Cost Per hour, Costs per route not updating in S114 structure

Dear PM Guru's,
i am using MET unit system for vehicle consumption analysis. After completion of measurement documents and material issuance through IFCU, i checked the MCIZ report , but there i could not find the value of Costs per Hour, Costs per route information. I am requesting you all please guide me where i did the mistake either in "Configure measurement document updation" or calculation method?
I am eagerly waiting for replies.
regards
JKM

Its not possible to give any specific section where it might have gone wrong. Suggest you to check the complete configuration under Settings for Fleet Management. Also check the configuration in IMG - PM & CS - Information Systems - Configure Measurement document update

Similar Messages

  • RE: Cost centre is not updating in FAGLFLEXT table

    Dear experts,
    During posting we give PSG and cost centre but cost centre is not updating in GL total table FAGLFLEXT as its statistical, in order to be able to update CC in the GL total table what we should activate?
    please advice.
    Regards,
    Chandu.

    Hi Chandu.
    Sadly, this is the standard behavior of the system. In FAGLFLEXT only arrive real cost object, not statistical. This is explained in oss
    964686 - Transfer of statistical postings in CO to FI
    If you really nead the Cost Center, you can enhace table FAGL and and create Z field for statistical cost center. This is a common solution.
    Arturo.

  • Changes in poduction order,routing not updating in product cost estimate

    Dear SAP Gurus,
    i had done mto thru sale order and done some changes in production order,routing,and not updated the standard costestimate  of newly updated can anybody tell me the procedure of updating the routings and production  orders after production order released .
    pls help me the standard cost estimate how to get updated while changing the routing,production order.
    regards,
    muralidhar putta

    Hi Muralidhar,
    Could you please share with us how your problem was resolved. It may help others too.
    Thanks,
    Manjula.S

  • Cost center is not updating in IT 0001

    Dear Mates,
    I've uploaded two sets of data using PP02 T-code where one is Historical data & the other is Current data. Here for Current data I'm facing a Issue  where Cost center & org unit's data aren't getting updated in IT 0001 & its still showing the Historical data in IT0001. This is even spoiling the show & frustrating, where users are unable to do CATS Reconciliation also. for more clarification kindly find below screenshots.
    PO13
    We have maintained historical data in system where one cost center is assigned from 01.01.2013 to 31.03.2014 & second cost center is assigned from 01.04.2014 to 31.12.9999 with current period, not only cost center's but also Org unit's are also not updating in the system. I've even tried with RHINTE00,10,20 & 30 program's but still I'm unable to get the desired results.
    Historical data from 12.11.2013 to 31.03.2014 in IT0001
    Current record 01.04.2014 to 31.12.9999 in IT0001
    Kindly let me know how to update IT0001.Is there any std program available to update the data apart from RHINTE**???
    Ur's
    Mohan

    Dear Mohan,
    Try assigning your cost center to position it will default both your org unit and cost center.
    Cheers!

  • Manual Reposting of Costs (KB11N) does not update Profit Center

    When I do Manual Reposting of Costs on KB11N, the system does not update the Profit center with the value but it does update the Cost center.
    Please Help
    Thanks,
    Sindane

    Hi,
    Please check whether sender as well as receiver cost object is assigned to profit center. If this is done PCA document gets generated and update is made in respective Profit center.
    Bye,
    Ramesh

  • Plan cost of IW31 not updating when MRP4 of Material master is individual requirement

    Hi,
    When Individal/coll of MRP4 tab of Raw material is 1 Individual requirement, plan cost is not updating in Tcode IW31 Repair order. It is updating when MRP4 is 2 collective requirement.
    Please let me know the possible reasons.
    Thanks

