90/- That means exactly after adding 3% overhead which I maintained in cost sheet.
    Itemization of Ck11N
    Itemization of COR2
    Please Help
    Thanks & Regards
    Subrata

  • CK11N Unit of Measure MIN & HR not consistenly shows

    We try to run standard cost estimate using CK11N. As a result some activity type "E" has MIN (minutes) as unit of measurement. By right it should show as HR (hours) because this was the unit we have been using since SAP went live. This problem occurs recently after we have done
    patch 22 to 55.
    There was no changes in work center, routing, material master. All remain the same.
    In routing using MIN for setup time, since long time back.
    This problem occured whenever we have setup time between
    1 to 5 minutes. If we put 5 minutes above then it will show
    as HR, which we are expected to.
    For the calculation of cost for activity type there is
    nothing wrong, the formula key and formula inside
    work center was correct.
    So, the question is, is there any setup to tell
    the converstion to display as MIN insteas of HR
    whenever setup time in routing we put
    between certain condition, let say
    1-10 will show as MIN
    10 and above will show as HR.
    There is no error message for this, only display
    a different result.
    Thank You

    Hi Berliner
    Yes, SAP converts the UOM on the lower degrees if the calculated figures are so small the they are going out of calculations. This I have observed many a times.
    Hence according to me costing lot size should be aligned with the routing base quantity or if some Fixed costs are involved in any operation/activity, the costing lot should be optimum to cover the fixed charges else per unit cost will be wrongly inflated.
    Regards
    Rajneesh Saxena

  • Internal Activity Costs not showing

    Dear all,
    I'm creating a production order and all my work center activities are not being costed nor showing. I've made sure my activity types have "variable" rates from kp26 and I made sure they're assigned to the production operations and shown in the production order operations list.
    I'm also facing this when I run ck11n.
    What could possibly be wrong?

    Hi,
    A few quick checks
    1. Check if the operation is relevant for costing (control key)
    2. In KP26, click on the first icon at the left hand top corner & check if the rate is mentioned for the present month.
    I suspect that the 2nd point could be the issue. Check & revert.
    Regards,
    Vivek
    Added
    Rafiq, you've marked the thread as answered, but not bothered acknowledge the inputs provided nor assigned any points. Great way to appreciate the forum members....!!!!
    Edited by: Vivek on Jun 18, 2009 6:27 AM

  • JDE worldsoft 9.1 Facing the problem of extending cost is calculating wrong

    IN JDE worldsoft 9.1 we are facing the problem of extending cost is calculating wrongly.
    at the time of shipment confirmation in table F42119 it is calculated with 100 that means with decimals if the extended cost i( Qunatity 1 * cost 100 = Extended cost should be100 but here it is showing 10000 )
    Can any one help on this.

    If I understand your problem correctly I would suggest looking into Sar# 8948245.
    Nichelle

  • Stock inconsistencies due to wrong Unit of measure

    Hi,
    I am currently facing an issue, generated due to master data inconsistencies. The problem is as follows:
    I have a  material with Unit of measure " pack". A PO was supposed to be created for "100 packs" of this material, but somehow Unit of measure in PO was "each", and thus it was created for "100 each". The supplier has sent quantity as 100 packs. GR was done on the basis of PO thus 100 each was entered. Invoice has been created and settled. Stock overview is showing this material as "100 each" whereas actually the material quantity physically available is 300 (100x3, each pack has 3 pcs).
    I need to correct this situation. so that stock and accounts show the correct data.
    Is there any simple way of correcting this issue. like scrapping etc... and how??
    Thank you.

    Dear Priya,
    You have completed the complete purchase cycle.
    One way is to reverse the complete cycle, change the UOM and redo the cycle.
    Ohter way is, if you need to increase the stock you can do that by delivery free of cost (mvt. type 511) or creating a PO with free tick followed by GR.
    In this case you need to check the MAP of the material. If you need to change the MAP also then use transaction MR21.
    Before doing please check the accounting impact of all these (the price difference account or the revaluation account will get hit).
    In second option you can not change the UOM.(Maintain conversion factor between EA and PACK as 1:1)
    Cheers,
    Satish Purandare

  • Condition rate/Amount (KONV- KBETR) is showing wrongly for Japanse currency

    Dear Friends,
    The Table data for the Condition rate/Amount (KONV- KBETR) is showing wrongly for Japanse currency(JPY).For ex-The invoice is showing correctly as 3 JPY but the Invoice output shows 300 JPY.This data being fetched from the KBETR shows 300JPY instead of 3JPY.Pl help to resolve this.
    Thanks
    Isaac

    Dear Isaac,
    This may due to condition record maintainenance for that condition type in the VK11 transaction so please go to VK12 transaction check the condition value for that condition type.
    KBETR -- Means Rate (condition amount or percentage) where no scale exists, it exists in KONP table(Condition record table).
    Also Check anybody change the values in the sales order or in invoice from 300 to 3.
    I hope this will help you,
    Regards,
    Murali.

