Cost Relevance Indicator default in BOM

Hi All,
The cost relevance indicator is by default X in the BOM. I have defined a new cost relevevance indicator as Y. How can i default the new indicator in teh BOM
Appreciiate your support
Regards
Tehseen

Hi,
Reason of making a new costing relevance indicator.
Our management wants to add 10% extra cost in that is calculated in Quotation. Also the 10% must only be applied on paperboard items of the BOM. The same BOM is used in Quotation and Sales orders. So i have defined a new indicator Y with 110%. I have changed all paperboard items in the BOM as Y. This solution works fine in the Quotations. But when i calculate cost in Sales order, the same 110% get applied on all paperboard cost which we dont want. In sales order we want 100% cost. Both sales order and quotations have diffrerent costing variants. Further please also explain that while i run CK11N, it calculates cost only based on indicator X which is ok. I want the same cost calculation in Sales orders. We are using condition EK02 to calculate cost in Quotation & Sales Orders.
Appreciate your support
SAPXPT

Similar Messages

  • Issue with update of BOM by Variant Config - Cost relevant indicator

    Hi All VC Expert,
    We are facing an issue with the update by reference characteristic of the field STPO-SANKA Cost relevancy indicator on the BOM.
    We are on SAP ECC 6.0 release 700 on Oracle
    Hot Package
    - SAPKA70015 on ERP Cross Application componenent
    - SAPKH60013 on SAP-APPL Logistics and accouting
    We are using material variant
    We are on the first level of configuration
    Classically, we built a procedure to set X to this data base field as below :
    $self.STPO_SANKA = 'X'
    We assigned this procedure to the relevant items
    Here is the result we have:
    At the creation of the Plan Order, this is not working
    At the creation of the Prod Order, this is not working
    When we do a Reload PP master data, this is working very well
    On CU50/VA02 when we check the trace, the procedure is executed.
    Do somebody have an idea or already facing this and solve it ?
    Thanks in advance for your appreciated help.

    Hi Fabien. Did you solve your problem?

  • Cost relevancy indicator for Material

    Dear PS colleagues,
    Refer to the subject, when we assign a material to activity then sometimes cost relevancy indicator (on General Data tab for material) is ticked & sometimes not, can you guide me how it is controlled.It seems that it may me controlled from material master but not sure.Pl suggest...
    Regards,
    Ashok Sangal

    Hi,
    All materials which are account assigned to network/ activity, or WBS element are defaulted with cost-relevancy indicator, though this can subsequently be changed manually. This defaulting is hard-coded (as far as I know) and is dependent on the procurement type . For instance, if you attach a stock (cat:L)material component with collective requirement indicator in MRP4 to a network activity and if you opt for procurement type "Planned Indpendent requirement", you will find that 'Cost Relevancy" indicator is not defauluted. For the same material component with the setting material master settings, if you opt for procurement type "Reservation to Network", the cost relevancy indicator gets defaulted.
    Obviously, text type materials etc. will not have any cost relevancy.
    Hence, we can conclude that materials which are account assigned (i.e which are relevant for adding  cost to proejct objects) will be defaulted with "Cost relevancy" indicator.
    If you use BOM transfer functionality, you can define the cost relevancy in the "Profile for BOM transfer"
    Hope the information provided is useful and relevant.
    Regards
    Muraleedharan.R

  • Costing Relevancy indicator cannot be set as 50%

    Hello,
    I have a issues with costing relevancy indicator in production order item. It doesnot consider the % such as (25% or 50%) costing relevancy. Only 100% or " " is considered.
    Kindly let me know the steps to achieve the 50% costing relevancy for order component.
    Best Regards
    Sameer

    Hi UKSAPPP ,
    I have checked transaction OS18 and found that the factors are maintained. Actually i am looking for the 50% cost of component in production order planned cost. Does this come under inventory coseting as per you reply?
    Because the customer wants this in production order cost for that component where this relevancy to costing is maintained as 50%.
    Regards
    Sameer

  • Mass Maintenence of cost relv indicator in the bom

    Hi all,
    I have a huge number more than 10000 of bom components for which i have to correct / change the cost relv indicator from " " (not relevant) to "X" (100 % relevant).
    I think i can do it by cs20. But how??? Shall i have to enter one by one material (component)  as an reference object in the initial screen of cs20. OR through one shot I can do it??? HOW??
    Regards,
    MANISH