    Yongguo
    The behavior you are seeing on your system is correct system behavior.                                                                               
    The system rolls costs/revenues up to the assigned wbs element                
    if an order or network activity is flagged for deletion so you                
    can archive orders/networks while the project is still 'alive' without        
    loosing information on costs/revenues.                                        
    The logic is that costs of deleted networks should not get lost but are       
    rolled up to the superior wbs-element.                                                                               
    SAP has the understanding that released activities are used immediately,      
    carry actual costs and, therefore, can not be deleted. To keep the            
    objects clearly arranged the reorganization run can be used to move           
    some objects (those with status DLFL) to the archive without losing           
    data (in the meaning of costs).                                                                               
    If you want to remove these costs of the WBS elements you have                
    to cancel the deletion flag of these networks, remove the planned costs       
    start network costing and save. You can then set the DLFL again and           
    the costs will not appear in the structure report.  
    Hope this helps.
    Best regards
    Martina

  • Error in Costing for Routing not maintained

    Dear Experts
    We are working on ECC6.0, creating Material Cost Estimates with Quantity Structure.
    The issue is we want the system to give error when Routing is not maintained for the Inhouse Materials.
    I've seen system only issues msg CK 461 as a warning message when executing CK11.
    This message moreover doesnt exist in Costing Error management.
    I'd tried adding this message in OBMSG ans then maintaing it as error in OBA5 but still it is displayed as warning.
    I've searched threads but didnt get any relevant results.
    Please suggest a way out.
    Regards
    Kapil

    Dear Christian
    Message CK 229 works but only if the routing is not maintained.
    But if the routing is maintained but without operation, then system issues message CK 461 which seems is not configurable.
    Can you suggest if an error can be given for such a case.
    Regards
    Kapil

  • Route not updated on the delivery

    Hello Experts,
    A STO(UB document type) is created & saved. In the STO on the shipping tab Route by default is getting updated but when delivery is created for the same STO Route is not getting copied under Transport Tab.
    Can anyone please suggest & guide what could be the problem?
    Rgds
    Deepak Prabhu

    Hi Deepak,
                      First check whether the delivery tpe "NL"(OR CUSTOMIZED DELIVERY TYPE LIKE ZNL WHICH IS USED FOR THIS STO) does have a new route determination assigned to it in the Transaction "OVLO". If it has either B/C options assigned to it, new route determination will be carried out. But for the system to determine new route you should have the entries in "0VRF"(ZERO VRF) Transaction. To check If your delivery has the route assigned to it , go to the table "TROAZ" in SE16 and check If the route is getting determined. If you see that your route is getting determined, then system should normally find that route other wiase maintain the entries in "0VRF". Kindly please let me know If you need any more information on this. But Kindly please note that Route determination should be done using "Weight group". You can define weight groups in "OVS8". Once you do this , go to "0VRF" and maintain the route determination using weight group.
    Regards,
    Ram Pedarla
    Edited by: RamPedarla on Mar 8, 2010 4:34 PM

  • Dependency objects not updated in MPD structure browser

    Dear All,
    In the structure browser, the dependency objects are not getting displayed in MPD transaction.
    What could be the reason?
    Please let me know
    Regards
    Ravi

    Hi Ravi,
    Please check the settings in TA DC10.
    Regards,
    Vandana Rao

  • Not updating G/L account and cost center with BAPI BAPI_PO_CREATE1

    Hello Friends,
    The two fields G/L ACCOUNT and Cost Center is not updated using BAPI BAPI_PO_CREATE1. I am unable to understand why? This is what i am passing to account assignment structure( POACCOUNT). Filled POACCOUNTX structre as well. I have passed company code at the header level.
    PO_ITEM = 00010
    SERIAL_NO = 01
    CREAT_DATE = sy-datum
    GL_ACCOUNT = 621000
    COSTCENTER = 1000
    CO_AREA = 4000
    Please let me know why it is not updating anything i missed while passing?
    2>I need to update GR quantity but this field is not available in the BAPI ..Please let me know how to update this field.
    Any help is highly appreciated.
    Regards,
    Raj