  • LR 5.3 showing wrong thumbnails

    I have been running LR 5.3 smoothly for a while but a couple of minutes ago LR started to show wrong thumbnails, it shows thumbnails from a delete Snapshot. I have tried purging my cache but nothing happens. I have upgraded from LR 3 to LR 3.5  Ideas ? This is my system:
    Lightroom version: 5.3 [938183]
    Operating system: Windows 7 Home Premium Edition
    Version: 6.1 [7601]
    Application architecture: x64
    System architecture: x64
    Logical processor count: 2
    Processor speed: 1.9 GHz
    Built-in memory: 3003.1 MB
    Real memory available to Lightroom: 3003.1 MB
    Real memory used by Lightroom: 912.9 MB (30.4%)
    Virtual memory used by Lightroom: 901.7 MB
    Memory cache size: 364.0 MB
    Maximum thread count used by Camera Raw: 2
    System DPI setting: 96 DPI
    Desktop composition enabled: Yes
    Displays: 1) 1366x768
    Application folder: C:\Program Files\Adobe\Adobe Photoshop Lightroom 5.3
    Library Path: C:\Users\User\Pictures\Lightroom\Lightroom 5 Catalog.lrcat
    Settings Folder: C:\Users\User\AppData\Roaming\Adobe\Lightroom
    Installed Plugins:
    1) 500px
    2) Behance
    3) Canon Tether Plugin
    4) Facebook
    5) Flickr
    6) Leica Tether Plugin
    7) Nikon Tether Plugin
    8) SmugMug
    Config.lua flags: None
    Adapter #1: Vendor : 8086
        Device : 2a42
        Subsystem : 360b103c
        Revision : 7
        Video Memory : 64
    AudioDeviceIOBlockSize: 1024
    AudioDeviceName: Speakers (Conexant High Definition SmartAudio 221)
    AudioDeviceNumberOfChannels: 2
    AudioDeviceSampleRate: 44100
    Build: LR5x89
    CardID: 10818
    Direct2DEnabled: false
    GPUDevice: D3D
    MaxTexture2DSize: 8192
    OGLEnabled: true
    Renderer: Mobile Intel(R) 4 Series Express Chipset Family
    ShaderModel: 10.0
    Vendor: Intel
    VendorID: 32902
    Version: 8086:2a42:360b103c:0007

    I have had this problem also ever since I updated to 5.3,  I think it is a major bug!
    At random the preview window on the left doesnt show the preview of the presets anymore when I hover them, and when I click back and forth to other images it suddenly starts working again, its a very annoying problem and I cannot believe that Adobe isnt aware of it yet!
    Marcel

  • "Invoice History Report "show wrong balance for supplier invoice with USD

    Invoice History Report show wrong balance for supplier invoice with USD Currency
    After I run this report i see in the last of this report there is difference between the supplier total
    USD (Currency ) and the open Balance USD , it is decreased the open balance
    for supplier with 2300 USD with out any reasons
    bellow is some data copy of the report
    ======================================================
    Supplier Site Total: SAR 34,700.00
    Supplier Site Total: USD 39,000.00
    Supplier Total: SAR 34,700.00
    Supplier Total: USD 39,000.00
    Open Balance: SAR 34,700.00
    Open Balance: USD 36,700.00
    *** End of Report ***
    ==============================================
    please advise me from where can this differenc ( 39000 - 36,700=2300 )COMMING
    or it is bug in this report , becuase i compare this report with other report in account payable like
    -supplier open balance letter
    -invoice register report
    -invoice aging report
    all this report give me the amount for supplier USD =39000
    BUT AGIN FROM WHERE THE SYSTEM DECREASED THE AMOUNT TO 36,700
    thanks

    Can you try running Create Accounting For payments just before you run the Invoice History Report and re-check .
    Thanks

  • Iphone 4 showing wrong IP address for home wireless

    2 days ago we reset our home wireless password and updated our devices (ipad, laptop, and two cell phones). Now my iphone 4 will no longer connet to the wireless. It accepts the new password to join the network but it never connects. It is showing wrong IP address. How can I change it to the correct IP ? Tried hard rest, forget network, and renew lease all trying to get it to automatically update the info. Out of ideas. Any suggestions?

    I have the exact same router as you, I have Comcast, and I am having the exact same INFURIATING problem.
    Comcast and Apple have no ideas. Linksys tells me I am having a router problem.
    I even went so far as to buy a new router and modem from Linksys (as they claim they no longer make the router/modem combo because it doesn't work well). I still don't buy this... my PC, my PS3, my DS... all of them connect to the router perfectly.
    I have the new modem and router here and planned to give that a whirl tonight but Comcast was being difficult and saying it could take 72 hours to activate my new modem. Totally unsat. I had them reconnect the WCG200 and I am still trouble shooting to no avail...
    If anyone finds a fix (short of a new router and new modem)... please post!