    Hi
    I do not think your problem will be addressed by CS20.
    You may have to write small programe to carry out this.
    Regards
    YMREDDY

  • Production Order - Cost Relevant Indicator

    Hi,
    What is the importance of Cost Relevane Indicator in the
    creation of a Production Order.
    In the strucuture CAUFVD or AFVGD, which field corresponds to
    this indicator.
    Advance Thanks
    Aadarsh

    Hi,
      I think the field is KKALKR in CAUFVD.
      And following is the F1 documentation,
    Short text
    Indicator: Components will not be costed
    Definition
    Use this indicator to specify, that all material components assigned to project stock are not relevant for costing in the network.
    Sri

  • Costing relevancy of BOM

    Hi guys,
    M a bit new in SAP.so this question may sound very basic.
    My question is when we go to item data in BOM,there is a tab status/lng text.
    In that tab there is costing relevancy indicator field.
    If i need it to be x all the time and it should be default to all items,what settings need to be done.
    Thanks,
    Sam

    Thanks a lot Ganesh/Anish,
    You gave me the required solutution.Can I ask you guys another question?
    If i am copying my prod bom from SD bom and the indicator u told me about is not set for SD BOM,will that indicator still appear in production BOM?
    Regards,
    SAM

  • Setting default costing relevancy on IW31

    Hi all,
    i have problems with the definition of the default value of the costing relevancy during the creation of an orden by the transaction IW31.
    In particular i have to set that default value just for a specific order type.
    is it possible doing it?
    Thanks.
    Lello

    Hi,
    To define your own logic you can use BAdI IWO1_ORDER_BADI with method CHANGE_COSTRELEVNCY to set 'relevant for costing flag'. See also some information in note [649743|https://service.sap.com/sap/support/notes/649743].
    -Paul

  • Costing relevancy in BOM "X" is not active.

    Dear Experts
    After MRP run, trying to convert Planned order to Proc. order the <b>costing relevancy in BOM "X" is not active</b>. But when i am trying  to create process order with manually(cor1) costing relevancy in BOM "X" is active. Can i know y this is happening??
    Note: In <b>Goods receipt</b> TAB of procees order <b>Goods recept non valuated </b> check box is active.
    Regards
    Ragesh

    please note sales order creation date is not relevant...when the system is reading the BOM is relevant to copy the BOM...just check the date of BOM explosition...
    As I know it is just because of master data.
    In routing...is it relavent to costing or not?

  • Costing relevancy in BOM and CK11n

    hi,
    In BOM for an item i have maintained Costing relevancy as 1 (50% relevancy) which is a procurement item, but even after running Ck11n for the matrl iam getting 100% cost for the child item.
    Is there any other setting to be maintained.
    regards

    Hi,
    The reason SAP has provided that is during the computation of the inventory cost estimate & not for the standard cost estimate the field is considered.
    For standard cost estimate it is either / or situation, i.e. it is relevant for costing or not relevant, there is no % relevance for this.
    This is in place due to financial & reporting requirements where some parts might require a devaluation. So i would strongly suggest to discuss with your Costing consultant for this.
    However for this case, if you can let us know what is the reason you want to have this kind of partial costing done, the forum can provide some possible alternative if its a genuine business need.
    Regards,
    Vivek

  • Material in which Costing relevancy has not been maintained

    Hi,
    I want list of materials in which Costing relevancy has not been maintained. From where i can see it...in which table??
    Thanks.

    Dear,
    Do Not Cost
        Controls whether a cost estimate or a procurement alternative can be
        created for a material.
    Use
        If you select this indicator, you cannot create any of the following for
        this material:
        o   Material cost estimate (with or without quantity structure)
        o   Sales order cost estimate
        o   Procurement alternative
        The material is excluded from selection and BOM explosion, so that no
        cost component split will be created by the costing process. If the
        material is included in another cost estimate as a component to be
        valuated, the valuation price is determined through the valuation
        variant if no cost estimate with the same key exists for the material.
    Regards,
    Chintan Joshi.