    Hi, I have a problem I use the bapi BAPI_PO_CREATE1, I pass the table pt_poaccount in the parameter poaccount but the bapi when register my purchase order doesn't register correctly the values KOSTL, AUFNR, PS_PSP_PNR, NPLNR of the tablepoaccount and register the default values of the contract. Please i need help with this.
    CLEAR s_poaccount.
         s_poaccount-po_item     = <fs_datos>-ebelp.
         s_poaccount-serial_no   = w_serial.
         s_poaccount-costcenter  = <fs_datos>-kostl.
         s_poaccount-orderid     = <fs_datos>-aufnr.
         s_poaccount-wbs_element = <fs_datos>-ps_psp_pnr.
         s_poaccount-network     = <fs_datos>-nplnr.
         s_poaccount-activity    = <fs_datos>-vornr.
         s_poaccount-quantity    = <fs_datos>-menge.
         s_poaccount-net_value   = <fs_datos>-brtwr.
         s_poaccount-creat_date  = sy-datum.          
         s_poaccount-itm_number  = <fs_datos>-ebelp.  
         s_poaccount-co_area = '1001'.               
         APPEND s_poaccount TO pt_poaccount.
    CLEAR s_poaccountx.
         s_poaccountx-po_item     = <fs_datos>-ebelp.
         s_poaccountx-serial_no   = w_serial.
         s_poaccountx-po_itemx = 'X'.
         s_poaccountx-serial_nox = 'X'.
         s_poaccountx-creat_date = 'X'.
         s_poaccountx-itm_number = 'X'.
         s_poaccountx-co_area = 'X'.
         s_poaccountx-costcenter = 'X'.
         s_poaccountx-orderid = 'X'.
         s_poaccountx-wbs_element = 'X'.
         s_poaccountx-network = 'X'.
         s_poaccountx-activity = 'X'.
         s_poaccountx-quantity = 'X'.
         s_poaccountx-net_value = 'X'.
         APPEND s_poaccountx TO  pt_poaccountx.
    CALL FUNCTION 'BAPI_PO_CREATE1'
         EXPORTING
           poheader          = pe_poheader
           poheaderx         = pe_poheaderx
         IMPORTING
           exppurchaseorder  = pi_exppurchaseorder
         TABLES
           return             = pt_return
           poitem           = pt_poitem
           poitemx         = pt_poitemx
           poschedule    = pt_poschedule
           poschedulex  = pt_poschedulex
           poaccount      = pt_poaccount
           poaccountx    = pt_poaccountx
           poservices     = pt_poservices
           posrvaccessvalues = pt_posrvaccessvalues.
    The BAPI is register with these values as default however i pass other values in table
    pt_poaccount

  • When I run the Reconciliation ledger KALC in the doc not update cost centre

    Hi
    I have done assessment and distribution in month ending. This distribution did in 2 company codes cost centers. it was successfully posted & updated in 2nd company code cost center.
    Then I ran the Reconciliation ledger in KALC month end. I was also successfully document posted in G/L account.
    But Cost centre was not updated or not picking in the document.
    Please give me suggestion .
    Thanks
    Indu

    Dear Indu,
    KALC will not update specific CO objects. The intention of the reconcilliation ledger is to reconcile CO internal postings with Financial Accounting. The necessity for reconciliation arises from the fact that, depending on controlling area / company code relationship and customizing, any CO posting can either be:
    u2022     Cross company code
    u2022     Cross business area
    u2022     Cross functional area
    or a combination of the above mentioned. For these CO internal postings there will be no corresponding FI documents with the result that CO and FI do not reconcile on company code/business area or functional area level. The reconciliation ledger adjusts this by creating the relevant FI documents. I hope this clarifies the issue.
    Regards
    Karl

  • Cost center assignment to Position not updated in IT0001 Org Assignment

    Hello,
    I have assigned Cost centers to all Positions (A011) in IT1001 through PP01 from 01/01/2011.
    Now when I see IT0001 in PA30, most of the employees have the updated IT0001 with cost center from 01/01/2011. But few employees have multiple IT0001 records past 01/01/2011.
    e.g. there are 2 records for  IT0001 for particular employee.
    1. from 02/01/2011 - 12/31/9999
    2. from 01/01/2011 - 01/31/2011
    For these employees, cost center is not updated in IT0001 Org Assignment. I tried running RHINT00 and RHINT30 reports but didn't help.
    Please guide, which report tp run to solve this issue.
    Thanks in advance.
    Madhu

    Mr.Fun,
    for these employee rerun the action with the same date.
    and chek.
    some of the table entries are not projected perfectly.
    If you rerun the action it will fills that if not the check the cost center assignment to the position done perfectly r not.
    it is advised to assign cost center to the Org.Unit. instead of no. of positions.
    system automatically considers for all the positions in that org.unit.