  • HT5622 I wrongly entered my apple id into my new i phone . It was my e mail address with a letter wrong I have registered right on the i cloud account but when I go to get apps it still shows wrong e mail How do I delete this incorrect e mail Thanks Mike

    I wrongly entered my apple id into my new i phone . It was my e mail address with a letter wrong
    I have registered correctly on the i cloud account but when I go to get apps it still shows wrong e mail
    How do I delete this incorrect e mail? Thanks Mike

    settings - app/itunes store - sign out - sign back in.

  • FBL5N t code and BSEG table is showing wrong contract number

    Hi,
    The proces flow is contract number>sales order>DMR-->Invoice
    Now when I am checking the VBFA table it's showing correct contract number against invoices but FBL5N t code and BSEG table are showing wrong contract numbers.
    Why FBL5N and BSEG table is showing wrong contract number?
    Currently we are using one enhancement and user exit is used to incorporate one customized field as identifier for bill type.
    1. During the billing document release to accounting VFX3, The user exit triggering and it is update the customized fields and Net settlement indicator.
    2. Using the Invoice number, get the fields VGBEL(Document number of the reference document) and VGPOS (Item number of the reference item) from VBRP and read table VBAP with VBELN and POSNR, to get DMR number (Sales Document) that created for the Invoice.
    3. Use fields VGBEL and VGPOS on table VBAP to get the sale order number.
    4. By using the Sales order number, get the Distribution channel to update Net indicator field
    In accounting table BSEG-UZAWE = JF must be updated on the customer line.
    5. Retrieve the sale order number and item level to get customized field from table VBAP
    Any pointers.
    Thanks
    Ashu

    Hi Reazuddin,
    Thanks for your reply,
    I am concercerned about BSEG table and using user exit EXIT_SAPLV60B_008 to post the document in FI.
    Now in we have enhanced this user exit  for contracts and included in this way.
      SELECT SINGLE ZZ_CONTRACT FROM VBAK INTO (LC_CONTRACT) WHERE VBELN EQ cvbrp-vgbel.
    Endloop.
    *Moving the values to final accounting table
    loop at xaccit.
    xaccit-vertn = lc_contract.
    xaccit-VBEL2 = xaccit-AUBEL.
    xaccit-xref3 = lc_vbel2.
    MODIFY xaccit .
    ENDLOOP.
    Clear: lc_contract,lc_vgbel,lc_vgpos,lc_vbel2.
    But I am getting correct data when checked other clients( development and quality), this problem I am getting in production.
    Do I need to ask the ABAP'er to debug this enhancement in production?
    Thanks
    Ashutosh

  • Customer Credit Limit showing wrong in VKM3

    Hi All,
    Customer credit limit is showing wrong in VKM3 for all the customer.
    i.e : actuall T.Code:F34 is showing 740,000.00 which is correct. But in VKM3 it is 740.00(insted of 740K it is showing 740 only)
    The same thing happening for all the customer. How can I correct this. Pls advise.
    Thank You ,
    Pranitha.

    Thank You for you replay.
    But I found some other client, the credit limit same in FD32 and VKM3.they also ECC6.0.
    So what is the solution.

Maybe you are looking for

  • Incremental Checkpoints

    Hi, I have a Oracle 10.2.0.4 Standard Edition database with a manual physical standby on a remote server. To synchronize my stnadby, I'm forcing a log switch then I copy the archive log on the standby site for recovery. I'm having several "Checkpoint

  • Monitoring physical standby progress

    Hi, On standby database: SQL> select max(sequence#) from v$log_history; max(sequence#) 643 SQL> select max(sequence#) from v$archived_log; max(sequence#) 647 ---> This is the same as from primary database. SQL> select max(sequence#) from v$archived_l

  • FORMAT TRIGER 'B_5' REFERENCES COLUMN 'DT' AT WRONG FREQUENCY

    I have a field B_5 as page footer & I have written the following code function B_5FormatTrigger return boolean is begin -- Automatically Generated from Report Builder. if :dt >= '02-oct-2007' then return (FALSE); end if; return (TRUE); end; when I ex

  • Syncing photos I took on my iphone with Iphoto

    Anyone know how I can transfer the photos I've taken on my iphone to my iphoto library? Seems like my only option is to transfer from computer to iphone, not the other way around. Thanks!

  • Why do I have so many "unknown" contacts?

    One of my most used contacts for both iMessage and FaceTime comes up as unknown. Most of the unknown contacts are from emails contacts. I have changed the computer I sync with from a PC to a MacBook Pro. I heard there is software to sort out contacts