  • Costing relevancy

    Hi All,
    When i add components in BOM, automatic costing relevancy is coming in statua long text. how can we keep this field blank when ever adding the component in BOM.
    Regards

    Hi Rakesh
    In your Item category setting, in Business Data area, please check whether Determine cost is flagegd or not
    If, its flagged means, it Indicates whether, during pricing, the system determines the cost (stock value) of a sales document item.
    Use
    The system checks the cost determination indicator as a requirement before applying the condition type that calculates the cost

  • Costing relevancy in bill of materials

    Hi Experts,
    We have default settings to mark items in bill of materials as costing relevant, we have certain materials for which we do not want default costing relevancy as waht has been sent in default values. but for most of the materials default settings should be applicable.
    is ther any settings where for certain materials default settings can be overwritten, do not cost in costing tab page did not worked, and default costing relevancy was taken for item.
    Thanks in advance
    Anand

    Dear,
    Pipeline materials are relevant for costing it pickup price from the Info-record. If you don't want to cost that item you need to remove its costing relevancy from bill of material. Or else define it as non valuated material and then assign it in BOM.
    Bulk material are not cost relevant it will available in mass. For the standard cost estimate and the calculation of planned costs and actual costs for a work order, will not included in costing.
    You can not make it material specific setting default for the BOM.
    In OS18 you can define you own cost Relevancy  and by BOM usage in OS20
    Customizing under Production -> Basic Data -> Bill of Material -> General Data -> BOM Usage -> Define BOM Usages.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Costing relevancy in prod order

    Hi.
    We have a production order with all the components fixed to relevancy for
    costing. sometimes we need to change the component at prod order level,
    If  we change the component, indicator / tick for "relevancy of costing" is disappering at general data of order.
    we have ETO , MTO & MTS scenario in our plant.
    Above mention problem is only for ETO order tyes prod orders.
    Is there any setting/config for order types to select costing relevancy tick.
    Thanks in advance.
    Jeevan

    Thanks for the reply, but costing relevancy is activated at operation level,
    normal prod orders are getting created correctly, but when we change the componentin CO02 then costing relevancy is getting disapper.
    Waiting for your reply.

  • Costing Relevancy to be activated

    Dear Experts
    As per our costing requirment,they want to valuate materials based on certain parameter like count in Textile industry,
    suppose we are putting 100rs.mtr &
    if we are  using 60s count yarn price should pick 25%
    if we are  using 80s count yarn price should pick 50%
    For this activity to be done,We want costing relevancy in BOM & Routing to be activated by percentages.
    But option is not working in our client,shall we have do any customisation for that.
    Regards
    Sandeep

    Dear Sandeep,
    For individual BOM Components you can decide whether its relevant to 100% costing or 50 %.
    But in the routing for individual operation I dont think it's possible to set its 100 % relevant to costing or 50
    % relevant to costing.Either you can set its relevant or ir-relevant.
    For BOM,after assigning the BOM components,select a single component (Row),then press F7---->Click
    on Status/Long Text tab key->there you can see costing relevancy->select one from the option.
    Also check the configuration setting in T code OS18.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Director Project incompatible with 10.4.3

    I ran into a strange incompatibility today when checking a director project on OS X 10.4.3. The icon for the OS X version of the projector was incorrect, and when you went to launch it, you were given the "could not find classic Mac OS" error. But if

  • Imac 10.6.1

    hi everyone , i have imac here with 10.6.1 , i want to upgrade it to 10.6.5 , can anyone help me to find out easiest way to do that ..

  • Why is the IDE so slow?

    Why is the Cocoa Integrated Development Environment so slow for the iPhone? Is there anything I can do to speed it up? For example, when a break point is reached it frequently takes many seconds before moving the cursor over a variable will cause a p

  • Accessing a java class method from the jsp page.

    Hi im a beginner with jsp and im trying to find a way to access a method of my java class file in jsp page. After searching through the forums i tried to use the usebean tag. Im using apache to host the jsp file.Below is an excerpt of my code and the

  • How do I get LabView to communicate with HP4142B, using GPIB?

    I have a PCI-GPIB card from NI and running Labview 6.1 under Windows 2000. I have trouble to communicate with a HP4142B. Every time I send a GPIB-command to the 4142B I get an EABO error. The instrument seems to receive the command but does not give