  • Profit Center  is not updating in Vendor line item

    Hi Experts,
    For my GL postings in F-43, F-41, F-53 ,F-54 and F-28 the 1st line item corressponds to Vendor or Customer, the profit center is not updaitng the values and shows nill. We have given check in Exit and Substitution but its not updating in BSEG structure as its functioning like loop.
    Pls advise, how to resolve it.
    thanks & reagrds
    sankar.

    Hi Bharathi,
    thanks for your prompt reply.
    But as per my Client requirement, we need to pass the profit center values to the vendor/customer line items also.In such case, what' s the solution?
    Pls advise.
    regards
    Sankar/Brahma

  • CDESK "Bill of Document is not update."

    Hello,
    The Bill of Documents (BOD) is not update when I make the checkin of an Assembly using the CDESK trough CAD integration ProE.
    Do I have to mark some parameter of CDESK_CUS so that happens?
    Regards
    Diogo Santos.

    Olá Niranjan.
    My situation is the following.
    Normal process. 
    I create a new structure (ASM) with 3 children in the ProEngineer. Then I execute the function that loads that structure in the CadView. When I click in the option Originals >> Original Check-in, the files are stored in Vault and one BOD it is created containing the 3 children. 
    My Problems. 
    If I execute the check-out of that ASM, soon after I include a new child or I modify the quantity of an existent child and I make the check-in again, BOD is not updated the new structure of ASM accordingly. (The BOD is not updated in relation to the new structure of ASM.) 
    Regards, 
    Diogo.

  • Cost Component Structure Price Not updating

    Hi,
    I have run cost estimate and successfully Mark and Released(CK40N). But when I see the cost estimate in CK13N its updating Ram Material cost (Overall and Lower level) but rest of the items not getting updated e.g. Mfg. Machine Time, Mfg Operter Labor, Quality Test Labour etc...
    I have checked in Routings each acitivity is assigned and checked. In log  "Mat xxxx, Routing does not match selection ID. ZC"
    Please advise how can will get update fields(mach cost, labour cost) with values in cost componenst strucure in cost estimate..
    Thanks
    Srinu

    Hi ,
    About why routing not match. Please inform your PP consultant as below :
    It could be your order type and plant selection id that assign are different. Please Check in OTD in OPL8 under routing tab also check in OPEB for automatic selection of routing also check the status of routing .
    If above cannot slove , please goto
    Goto OKKN->select the Costing variant that you have used in CK11N and under control tab goto quantity structure control
    -check the value or ID assigned for routing selection.
    As per this your routing gets selected in CK11N or CK40N.
    Thank you.

Maybe you are looking for

  • I have a itunes account and i tried loging in on a different computer bc my other computer is broken and it doesnt give me my song i had on it

    I have a computer that my itunes is on, but that computer broke and i am able to turn it on now, but when i go to the itunes it says that i need to redownload it and i tried but it said that it cant download becuae itunes is already on the computer.

  • Call RFC  by E*way

    Hello, We build some RFCs to be called from a e*way (Seebeyond). Everything seem to work fine until we change some of the RFC code, and the eway steel run the old code.  I even cleared the code of the RFC in the SAP system and the eway still run the

  • SCCM 2012 SP1 | Database Replication Failing on from Child to Parent

    I am having a very urgent issue. The symptom manifested itself as an inability to distribute content (this months software update package) to a secondary site server with DP role.  As we dived into it we see that the replication links are dead with "

  • User ID generation in 11G

    Hi I need to generate an User ID from first name and last name. I have to created an Entity ADP and its working fine in 10G and the same is done using event handler also in 10G. I am not able to use the same in 11G as there is no user form in Data Ob

  • Jdbc to multi idocs

    After a message is sent to xi through sender jdbc adapter, I need to map this message to several idocs according to the key value of the rows in message. For example, the following message should be mapped to two idocs as we have two different key va